Halifax Watershed Studies:Sandy Lake and Preston Areafor theRegional Watersheds Advisory Board

AECOM

Timothy Bachiu M.Sc., P.Geo.

September 10, 2014

Client logo

Two Watershed Study Areas• Sandy Lake

– 24 hectares– Sub-watershed of the Sackville River

• Preston Area– 66 hectares– Two watersheds

• Salmon River• Partridge River

– Rural Dartmouth– Little

development anticipated

– Groundwater used for potable water in several communities

September 10, 2014

Bedford AreaDevelopment plans

Client logo

Sandy LakeStudy Area

September 10, 2014

Client logo

Sandy LakeExisting Conditions

September 10, 2014

Client logo

Sandy LakePotential Development

September 10, 2014

Client logo September 10, 2014

Sandy Lake - Objectives

• What are the existing lake water quality conditions?– Historical data and three sampling events– Set Water Quality Objectives based on historical and recent data

• What are the potential impacts of future development on lake water quality?– Lakeshore Capacity Model– 3 scenarios of development

• What areas are suitable/not-suitable for development?– Constraints map

Client logo September 10, 2014

Sandy Lake – Existing water quality conditions

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

45.00

50.00

May-05 May-06 May-07 May-08 May-09 May-10 May-11 May-12 May-13 May-14

Tota

l Pho

spho

rus

(ug/

L)

HRM samples AECOM Samples Phosphorus Average Phosphorus Median

Eutrophic

Mesotrophic

Oligotrophic

Water Quality Objective: 18 µg/L

Client logo September 10, 2014

Sandy Lake – Lakeshore Capacity Model

• Phosphorus load modeling– Land Use map– Phosphorus export for each land use type

• Phosphorus flux + hydraulic budget = average concentration

• Model Uncertainty

• Four scenarios– Modeling Scenario 1: Existing Conditions; – Modeling Scenario 2: Future Developments; – Modeling Scenario 3: Future Developments plus; and– Modeling Scenario 4: Future Developments (Scenario 3) with

Advanced Stormwater Management

Client logo September 10, 2014

Sandy Lake – Lakeshore Capacity Model

Scenario Sandy LakePredicted Phosphorus (µg/L)

Marsh LakePredicted

Phosphorus (µg/L)

Scenario 1: Existing Conditions 12 11

Scenario 2: Planned Developments 16 15

Scenario 3: Planned Developments + removal of Uplands WWTF and Septic Systems near Sandy Lake

15 14

Scenario 4: Future Developments (Scenario 3) with Advanced Stormwater Management

13 12

Recommended Water Quality Objective 18 15.5

Client logo

Sandy LakeConstraints Map

September 10, 2014

Client logo

Sandy Lake Summary

• Increasing total phosphorus concentrations

• Future development will impact water quality

• Mitigation measures– Septic and WWTF to

municipal waste water– Advanced stormwater

management

September 10, 2014

Client logo

Break for Questions regarding Sandy Lake

September 10, 2014

Client logo

Preston Study Area• Little Salmon River

• Lake Major• Long Lake• Tributaries to Major• Cole Harbour

• Partridge River• Winder Lake• Eagle Lake• Frog Lake• Lawrencetown Lake

• Protected Areas• Lake Major PWA• Waverley Game Sanctuary• Waverley Salmon River Long

Lake Wilderness Area

• Additional Sampling

Major

Long

Eagle

Surface Water Sample

Client logo

Objectives

• What are the conditions of the surface water?– Historical data and

sampling completed.

• Are there groundwater issues in areas that rely on groundwater?– Residential well survey

September 10, 2014

Client logo

Water Quality DataSampled

bySampling Program

Sampling Period

Sampling Locations

HRMWinder Lake

TreatmentPlant

2006 - 2011 Winder Lake

HalifaxWater

Lake MajorProtected

Water Area2009 - 2013

Lake MajorLong Lake

AECOM This Study

2013 - 2014

3 sampling events

Long LakeLake MajorEagle LakePartridge

River

2014

2 sampling events

Frog LakeGammon

LakeRobinson

LakeNelson Lake

September 10, 2014

(2013-2014)

Client logo

Salmon River Watershed

• Lake Major total phosphorus• Inputs to Lake Major: 8 to

17 µg/L • Lake Major: 2 to 7 µg/L • Oligotrophic

• Long Lake TP• 2 to 34 µg/L• Mesotrophic

September 10, 2014

(2013-2014)

Client logo

Partridge River Watershed• Winder Lake (n=17)

• Total Phosphorus: 100 to 300 µg/L (median 100 µg/L) Eutrophic

• Eagle Lake (n=3)• Total Phosphorus: 15, 27,

20 µg/L Mesotrophic/Eutrophic

• Frog Lake (n=2)• Total Phosphorus: 23, 33

µg/L Eutrophic

• Partridge River Outlet (n=3)• 15, 15, 21 µg/L

Mesotrophic

September 10, 2014

(2013-2014)

Client logo

Additional Lake Sampling

• Nelson Lake– May 2014: 24 µg/L– July 2014: 16 µg/L

• Robinson Lake– May 2014: 22 µg/L– July 2014: 18 µg/L

• Gammon Lake– May 2014: 21 µg/L– July 2014: 16 µg/L

September 10, 2014

Nelson Lake

Robinson Lake

GammonLake

Client logo

Preston Residential Well Survey

September 10, 2014

Montague Gold Mines

East Preston

Lawrencetown/Mineville

Client logo

Arsenic in Groundwater

September 10, 2014

Client logo

Preston residential well results summary

September 10, 2014

0

10

20

30

40

50

60

70

80

90

100

% of Residences with yield issues

% of residences with As > 10 ug/L or total coliforms present

0

10

20

30

40

50

60

70

80

90

100

Perc

enta

ge o

f Res

iden

ts S

urve

yed

% of residences without treatment systems and havetotal coliforms present% of residences without treatment systems and havehigh arsenic concentrations

Perc

enta

ge o

f Res

iden

ts S

urve

yed

Client logo

Preston Area Summary• Lake Major water

quality is good

• North Preston WWTP is impacting Eagle Lake and Frog Lake – Both lakes may be

eutrophic

• Groundwater Quality– Arsenic in Montague and

Mineville/Lawrencetown– Bacteria in dug wells in

PrestonSeptember 10, 2014