Groundbreaking Ceremony Clemson University Restoration Institute October 28, 2010

Post on 19-Jan-2016

36 views 0 download

Tags:

description

Clemson University Wind Turbine Drive Train Testing Facility. Groundbreaking Ceremony Clemson University Restoration Institute October 28, 2010. Conceptual Design. Special Thanks to our Project Partners. Economic Development and Innovation. Public Partners - PowerPoint PPT Presentation

Transcript of Groundbreaking Ceremony Clemson University Restoration Institute October 28, 2010

Groundbreaking CeremonyClemson University Restoration Institute

October 28, 2010

Clemson University Wind Turbine Drive Train Testing Facility

Conceptual Design

Special Thanks to our Project Partners

Public Partners•Naval Complex Redevelopment Authority•State of South Carolina•South Carolina Ports Authority•South Carolina Public Railways•Savannah River National Laboratory

Private Partners•Renk Test Systems•Fluor•SCE&G•CMMC•EcoEnergy•James Meadors•Tony Bakker

Eco

nom

ic Develo

pm

ent a

nd

Innovatio

n

Eco

nom

ic Develo

pm

ent a

nd

Innovatio

n15 MW Capacity with Dynamic Load Applicator

7.5 MW Capacity with Static Load Applicator E

conom

ic Develo

pm

ent a

nd

Innovatio

n

Eco

nom

ic Develo

pm

ent a

nd

Innovatio

n

Clemson University Restoration InstitutePhase I

Conceptual Design