FFY 18-27 STIP Project Funding Status Report - Post SolicitationBarrington
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Rt 114, Wampanoag Trail (East Shore Expressway to Federal Rd)
1290 East Shore Expressway to Federal Rd 2022 Non-Bridge2019
Pavement Capital Program Nyatt Rd (Rumstick Rd to Washington Rd)
1296 Rumstick Rd to Washington Rd 2018 Non-Bridge2017
Pavement Capital Program Rt 103/114, County Rd (Federal Rd to Barrington Bridge)
1297 Federal Rd to Barrington Bridge 2023 Non-Bridge2023
Pavement Capital Program Rt 103, Willet Ave (Bullocks Point Ave to Wamponoag Ave)
1298 Bullocks Point Ave to Wamponoag Ave 2024 Non-Bridge2023
Transportation Alternatives New Meadow Road Sidewalk1473 Christine Drive to Deep Run Road 2026 Non-BridgeNA
Transportation Alternatives Massasoit Ave Sidewalk1474 Woodward Ave to Arvin Ave 2026 Non-BridgeNA
Transportation Alternatives Safe Routes to School Infrastructure Improvements for Barrington Middle School
5001 Middle Hwy, South Lake Dr, Seven Oaks Dr, Lincoln Ave
2018 Non-Bridge2017
Transportation Alternatives Safe Routes to School Infrastructure Improvements for Primrose Elementary School
5002 Middle Hwy, Pine Ave, Elton Rd, Highview Ave, Western Ave, Old County Rd, Sherwood Ln
2018 Non-Bridge2017
Transportation Alternatives East Bay Bike Path Bridge Replacement (Barrington River and Warren Bridges)
5005 Barrington River 2022 Non-Bridge2022
Bridge Capital Program RI 114/103 CNTY RD Bridge at Barrington River
6001 2018 Bridge Group 152017
Bridge Capital Program RI 114/103 CNTY RD Bridge at Warren River
6002 2018 Bridge Group 152017
Bridge Capital Program Washington Rd Bridge at Nayatt Pond6003 2018 Bridge Group 152017
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationBristol
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Route 114 Hope Street and Ferry Road (Metacom Ave at RWU to Constitution St)
1299 Metacom Ave at RWU to Constitution St
2021 Non-Bridge2021
Pavement Capital Program Rt 114, Hope St and Main St (Washington St to Dyer Ave)
1300 Washington St to Dyer Ave 2022 Non-Bridge2019
Pavement Capital Program Rt 136, Metacom Ave (Warren T/L to Ferry Road)
1301 Warren T/L to Ferry Road 2023 Non-Bridge2023
Traffic Safety Capital Program
Intersection Safety Improvements to Metacom Avenue (RI 136) - Signal Upgrades and Left Turn Lanes
1458 RI 136 2018 Non-Bridge2017
Traffic Safety Capital Program
Intersection Safety Improvements to Warren Avenue, Pawtucket Avenue, and Ferry Road
1541 2022 Non-Bridge2021
Transportation Alternatives Herreshoff Marine Museum5007 2025 Non-Bridge2025
Bridge Capital Program Mill Gut Bridge, Colt Dr at Mill Gut Tidal Inlet
6004 2021 Bridge Group 442021
Bridge Capital Program Silver Creek Bridge, RI 114 Hope St at Tidal Inlet
6005 2021 Bridge Group 442021
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationBurrillville
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Victory Hwy & Rte 107 East Avenue1302 Victory Hwy (Rt 102 to Rt 107) 2018 Non-Bridge2018
Pavement Capital Program Reservoir Rd (South Main St to US-44)1304 South Main St to US-44 2023 Non-Bridge2024
Traffic Safety Capital Program
Safety Corridor Improvements to Route 102 Phase 2 Burrillville - Guardrail and Pedestrian Upgrades
1526 2021 Non-Bridge2020
Pavement Capital Program Rt 7 - Douglas Pike (Whipples Pond to Joslin Rd)
1578 Whipples Pond to Joslin Rd 2024 Non-Bridge2024
Pavement Capital Program Rt 107, Main St (Rt 100 to Union Ave)2006 Route 100 to Union Avenue NA Non-Bridge2017
Bridge Capital Program Frank H Potter Bridge, Bridgeway Rd at Pascoag River
6006 2018 Bridge Group 172018
Bridge Capital Program Gazza Road Bridge at Chapachet River6007 2018 Bridge Group 172018
Bridge Capital Program Glendale Bridge, Victory Hwy at Branch River
6008 2018 Bridge Group 172018
Bridge Capital Program Granite Mill Canal Bridge, RI 107 Chapel St at Mill Canal
6009 2018 Bridge Group 172018
Bridge Capital Program Joslin Road Bridge, RI 102 Bronco Hwy at Branch River & Joslin Rd
6010 2018 Bridge Group 172018
Bridge Capital Program Leland Bridge, RI 100 Wllm Lk Rd at Leland Brook
6011 2018 Bridge Group 172018
Bridge Capital Program Nasonville Concrete Arch, RI 7 Douglas Pike at Mill Canal
6012 2018 Bridge Group 172018
Bridge Capital Program Pascoag River Bridge, 102 Bronco Hwy at Pascoag River
6013 2018 Bridge Group 172018
Bridge Capital Program Sayles Avenue Bridge at Pascoag River6014 2018 Bridge Group 172018
Bridge Capital Program Harrisville Bridge, RI 107 East Ave at Pascoag River
6015 2025 Bridge Group 432025
Bridge Capital Program Lapham Bridge, RI 102 Bronco Hwy at Whipple Ave
6016 2025 Bridge Group 432025
Bridge Capital Program Laurel Ridge Bridge at Clear River6017 2025 Bridge Group 432025
Bridge Capital Program Mohegan Bridge, RI 102 Bronco Hwy at Branch River
6018 2025 Bridge Group 432025
FFY 18-27 STIP Project Funding Status Report - Post SolicitationBurrillville
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Nasonville Stone Arch Bridge, RI 7 Douglas Pike at Branch River
6019 2025 Bridge Group 432025
Bridge Capital Program North Road Bridge at Clear River6020 2025 Bridge Group 432025
Bridge Capital Program Oak Valley Bridge, RI Douglas 7 Pike at Branch River
6021 2025 Bridge Group 432025
Bridge Capital Program Oakland Bridge, Victory Hwy at Pascoag River
6022 2025 Bridge Group 432025
Bridge Capital Program Railroad Avenue Bridge at Pascoag River6023 2018 Bridge Group 58BNA
Pavement Capital Program Rt 102/Bronco Highway (Main St to Rt 5/Providence Pike)
9531 Rt 102/Bronco Highway from Main St to Rt 5/Providence Pike
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationCentral Falls
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Rt 122, Lonsdale Ave (Dexter St to US-1)1306 Dexter St to US-1 2023 Non-Bridge2022
Pavement Capital Program Rt 114, Broad St (Cumberland T/L to Exchange St)
1307 Cumberland T/L to Exchange St NA Non-Bridge2022
Pavement Capital Program Rt 114, Broad St (Mendon Rd to Central Falls C/L)
1317 Mendon Rd to Central Falls C/L NA Non-Bridge2023
Transit Capital Program - RIDOT
Pawtucket/Central Falls Transit Center5011 Conant Street to Dexter Street 2018 Non-Bridge2017
Transportation Alternatives Blackstone River Bikeway - Segment 3B-1
5012 Pierce park, Central Falls to Heritage Park, Cumberland
2018 Non-BridgeNA
Bridge Capital Program Clay Street RR Bridge6024 2023 Bridge Group 242023
Bridge Capital Program Cross Street Bridge at Amtrak6025 2023 Bridge Group 242023
Bridge Capital Program Cross Street Bridge at Blackstone River6026 2023 Bridge Group 242023
Bridge Capital Program Jenks Street RR Bridge6027 2023 Bridge Group 242023
Bridge Capital Program Sacred Heart Ave RR Bridge6028 2020 Bridge Group 472020
Bridge Capital Program Broad Street Bridge at Blackstone River6110 2020 Bridge Group 472020
Pavement Capital Program Broad Street Regeneration Project9007 Broad Street (Rt. 114) (Mendon Rd, Cumberland to Exchange St, Pawtucket)
2018 Non-Bridge2018
Pavement Capital Program Rt. 122/Lonsdale Ave (Dexter St to Cumberland T/L)
9556 Rt. 122/Lonsdale Ave from Dexter St to Cumberland Townline
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationCharlestown
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Rt 1A, Old Post Rd (US-1 to US-1)1308 US-1 to US-1 2020 Non-Bridge2020
Pavement Capital Program US-1, Post Rd (Robin Hollow Rd to Prosser Tr)
1423 Robin Hollow Rd to Prosser Tr 2023 Non-Bridge2023
Traffic Safety Capital Program
Roadway Departure Mitigation - Guardrail and Median Improvements to Route 1
1469 2018 Non-Bridge2017
Bridge Capital Program Wawaloam Bridge, RI 2 So County Trail at Pawcatuck River
6029 2018 Bridge Group 122017
Bridge Capital Program New Pawcatuck River Bridge, Shannock Road
6030 2026 Bridge Group 45NA
Bridge Capital Program Cross Mills6786 2027 Bridge Group 07NA
Bridge Capital Program Pawcatuck River6794 2027 Bridge Group 07NA
Bridge Capital Program Kenyons6800 2027 Bridge Group 07NA
Bridge Capital Program Burdickville Road6809 2027 Bridge Group 07NA
Bridge Capital Program Charlestown Beach Road6810 2027 Bridge Group 07NA
Pavement Capital Program Shannock Road (Rt 112/Carolina Back Rd to Rt 2/South County Trail)
9562 Shannock Road from Rt 112/Carolina Back Rd to Rt 2/South County Trail
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
STIP Program Category Project NameSTIP ID Project Limits Current FFY 17‐25
STIP
DRAFT FFY 18‐27
STIPBridge Group
FFY 18‐27 STIP Project Funding Status Report ‐ Post SolicitationCoventry
Pavement Capital Program Old Summit Rd & Susan Bowen Rd (Rt 117 to Rt 117)
1309 Rt 117 to Rt 117 2020 Non‐Bridge2020
Pavement Capital Program Old Flat River Rd (Rt 117 to Rt 117)1311 Rt 117 to Rt 117 2024 Non‐Bridge2024
Pavement Capital Program Rt 3, Cowesett Ave and Tiogue Ave (Pilgrim Ave to Rt 2)
1313 Pilgrim Ave to Rt 2 2024 Non‐Bridge2024
Pavement Capital Program Sandy Bottom Road Street Scape5018 Route 117/Sandy Bottom Rd to Route 3/Sandy Bottom Road
2026 Non‐BridgeNA
