Form works & Brick works

NM.RaneesB/QS/14/08/04

Form work

Introduction Loads on form work Requirements of a good form work

Materials for form work

Plywood Plastic Hard board Timber Steel

Propping and Centering

Shuttering

Provision of camber

Cleaning and surface treatment

Process of form work

Column form work

Column form work includes Sheathing (panels) Yokes Wedges

In my site

Form work for beamBeam form work has 2 partsInvert panel ( Soffit shuttering)Hanging panel

In my site

Its likes wise beam form work but soffit shuttering is larger than beam form work

In preparing form work 1. plywood supported by 2” * 2” timber

2. 2” diameter GI pipes3. Over 4” * 2” timber joists

Slab form work

In my site

Form work for stair cases

Its containts1.Planks2.Plank connectors3.Skirting board4.Soffit board

In my site

Brick work Brick

This is the unit of walling Its made by moulding clay

Bonds

Strecher bond

Header bond

Flemish bond

English bond

Herring bone bond

(Strecher bond)(Header bond)

(Flemish bond)

(English bond)

(Hering bone bond)

In my visited site