r
b
e
r
t
_
O
l
d
h
a
m
_
R
o
a
d
Level 3 AMI Building, 15 Osterley Way, Manukau City. Phone: 2222445
DRAWN:
APPROVED:DATE:
DATE:
DATE:PLOTTED:
THIS DRAWING AND DESIGN REMAINS THE PROPERTY
OF, AND MAY NOT BE REPRODUCED OR ALTERED,
WITHOUT THE WRITTEN PERMISSION OF CIVILPLAN
CONSULTANTS LIMITED. NO LIABILITY SHALL BE
ACCEPTED FOR UNAUTHORISED USE OF THIS DRAWING.RJP 06-19
MSS 06-19
RJP 06-19
0 20 40 60 80 100m
SCALE: (A1/A3)
ISSUE STATUS:
DRAWING NUMBER: REV:
136701-06C1-AB300A
1:500 / 1:1000
AS BUILT
BY DATEREVISION DETAILSREV
Filepath: P\APPDATA\LOCAL\AUTODESK\C3D 2020\ENU\TEMPLATE C:\DATA\POKENO\HITCHEN\STAGE 6\AS BUILT\136701-06C1-AB300.DWG
SHEET TITLE:
AS BUILT ROADING
PROJECT TITLE:
DFH JOINT VENTURE
HITCHEN STAGE 6C1 SUBDIVISION
POKENO
H
i
t
c
h
e
n
_
R
o
a
d
6C1
J
O
A
L
LOT 1
DP 73437
ALLOT 1
PSH_OF_MANGATAWHIRI
SECT 10
6C2
1011
1001
S
k
i
f
f
i
n
g
t
o
n
_
R
o
a
d
P
e
t
e
r
_
B
o
u
r
n
e
_
D
r
i
v
e
H
e
r
b
e
r
t
_
O
l
d
h
a
m
_
R
o
a
d
1
.
5
NOTES
1. ALL COORDINATES ARE IN METRES AND IN TERMS OF
GEODETIC 2000 MT. EDEN
2. ALL LEVELS ARE IN METRES AND IN TERMS OF THE LANDS
AND SURVEY DATUM (MEAN SEA LEVEL) AUCKLAND 1946
3. ALL LOT CONNECTIONS ARE 100NB PVC UNLESS SHOWN
OTHERWISE.
4. MANHOLE INVERT LEVELS ARE LISTED CLOCKWISE FROM
THE OUTLET PIPE.
5. ALL MANHOLES ARE 1050NB WITH STANDARD DUTY
LIDS AND COVERS UNLESS SHOWN OTHERWISE.
ALL STORMWATER PIPES 225NB AND OVER ARE RCRRJ CLASS 2
UNLESS SHOWN OTHERWISE EXCEPT FOR CATCHPIT LEADS
WHICH ARE ALL CLASS 4. ALL CATCHPIT LEADS ARE 225NB
UNLESS SHOWN OTHERWISE.
6. ALL CONCRETE PIPES AND STRUCTURES ARE
MANUFACTURED BY HYNDS PIPES. ALL PLASTIC PIPES ARE
MANUFACTURED BY MARLEY.
I, MICHAEL STEPHEN SMITH, MIPENZ CPENG HEREBY BELIEVE
ON ALL REASONABLE GROUNDS THAT THE PIPE SIZES,
FITTINGS, POSITIONS, COORDINATES AND LEVELS SHOWN ARE
ACCURATELY PLOTTED IN RELATION TO BOUNDARIES AND IS
CORRECT AS THIS INFORMATION HAS BEEN PROVIDED BY THE
CONTRACTOR OF THE WORKS - KERRY DINES LTD.
--------------- -----
MICHAEL STEPHEN SMITH DATE
CMENGNZ, CPENG
LEGEND
MANHOLE
OUTLET
CATCHPIT
SW LINE
EX.MANHOLE
EX.CATCHPIT
EX.SW LINE
3
.
9
2
.
2
2
.
0
3
.
8
1
.
2
4
.
0
2
.
8
2
.
8
2
.
4
2
.
8
4
.
2
2
.
3
3
.
7
2
.
4
3
.
2
2
.
6
1
.
9
1
.
5
2
.
8
2
.
3
4
.3
2
.3
8
.
0
7
.