Bridge Capital Program Green Bridge, RI 117 Flat River Road at Bucks Horn Brook
6031 2018 Bridge Group 122017
Bridge Capital Program Sandy Bottom Bridge, RI 33 Sandy Bottom Rd at Pawtuxet River
6032 2018 Bridge Group 12A2017
Bridge Capital Program Spring Lake Bridge, RI 3 Nooseneck Hill Rd at Mishnock River
6033 2018 Bridge Group 122017
Bridge Capital Program Tiogue Lake Bridge, RI 3 Tiogue Rd at Dyer Brook
6034 2018 Bridge Group 122017
Bridge Capital Program Town Farm Culvert, RI 117 Flat River Road at Flat River
6035 2018 Bridge Group 122017
Bridge Capital Program Coventry Center Bridge, Old Flat River Rd at Flat River Reservoir
6036 2022 Bridge Group 252022
Bridge Capital Program Fairbanks Bridge, RI 14 Plainfield Pk at Moosup River
6037 2022 Bridge Group 252022
Bridge Capital Program Harris Bridge, Lincoln Ave at Pawtuxet River N Branch
6038 2022 Bridge Group 252022
Bridge Capital Program Interlaken Bridge, RI 115 Main St at Mill Canal
6039 2022 Bridge Group 252022
Bridge Capital Program Johnsons Pond Bridge, Hill Farm Rd at Johnson’s Pond
6040 2022 Bridge Group 252022
Bridge Capital Program Log Bridge, RI 102 Victory Hwy at Quidnick Brook
6041 2022 Bridge Group 252022
Bridge Capital Program Summit Bridge, Old Summy Rd at Bucks Horn Brook
6042 2022 Bridge Group 252022
STIP Program Category Project NameSTIP ID Project Limits Current FFY 17‐25
STIP
DRAFT FFY 18‐27
STIPBridge Group
FFY 18‐27 STIP Project Funding Status Report ‐ Post SolicitationCoventry
Bridge Capital Program Summit RR Bridge, RI 102 Victory Hwy at bridle/hiking trail
6043 2022 Bridge Group 252022
Bridge Capital Program Unnamed Stone Arch, RI 115 Main St and Harris at Mill Canal
6044 2022 Bridge Group 252022
Bridge Capital Program Washington RI Bridge, South Main St at Pawtuxet River SW Branch
6045 2022 Bridge Group 252022
Bridge Capital Program Bucks Horn Brook Bridge, RI 117 Flat River Rd
6046 2021 Bridge Group 422021
Bridge Capital Program Cahoone Road Bridge at Bucks Horn Brook
6047 2021 Bridge Group 422021
Bridge Capital Program Harkney Hill Rd Bridge at Johnson Pond6048 2021 Bridge Group 422021
Bridge Capital Program Hill Street Bridge at Pawtuxet River N Branch
6049 2021 Bridge Group 422021
Bridge Capital Program Maple Valley Road Bridge at Flat River6050 2021 Bridge Group 422021
Bridge Capital Program Nicholas Road Bridge at Roaring Brook6051 2021 Bridge Group 422021
Bridge Capital Program Unnamed Stone Arch, RI 115 Main St at Mill Canal
6052 2021 Bridge Group 422021
Bridge Capital Program Barbs Hill Road Brudge at Mossup River6053 2018 Bridge Group 58ENA
Bridge Capital Program Pontiac Ave RI 37 Culvert No. 1263016769 2018 Bridge Group 51ANA
Bridge Capital Program Flat River6777 2018 Bridge Group 69DNA
Bridge Capital Program Hopkins Hollow6778 2018 Bridge Group 69DNA
Transportation Alternatives Trestle Trail ‐ West Section ‐2 bridges9001 Bucks Horn Brook and Moosup River NA Non‐Bridge2017
Transportation Alternatives Trestle Trail ‐ West Section ‐ Paving 9002 Log Bridge Rd. to CT border 2023 Non‐Bridge2023
Pavement Capital Program Rt 117, Flat River Road (Hill Farm Rd to Read School House Road)
9537 Rt 117, Flat River Road from Hill Farm Rd to Read School House Road
2027 Non‐BridgeNA
Pavement Capital Program Rt 3, Nooseneck Hill Road (Harkney Hill Rd to Reservoir Rd)
9545 Rt 3, Nooseneck Hill Road from Harkney Hill Rd to Reservoir Rd
2026 Non‐BridgeNA
STIP Program Category Project NameSTIP ID Project Limits Current FFY 17‐25
STIP
DRAFT FFY 18‐27
STIPBridge Group
FFY 18‐27 STIP Project Funding Status Report ‐ Post SolicitationCoventry
Pavement Capital Program Rt. 116, North Road (Rt 12/Scituate Ave to Clarke Rd)
9554 Rt. 116, North Road from Rt 12/Scituate Ave to Clarke Rd
2026 Non‐BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17‐25 STIP or not funded in DRAFT FFY 18‐27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17‐25 STIP column and the earliest funded year listed as 2018 in the DRAFT 18‐27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
‐
‐
‐
FFY 18-27 STIP Project Funding Status Report - Post SolicitationCranston
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program I-295 (I-95 to Rt 5)1274 I-95 to Rt 5 2024 Non-Bridge2023
Pavement Capital Program Rt 10 (US-6 to Park Ave)1285 US-6 to Park Ave 2024 Non-Bridge2023
Pavement Capital Program Rt 2, Reservoir Ave (Sockanosset Cross Rd to Rt 12)
1314 Sockanosset Cross Rd to Rt 12 2018 Non-Bridge2018
Pavement Capital Program Rt 12, Scituate Ave (Pippen Orchard Rd to Rt 51)
1315 Pippen Orchard Rd to Rt 51 2024 Non-Bridge2024
Pavement Capital Program Rt 2, Bald Hill Rd and New London Ave (West Natick Ave to Rt 37)
1411 West Natick Ave to Rt 37 2021 Non-Bridge2021
Pavement Capital Program Rt 5, Lambert Lind Hwy (Mayfield Ave to I-95)
1415 Mayfield Ave to I-95 2019 Non-Bridge2019
Traffic Safety Capital Program
Intersection Safety Improvements - Park Avenue Intersections Cranston - Pedestrian Improvements and Left Turn Lanes
1506 NA Non-Bridge2018
Traffic Safety Capital Program
RISTARS - Localized Bottleneck Improvements to I-295
1531 2021 Non-Bridge2020
Traffic Safety Capital Program
RISTARS - Localized Bottleneck Improvements to I-295 Southbound Cranston
1532 NA Non-Bridge2020
Traffic Safety Capital Program
Arterial Traffic Signal Improvements - Warwick Ave
1537 2021 Non-Bridge2021
Transportation Alternatives Safe Routes to School Infrastructure Improvements for Western Hills Middle School
5021 Ambrose St, Cranston St 2018 Non-Bridge2017
Drainage Capital Program Oaklawn Avenue/Wilbur Avenue Drainage Project
5024 Wilbur from Oaklawn Avenue to Vinton Avenue
2020 Non-Bridge2020
Transportation Alternatives Cranston Street Transportation Enhancements
5028 Atwood Ave rotary to Rt 37 overpass NA Non-Bridge2017
Transportation Alternatives Washington Secondary Bike Path Extension
5215 From Depot Ave (Cranston) to Broadway (Providence
2022 Non-Bridge2022
Bridge Capital Program Huntington Viaduct, RI 10 Huntington Exp at I-95 NB & SB, & Amtrak
6054 2022 Bridge Group 042022
FFY 18-27 STIP Project Funding Status Report - Post SolicitationCranston
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Pawtuxet River Bridge, I-95 NB & SB at Pawtuxet River
6055 2022 Bridge Group 042022
Bridge Capital Program Ramp B-EL, I-95 at Wellington Ave & Amtrak
6056 2022 Bridge Group 042022
Bridge Capital Program Ramp FCB, I-95 at Wellington Ave & Amtrak
6057 2022 Bridge Group 042022
Bridge Capital Program Aqueduct SB, I-295 SB over water supply aqueduct
6058 2018 Bridge Group 34TNA
Bridge Capital Program Cranston Park at I-295 SB6059 2020 Bridge Group 51BNA
Bridge Capital Program Meshanticut Brk Clvt 2 S, I-295 SB at Meshanticut Brook
6060 2018 Bridge Group 092017
Bridge Capital Program Meshanticut Brook Culvert 4 NB, I-295 NB at Meshanticut Brook
6061 2018 Bridge Group 092017
Bridge Capital Program Phenix Ave WB Bridge over I-295 SB6062 2018 Bridge Group 092017
Bridge Capital Program Plainfield Pike NB, I-295 NB at Rt 14 Plainfield Pike
6063 2018 Bridge Group 34TNA
Bridge Capital Program Cranston Street at RI 376064 2020 Bridge Group 51BNA
Bridge Capital Program Glenhills Drive Bridge at RI 37 EB & WB6065 2020 Bridge Group 51BNA
Bridge Capital Program Mashapaug Bridge, RI 2 Reservoir Ave at RI 10 Huntington Express
6066 2018 Bridge Group 122017
Bridge Capital Program Meshanticut Bridge, RI 2 Mesh Int at RI 5 Oaklawn Ave
6067 2018 Bridge Group 122017
Bridge Capital Program Meshanticut Viaduct, RI 2 Mesh Int at RI 5 Oaklawn Ave & Lane C
6068 2018 Bridge Group 122017
Bridge Capital Program Moons Cut Bridge, RI 33 Providence St at Meshanticut Brook
6069 2018 Bridge Group 122017
Bridge Capital Program Moons Cut RR Bridge, RI 33 Providence St at Washington Secondary Bike Path
6070 NA None Indicated2017
Bridge Capital Program New London Ave, Lane H, Mesh Interchange Lane A
6071 2018 Bridge Group 122017
FFY 18-27 STIP Project Funding Status Report - Post SolicitationCranston
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Reservoir Ave Bridge, RI 2 New London Ave at Mesh Interchange Lane B
6072 2018 Bridge Group 122017
Bridge Capital Program Warwick Ave Bridge at Pawtuxet River6073 2018 Bridge Group 122017
Bridge Capital Program Arrow Lakes Bridge, RI 12 Scituate Ave at brook
6074 2022 Bridge Group 222022
Bridge Capital Program Canam Bridge, RI 12 Scituate Ave at Meshanticut Brook
6075 2022 Bridge Group 222022
Bridge Capital Program Cranston Street Viaduct RU 10 Huntington Exp at Cranston St, SR-3, Amtrak
6076 2022 Bridge Group 222022
Bridge Capital Program Elm Lake Brook Bridge, RI 12 Park Ave at Elm Lake Brook
6077 2022 Bridge Group 222022
Bridge Capital Program Elmwood Ave Bridge at Pawtuxet River6078 2022 Bridge Group 222022
Bridge Capital Program Furnace Hill Brook Bridge, Natick Ave at Furnace Hill Brook
6079 2022 Bridge Group 222022
Bridge Capital Program Gansett Ave Bridge at Washington Secondary Bike Path
6080 2022 Bridge Group 222022
Bridge Capital Program Garden City Drive Bridge at Pocasset River
