FLOATING DOCKGANGWAY
DOCK MASTEROFFICE
RESTROOMSLAUNDRYSTORAGE
FUEL
DO
CK
GAZEBO
Existing Building • Below FEMA minimum finish floor
• 7.8ft NAVD finish floor elevation• Typical wood frame construction• Typical building materials• No flood panels
Proposed Building • Floating foundation
• Finish floor will always be 24” above the water• Upgraded frame construction
• PT Lumber• Stainless fasteners• Synthetic interior and exterior siding and trim• No flood panels needed
Existing Building• Below FEMA minimum finish floor
• 4.9ft NAVD finish floor elevation• Typical wood frame construction• Typical building materials• No flood panels
Proposed Building • Floating foundation
• Finish floor will always be 24” above the water• Upgraded frame construction
• PT Lumber• Stainless fasteners• Synthetic interior and exterior siding and trim
• No flood panels needed
Naples Boat Club• Constructed in 2003• 18” Freeboard • No flood panels needed• Severe Storms that have affected Naples
since 2003• Charlie (2004)• Jeanne (2004)• Wilma (2005)• Meteotsunami (2016)• Other un-named storm events