4
1
.8
1
.5
1.7
1.4
2.3
1.7
1
.5
1
.
9
1
.
8
3
.2
4.5
2
.
8
6
.
4
7
.
7
2.0
3
.
1
3
.
4
1
.
23
.
6
3
.
5
3
.
8
2
.
8
3
.
8
3
.
1
4
.
1
2
.
4
1
.
9
3
.8
1
.
7
1
.
1
4
.
7
3
.5
3
.
4
1
.
3
MH=MANHOLE, CP=CATCHPIT
CON=LOT CONNECTION
MH3.19 758926.65421631.23
MH3.20 758893.89421647.00
BC37.6 759017.34421673.46
MH38.1 758960.66421638.63
MH38.2 758949.57421614.06
MH38.3 758946.12421588.78
MH38.4 758947.60421571.27
MH38.5 758903.82421553.38
BC348 758919.28421611.95
CP87 758974.98421633.87
CP88 758967.64421637.31
CP91 758945.74421571.29
CON342 758960.49421715.24
CON343 758951.77421697.00
CON344 758944.32421681.38
CON345 758936.57421664.80
CON346 758928.98421649.23
CON347 758922.09421633.11
CON348 758916.23421612.89
CON352 758947.24421564.73
CON353 758916.62421552.23
CON354 758915.02421562.88
CON355 758946.09421585.09
CON356 758947.73421603.02
CON357 758947.58421614.33
CON358 758958.42421634.90
CON359 758965.74421650.92
CON360 758973.29421666.67
CON361 758980.88421682.47
CON362 758989.07421700.04
CON363 759029.18421670.92
CON364 759016.25421669.45
CON365 759034.07421656.53
CON366 759037.27421653.77
STORMWATER COORDINATES
Level 3 AMI Building, 15 Osterley Way, Manukau City. Phone: 2222445
DRAWN:
APPROVED:DATE:
DATE:
DATE:PLOTTED:
THIS DRAWING AND DESIGN REMAINS THE PROPERTY
OF, AND MAY NOT BE REPRODUCED OR ALTERED,
WITHOUT THE WRITTEN PERMISSION OF CIVILPLAN
CONSULTANTS LIMITED. NO LIABILITY SHALL BE
ACCEPTED FOR UNAUTHORISED USE OF THIS DRAWING.RJP 06-19
MSS 06-19
RJP 06-19
0 20 40 60 80 100m
SCALE: (A1/A3)
ISSUE STATUS:
DRAWING NUMBER: REV:
136701-06C1-AB400A
1:500 / 1:1000
AS BUILT
BY DATEREVISION DETAILSREV
Filepath: P\APPDATA\LOCAL\AUTODESK\C3D 2020\ENU\TEMPLATE C:\DATA\POKENO\HITCHEN\STAGE 6\AS BUILT\136701-06C1-AB400.DWG
SHEET TITLE:
AS BUILT STORMWATER DRAINAGE
PROJECT TITLE:
DFH JOINT VENTURE
HITCHEN STAGE 6C1 SUBDIVISION
POKENO
H
i
t
c
h
e
n
_
R
o
a
d
6C1
J
O
A
L
LOT 1
DP 73437
ALLOT 1
PSH_OF_MANGATAWHIRI
SECT 10
6C2
1011
1001
S
k
i
f
f
i
n
g
t
o
n
_
R
o
a
d
P
e
t
e
r
_
B
o
u
r
n
e
_
D
r
i
v
e
H
e
r
b
e
r
t
_
O
l
d
h
a
m
_
R
o
a
d
I, MICHAEL STEPHEN SMITH, MIPENZ CPENG HEREBY BELIEVE ON ALL
REASONABLE GROUNDS THAT THE PIPE SIZES, FITTINGS, POSITIONS,
COORDINATES AND LEVELS SHOWN ARE ACCURATELY PLOTTED IN
RELATION TO BOUNDARIES AND IS CORRECT AS THIS INFORMATION HAS
BEEN PROVIDED BY THE CONTRACTOR OF THE WORKS - KERRY DINES
LTD.