6081 2022 Bridge Group 222022
Bridge Capital Program Haven Street Bridge at Pocasset River6082 2022 Bridge Group 222022
Bridge Capital Program Knight Bridge, Pippin Orchard Rd at Furnace Hill Brook
6083 2022 Bridge Group 222022
Bridge Capital Program Locust Brook Bridge, RI 14 Plainfield Pike at Locust Brook
6084 2022 Bridge Group 222022
Bridge Capital Program Louis Bridge, Pippin Orchard Road at Furnace Hill Brook
6085 2022 Bridge Group 222022
Bridge Capital Program Meshanticut Brook Culvert 6, Ramps E-S, E-N, S-E at Meshanticut Brook
6086 2020 Bridge Group 51BNA
Bridge Capital Program Park Ave East, RI 10 North, Ramp Lane6087 2022 Bridge Group 222022
Bridge Capital Program Pawtuxet Bridge, US 1A Broad St at Pawtuxet River
6088 2022 Bridge Group 222022
FFY 18-27 STIP Project Funding Status Report - Post SolicitationCranston
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Phenix Ave Bridge at Furnace Hill Brook6089 2022 Bridge Group 222022
Bridge Capital Program Pontiac Ave Bridge at Pocasset River6090 2022 Bridge Group 222022
Bridge Capital Program Pontiac Ave Bridge at RI 10 Huntigton Expressway
6091 2022 Bridge Group 222022
Bridge Capital Program Pontiac Ave RR Bridge6092 2022 Bridge Group 222022
Bridge Capital Program Skeleton Valley Ped UP, RI 12 Scituate Ave Pedestrian Underpass
6093 2022 Bridge Group 222022
Bridge Capital Program Huntington North Bridge, RI 10 BC at I-95 NB & SB
6094 2019 Bridge Group 322019
Bridge Capital Program Huntington South Bridge, RI 10 DB at I-95 NB & SB
6095 2019 Bridge Group 322019
Bridge Capital Program Wellington Ave Bridge, I-95 NB & SB at Wellington Ave
6096 2019 Bridge Group 322019
Bridge Capital Program Aqueduct NB, I-295 NB at water supply aqueduct
6097 2018 Bridge Group 34TNA
Bridge Capital Program Lawton Bridge, RI 12 Scituate Ave at I-295 NB
6098 2021 Bridge Group 342021
Bridge Capital Program Phenix Ave EB, RI 51 Phenix Ave at I-295 NB
6099 2021 Bridge Group 342021
Bridge Capital Program Budlong Bridge, Dyer Avenue at Pocasset River
6273 2025 Bridge Group 412025
Bridge Capital Program Dean St RR Bridge at Washington Secondary Bike Path
6274 2025 Bridge Group 412025
Bridge Capital Program Furnace Hill Road Bridge at Furnace Hill Brook
6275 2025 Bridge Group 412025
Bridge Capital Program Hillside Farms Bridge, Kimberly Lane at Furnace Hill Brook
6276 2025 Bridge Group 412025
Bridge Capital Program Oaklawn Ave RR at Washington Secondary Bike Path
6277 2025 Bridge Group 412025
Bridge Capital Program Park Ave Bridge at Pocasset River6278 2025 Bridge Group 412025
FFY 18-27 STIP Project Funding Status Report - Post SolicitationCranston
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Seven Mile Road Bridge, Main St at Clark Brook
6279 2025 Bridge Group 412025
Bridge Capital Program Thornton Bridge, RI 14 Plainfield St at Pocasset River
6280 2025 Bridge Group 412025
Bridge Capital Program Cranston Park East Bridge, RI 37 EB & WB over I-295 NB
6281 2020 Bridge Group 51BNA
Bridge Capital Program Cranston Park RR, RI 37 EB & WB at Washington Secondary Bike Path
6282 2020 Bridge Group 51BNA
Bridge Capital Program Cranston Park West, RI 37 EB & WB at I-295 SB
6283 2020 Bridge Group 51BNA
Bridge Capital Program Cranston Street, RI 37 EB & WB at Cranston St
6284 2020 Bridge Group 51BNA
Bridge Capital Program Howard Bridge, RI 37 EB & WB at Power Road
6285 2020 Bridge Group 51BNA
Bridge Capital Program New London Ave Bridge, RI 37 EB & WB at New London Ave
6286 2020 Bridge Group 51BNA
Bridge Capital Program Oaklawn Ave Bridge, RI 37 EB & WB at Oaklawn Ave
6287 2020 Bridge Group 51BNA
Bridge Capital Program Pawtuxet River South, RI 37 EB at Pawtuxet River
6288 2018 Bridge Group 51ANA
Bridge Capital Program Pontiac Ave Bridge, RI 37 EB & WB at Pontiac Ave
6289 2018 Bridge Group 51ANA
Bridge Capital Program Park Ave RR Bridge6292 2018 Bridge Group 59A2017
Bridge Capital Program Pawtuxet River North Bridge at RI 37WB and Pawtuxet River
6710 2018 Bridge Group 51ANA
Bridge Capital Program Plainfield Pike SB, I-295 SB at Rt 14 Plainfield Pike
6744 2018 Bridge Group 34TNA
Bridge Capital Program Pontiac Branch RR6768 2018 Bridge Group 51ANA
Bridge Capital Program Pontiac Ave RI 37 Culvert No.1264016770 2018 Bridge Group 51ANA
Pavement Capital Program I-95 (Route 10 to I-195)9521 I-95 from Route 10 to I-195 2027 Non-BridgeNA
FFY 18-27 STIP Project Funding Status Report - Post SolicitationCranston
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program I-95 NB (160' south of Jefferson Blvd to 320' north of Laurens St overpass)
9522 I-95 NB (160' south of Jefferson Blvd to 320' north of Laurens St overpass)
2026 Non-BridgeNA
Pavement Capital Program I-95 SB (140' south of Service Ave to 90' North of Milford St overpass)
9523 I-95 SB (140' south of Service Ave to 90' North of Milford St overpass)
2027 Non-BridgeNA
Pavement Capital Program Rt 1/Elmwood Ave (Providence T/L to Warwick T/L)
9530 Rt 1/Elmwood Ave from Providence Townline to Warwick Townline
2027 Non-BridgeNA
Pavement Capital Program Rt 2 Reservoir Ave (Park Ave to Rt 10)9544 Rt 2 Reservoir Ave from Park Ave to Rt 10
2026 Non-BridgeNA
Pavement Capital Program Rt 5, Atwood Ave (Cranston St to Rt 12/Phenix Ave)
9550 Rt 5, Atwood Ave from Cranston St to Rt 12/Phenix Ave
2026 Non-BridgeNA
Pavement Capital Program Rt. 5, Atwood Avenue (Rt 12/Phenix Ave to Rt 14/Plainfield Pike)
9560 Rt. 5, Atwood Avenue from Rt 12/Phenix Ave to Rt 14/Plainfield Pike
2026 Non-BridgeNA
Pavement Capital Program Rt. 5/Oaklawn Avenue (Rt 2/New London Ave to Cranston St)
9561 Rt. 5/Oaklawn Avenue from Rt 2/New London Ave to Cranston St
2026 Non-BridgeNA
Pavement Capital Program Warwick Ave (Park Ave to Broad Street)9564 Warwick Ave from Park Ave to Broad Street
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationCumberland
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program I-295 (RT 146 to Massachusetts S/L)1276 RT 146 to Massachusetts S/L 2027 Non-Bridge2024
Pavement Capital Program Rt 114, Broad St (Cumberland T/L to Exchange St)
1307 Cumberland T/L to Exchange St NA Non-Bridge2022
Pavement Capital Program Rt 114, Broad St (Mendon Rd to Central Falls C/L)
1317 Mendon Rd to Central Falls C/L NA Non-Bridge2023
Pavement Capital Program Rt 122, Mendon Rd (I-295 to Ann & Hope Way)
1318 I-295 to Ann & Hope Way 2023 Non-Bridge2022
Pavement Capital Program Sneech Pond Rd (Rt 120 to end)1319 Rt 120 to end 2022 Non-Bridge2022
Pavement Capital Program Rt 114, Diamond Hill Rd (I-295 to Rt 120)1321 I-295 to Rt 120 2023 Non-Bridge2023
Pavement Capital Program Rt 116, Angell Rd (Rt 122 to Rt 114)1322 Rt 122 to Rt 114 2023 Non-Bridge2023
Pavement Capital Program Rt 122, Mendon Rd and Cumberland Hill Rd (Eaton St to Hamlet Ave)
1424 Eaton St to Hamlet Ave 2018 Non-Bridge2018
Traffic Safety Capital Program
Intersection Safety Improvements to Route 114 between Bear Hill and I-295 Cumberland - Signal Upgrades
1514 2018 Non-Bridge2017
Traffic Safety Capital Program
Intersection Safety Improvements to Route 146/Route 123, Hartford Avenue
1542 NA Non-Bridge2021
Transportation Alternatives Blackstone River Bikeway - Segment 3B-1
5012 Pierce park, Central Falls to Heritage Park, Cumberland
2018 Non-BridgeNA
Traffic Safety Capital Program
Railroad At-Grade Crossing - Martin Street
5034 PW RR Mile Post 8.73 2018 Non-Bridge2018
Traffic Safety Capital Program
Railroad At-Grade Crossing - Mendon Rd5035 PW RR Mile Post 7.21 2019 Non-Bridge2019
Traffic Safety Capital Program
Railroad At-Grade Crossing - Raico Way5036 PW RR Mile Post .23 2022 Non-Bridge2022
Bridge Capital Program Manville Trench, Manville Rd at Manvill Mill Trench
6100 2023 Bridge Group 242023
Bridge Capital Program P & W RR Bridge at Chruch St6101 2023 Bridge Group 242023
Bridge Capital Program Reservoir Road Bridge at Diamond Hill Reservoir
6102 2023 Bridge Group 242023
Bridge Capital Program Silva Brook Bridge, RI 114 at Silva Brook6103 2023 Bridge Group 242023
FFY 18-27 STIP Project Funding Status Report - Post SolicitationCumberland
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Sneech Brook Bridge, Albion Rd at Sneech Brook
6104 2023 Bridge Group 242023
Bridge Capital Program Leigh Road NB, I-295 NB at Leigh Rd6105 2018 Bridge Group 37T (I)2017
Bridge Capital Program Leigh Road SB, I-295 SB6106 2018 Bridge Group 37T (I)2017
Bridge Capital Program Mendon Road Bridge, I-295 NB & SB at Mendon Rd
6107 2020 Bridge Group 372020
Bridge Capital Program Scott Road NB, I-295 NB at Scott Rd6108 2018 Bridge Group 37T (I)2017
Bridge Capital Program Scott Road SB, I-295 SB at Scott Rd6109 2018 Bridge Group 37T (I)2017
Bridge Capital Program Arnold Mills Bridge, Sneech Pond Rd at Abbott Run River
6111 2023 Bridge Group 482023
Bridge Capital Program Howard Road Bridge at Abbott Run River
6112 2023 Bridge Group 482023
Bridge Capital Program Manville Bridge, Manville Hill Rd at Blackstone River, P & W, BP
6113 2018 Bridge Group 622017
Bridge Capital Program Abbott Run Culvert, I-295 NB & SB at Abbott Run River
