HYSPEC status. June 16, 2010. HYSPEC Overview. 6~15m Shielding. External building. 15~33m Shielding. Chopper Box B Shielding. Drum Shield. Sample position. Detector Vessel. Detector Vessel, designed and in procurement. Removable hatch for course collimator access. 1/8 ” O-Ring. - PowerPoint PPT Presentation

Transcript of HYSPEC status

HYSPEC status

June 16, 2010

6~15m Shielding

15~33m Shielding

External building

Drum Shield

Detector Vessel

HYSPEC Overview

Sample position

Chopper Box B Shielding

Detector Vessel,designed and in

procurement

Removable hatch for course collimator access

Front section removable

1/8” O-Ring

¼” O-Ring (Hidden)

PIP Shield all in, &Guide installation

Secondary shutter being installed

Shield blocks delivered

Shield blocks getting ready

Monochromator delivered

Monochromator Shield component lead pours