Implementing ISO 50001A Case Study

Neil Pike

Head of Sustainability

Agenda

Introduction to Morgan Lovell

The ISO steps to success

Why ISO 50001?

The route to registration

Implementation tips

Benefits achieved

Who are Morgan Lovell?

UK’s largest office interior design and build company

Founded by John Morgan and Jack Lovell in 1977

100% owned by Morgan Sindall Group plc

CONSTRUCTION >>

<< DESIGN

APPRAISAL >>

Who we are, what we do

Recent Morgan Lovell Clients

Recent Morgan Lovell Clients

Recent Morgan Lovell Clients

The ISO 9001 steps to success

The ISO 9001 steps to success

9001

Business

9001

The ISO steps to success

The ISO steps to success

Keep it simple for the main board

Keep the main board informed of results!

The ISO 14001 steps to success

We now had the main board’s buy-in.

ISO14001 gave Morgan Lovell the ability to take a step back, look at where we were, where we needed to be and provided the structure to get there

The ISO 14001 steps to success

14001 – Environmental managementISO 14001 enabled Morgan Lovell to demonstrates to our clients transparency,

commitment and assurance regarding environmental risk management and innovations.

The ISO 14001 steps to success

The key to implementing any system, especially an environmental system, where you are

requiring people to embrace a concept and change their behaviour is to ask questions and

listen to them

The ISO 14001 steps to success

Keep things simple and do things for the

right reason.

Not just to keep the auditors happy!

Change has to deliver real &

accountable value.

Why ISO 50001?

We were already pretty good with energy but…

.…we wanted to:

1. Reduce operating costs

2. Comply with legislation

3. Walk the talk

Implementing our EnMS – Step 1

Appointed internal team

• Environmental Manager

• Business Improvement manager

• M&E Manager / Low Carbon Consultant

• Office Manager

Implementing our EnMS – Step 1

Identify energy aspects

• Office energy use

• Energy use on site

• Energy efficient

design offerings

• Transportation

Develop the EnMS

• Top management direction

• Roles & responsibilities for all staff

• Targets & objectives

• Aspects register

Implementing our EnMS – Step 1

The route to registration – Step 2

BSI Pre-assessment visit

Review of our energy management system detailed key

areas for improvement .

8 minor nonconformities were raised but the value of

this BSI visit was immeasurable

The ML EnMS team left this audit totally ‘energised’ by

the potential that our energy system could deliver!

The route to registration – Step 3

• Installation of an energy footprint tracker to monitor energy

usage 24/7

• Air conditioning of meeting rooms linked to booking times

• Light sensors throughout building

• Temperature gauges on each floor and externally

• Engagement with our suppliers and subcontractors on energy

• Switching off all office equipment when not in use

• Desking located near natural light where possible

Our offices…

The route to registration – Step 3

• Energy monitors measuring electricity used

• Timer switches to manage temporary lights and welfare equipment

• Monitoring site office equipment

• Inducting site staff into energy rules

• Engagement with our suppliers and subcontractors on energy

• Scoring all subcontractors on energy performance

• Report to clients on energy savings

Our sites…

The route to registration – Step 3

• Educate & assist clients on legal requirements

• Demonstrate best practice and energy innovations in action

• Embrace energy concepts from initial discussions

• Develop long-term energy strategies and cost benefit forecasts

• Build in energy monitoring and measuring devices within the fitout

• Design the refurbishment to maximise energy savings

Our design…

Overcoming key challenges

• Allocating time to

energy champions

• Giving staff time to

contribute / participate

• Thinking outside the box

for energy factors

How does ML benefit using ISO 50001?

• Improved quality of data therefore more confidence in decision making

• Identified opportunities for continual improvement

• Reduced our energy bills!

• Helping us to meet our requirements under the CRC

• Improved reputation – we’re walking the talk

03

:0 0

02

:0 0

Energy - How we saved 30%

00

:0 00

1:0 0

06

:00

21

:00

04

:00

07

:00

05:0

0

08

:00

09

:00

10

:00

11

:00

12

:00

15

:00

13

:00

16:0

0

17

:00

18

:00

19

:00

20

:00

22:0

0

14

:00

23

:00

En

erg

y k

Wh

(E

lec

tric

ity)

500

1,000

1,500

2,000

2,500

January 7, 2009

January 14, 2009

Daikin Energy waste captured by Workplace Footprint Tracker

During the week

Waste equiv £21.81 per day

Saving of £5670.60 over one year

03

:0 0

02

:0 0

Energy - How we saved 30%

00

:0 00

1:0 0

06

:00

21

:00

04

:00

07

:00

05:0

0

08

:00

09

:00

10

:00

11

:00

12

:00

15

:00

13

:00

16:0

0

17

:00

18

:00

19

:00

20

:00

22:0

0

14

:00

23

:00

En

erg

y k

Wh

(E

lec

tric

ity)

500

1,000

1,500

2,000

2,500

January 4, 2009

January 11, 2009

Daikin Energy waste captured by Workplace Footprint Tracker

During the weekend

Waste equiv £39.68 per day

Saving of £4126.72 over one year

Total saving of £9798.36 over one year

Energy - How we saved 30%

Accurate costing of site energy costs

Predictions of energy use during site setup, strip out &

construction

Changes to welfare equipment on site

Trade contractors scored on energy management

Energy Management – on site

Looking Back

•Attend a BSI training course & draft an EnMS

manual

• Pre-assessment visit – a Must!

• Amend processes of other management system

• Get everyone’s buy in by workshops &

champions

• Registration to ISO 50001 will greatly enhance

your company performance

Tips for implementation

• Get top management buy-in

• Appoint energy champions

• Get everyone involved

• Get balance of communication right

• Put results in terms that mean something

to staff

Final words…

• All companies have an impact on the environment

• We wanted to better manage that impact

• ISO 50001 provides a framework and a standard

for best practice

• It helps us enhance our reputation and profile

• It really helps make a difference to the

environment