IE 419 1 Work Design: Productivity and Safety Dr. Andris Freivalds Class #21.

Post on 18-Dec-2015

216 views 0 download

Tags:

Transcript of IE 419 1 Work Design: Productivity and Safety Dr. Andris Freivalds Class #21.

IE 419 1

IE 419 Work Design:

Productivity and Safety

Dr. Andris Freivalds

Class #21

IE 419 2

Basics of Accident Prevention(Heinrich, Petersen, Roos – Industrial Accident Prevention)

• Accident Prevention – direct control of workers, machines, environment to prevent accidents

• Safety Management - long range planning, education, training to prevent accidents

IE 419 3

Accident Prevention Process

Identify Problem

Collect Data

Analyze Data

Select Remedy

Apply Remedy

Monitor

IE 419 4

Domino Theory (Identify Problem)

IE 419 5

Ex. #1 - Domino Theory

Sparks from grinder ignite nearby gasoline causing operator to be burned.

• Lack of Control• Basic Causes• Immediate Causes• Accident• Injury

Multiple causation!

IE 419 6

Accident Causation

Unsafe Acts Unsafe Conditions

IE 419 7

Accident “Iceberg”

IE 419 8

3 E’s of Accident Prevention

• Engineering – redesign of job/workplace

• Education – training

• Enforcement – discipline, rules

Accident Causation Models →

IE 419 9

Life Change Unit Theory

• Accident probability is situational

• Overload taxes person’s capacity

• Leads to accidents (or illness)

• >300 → 79% in 2 yrs• >200 → 51% in 2 yrs• >150 → 37% in 2 yrs

Rank Life Event Units

1 Death of spouse

100

2 Divorce 73

4 Jail term 63

6 Injury 53

27 End school 26

41 Vacation 13

IE 419 10

Motivation-Reward Satisfaction Model(Identify Problem)

IE 419 11

Behavioral Based Training

• ABC approach

• A – antecedents

• B – behavior

• C - consequences

IE 419 12

Collect Data – Analyze Data

• Systematic approach

• Who, what, where, when, how, why

• Inspection– Job/methods analysis

– Worksite analysis

– Job Safety Analysis (JSA)

– (Look beyond direct causes!!)

IE 419 13

Job Safety Analysis (JSA)(Job Hazard Analysis, Methods Safety Analysis,

Critical Incident Technique, Failure Mode and Effects Analysis (FMEA), Hazard and Operability Study (HAZOP))

1) Break down job into elements

2) List them in sequential order

3) Examine them critically

4) Focus on:• Worker• Method• Machine• Material

IE 419 14

IE 419 15

Ex. #2 - JSAScenario: Two inspectors smashed their toes

when a stack of armor plate (36x24x⅜ in), standing on end against workbench, slid to the floor. They were stacked there because of insufficient room to leave them on delivery pallet, towed from Receiving. Since each piece needed to Rockwell tested, the inspectors stacked the plates on end rather than laying them flat on the floor, which would require later lifting (NIOSH!!). Similar accidents had occurred earlier, but without injuries.

Typical Solution:

IE 419 16

Ex. #2 – JSA con’t (Old Method)

IE 419 17

Ex. #2 – JSA con’t (New Method)

Recommendation: Adjustable, powered transporter (two)

IE 419 18

Advantages of JSA

• Maps out all details

• Quick, simple, objective

• Compares old & new methods

• Examines effects on production

• Analyze safety before accident occurs

• Leads into Fault Tree Analysis

IE 419 19

Select Remedy Decision-Making Tools - Hazard Action Table

Conditions

IE 419 20

Ex. # 3 - Value Engineering

IE 419 21

Value Engineering - Safety

• Define Factors:– Effect on safety– Cost– Morale– Social/environment

• Choose Alternatives – depends • Determine Weights – judgmental• Rate each alternative by factor - relative• Resulting Value (sum of products) selects

proper alternative

IE 419 22

Risk Analysis – Basics

• Basic premise/approach– All risks can not be eliminated– However, can reduce potential loss– Go for max cost effectiveness

• Risk of loss increases with:– ↑ probability that hazard will occur– ↑ exposure to the hazard– ↑ consequences of hazardous event

IE 419 23

Risk Analysis - Procedure

• Assign numerical values to factors

• Multiply factors → overall risk score

• Risk score is a numerical value

• Good for relative comparison (not absolute)

IE 419 24

Likelihood Values

Expected 10

Possible 6

Unusual 3

Remote 1

~ Conceivable 0.5

~ Impossible 0.1

Exposure Values

Continuous 10

Daily 6

Weekly 3

Monthly 2

Few/year 1

Yearly 0.5

Factor Values

IE 419 25

Possible Consequences Value

Catastrophe (many fatalities, $108 damage) 100

Disaster (few fatalities, $107 damage) 40

Very serious (fatality?, $106 damage) 15

Serious (serious injuries, $105 damage) 7

Important (injuries, $104 damage) 3

Noticeable (first aid, $103 damage) 1

Possible Consequences

IE 419 26

Risk Situation Value

Very high risk, discontinue operations 400

High risk, immediate correction 200-400

Substantial risk, correction needed 70-200

Possible risk, attention needed 20-70

Risk?, perhaps acceptable < 20

Risk Score

IE 419 27

Ex. #4 - Risk Calculation

IE 419 28

Ex. #5 - Risk and Cost Effectiveness

IE 419 29

Apply Remedy and Monitor

• Who applies remedy– Safety specialist/engineer– Line supervisors– Workers

• Monitor effectiveness of accident prevention– Close the feedback loop– Variety of statistical

approaches

Identify Problem

Collect Data

Analyze Data

Select Remedy

Apply Remedy

Monitor

IE 419 30

Accident and Injury Statistics

• Incidence (frequency) rate

IR = # incidents x 200,000

# hrs exposure

• Severity rateSR = # days lost x 200,000

# hrs exposure

IE 419 31

Chi-Square Analysis• χ2 = ∑ (Ei – Oi)2/ Ei Ei = HixOT/HT

• M = # areas Ei = expected

• Oi = observed OT = Total observed

• Hi = hours worked in area i

• HT = total hours worked ν = m -1

IE 419 32

Ex. #6 - Chi-Square Analysis

χ2 = ∑ (Ei – Oi)2/ Ei

Dept. # CTD # Hours IR Ei

A 22 900,000

B 4 600,000 1.3 7.4

C 10 1,400,000 1.4 17.4

Total 36 2,900,000 2.5 36

IE 419 33

Red Flagging – Control Chart

IE 419 34

Red Flagging - Monitor