3

Department of Environmental Services General Fund

Proposed FY 2015 Budget Highlights

March 20, 2014

5

DES Budget at a Glance

• Proposed budget totals $84.2M – A 6% increase from FY 2014 includes:

• Personnel increases due to new positions, regular step increases, and reclassifications

• Non-discretionary contractual increases • Maintenance and replacement of County vehicles • Software license, maintenance and subscription fees

• Total FTEs: 402.2 – a net increase of 6.5 FTE from FY 2014

6

DES Budget Highlights

• Added Funding for: − Parking Program (1.5 FTE) − Permits Plus conversion support − Facility Maintenance support for:

• Fire Station #6 (1.0 FTE) • Homeless Services Center (1.0 FTE)

• Reprioritized Resources to fund: − Design Standards Engineer (1.0 FTE) − Street Light Technician (1.0 FTE) − Rosslyn-Ballston Corridor Cleaning (1.0 FTE) − Electronic Plan review support

7

DES Budget Highlights

• ART service increases (ART 43,45, and 92) funded by new fare revenue and state reimbursement

• Commuter Services programming increases funded by grant revenue

• Community Energy Plan position now funded by increased residential energy tax receipts

8

• FY 2015 Household Solid Waste Rate − Annual rate for current services will

decrease slightly as a result of new contract

− New contract includes option for year-round yard waste and organics collection

− Household Solid Waste Rates • FY 2014 Current Rate: $293.76 • County Manager’s Proposed Budget Rate: $300.72 • FY 15 Rate for Current Services will decrease from

proposed rate • FY 15 With Yard Waste will be within the advertised

rate

HSWR

Major Initiatives & Issues

• Maintaining good levels of service for core services, while facing the reality of a growing infrastructure

• Successfully implement changes in operations due to the MS4 Permit and more stringent enforcement of stormwater regulations

• Street lights • Road maintenance • Provide software for capital projects, upgrade asset

management and daily work orders software • Community Energy Plan Implementation • GIS Strategic Plan

9

FY 2016 and Beyond

• Maintaining good levels of service for core services, while facing the reality of a growing infrastructure

• Community Energy Plan Implementation • Implement GIS Strategic Plan

10

Stormwater Fund Proposed FY 2015 Budget Highlights

March 20, 2014

12

Stormwater Fund Budget at a Glance

• Proposed budget totals $8.6M − A 7% increase from FY 2014 due to increased

assessments

• Total FTEs: 37.00 − Increase of 11.0 FTE from FY 2014 − Required to implement new MS4 permit and Virginia

Stormwater Management Program (VSMP) regulations effective July 1, 2014

− Increased plan review and inspection capacity for development projects, and engineering design, construction, and inspections for capital projects

Major Initiatives

• Environmental Quality − Ballston Pond wetland restoration project − Stream restoration projects − Watershed retrofit projects

• Stormwater infrastructure − Stormwater capacity projects − Flood risk reduction studies − Maintenance capital to address local drainage issues

and deteriorating infrastructure

• Education and Outreach 13

FY 2016 and Beyond

• MS4 permit compliance

− Will require new stormwater facilities and programs to meet challenging Chesapeake Bay nutrient and sediment reductions

− Additional funding will be needed in the future, resulting in potential Sanitary District tax increase

14

Utilities Fund Proposed FY 2015 Budget Highlights

March 20, 2014

16

Utilities Fund Budget at a Glance

• Proposed budget totals $88.9M, a 1% increase from FY 2014 due to: − Increase in personnel budget for 4.25 new FTEs

(total: 235.75) & normal salary/benefit increases − Funding increase for valve work, and overhead and

miscellaneous charges − Reduction in debt service, water purchase expenses,

and funding for overstrength positions

Utilities Fund Budget at a Glance

• The total water/sewer rate is proposed to increase from $12.61 to $13.04/TG (3.4%) − Water rate increases $0.12 from $3.98/TG to

$4.10/TG (3.0%) − Sewer rate increases $0.31 from $8.63/TG to

$8.94/TG (3.6%)

17

Major Initiatives

• Utilities Information Billing System replacement (implemented: 1996)

• Water Rules & Regulations Handbook update (last update: 1993)

• Water Sales Agreement update (current agreement: 1997)

• Water Master Plan update (last update: 1992) • Water Pollution Control Plant Master Plan

update (last update: 2001)

18

FY 2016 and Beyond

• Sanitary Sewer Master Plan update (last update: 2002)

19

Auto Fund Proposed FY 2015 Budget Highlights

March 20, 2014

21

Auto Fund Budget at a Glance

• Proposed budget totals $16.7M – A 6% decrease from FY 2014 due to:

• Decreased replacement expenses based on number and configuration of vehicles set for replacement

• Total FTEs: 61.00 – no increase from FY 2014

Printing Fund Proposed FY 2015 Budget Highlights

March 20, 2014

23

Printing Fund Budget at a Glance

• Proposed budget totals $1.8M – A 13% increase from FY 2014 due to:

• Personnel increases – regular step increases and reclassifications

• Contractual obligations

− Printing Services supported by user fees − Mail services funded by the General Fund

• Total FTEs: 8.00 – no increase from FY 2014

Ballston Public Parking Garage Funds Proposed FY 2015 Budget Highlights

March 20, 2014

Ballston Public Parking Garage Funds

• Levels 1-7 − Proposed budget totals $6.95 M

• A less than 1% increase from FY 2014 • Revenue decreases 9% due to less hourly parking revenue

and completion of 8th Level construction

• Level 8 − Proposed budget totals $73.5 K

• A 5% increase from FY 2014 for adjustments in the cost of contracted services

• Revenues increases 15% due to completion of garage construction on Level 8