6296 2022 Bridge Group 082022
Bridge Capital Program Abbott Run Valley Rd NB, I-295 NB at Abbot Run Valley Rd
6297 2022 Bridge Group 082022
Bridge Capital Program Abbott Run Valley Rd SB, I-295 SB at Abbot Valley Rd
6298 2022 Bridge Group 082022
Bridge Capital Program Second Ave NB, RI 99 NB at Second Ave6299 2020 Bridge Group 142020
Bridge Capital Program Second Ave SB, RI 99 SB at Second Ave6300 2020 Bridge Group 142020
Bridge Capital Program Broad Street RR Bridge, Rt 114 Broad St at P & W RR
6301 2018 Bridge Group 172018
Bridge Capital Program Cumberland Mills Bridge, RI 123 Dexter St over Abbott Run River
6302 2018 Bridge Group 172018
Bridge Capital Program Diamond Hill Road Bridge, Rt 114 Diamond Hill Rd at I-295 NB & SB
6303 2018 Bridge Group 172018
Bridge Capital Program John Street Bridge at Blackstone River6304 2018 Bridge Group 172018
FFY 18-27 STIP Project Funding Status Report - Post SolicitationCumberland
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Lonsdale Arch, RI 122 Mendon Rd at Rusty Brook
6305 2018 Bridge Group 172018
Bridge Capital Program Newell Bridge, RI 114 Diamond Hill Rd at E Branch Sneech Brook
6306 2018 Bridge Group 172018
Bridge Capital Program Albion Bridge, School St at Blackstone River
6307 2023 Bridge Group 242023
Bridge Capital Program Ashton Viaduct, RI 116 George Washington Hwy, Blackstone River, P & W RR
6308 2023 Bridge Group 242023
Bridge Capital Program Catamint Bridge, RI 120 North Whipple Hwy at Ash Swamp Brook
6309 2023 Bridge Group 242023
Bridge Capital Program Grant Bridge, RI 121 Wrentham Rd at Silvia Brook
6310 2023 Bridge Group 242023
Bridge Capital Program Mackenzie Bridge, RI 120 N Whipple Hwy at Abbott Run River
6311 2023 Bridge Group 242023
Pavement Capital Program Broad Street Regeneration Project9007 Broad Street (Rt. 114) (Mendon Rd, Cumberland to Exchange St, Pawtucket)
2018 Non-Bridge2018
Pavement Capital Program Rt 122/Mendon Rd (Rt 120/Nate Whipple Highway to Homestead Rd)
9539 Rt 122/Mendon Rd from Rt 120/Nate Whipple Highway to Homestead Rd
2026 Non-BridgeNA
Pavement Capital Program Rt 123/Dexter St (Broad St to Massachusetts S/L)
9540 Rt 123/Dexter St from Broad St to Massachusetts Stateline
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationEast Greenwich
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Rt 4 (Lafeyett Rd to Rt 403)1283 Lafeyett Rd to Rt 403 2024 Non-Bridge2024
Pavement Capital Program Rt 4 (Rt 403 to I-95)1284 Rt 403 to I-95 NA Non-Bridge2017
Traffic Safety Capital Program
Arterial Traffic Signal Improvements to Route 1 and Route 3
1536 2021 Non-Bridge2021
Pavement Capital Program Main Street (Rt.1) Resurfacing & Sidewalk Rehabilitation
5038 Division St. to First Ave NA Non-Bridge2017
Bridge Capital Program Shippeetown Road Bridge, I-95 NB & SB at Shippeetown Road
6114 2018 Bridge Group 052017
Bridge Capital Program Great River Bridge, RI 2 Quaker Lane at Great River
6115 2018 Bridge Group 122017
Bridge Capital Program Bleachery Bridge, US 1 Post Rd at Bleachery Brook
6116 2019 Bridge Group 18B2019
Bridge Capital Program Charles Eldredge Bridge, Cedar Ave at Middle Road Brook
6117 2019 Bridge Group 18B2019
Bridge Capital Program Davis Bridge, Davisville Rd at Hunt River6118 2019 Bridge Group 182019
Bridge Capital Program Division Street Bridge at Maskerchuff River
6119 2019 Bridge Group 18B2019
Bridge Capital Program Frenchtown Brook Culvert, RI 4 NB & SB at Frenchtown Brook
6120 2019 Bridge Group 182019
Bridge Capital Program Frenchtown Rd 2 Bridge at Frenchtown Brook
6121 2019 Bridge Group 18B2019
Bridge Capital Program Frenchtown Road West, RI 402 Frenchtown Rd at Ramp 4E to RI 402, RI 4
6122 2019 Bridge Group 18B2019
Bridge Capital Program Kenyon Ave Bridge at Maskerchugg River
6123 2019 Bridge Group 18B2019
Bridge Capital Program Rocky Hollow Rd Bridge at Amtrak6124 2019 Bridge Group 182019
Bridge Capital Program South Road Bridge, South Road at RI 46125 2019 Bridge Group 182019
Bridge Capital Program South Road River Bridge at Hunt River6126 2019 Bridge Group 182019
Bridge Capital Program Tillinghast Rd 2 Bridge at Frenchtown Brook
6127 2019 Bridge Group 182019
FFY 18-27 STIP Project Funding Status Report - Post SolicitationEast Greenwich
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Sylvan Drive Arch at Maskerchugg River6128 2027 Bridge Group 46NA
Bridge Capital Program Division Bridge, RI 401 Division St at RI 46129 2018 Bridge Group 58ANA
Pavement Capital Program Rt 2, Quaker Lane (Division St. to Barton Corner Bridge Project Limit)
9510 Rt 2, Quaker Lane from Division St. to Barton Corner Bridge Project Limit
2018 Non-BridgeNA
Pavement Capital Program I-95 SB (140' south of Service Ave to 90' North of Milford St overpass)
9523 I-95 SB (140' south of Service Ave to 90' North of Milford St overpass)
2027 Non-BridgeNA
Pavement Capital Program Rt. 2, South County Trail (Frenchtown Road to Route 4)
9558 Rt. 2, South County Trail from Frenchtown Road to Route 4
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationEast Providence
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program I-195 (Washington Bridge to Broadway)1272 Washington Bridge to Broadway 2021 Non-Bridge2022
Pavement Capital Program Rt 114, Wampanoag Trail (East Shore Expressway to Federal Rd)
1290 East Shore Expressway to Federal Rd 2022 Non-Bridge2019
Pavement Capital Program East Shore Exp (Rt 114 to US-6)1295 Rt 114 to US-6 2022 Non-Bridge2021
Pavement Capital Program Rt 103, Willet Ave (Bullocks Point Ave to Wamponoag Ave)
1298 Bullocks Point Ave to Wamponoag Ave 2024 Non-Bridge2023
Pavement Capital Program US- 44, Taunton Ave (Rt 1A/114 to Mass.)
1323 Rt 1A/114 to Mass. 2018 Non-Bridge2018
Pavement Capital Program Rt 103, Veterans Memorial Prky (Warren Ave to South Broadway)
1324 Warren Ave to South Broadway 2023 Non-Bridge2023
Pavement Capital Program Rt 114, Pawtucket Ave (Taunton Ave to Warren Ave)
1325 Taunton Ave to Warren Ave 2019 Non-Bridge2019
Pavement Capital Program Rt 103, Bullocks Ave and Pawtucket Ave (Cresent View Ave to Veterans Mem. Ave)
1326 Cresent View Ave to Veterans Mem. Ave
2023 Non-Bridge2023
Pavement Capital Program Rt 1A, Newport Ave (Federal St to Pawucket Ave)
1375 Federal St to Pawucket Ave 2023 Non-Bridge2022
Traffic Safety Capital Program
Intersection Safety Improvements to Waterman and Pawtucket Avenue - Left Turn Lanes
1522 NA Non-Bridge2019
Traffic Safety Capital Program
Intersection Safety Improvements to Warren Avenue, Pawtucket Avenue, and Ferry Road
1541 2022 Non-Bridge2021
Transportation Alternatives Safe Routes to School Infrastructure Improvements for Kent Heights Elementary School
5039 Wannamoisett Rd, Howland Ave, Pawtucket Ave, Dover Ave, Highland Ave, Allerton Ave, Greenwich Ave
2018 Non-Bridge2017
Transportation Alternatives Safe Routes to School Infrastructure Improvements for Myron Francis Elementary School
5040 Horsford Ave, Holmes Ave, Wilson Ave 2018 Non-Bridge2017
Transportation Alternatives Ten Mile River Greenway, Segment 1-45045 2025 Non-Bridge2025
Bridge Capital Program Barrington Parkway, Veteran’s Memorial Parkway at Watchemoket
6130 2018 Bridge Group 152017
FFY 18-27 STIP Project Funding Status Report - Post SolicitationEast Providence
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program E Bay Bicycle Facility at Bullocks Point RR Bridge
6131 2018 Bridge Group 152017
Bridge Capital Program Greenwood Ave RR Bridge6132 2018 Bridge Group 152017
Bridge Capital Program Luther's Corner Bridge, US 6 Highland Ave at Runnins River
6133 2018 Bridge Group 152017
Bridge Capital Program Massasoit Ave Ramp North at Seekonk River Crossing
6134 2018 Bridge Group 152017
Bridge Capital Program Massasoit Ave Ramp South at Seekonk River Crossing
6135 2018 Bridge Group 152017
Bridge Capital Program North Broadway Ramp, Seekonk River Crossing
6136 2018 Bridge Group 152017
Bridge Capital Program Peck’s Bridge, RI 103 Willett Ave at Annawomscutt Brook
6137 2018 Bridge Group 152017
Bridge Capital Program River Road Bridge at Runnins River6138 2018 Bridge Group 152017
Bridge Capital Program Roger Williams Ave Bridge at Ten Mile River
6139 2018 Bridge Group 152017
Bridge Capital Program Rumford RR Bridge, US 1A at RI 114 Pawtucket Ave, P & W RR
6140 2018 Bridge Group 152017
Bridge Capital Program Runnins River, Warren Ave at Runnins River
6141 2018 Bridge Group 152017
Bridge Capital Program Six Corners Underpass, US 44 Taunton Ave & Waterman Ave at Broadway & N Broadway
6142 2018 Bridge Group 152017
Bridge Capital Program Standard Oil Co, RI 103 Pawtucket Ave at Mobil Pipeline Co ROW
6143 2018 Bridge Group 152017
Bridge Capital Program Washington Bridge South, I-195 EB at Seekonk River
6144 2018 Bridge Group 152017
Bridge Capital Program Waterman Ave Spur RR Bridge at P & W RR ROW
6145 2018 Bridge Group 152017
Bridge Capital Program RI 114 East Shore Expressway at Wampanoag Expressway
6146 2021 Bridge Group 442021
FFY 18-27 STIP Project Funding Status Report - Post SolicitationEast Providence
