Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat.

Post on 31-Mar-2015

215 views 1 download

Tags:

Transcript of Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat.

Foundation has been tarred to grade line

Bluewater Plumbing has arrived for in-floor heat

Peter changing light bulbs on the pole

Former Parkhill PUC utility truck

Installing the top plates

Basement bathroom roughed in with pump pit

Solid Big ‘O’ for downspouts

Stone covering the footing tile, laying the downspout tile

Joins to drain to the east slope

Upright Big ‘O’ is for a downspout

Don and J.J. creating a drain area at the garage door

Backfill for the foundation - gravel

Don Heard backfilling the foundation

Replacement windows arrive under black sky

Replacement windows stacked and ready to install

Insulation blanket to go under the radiant floor heating

Organized chaos

Spreading the backfill along the foundation wall

Laying out the wire mesh for the concrete floor

We’ve started with the open web floor joists

Installing the floor heating tubes

Wired to the mesh in a grid

Moving the concrete slab – carefully! Tipping as he moves.

Unload it at the back of the barn

Layout is completed

I will have to take measurements for partitions

The heater will be located in the old basement