--------------- -----
MICHAEL STEPHEN SMITH DATE
CMENGNZ, CPENG
LEGEND
MANHOLE
WW LINE
EX.MANHOLE
EX.WW LINE
NOTES
1. ALL COORDINATES ARE IN METRES AND IN TERMS OF GEODETIC 2000 MT. EDEN
2. ALL LEVELS ARE IN METRES AND IN TERMS OF THE LANDS AND SURVEY DATUM
(MEAN SEA LEVEL) AUCKLAND 1946
3. ALL LOT CONNECTIONS ARE 100NB PVC UNLESS SHOWN OTHERWISE.
4. MANHOLE INVERT LEVELS ARE LISTED CLOCKWISE FROM THE OUTLET PIPE.
5. ALL MANHOLES ARE 1050NB WITH STANDARD DUTY
LIDS AND COVERS UNLESS SHOWN OTHERWISE.
6. ALL PIPES ARE MANUFACTURED BY MARLEY AND MANHOLES BY HYNDS PIPES.
5
.
6
1
.
8
1
.
7
1
.
7
3
.
4
2
.
9
3
.
8
2
.
5
2
.
4
2
.
5
1
.
7
3
.
5
2
.
7
2
.
8
3
.
5
3
.
6
1
.
9
1
.
6
3
.
6
2
.
4
5
.
1
2
.
3
3
.
4
3
.4
4
.53
.4
4.3
2
.5
2
.
0
2
.
2
3
.9
3
.
9
2
.
0
4
.
2
2
.
2
4
.
1
2
.
3
2
.
1
1
.
0
3
.
7
2
.1
2
.
1
1
.6
1.3
6.0
1.5
3
.
8
1.4
0
.
6
1
.
6
2
.
1
4
.
4
2
.
7
2
.
2
3
.
3
2
.
0
4
.
3
2
.
3
4
.
0
MH=MANHOLE, BC=BLANK CAP
CON=LOT CONNECTION
MHEE7 758924.62421635.13
BCEE8 758918.72421614.32
MHGG3 759041.19421652.86
BCGG4 759018.52421669.78
MHHH1 758993.99421698.98
MHHH2 758958.39421623.73
MHHH3 758951.78421570.75
MHHH4 758907.28421552.64
MHHH5 758897.81421565.75
MHHH6 758898.29421597.20
MHHH7 758885.62421597.48
MHNN1 758909.16421531.41
MHNN2 758919.16421487.46
CON342 758960.88421712.77
CON343 758953.04421695.94
CON344 758945.13421679.35
CON345 758937.44421663.01
CON346 758929.89421646.95
CON347 758923.14421630.67
CON348 758918.65421614.60
CON352 758946.70421564.12
CON353 758913.81421554.60
CON354 758910.73421560.52
CON355 758944.47421583.12
CON356 758945.39421600.67
CON357 758950.32421619.35
CON358 758957.84421636.54
CON359 758965.35421652.48
CON360 758972.73421667.98
CON361 758980.42421684.29
CON362 758989.20421700.32
CON363 759026.32421671.00
CON364 759016.94421668.45
CON365 759034.70421658.30
CON366 759039.78421651.14
WASTEWATER COORDINATES
Level 3 AMI Building, 15 Osterley Way, Manukau City. Phone: 2222445
DRAWN:
APPROVED:DATE:
DATE:
DATE:PLOTTED:
THIS DRAWING AND DESIGN REMAINS THE PROPERTY
OF, AND MAY NOT BE REPRODUCED OR ALTERED,
WITHOUT THE WRITTEN PERMISSION OF CIVILPLAN
CONSULTANTS LIMITED. NO LIABILITY SHALL BE
ACCEPTED FOR UNAUTHORISED USE OF THIS DRAWING.RJP 06-19
MSS 06-19
RJP 06-19
0 20 40 60 80 100m
SCALE: (A1/A3)
ISSUE STATUS:
DRAWING NUMBER: REV:
136701-06C1-AB401A
1:500 / 1:1000
AS BUILT
BY DATEREVISION DETAILSREV
Filepath: P\APPDATA\LOCAL\AUTODESK\C3D 2020\ENU\TEMPLATE C:\DATA\POKENO\HITCHEN\STAGE 6\AS BUILT\136701-06C1-AB401.DWG
SHEET TITLE:
AS BUILT WASTE WATER DRAINAGE
PROJECT TITLE:
DFH JOINT VENTURE
HITCHEN STAGE 6C SUBDIVISION
POKENO