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Runnins River Slab, RI 114A Mink St over Runnins River
6147 2021 Bridge Group 442021
Bridge Capital Program Horton Farm, RI 114 Lane F at I-195 EB & WB
6148 2018 Bridge Group 57M2017
Bridge Capital Program Newman Ave Bridge, RI 152 Newman Ave at Ten Mile River
6149 2018 Bridge Group 57D2017
Bridge Capital Program Washington Bridge North, I-195 WB at Seekonk River
6151 2018 Bridge Group 57T (J)2017
Bridge Capital Program Lyon Ave Bridge, Lyon Ave at I-195 EB & WB
6152 2018 Bridge Group 772018
Bridge Capital Program Parkway Ramp, US 6 Warren Ave Ramp, I-195 EB & WB
6153 2018 Bridge Group 772018
Bridge Capital Program Potter Street, I-195 EB & WB at Potter Street
6154 2018 Bridge Group 772018
Bridge Capital Program Purchase Street Bridge, I-195 EB & WB at Purchase Street
6155 2018 Bridge Group 772018
Bridge Capital Program Red Bridge, Seekonk River Crossing at Seekonk River & City Streets
6737 2025 Bridge Group 492025
Bridge Capital Program Hunts Mills6780 2018 Bridge Group 69ENA
Maintenance Capital Program
Salt Brine Facilities7907 2022 Non-Bridge2022
Pavement Capital Program Rt 6/Highland Ave (County St to MA S/L)9507 Rt 6/Highland Ave from County St to MA Stateline
2023 Non-BridgeNA
Pavement Capital Program I-195 (Broadway to Massachusetts S/L)9518 I-195 from Broadway to Massachusetts Stateline
2027 Non-BridgeNA
Pavement Capital Program Pawtucket Ave (Veteran's Memorial Parkway to Waterman Ave)
9525 Pawtucket Ave from Veteran's Memorial Parkway to Waterman Ave
2026 Non-BridgeNA
Pavement Capital Program Rt 103/Warren Ave (Pawtucket Ave to Broadway)
9532 Rt 103/Warren Ave from Pawtucket Ave to Broadway
2026 Non-BridgeNA
Pavement Capital Program Rt 114A/Pleasant St (Rt 114/Pawtucket Ave to Mass S/L)
9533 Rt 114A/Pleasant St from Rt 114/Pawtucket Ave to Mass Stateline
2026 Non-BridgeNA
FFY 18-27 STIP Project Funding Status Report - Post SolicitationEast Providence
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Rt 44, Taunton Ave (Pawtucket Ave to Hall St)
9546 Rt 44, Taunton Ave from Pawtucket Ave to Hall St
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18‐27 STIP Project Funding Status Report ‐ Post SolicitationExeter
STIP Program Category Project Name STIP ID Project Limits Bridge Group DRAFT FFY 18‐27
STIP
Current FFY 17‐25
STIP
Pavement Capital Program Rt 2 ‐ South County Trail (Rt 138 to Rt 102)
1576 Rt 138 to Rt 102 2024 Non‐Bridge2024
Bridge Capital Program Austin Farm Road Bridge at I‐95 NB & SB6156 2018 Bridge Group 052017
Bridge Capital Program Browning Mill Culvert, Arcadia Rd at Mill Canal
6157 2022 Bridge Group 252022
Bridge Capital Program Escoheag Hill Rd Bridge at Parris Brook6158 2022 Bridge Group 252022
Bridge Capital Program Falls River Bridge, Plains Rd at Falls River6159 2022 Bridge Group 252022
Bridge Capital Program Lawton Mill Bridge, RI 102 Ten Rod Rd at Queens River
6160 2022 Bridge Group 252022
Bridge Capital Program Liberty Church Rd Bridge at Sodom Brook
6161 2022 Bridge Group 252022
Bridge Capital Program Mill Access Rd Culvert at Chipuxet River6162 2022 Bridge Group 25B2022
Bridge Capital Program White Pine Bridge, Blitzkreig Trail at Woody Hill Brook
6163 2022 Bridge Group 252022
Bridge Capital Program Yawgoo Pond, Bridge Rd at Yawgoo Mill Pond and Amtrak
6164 2022 Bridge Group 25B2022
Bridge Capital Program Breakheart Brook Bridge, Breakheart Trail at Breakheart Brook
6167 2026 Bridge Group 45NA
Bridge Capital Program Brown Brook Bridge, RI 102 Victory Hwy at Queens Fort Brook
6168 2026 Bridge Group 45NA
Bridge Capital Program Frosty Hollow Road Bridge at Breakheart Brook
6169 2018 Bridge Group 38B2017
Bridge Capital Program Midway Bridge, Barber Trali at Falls River
6170 2018 Bridge Group 38B2017
Bridge Capital Program Browning Mill, Arcadia Rd at Roaring Brook
6171 2018 Bridge Group 57JNA
Bridge Capital Program Teft Hill Trail NB Bridge, I‐95 NB at Teft Hill Trail
6713 2018 Bridge Group 67T2017
FFY 18‐27 STIP Project Funding Status Report ‐ Post SolicitationExeter
STIP Program Category Project Name STIP ID Project Limits Bridge Group DRAFT FFY 18‐27
STIP
Current FFY 17‐25
STIP
Bridge Capital Program Teft Hill Trail SB Bridge, I‐95 SB at Teft Hill Trail
6714 2018 Bridge Group 67T2017
Where shown: NA = Not Applicable (project is not in Current 17‐25 STIP or not funded in DRAFT FFY 18‐27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17‐25 STIP column and the earliest funded year listed as 2018 in the Draft 18‐27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
‐
‐
‐
FFY 18-27 STIP Project Funding Status Report - Post SolicitationFoster
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program US-6 - Danielson Pike (Connecticut S/L to Rt 102)
1579 Connecticut S/L to Rt 102 2022 Non-Bridge2023
Bridge Capital Program Dolly Cole Brook Bridge at US 6 Danielson Pk
6172 2018 Bridge Group 16B2018
Bridge Capital Program Paine Brook Bridge, US 6 Danielson Pk at Paine Brook
6173 2018 Bridge Group 162018
Bridge Capital Program Barden Reservoir Bridge, Central Pike at Barden Reservoir
6175 2022 Bridge Group 262022
Bridge Capital Program Beaver Dam Bridge, RI 101 Hartford Pk at Ponagansett River
6176 2022 Bridge Group 262022
Bridge Capital Program Bush Meadow Brook Bridge, RI 101 Hartford Pk at Bush Meadow Brook
6177 2022 Bridge Group 262022
Bridge Capital Program Clayville Brook Bridge, Old Plainfield Pk at Clayville Brook
6178 2022 Bridge Group 262022
Bridge Capital Program Cranberry Brook Bridge, Old Plainfield Pk at Cranberry Brook
6179 2022 Bridge Group 262022
Bridge Capital Program Dolly Cole Brook Bridge, Old Danielson Pike at Dolly Cole Brook
6180 2022 Bridge Group 262022
Bridge Capital Program Ford Pond Bridge, RI 94 Mt Hygeia Rd at Paine Brook
6181 2022 Bridge Group 262022
Bridge Capital Program Hemlock Brook Bridge, Central Pike at Hemlock Brook
6182 2022 Bridge Group 262022
Bridge Capital Program Mill Road Bridge at Hemlock Brook6183 2022 Bridge Group 262022
Bridge Capital Program Moosup Valley Rd Bridge at Moosup River
6184 2022 Bridge Group 262022
Bridge Capital Program Morning Star Bridge, RI 101 Hartford Pk at Hannah Brook
6185 2022 Bridge Group 262022
Bridge Capital Program Mount Vernon Bridge, RI 14 Plainfield Pk at Turkey Meadow Brook
6186 2022 Bridge Group 262022
Bridge Capital Program North Road Bridge at Hemlock Brook6187 2022 Bridge Group 262022
Bridge Capital Program Rams Tail Road Rd Bridge at Pongansett Brook
6188 2022 Bridge Group 262022
FFY 18-27 STIP Project Funding Status Report - Post SolicitationFoster
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Shippee Brook Bridge, RI 94 Mt Hygeia Rd at Shippee Brook
6189 2022 Bridge Group 262022
Bridge Capital Program Winsor Rd Bridge at Ponagansett River6190 2022 Bridge Group 262022
Bridge Capital Program Central Pike Bridge at Hemlock Brook6191 2025 Bridge Group 432025
Bridge Capital Program Hemlock Road Bridge at Barden Reservoir
6192 2025 Bridge Group 432025
Bridge Capital Program Killy Brook Bridge, RI 101 Hartford Pk at Killy Brook
6193 2025 Bridge Group 432025
Bridge Capital Program Winsor Road Bridge at Winsor Brook6194 2025 Bridge Group 432025
Bridge Capital Program Ponagansett River Bridge, US 6 Danielson Pk at Ponagansett River
6715 2018 Bridge Group 162018
Bridge Capital Program Spears6779 2018 Bridge Group 69DNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationGlocester
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Reservoir Rd (South Main St to US-44)1304 South Main St to US-44 2023 Non-Bridge2024
Pavement Capital Program US-44, Putnam Pike (RIDOT Maintenance to West Greenville Rd)
1328 RIDOT Maintenance to West Greenville Rd
2018 Non-Bridge2017
Pavement Capital Program Rt 94, Reynolds Rd (Foster T/L to US-44)1329 Foster T/L to US-44 2022 Non-Bridge2019
Pavement Capital Program US 44 and Rt 100 Intersection1330 NA Non-Bridge2017
Bridge Capital Program Brandy Brook Bridge, US 44 Putnam Pike at Brandy Brook
6195 2018 Bridge Group 162018
Bridge Capital Program Chepachet Flume Bridge, US 44 Putnam Pike at Mill Canal
6196 2018 Bridge Group 162018
Bridge Capital Program Chepachet River Bridge, US 44 Putnam Pike at Chepachet River
6197 2018 Bridge Group 162018
Bridge Capital Program US 44 Putnam Pike Pedestrian Underpass
6198 2018 Bridge Group 162018
Bridge Capital Program Cherry Valley Pond Overflow Bridge, Chopmist Hill Rd at Cherry Valley Pond
6199 2022 Bridge Group 262022
Bridge Capital Program Coleman Reservoir Bridge, US 44 Snake Hill Rd at Pepptoad Brook
6200 2022 Bridge Group 262022
Bridge Capital Program Cornell Stand Bridge, Old Harford Pk at Killy Brook
6201 2022 Bridge Group 262022
Bridge Capital Program Jackson School House Rd Bridge at Echo Lake Pascoag Reservoir
6202 2022 Bridge Group 262022
Bridge Capital Program Sandy Brook Road Bridge at Peeptoad Brook
6203 2022 Bridge Group 262022
Bridge Capital Program Saw Mill Hill Rd Bridge at Cutler Brook6204 2022 Bridge Group 262022
