Post on 29-Jan-2021
IMPROVEMENT OF THE SAFETY OF THE WORK IN NRIC
Opera&onal program “Human resources development” 2007-‐2013, Scheme: BG051PO001-‐2.3.03 “Safe labor”
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree
Key dates for the implementaBon of the project
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
Commencing of the
procedure
Final term for submission of applica&ons
List of the approved projects
Signing of Agreement
Confirming of the schedule for
tendering procidures
Analyses of the labor’s ac&vi&es
End of the tendering procedure for
equipment and training – signed Agreement
End of the tendering
procedures for СРО-‐signed agreement
End of the ac&vi&es
Submission of final report
18.09.2012г. 26.11.2012г. 23.05.2013г. 28.06.2013г. 11.09.2013г.
27.09.2013г. 28.02.2014г. 08.08.2014г. 06.09.2014г. \.
Accomplished objecBves? Ø General objecBve:
§ Improved of the labor condi&ons and safety of the work force in NRIC.
Ø Specific objecBves: § Achieved factor of labor trauma&sm in NRIC is Кlт-‐0,91, which is lower than the average trauma&sm (Klt-‐1,22) under the economic ac&vi&es. From the beginning of the year up to the moment we have 4 registered case of labor trauma&sm. For the same period of the last year the registered cases had been 9; § Improvement of safety, health and produc&vity of the employees; § Gaining of knowledge and skills for work with the new equipment; § Becer produc&vity and effec&veness of the work force.
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
Task force
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
Ø 3800 employee of NRIC working in the fields of maintenance and repairing of the railway lines in different weather condi&ons wearing a special working clothes a n d w o r k i n g w i t h s p e c i a l equipment.
Employees of NRIC working in the following units:
Ø Maintenance and repairing of the railway lines and equipment; Ø Maintenance and repairing of signaling and tele-‐communica&on
equipment; Ø Maintenance and repairing of the catenary; Ø Rapid response units for recovering of the railway traffic in case of
accidents and incidents.
Task force IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
AcBviBes • 100% progress D1: Commencing of the project and formaBon of the team (opera&onal management)
• 100% progress D2: Performance of analyses of the labor acBviBes in NRIC
• 100% progress D3: Performing of tendering procedure and delivery of special working clothes
• 100% progress D4: Performing of tendering procedure and delivery of equipment (polyester sapans)
• 100% progress D5: Training of the employees for safety work with new delivered equipment
• 100% progress D6: Publicity and informa&on
• Forthcoming in near future D7: Audit of the project
up to 28.08.2014
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
Financing and duraBon of the project Ø Financing
§ Total amount of the project– 232 540 лв.
§ GFC (ESF + EFRD) – 186 032 лв.
Ø DuraBon § 12 months § June 2013 – September 2014 (temporary interrup.on for 2
months)
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Special working clothes
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Ø Water resistance suit: jacket with hood and trouser with signaling elements for becer visibility.
Ø The general purpose of the suit is protec&on of the employees from the impact of different weather condi&ons and from vehicles moving along the railway line.
Ø Polyester sapans – used for equipment of the railways cranes working for recovering of the railway traffic aoer accidents or incidents;
Ø Reducing the heavy physical labor during the work with the exis&ng steel sapans (especially when is necessary their movement from one place to the other);
Ø The polyester sapans are not so heavy, they are more reliable, required significantly less number of employees to work with them and do not influence the health and the abili&es of the employees.
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Delivered equipment
Ø Performed training for safety exploita&on of the new equipment • DuraBon of the training: 45 hours • Form of the training – every day lectures
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
Theore&cal part: Module 1-‐ Introduc&on and horizontal principles: 1. General requirements for safety work 2. Rights, requirements and responsibili&es of the employees, related with safety work. 3. Circled sapans from polyester fibers: 3.1. Defini&on, construc&on, terms and marking 3.2. Color codding. 3.3. Table for hois&ng capacity. 4. Determina&on of working angel and choice of sapans
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
Theore&cal part: Module 2 – Working with the new equipment: 1. Safety requirements 1.1. Signs and signals 1.2. Collec&ve protec&ve equipment. 1.3. Personal protec&ve equipment /PPE/ 2. Instruc&ons for exploita&on: 2.1. Control and check-‐up of sapans. 2.2. Way of exploita&on and types of catches. 2.3. Exploita&on in extreme working and weather condi&ons. 3. Keeping and condi&ons for discarding.
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
Theore&cal part: Module 3-‐ Improvement of the working process and implementa&on of good
prac&ces 1. Use of special joint elements. 2. Dobри практики при повдигане и монтаж 2.1. Laser leading 3. Contemporary technics for working posi&oning.
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
Ø PracBcal training
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
Trainings of 106 employees and issue of cerBficate for accomplishment работещи и предоставено
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
Results Ø Set up a team for project management; Ø Analyses for the present working condi&ons in
the company; Ø Have been performed 2 tender procedures; Ø On &me delivery of working clothes and
equipment in accordance with preliminary prepared specifica&on;
Ø Training of the employees working with new delivered equipment;
Ø Organiza&on and performance of two press conferences, issued 200 brochures, folders and ball-‐point pens;
Ø Prepara&on and installa&on of tree informa&on boards;
Ø Forthcoming prepara&on of audit report.
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree
The team
Take care!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
What should not be done in electrified secBons with tracBon current 25 КV :
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
• Do not go up to the roof of the vehicles; do not open apertures of cisterns, freezing and other special wagons. • Do not go near and do not touch broken or hanging wires and ropes of the catenary and catenary’s elements, despite that they might touch the ground or grounded constructions.
Thank you for your apenBon!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!