HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY

Post on 25-Feb-2016

57 views 0 download

description

HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY. ELECTRICITY. Hyde Park Towers. Energy audits subsidised through the NSW Office of Environment & Heritage’s Energy Saver program. Consumption 30% v Network & other charges 70%. LIGHT LEVELS BEFORE UPGRADES. SUSTAINABILTY INITIATIVES TO DATE. - PowerPoint PPT Presentation

Transcript of HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY

HYDE PARK TO

WERS

COST SAVINGS/SUSTA

INABILITY

E L E C T R I CI T

Y

Hyde Park Towers

Energy audits subsidised through the NSW Office of Environment & Heritage’s Energy Saver program.

CONSUMPTION 30% V NETWORK & OTHER CHARGES 70%

30%

49%

21%

Power Bills

Consump-tionNetwork

LIGHT LEVELS BEFORE UPGRADES

AREA AVERAGE (lux) UNDERLIT/OVERLIT

Car Park 45 OverlitFire Stairs 112 OverlitLift Lobby 185 OverlitGround Floor 242 OverlitApt. Corridors 38 Overlit

SUSTAINABILTY INITIATIVES TO DATE

November 2010 Installed Power Factor Correction EquipmentAugust 2011– Approval for LED Upgrades at Annual General

MeetingSeptember 2011 –156 Fluoro Lights in Fire Stairs converted

to 82 LED multi function sensor lights November 2011 – Converted 262 x 35w Halogen down lights to 7w LED globes on residential levels, gym, pool and lobbies

February 2012– Converted 307 Fluoro Lights in Car Parkfrom T8 to T5 Eco Savers Kits

June 2012 Completed LED UpgradeJuly 2012 Adjusted Variable Speed Controllers - TOU

March/April 2013 Installed 4 new Hydraulic Water Pumps Sets

CONVERSION COST/ENERGY SAVING CERTIFICATES• Fire Stairs Multi Function LEDProject Cost = $28,750.00

Generated 858 ESC’s = $18,000Net Cost = $10,750.00

LED LIGHTS IN COMMON AREAS• Project Cost = $9,633.00

(Not eligible for ESC’s however power savings significant)• T8-T5 CAR PARK CONVERSIONS

Project Cost = $8,018.00ESC Rebate = $4,650.00

Net Cost $3,330

Total Project Cost After ESCs = $23,713

PAYBACK ON LED UPGRADE=19 MONTHS

AUSGRID WEBGRAPH

POWER CONSUMPTION KW HOURS PEAK SHOULDER OFF PEAK

1 2 305000

100001500020000250003000035000400004500050000

Jul-11Jul-12

NO INITIATIVES?

$15,400PER MONTH

$184,000 per yearBudget $117,000

POWER FACTOR CORRECTION EQUIPMENT

What is Power Factor Correction?Power Factor is the ratio of “useful” power to “total” power consumed.In simple words Power Factor is a measure of how efficiently electrical power is consumed. The ideal Power Factor is unity - or one. Anything less than one, (or 100% efficiency), means that extra power is required to run equipment and a significant amount of wastage occurs.

POWER BILL - DECREASEJULY 2011 – MAY 2013Network Charges

+50%Usage Charges - 4 year

Contract with Energy Australia

Energy Australia BillsJuly 2011 = $11,614.00

May 2013 = $10,447.13

NO INITIATIVES?

$15,400PER MONTH

$184,000 per yearBudget $117,000

ACT NOW - SMART GREEN BLOCKS