Bridge Capital Program Sucker Brook - Harris, RI 98 Harrisville Rd at Sucker Brook
6205 2022 Bridge Group 262022
Bridge Capital Program Sucker Brook - Oakland, RI 102 Victory Hwy at Sucker Brook
6206 2022 Bridge Group 262022
Pavement Capital Program Rt 44/Putnam Pike (Rt 102/Chomist Hill Rd to Reservoir Rd)
9547 Rt 44/Putnam Pike from Rt 102/Chomist Hill Rd to Reservoir Rd
2026 Non-BridgeNA
FFY 18-27 STIP Project Funding Status Report - Post SolicitationGlocester
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Rt 44/Putnam Pke (Sprauge Hill Rd to Connecticut S/L)
9549 Rt 44/Putnam Pke from Sprauge Hill Rd to Connecticut Stateline
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationHopkinton
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Statewide Resurfacing 20171316 Mechanic St (Nichols Ln to Rt 3), Woodville-Alton Rd (Rt 3 to Townsend Rd), Rt 2 Bald Hill Rd (West Natick to WB Mason U-turn), Rt 5/104 Greenville Rd (Rt 7 to Rt 5), Middle Rd (Union St to Schoolhouse Ln)
NA Non-Bridge2017
Pavement Capital Program Rt 3, Main St (Rt 216 to I-95)1331 Rt 216 to I-95 2022 Non-Bridge2022
Pavement Capital Program Clarks Falls Rd (Connecticut S/L to Main St)
1332 Connecticut S/L to Main St 2020 Non-Bridge2024
Pavement Capital Program Wellstown Rd (Rt 3 to Rt 216)1333 Rt 3 to Rt 216 2022 Non-Bridge2024
Pavement Capital Program Resurfacing Laurel and Maxon Streets1334 Maxson St (Laurel St to Rt 3) and Laurel St (Potter Hill Rd to Rt 216
2020 Non-Bridge2020
Pavement Capital Program Woodville Rd (Rt 3 to Switch Rd)1335 Rt 3 to Switch Rd 2018 Non-Bridge2017
Transportation Alternatives Main Street Handicap Access Sidewalk5058 Highview Avenue to Spring Street (Rt 138)
2026 Non-BridgeNA
Bridge Capital Program Canonchet Brook Bridge, RI 3 Nooseneck Hill Rd at Canochet Brook
6207 2018 Bridge Group 122017
Bridge Capital Program Meeting House Bridge, RI 3 Main St at Pawcatuck River
6208 2018 Bridge Group 122017
Bridge Capital Program Main Street RT 3 Bridge at No Named Brook
6209 2026 Bridge Group 45NA
Bridge Capital Program New London Turnpike Bridge at Green Falls River
6210 2026 Bridge Group 45NA
Bridge Capital Program Potter Hill Culvert, Potter Hill Rd at Maxon Brook
6211 2026 Bridge Group 45NA
Bridge Capital Program Wellstown Rd Bridge at Ashaway River6212 2026 Bridge Group 45NA
Bridge Capital Program Holburton Bridge at RI 91 Altn Brad Rd6213 2018 Bridge Group 58DNA
Bridge Capital Program Wood River at RI 91 Church St6214 2018 Bridge Group 58DNA
Bridge Capital Program Wood River Valley Bridge, I-95 NB & SB at Wood River & Mechanic St
6716 2018 Bridge Group 07T (A)2017
Bridge Capital Program Hope Valley6776 2018 Bridge Group 69DNA
FFY 18-27 STIP Project Funding Status Report - Post SolicitationHopkinton
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program First Barberville6790 2027 Bridge Group 07NA
Bridge Capital Program Second Barberville6791 2027 Bridge Group 07NA
Bridge Capital Program Potter Hill6792 2027 Bridge Group 07NA
Bridge Capital Program Ashaway6796 2027 Bridge Group 07NA
Bridge Capital Program Bradford6799 2027 Bridge Group 07NA
Bridge Capital Program Chase Hill6804 2027 Bridge Group 07NA
Bridge Capital Program Pine Grove6805 2027 Bridge Group 07NA
Bridge Capital Program Woodville6806 2027 Bridge Group 07NA
Bridge Capital Program Woodville Canal6807 2027 Bridge Group 07NA
Bridge Capital Program Hopkinton-Westerly Rd6811 2027 Bridge Group 07NA
Bridge Capital Program Richard Farm6812 2027 Bridge Group 07NA
Bridge Capital Program Canonchet Road6815 2027 Bridge Group 07NA
Bridge Capital Program Woodville Road6816 2027 Bridge Group 07NA
Bridge Capital Program Green Fall NB6817 2027 Bridge Group 07NA
Bridge Capital Program Green Fall SB6818 2027 Bridge Group 07NA
Bridge Capital Program Woody Hill South6823 2027 Bridge Group 07NA
Bridge Capital Program Woody Hill6824 2027 Bridge Group 07NA
Pavement Capital Program I-95 (Connecticut S/L to Rt. 138)9520 I-95 from Connecticut Stateline to Rt. 138
2027 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationJamestown
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Narragansett Ave (End to Southwest Ave)
1336 End to Southwest Ave 2022 Non-Bridge2022
Transportation Alternatives Jamestown Bridge Bike/Pedestrian Access
5060 2022 Non-Bridge2022
Bridge Capital Program Conanicut Bridge, East Shore Rd at Brook
6215 2021 Bridge Group 442021
Bridge Capital Program Round Swamp Bridge, North Main Rd at Tidal Inlet
6216 2021 Bridge Group 442021
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationJohnston
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program I-295 (I-95 to Rt 5)1274 I-95 to Rt 5 2024 Non-Bridge2023
Pavement Capital Program I-295 (Rt 5 to Rt 146)1275 Rt 5 to Rt 146 2024 Non-Bridge2024
Pavement Capital Program US-6 (I-295 to Rt 10)1280 I-295 to Rt 10 2024 Non-Bridge2024
Pavement Capital Program Rt 5, Atwood Ave (Central Ave to Rt 14)1337 Central Ave to Rt 14 2022 Non-Bridge2022
Pavement Capital Program Winsor Ave (Rt 116 to Greenville Ave)1338 Rt 116 to Greenville Ave 2019 Non-Bridge2019
Pavement Capital Program Rt 6A, Hartford Ave (Rt 5 to Killingly St)1339 Rt 5 to Killingly St 2018 Non-Bridge2018
Pavement Capital Program Rt 14, Plainfield Pk (Green Hill Rd to I-295)
1340 Green Hill Rd to I-295 2023 Non-Bridge2023
Pavement Capital Program Rt 5, Greenville Ave and Sanderson Rd (Atwood Ave to US-44)
1341 Atwood Ave to US-44 2024 Non-Bridge2024
Pavement Capital Program US-6, Hartford Pike and Hartford Ave (Danielson Pk to I-295)
1393 Danielson Pk to I-295 2018 Non-Bridge2017
Traffic Safety Capital Program
Intersection Safety Improvements to I-295 NB at Route 6 Johnston and Jefferson Boulevard at Main Avenue Warwick
1451 NA Non-Bridge2017
Traffic Safety Capital Program
Intersection Safety Improvements to Route 146 corridor North Smithfield - Signal Improvements
1459 Rout 146 (Route 99 to Route 146A) 2019 Non-Bridge2017
Traffic Safety Capital Program
Intersection Safety Improvements to Route 6 – Scituate/Johnston
1509 Intersections of Route 6 with Route 101 and Route 102 and Danielson Pike with Route 102.
2018 Non-Bridge2018
Traffic Safety Capital Program
Intersection Safety Improvements to Route 146/Route 123, Hartford Avenue
1542 NA Non-Bridge2021
Bridge Capital Program Central Ave NB at I-295 NB6217 2018 Bridge Group 092017
Bridge Capital Program Central Ave SB at I-295 SB6218 2018 Bridge Group 092017
Bridge Capital Program Dry Brook Bridge at Central Ave & I-2956219 2027 Bridge Group 072017
Bridge Capital Program Greenville Ave NB at I-295 NB6220 2018 Bridge Group 35TNA
Bridge Capital Program Hartford Pike NB at I-2956221 2018 Bridge Group 09TNA
FFY 18-27 STIP Project Funding Status Report - Post SolicitationJohnston
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Hartford Pike SB at I-295 SB6222 2018 Bridge Group 09TNA
Bridge Capital Program Ramp Bridge North, I-295 NB at Ramp 6 E-N (proposed)
6223 2018 Bridge Group 09TNA
Bridge Capital Program Ramp Bridge South, I-295 SB at Ramp 6 E-N (proposed
6224 2018 Bridge Group 09TNA
Bridge Capital Program Scituate Ave NB at I-2956312 2018 Bridge Group 092017
Bridge Capital Program Scituate Ave SB at I-295 SB6313 2018 Bridge Group 092017
Bridge Capital Program Simmons Brook Bridge, I-295 NB & SB at Simmons Brook
6314 2018 Bridge Group 092017
Bridge Capital Program US 6 South Bridge at I-295 SB6315 2018 Bridge Group 09TNA
Bridge Capital Program Atwood Ave Bridge, RI 5 Atwood Ave at Simmons Brook
6316 2018 Bridge Group 16B2018
Bridge Capital Program Atwood Ave EB at US 6 EB6317 2018 Bridge Group 16B2018
Bridge Capital Program Atwood Ave WB at US-6 WB6318 2018 Bridge Group 16B2018
Bridge Capital Program Centredale Bridge, US 44 Putnam Pk at Woonasquatuck River
6319 2018 Bridge Group 16B2018
Bridge Capital Program Hartford Ave Ramp, US EB & WB6320 2018 Bridge Group 16B2018
Bridge Capital Program Hughesdale, RI 5 Atwood Ave at Dry Brook
6321 2018 Bridge Group 16B2018
Bridge Capital Program Irons Bridge, RI 128 G Wtrmn Rd at Assapumpset Brook
6322 2018 Bridge Group 16B2018
Bridge Capital Program Pocasset River Culvert at US 6 ramp AA & AB
6323 2018 Bridge Group 16B2018
Bridge Capital Program Pocasset Sluiceway, US 6A Hartford Ave at Pocasset River
6324 2018 Bridge Group 16B2018
Bridge Capital Program Samson Amy Pond Bridge, Central Ave at Pocasset River
6325 2018 Bridge Group 16B2018
Bridge Capital Program Greenville Ave SB at I-295 SB6326 2018 Bridge Group 35TNA
Bridge Capital Program Hartford Ave West Bridge at US 66327 2025 Bridge Group 432025
FFY 18-27 STIP Project Funding Status Report - Post SolicitationJohnston
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Simmonsville Bridge, Simmonsville Ave at Simmons Brook
6328 2018 Bridge Group 57C2017
Bridge Capital Program US 6 North Bridg, I-295 NB at US 66329 2018 Bridge Group 09TNA
Pavement Capital Program Greenville Ave (Providence C/L to Salina Ave)
9516 Greenville Ave from Providence C/L to Salina Ave
2027 Non-BridgeNA
