GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope:...

Post on 21-Dec-2015

215 views 0 download

Tags:

Transcript of GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope:...

GLAST LAT Project Quarterly Review, Aug. 14, 2001

Gunther Haller 1

GLAST Large Area Telescope:GLAST Large Area Telescope:

Electronics, DAQ & Flight Software

Gunther HallerStanford Linear Accelerator CenterElectronics System Engineer

haller@slac.stanford.edu

Gamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope

GLAST LAT Project Quarterly Review, Aug. 14, 2001

Gunther Haller 2

ContentContent

• Electronics System– Overview– Location– Architecture– Deliverables– WBS Organization

• Recent Progress• Milestones & Budget• Response to Recommendations from last Review

GLAST LAT Project Quarterly Review, Aug. 14, 2001

Gunther Haller 3

LAT Electronics OverviewLAT Electronics Overview

• TKR, CAL & ACD Sub-System Electronics

– Amplification/shaping/digitization of detector signals

• Trigger path for fast response (2 usec trigger latency)

• Event path for trigger-selected high-resolution data readout

• Trigger & Dataflow Electronics

– Commanding and messaging of LAT electronics

– Configuration & Control of TKR, CAL, & ACD front-end electronics

– Triggering

– Event data acquisition, buffering, reconstruction and filtering

– Spacecraft interface electronics

– Instrument health monitoring

– Support for sub-system electronics development

• Power System

– Distribution, switching, conditioning, regulation of spacecraft supplied power to all LAT electronics

GLAST LAT Project Quarterly Review, Aug. 14, 2001

Gunther Haller 4

Location of LAT Electronics Location of LAT Electronics

TKR Elex on each of the 16

towers CAL Elex on each of the 16 towers

ACD Elex on all 4 sides

• Distributed in boxes under the 16 towers (LAT shown upside-down):

– Trigger & Dataflow (DAQ) Electronics

– Power System

GLAST LAT Project Quarterly Review, Aug. 14, 2001

Gunther Haller 5

Electronics ArchitectureElectronics Architecture

Front-End

CAL

TKR

TKR-CAL TEM

Event Processor

Units

Intercon-nection Module

Space-craft Interface

Unit

Tower

ACD ACD EM

to/from SC

Control & Processed Event Data

Event Data

Control & Processed Event Data

5 each (4+1)

2 each (1+1)

16 each (16+0)

2 each (1+1)

Front-End

* (1+1) = (1 Primary + 1 Secondary)

Monitoring Module

Distribution & GLT Assembly

Control, HSK Data

Control, Trigger, Event &

HSK Data

Global Trigger Module

2 each (1+1) Power Supply System

2 each (1+1)

GLAST LAT Project Quarterly Review, Aug. 14, 2001

Gunther Haller 6

Trigger & Dataflow, Power ModulesTrigger & Dataflow, Power Modules

• 16 TKR-CAL Tower Electronics Modules (16 Primary + 0 Secondary)• 2 ACD Electronics Modules (1 P + 1 S)• 2 Interconnection Modules (1 P & 1 S)• 2 Global Trigger Modules (1 P & 1 S)• 5 Event-Processor Units (4 P & 1 S)

– 603e/750 Power-PC processor PCI card– Event-Processor - LAT communication PCI card– PCI Backplane

• 2 Spacecraft Interface Units (1 P & 1 S)– 603e/750 Power-PC processor PCI card– SIU - LAT communication PCI card– SIU - Spacecraft communication PCI card– PCI Backplane

• 2 LAT Monitoring Units (1 P & 1 S)• Power supplies for all modules above• Power Distribution Module (1 P & 1 S)

GLAST LAT Project Quarterly Review, Aug. 14, 2001

Gunther Haller 7

WBS OrganizationWBS Organization

Reliab ility & QAD. Nelso nSU-SL AC

W BS 4.1.7.2

T &DF E lexG . HallerSU-SL AC

W BS 4.1.7.4/4.1.7.5

En clo su res/Harn essM .F reytagSU-SL AC

W BS 4.1.7.7/4.1.7.8

Po w er SystemD. Nelso nSU-SL AC

W BS 4.1.7.6

F lig h t So ftw areJ. Ru ssellSU-SL AC

W BS 4.1.7.9

G SE & Op eratio nS . W illiam s

SU-HE PLW BS 4.1.7.A

In stru m en t I&TG . HallerSU-SL AC

W BS 4.1.7.C

T racker E lexR. Jo h n so n

UCS CW BS 4.1.4.3.3.3

CAL E lexW .N .Jo h n so n

NRLW BS 4.1.5.7

ACD E lexJ. Orm es

G SF CW BS x.x.x

F ro n t-En d E lexG . HallerSU-SL AC

Electro n ics M an ag em en tG . HallerSU-SL AC

W BS 4.1.7.1

E lectro n ics, DAQ & F lig h t S o ftw areG . HallerSU-SL ACW BS 4.1.7

NRL

SU-HEPL

SU-SLAC

NRL

SU-HEPL

SU-SLAC

NRL

SU-SLAC

CEA-DAPNIA INFN SU-SLAC

NRL

NRL SU-HEPL SU-SLAC

NRL SU-HEPL SU-SLAC

NRL SU-HEPL SU-SLAC

GLAST LAT Project Quarterly Review, Aug. 14, 2001

Gunther Haller 8

Recent Technical ProgressRecent Technical Progress

• Requirement Documents for

– Trigger & Dataflow System Level III

– Trigger Level IV

– Dataflow Level IV

– Power System Level III

– Power Supplies Level IV

• Design Documents for

– Overall Electronics System

– Global Trigger System

– Tower Electronics Module

– Spacecraft Interface Unit

– Grounding & Shielding (EMI)

– Mission Assurance

– Flight-Software

• All documents on web page see

– http://www.slac.stanford.edu/exp/glast/daq

GLAST LAT Project Quarterly Review, Aug. 14, 2001

Gunther Haller 9

Recent Budget & Schedule ProgressRecent Budget & Schedule Progress

• Tasks entered to lowest level (7) in PMCS

• Resource loaded schedule

• Components organized as

– Pre-Engineering Module

– Engineering Module 1

– Engineering Module 2 (function and interface like flight-electronics but with commercial components)

– Qualification Module

– Flight Module

• Each of the modules scheduled as

– Requirements

– Conceptual Design

– Preliminary Design

– Layout, Fabrication, Assembly

– Standalone Test

– System Test

GLAST LAT Project Quarterly Review, Aug. 14, 2001

Gunther Haller 10

MilestonesMilestones

• Trigger & Dataflow Requirements Review 03/27/01• T & DF PDR 07/16/01• Flight Software PDR 07/16/01• LAT Instrument PDR 09/25/01• Engineering Model 1 (EM1) System Test Complete 03/15/02• T&DF CDR 06/19/02• Flight Software CDR 06/12/02• LAT Instrument CDR 08/05/02• Engineering Model 2 (EM2; flight software & DAQ) System Test Complete 05/10/03• Deliver Electronics Units for Calibration Unit 05/10/03• Assemble/Test Qual Unit 07/15/03• Assemble/Test last Flight Unit 12/01/03

GLAST LAT Project Quarterly Review, Aug. 14, 2001

Gunther Haller 11

Budget ProfileBudget Profile

GLAST LAT Project Quarterly Review, Aug. 14, 2001

Gunther Haller 12

Recommendations from Last ReviewRecommendations from Last Review

• Additional Manpower for Flight Software– Added 2 SLAC people to work on FSW

• Rick Claus (moving to GLAST project)• Curt Brune (new hire)