Increasing tsunami preparedness

Post on 25-Jun-2015

345 views 0 download

Tags:

description

Dr. Yong Chen's 2012-14 Oregon Sea Grant-supported project, "An Integrated Engineering-Economic Vulnerability Tool to Increase Tsunami Preparedness in rural Coastal Counties"

Transcript of Increasing tsunami preparedness

An Integrated Engineering-Economic Vulnerability Assessment Tool to

Increase Tsunami Preparedness in Rural Coastal Counties

Yong Chen, Patrick Corcoran, Daniel Cox, and Bruce Weber

We are on the subduction zone and vulnerable to earthquake and tsunamis.

Well within the window of recurrence : 312 years since the last M9.

Probability: in the next 50 years, 10-14% chance of M9 and 37% chance of M8.

Background

Figure 1. Cascadia Subduction Zone (Source: Wood 2007)

Research Question and Project Components

Q: What we wish we had done to prepare for the CSZ event?

Project components:

Engineering Model of Tsunami Event

Economic Input-Output Model

Research Question and Project Components

Q: What we wish we had done to prepare for the CSZ event?

Project components:

Thank you!

Groat, C.G., 2005. Statement of C.G. Groat, Director, US Geological Survey, US Department of the Interior, Before the Committee of Science, US House of Representative, January 26, http://www.usgs.gov/congressional/hearings/testimony_groat_01262005.asp

References