Pavement Capital Program Greenville Ave (Salina Ave to Rt 5/Atwood Ave)
9517 Greenville Ave from Salina Ave to Rt 5/Atwood Ave
2026 Non-BridgeNA
Pavement Capital Program Rt 128/Killingly Street (Hartford Ave to Greenville Ave)
9542 Rt 128/Killingly Street from Hartford Ave to Greenville Ave
2026 Non-BridgeNA
Pavement Capital Program Rt 44/Putnam Pike (Rt 104/Waterman Ave to I-295 )
9548 Rt 44/Putnam Pike from Rt 104/Waterman Ave to I-295
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationLincoln
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program I-295 (Rt 5 to Rt 146)1275 Rt 5 to Rt 146 2024 Non-Bridge2024
Pavement Capital Program I-295 (RT 146 to Massachusetts S/L)1276 RT 146 to Massachusetts S/L 2027 Non-Bridge2024
Pavement Capital Program Rt 146 (I-95 to 0.6 miles south of Sherman Ave)
1291 I-95 to 0.6 miles south of Sherman Ave 2018 Non-Bridge2017
Pavement Capital Program Rt 146, Eddie Dowling Hwy (I-295 to Rt 146A)
1292 I-295 to Rt 146A 2022 Non-Bridge2022
Pavement Capital Program New River Rd (School St to Mussey Brook Rd)
1342 School St to Mussey Brook Rd 2022 Non-Bridge2022
Pavement Capital Program Railroad St (Manville Hill Rd to Rt 126)1343 Manville Hill Rd to Rt 126 2019 Non-Bridge2018
Pavement Capital Program Rt 123, Great Rd and Front St (Great Rd to Old River Rd)
1346 Great Rd to Old River Rd 2022 Non-Bridge2022
Pavement Capital Program School St (Rt 126 to Main St)1347 Rt 126 to Main St 2021 Non-Bridge2021
Pavement Capital Program Rt 126, Smithfield Ave (Pawtucket C/L to Woodland St)
1348 Pawtucket C/L to Woodland St 2021 Non-Bridge2021
Pavement Capital Program Albion Rd (Old River Rd to Eagle Rock Rd)
1349 Old River Rd to Eagle Rock Rd 2022 Non-Bridge2024
Pavement Capital Program Rt 123, Jenckes Hill Rd (Albion to Rt 246)1350 Albion to Rt 246 2024 Non-Bridge2024
Pavement Capital Program Sayles Hill Rd (Rt 146 to Rt 126)1371 Rt 146 to Rt 126 2022 Non-Bridge2022
Traffic Safety Capital Program
Safety Corridor Improvements to Route 116 Lincoln - Guardrail and Median Improvements
1485 NA Non-Bridge2020
Traffic Safety Capital Program
Route 146 Guide Sign and Sign Structure Replacement -Route 146A to Route 123 Lincoln
1512 2019 Non-Bridge2019
Traffic Safety Capital Program
Interchange Safety Improvements to Route 146/Route 116 Lincoln - Acceleration/Deceleration Lanes
1528 2021 Non-Bridge2020
Traffic Safety Capital Program
Railroad At-Grade Crossing - School St5069 PW RR Mile Post 11.3 2021 Non-Bridge2021
Bridge Capital Program Twin River Road Bridge at RI 146 Eddie Dowling Hwy
6225 2019 Bridge Group 392019
FFY 18-27 STIP Project Funding Status Report - Post SolicitationLincoln
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Barney's Pond Bridge, RI 126 Smithfield at Moshassuck River
6226 2020 Bridge Group 472020
Bridge Capital Program Cobble Hill Road Bridge at RI 146 Eddie Dowling Hwy
6227 2020 Bridge Group 472020
Bridge Capital Program Higginson Avenue Bridge at Moshassuck River
6228 2020 Bridge Group 472020
Bridge Capital Program Moshassuck River Bridge at RI 123 Breakneck Hill Rd
6229 2020 Bridge Group 472020
Bridge Capital Program Louisquisset Pike Bridge, RI 146 Eddie Dowling Hwy at RI 116 George Washington Hwy
6230 2018 Bridge Group 62T (K)2017
Bridge Capital Program Louisquisset Pike South Bridge, I-195 SB at RI 146 Eddie Dowling Hwy
6330 2022 Bridge Group 082022
Bridge Capital Program Crookfall Brook Bridge at RI 126 Old River Rd
6331 2018 Bridge Group 13B2017
Bridge Capital Program Lincoln Woods Pedestrian Underpass at RI 146 NB & SB
6332 2018 Bridge Group 13B2017
Bridge Capital Program Reservoir Bridge, RI 146 Eddie Dowling Hwy at Crookfall Brook
6333 2018 Bridge Group 13B2017
Bridge Capital Program Blackstone River Bridge at RI 99 NB & SB6334 2020 Bridge Group 142020
Bridge Capital Program Rt 146 Ramp at Rt 99 Ramp6335 2020 Bridge Group 142020
Bridge Capital Program Sayles Hill Rd Bridge at RI 99 NB & SB6336 2020 Bridge Group 142020
Bridge Capital Program Butterfly Factory Bridge, RI 123 Breakneck Hill Rd at Moshassuck River
6337 2018 Bridge Group 172018
Bridge Capital Program Front Street Bridge at Mill Pond6338 2018 Bridge Group 172018
Bridge Capital Program Moffit Pond Bridge, RI 123 Breakneck Hill Rd at Moshassuck River
6339 2018 Bridge Group 172018
Bridge Capital Program Albion Trench Bridge, School St at Old Worcester & Boston Canal
6340 2023 Bridge Group 242023
Bridge Capital Program Crookfall Brook Bridge at Sayles Hill Rd6341 2023 Bridge Group 242023
FFY 18-27 STIP Project Funding Status Report - Post SolicitationLincoln
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Kelly House Bridge, Lower River Rd at Blackston Canal
6342 2023 Bridge Group 242023
Bridge Capital Program Moshassuck Industrial Highway Bridge, Moshassuck Rd at Moshassuck River
6343 2023 Bridge Group 242023
Bridge Capital Program Mussey Brook Bridge at New River Rd6344 2023 Bridge Group 242023
Bridge Capital Program Sayles Bridge, Walker St at Moshassuck River
6345 2023 Bridge Group 242023
Bridge Capital Program Louisquisset Pike North Bridge, I-295 NB at Rt 146 Eddie Dowling Hwy
6346 2020 Bridge Group 352020
Bridge Capital Program Old River Road Bridge at I-295 NB & SB6347 2027 Bridge Group 36NA
Bridge Capital Program Breakneck Hill Road Bridge at RI 146 Eddie Dowling Hwy
6348 2019 Bridge Group 392019
Bridge Capital Program Mussey Brook Stone Arch Culvert, RI 126 Old River Rd at Mussey Brook
6738 2018 Bridge Group 56CNA
Pavement Capital Program Rt 126/River Road (Curtis Ln to Rt 116/George Washington Highway)
9508 Rt 126/River Road from Curtis Ln to Rt 116/George Washington Highway
2022 Non-BridgeNA
Pavement Capital Program Rt 116/George Washingtown Highway (Lincoln Mall to Albion Rd)
9534 Rt 116/George Washingtown Highway from Lincoln Mall to Albion Rd
2026 Non-BridgeNA
Pavement Capital Program Rt. 122/Lonsdale Ave (Dexter St to Cumberland T/L)
9556 Rt. 122/Lonsdale Ave from Dexter St to Cumberland Townline
2026 Non-BridgeNA
Pavement Capital Program Twin River Road (Rt 7/Douglas Pike to Lincoln Woods State Park entrance)
9563 Twin River Road from Rt 7/Douglas Pike to Lincoln Woods State Park entrance
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationLittle Compton
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program East Main Rd (Peckham Rd to Simmons Rd)
1351 Peckham Rd to Simmons Rd 2023 Non-Bridge2023
Pavement Capital Program Meeting House Ln (Rt 77 to South of Commons Rd)
1352 Rt 77 to South of Commons Rd 2019 Non-Bridge2020
Pavement Capital Program Snell Rd (East Main Rd to Long Hwy)1353 East Main Rd to Long Hwy 2018 Non-Bridge2017
Pavement Capital Program South Commons Rd and Simmons Rd (Brownell Rd to East Main Rd)
1354 Brownell Rd to East Main Rd 2019 Non-Bridge2023
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationMiddletown
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Rt 138A, Aquidneck Ave (East Main Rd to Green End Ave)
1355 East Main Rd to Green End Ave 2018 Non-Bridge2019
Pavement Capital Program Two Mile Corner1356 (Routes 138/114) East Main Road (West Main Rd to Bailey Brook) and West Main Rd (Smythe St to Maplewood Rd)
2018 Non-Bridge2017
Pavement Capital Program Rt 138, East Main Rd (Porstmouth T/L to Aquidneck Ave)
1357 Porstmouth T/L to Aquidneck Ave 2024 Non-Bridge2024
Pavement Capital Program Greene Ln (Navy Base to Rt 114)1358 Navy Base to Rt 114 2019 Non-Bridge2018
Pavement Capital Program Rt 214, Valley Rd (Green End Ave to Rt 138)
1359 Green End Ave to Rt 138 2024 Non-Bridge2024
Pavement Capital Program Rt 114, West Main Rd (John Kesson to Mill Ln)
1360 John Kesson to Mill Ln 2022 Non-Bridge2019
Pavement Capital Program JT Connell Hwy (Admiral Kalbfus to Rt 114)
1364 Admiral Kalbfus to Rt 114 2020 Non-Bridge2020
Traffic Safety Capital Program
Intersection Safety Improvements to West Main Road (RI 114) at Forest Avenue, Lower Aquidneck Avenue
1467 RI 114 2018 Non-Bridge2017
Drainage Capital Program Newport/ Middletown/ Portsmouth2038 2018 Non-BridgeNA
Pavement Capital Program Rt. 138A, Aquidneck Ave. (Valley Rd. to Purgatory Rd.)
5070 Aquidneck Avenue (Route 138A) (Valley Road to Purgatory Road)
2020 Non-Bridge2019
Transportation Alternatives Purgatory Road Sidewalk Installation5072 Purgatory Road (Aquidneck Avenue to Paradise Avenue)
2021 Non-Bridge2021
Bridge Capital Program Bailey Brook Bridge at RI 138 E Main Rd6231 2018 Bridge Group 15B2017
Bridge Capital Program Easton Beach Bridge, RI 138 Memorial Blvd at Easton Pond Channel
6232 2018 Bridge Group 15B2017
Bridge Capital Program Norman Brook Bridge at RI 114 W Main Rd
6233 2018 Bridge Group 15B2017
FFY 18-27 STIP Project Funding Status Report - Post SolicitationMiddletown
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Transportation Alternatives East Main Road Shared Use Path - Hedly St to Enterprise Drive
9005 East Main Road (RI-138) corridor, from Turnpike Rd to Hedley St, including signal improvements to the intersections of Union Rd and Sandy Point Rd at East Main Road.
2021 Non-Bridge2021
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationNarragansett
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program South Pier Rd (Rt 108 to Boone St)1361 Rt 108 to Boone St 2019 Non-Bridge2019
Pavement Capital Program Rt 1A, Boston Neck Rd (Bridgetown Rd to Sprague Bridge)
1362 Bridgetown Rd to Sprague Bridge 2022 Non-Bridge2022
Pavement Capital Program Bridgetown Rd (US-1 to Rt 1A)1401 US-1 to Rt 1A 2019 Non-Bridge2019
Transportation Alternatives Safe Routes to School Infrastructure Improvements for Narragansett Pier Middle School
5088 South Pier Rd, Mariner Rd, Thayer Ave, Prospect Ave, Central St, Fifth Ave
2018 Non-Bridge2017
Transportation Alternatives William C. O'Neill Bike Path Extension - Phase 4B
5089 Mumford Road, Narr. Elementary School (rear of site) to Narragansett Town Beach
2018 Non-Bridge2017
Transportation Alternatives Ocean Road Beautification - Phase 1 & 25093 Beach St to South Pier Rd 2026 Non-BridgeNA
Bridge Capital Program Bridgetown Rd Bridge at Pettaquamscutt River
6371 2018 Bridge Group 15B2017
Bridge Capital Program Point Judith Road Bridge at US 1 Post Rd Ramp
6372 2019 Bridge Group 182019
Bridge Capital Program Governor Sprague Bridge, US 1A Boston Neck Rd at Narrow River
6373 2027 Bridge Group 46NA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationNew Shoreham
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Drainage Capital Program Block Island2065 2027 Non-BridgeNA
Transportation Alternatives West Side Road - Sidewalks5096 Between Ocean Rd. intersection and entrance to Champlin Marina
2018 Non-Bridge2018
Transportation Alternatives Corn Neck Road - Sidewalks5097 Ocean Ave. (Bridge Gate Sq) to Beach Avenue
2026 Non-BridgeNA
Pavement Capital Program Chapel Street - Sidewalks5098 Weldon's Way to Old Town Road 2026 Non-BridgeNA
Bridge Capital Program New Harbor Road Bridge, Ocean Ave at Trimms Pond
6374 2018 Bridge Group 15B2017
Bridge Capital Program New Shoreham Bridge, Beach Ave at Harbor Pond
6375 2018 Bridge Group 15B2017
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationNewport
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program JT Connell Hwy (Admiral Kalbfus to Rt 114)
1364 Admiral Kalbfus to Rt 114 2020 Non-Bridge2020
Traffic Safety Capital Program
Pedestrian Improvements to Memorial Boulevard – Newport
1441 2018 Non-BridgeNA
Drainage Capital Program Newport/ Middletown/ Portsmouth2038 2018 Non-BridgeNA
Transportation Alternatives Thames and Spring Streetscape Improvements
5105 Thames St., from Memorial Blvd. to Wellington; Spring St, from Memorial Blvd to Morton Ave.
2021 Non-Bridge2021
Transportation Alternatives Farewell Street Pavement Preservation and Sidewalk Improvements
5106 America's Cup Avenue to Van Zandt Avenue
2026 Non-BridgeNA
Transportation Alternatives Bellevue Avenue ADA Sidewalk/Access Improvements
5107 Kay St. to Ocean Ave. 2023 Non-BridgeNA
Transportation Alternatives Marlborough Street/West Marlborough Streetscape Improvements
5108 Broadway/Thames to Thames St/America's Cup Avenue
2021 Non-Bridge2021
Transportation Alternatives Safe Routes to School - Bedlow Avenue/Hillside Avenue Sidewalks
5109 Admiral Kalbfus Rd to Broadway 2021 Non-Bridge2021
Bridge Capital Program Ocean Avenue Anna2 Bridge at Goose Neck Cove
6376 2018 Bridge Group 15B2017
Bridge Capital Program Old Colony Ramp North, RI 138 WB at Newport Secondary RR
6377 2018 Bridge Group 15B2017
Bridge Capital Program Van Zandt Ave RR Bridge6378 2018 Bridge Group 15B2017
Bridge Capital Program Goat Island Causeway at Newport Harbor
6379 2022 Bridge Group 502022
Transportation Alternatives Newport North End Bicycle/Pedestrian Connectivity and Safety Improvements
9003 2019 Non-Bridge2021
Traffic Safety Capital Program
Railroad At-Grade Crossing - Poplar and Elm Streets
9010 Newport Secondary at Poplar Street and Newport Secondary at Elm Street
2018 Non-Bridge2017
FFY 18-27 STIP Project Funding Status Report - Post SolicitationNewport
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Reconstructing Pell Bridge approaches9201 (Adm Kalbfus Rd - JT Connel Hwy to Rt 138), (Adm Kalbfus - Adm Kalbfus to Malbone Rd), (Adm Kalbfus - Third St to JT Connel Hwy), (Farwell and JT Connell Hwy - Van Zant Ave to Newport Center Pz), (Rt 138 - Clairborne Pell Bridge to Adm Kalbfus Rd)
2018 Non-Bridge2018
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationNorth Kingstown
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program US-1, Tower Hill Rd (Government Center to Rt 4)
1279 Government Center to Rt 4 2020 Non-Bridge2020
Pavement Capital Program Rt 4 (Lafeyett Rd to Rt 403)1283 Lafeyett Rd to Rt 403 2024 Non-Bridge2024
Pavement Capital Program Rt 1A, Boston Neck Rd (Brown St to Rt 138)
1365 Brown St to Rt 138 2023 Non-Bridge2023
Pavement Capital Program Rt 102, Philips St (Rt 1A to US-1)1367 Rt 1A to US-1 2024 Non-Bridge2024
Pavement Capital Program Rt 1A, West Main St (US-1 to Brown St)1368 Rt 1A (US-1 to Brown St) 2019 Non-Bridge2019
Traffic Safety Capital Program
Intersection Safety Improvements to Route 2 at Route 102 - Roundabout
1439 Route 2 at Route 102 2018 Non-Bridge2017
Pavement Capital Program Rt 2 - South County Trail (Rt 138 to Rt 102)
1576 Rt 138 to Rt 102 2024 Non-Bridge2024
Traffic Safety Capital Program
Romano Vineyard Way Rail Crosssing Improvements
5115 Northrup Rd to Commerce Park Rd. NA Non-Bridge2017
Transportation Alternatives Post Road - Curbing and Sidewalks5120 Camp Avenue to Route 1A (West Main Street)
2019 Non-Bridge2019
Transportation Alternatives Belleville House to Wickford village sidewalk and crosswalk improvements
5125 Phillips Street between Belleville House (just south of Ten Rod Road) to Brown Street in Wickford Village
2026 Non-BridgeNA
Transportation Alternatives Sidewalks on 102 from Home Depot- Wickford Junction
5127 Home Depot to Wickford Junction Plaza
2026 Non-BridgeNA
Drainage Capital Program Essex Road and Post Road Intersection - Drainage
5128 Essex Road and Post Road Intersection 2018 Non-Bridge2017
Bridge Capital Program Austin Farm Bridge, US 1 Post Rd NB at Hunt River
6234 2019 Bridge Group 182019
Bridge Capital Program Babbitt Farm Bridge, US 1 Post Rd at Cocumussoc Brook
6235 2019 Bridge Group 18B2019
Bridge Capital Program Briarbrook Dr South Bridge at Sandhill Brook
6236 2019 Bridge Group 182019
Bridge Capital Program Davisville RR Bridge at Devils Foot Rd6237 2019 Bridge Group 18B2019
Bridge Capital Program Gilbert Stuart Bridge, Gilbert Stuart Rd at Mattatuxet River
6238 2019 Bridge Group 182019
FFY 18-27 STIP Project Funding Status Report - Post SolicitationNorth Kingstown
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Gilbert Stuart Mill Bridge, Gilbert Stuart Rd at Gilbert Stuart Stream
6239 2019 Bridge Group 18B2019
Bridge Capital Program Gilbert Stuart Road Bridge at RI 1386240 2019 Bridge Group 182019
Bridge Capital Program Goosenest Brook Bridge at Lang Dr6241 2019 Bridge Group 18B2019
Bridge Capital Program Hamilton Canal Bridge, US 1A Boston Neck Rd at Mill Canal
6242 2019 Bridge Group 18B2019
Bridge Capital Program Hamilton Mill Bridge, US 1A Boston Neck Rd at Annaquatucket River
6243 2019 Bridge Group 18B2019
Bridge Capital Program Hunt River Bridge at US 1 Post Rd SB6244 2019 Bridge Group 18B2019
Bridge Capital Program James L. Baldwin-Second Lieutenant Matthew C Bridge, US 1A Boston Neck Rd at RI 138
6245 2019 Bridge Group 182019
Bridge Capital Program Lafayette RR Bridge at RI 4 Col Rodman Hwy
6246 2019 Bridge Group 18B2019
Bridge Capital Program North Quidnessett Rd Bridge at Sandhill Brook
6247 2019 Bridge Group 182019
Bridge Capital Program Potowomut River Bridge at Potowomut Rd
6248 2019 Bridge Group 18B2019
Bridge Capital Program Route 102 Bridge at RI 4 Col Rodman Hwy
6249 2019 Bridge Group 182019
Bridge Capital Program Route 4 Culvert 1 at Annaguatucket River
6250 2019 Bridge Group 18B2019
Bridge Capital Program Sandhill Brook Bridge at Chadsey Rd6251 2019 Bridge Group 18B2019
Bridge Capital Program Sandhill Pond Bridge at US 1 Post Rd6252 2019 Bridge Group 182019
Bridge Capital Program Silver Spring Mill Brook at US 1 Tower Hill Rd
6253 2019 Bridge Group 182019
Bridge Capital Program Stony Lane Bridge, RI 4 NB & SB at Stony Lane and Scrabbletown Brook
6254 2019 Bridge Group 18B2019
Bridge Capital Program Stony Lane RR Bridge6255 2019 Bridge Group 182019
Bridge Capital Program Wickford Hill RR Bridge at Exeter Rd6256 2019 Bridge Group 182019
FFY 18-27 STIP Project Funding Status Report - Post SolicitationNorth Kingstown
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Essex Bridge, Austin Rd at Potowomut Pond
6257 2027 Bridge Group 46NA
Bridge Capital Program Hatchery Road RR Bridge6258 2027 Bridge Group 46NA
Bridge Capital Program Lafayette Road Bridge at RI 4 NB & SB6259 2027 Bridge Group 46NA
Bridge Capital Program Slocum Bridge, Rail Road Ave at Cattle Pass
6260 2027 Bridge Group 46NA
Bridge Capital Program Tower Hill Road Bridge at RI 1386261 2027 Bridge Group 46NA
Bridge Capital Program Wickford Bridge, US 1A Boston Neck Rd at Academy Cove
6262 2027 Bridge Group 46NA
Transit Operations - RIDOT Commuter Rail Marketing7104 2018 Non-Bridge2017
Transit Operations - RIDOT Providence to Green Airport Service7108 2018 Non-Bridge2017
Pavement Capital Program Rt. 1, Tower Hill Road Road (West Main Street to Rt 4/Rt 1)
9553 Rt. 1, Tower Hill Road Road from West Main Street to Rt 4/Rt 1
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationNorth Providence
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Rt 146 (I-95 to 0.6 miles south of Sherman Ave)
1291 I-95 to 0.6 miles south of Sherman Ave 2018 Non-Bridge2017
Pavement Capital Program Rt 104, Farnum Pk and Waterman Ave (Rt 116 to Rt 15)
1394 Rt 116 to Rt 15 2024 Non-Bridge2024
Traffic Safety Capital Program
Route 146 Guide Sign and Sign Structure Replacement -Route 246 to I-95
1540 2021 Non-Bridge2021
Pavement Capital Program Rt 7 - Douglas Pike (Whipples Pond to Joslin Rd)
1578 Whipples Pond to Joslin Rd 2024 Non-Bridge2024
Bridge Capital Program Douglas Ave Bridge, RI 7 Douglas Pike at West River
6263 2018 Bridge Group 172018
Bridge Capital Program Benjamin Pond Bridget, RI 15 Mineral Spring Ave at West River
6264 2023 Bridge Group 242023
Bridge Capital Program Greystone Sluiceway, Greystone Ave at Woonasquatucket River
6265 2023 Bridge Group 242023
Bridge Capital Program Lincoln Farms Bridge, RI 146 Eddie Dowling Hwy at RI 246 Charles St
6266 2019 Bridge Group 392019
Bridge Capital Program Mineral Spring Ave Bridge at RI 146 Eddie Dowling Hwy
6267 2019 Bridge Group 392019
Bridge Capital Program Celona Culvert, RI 15 Mineral Spring Ave at Kit Brown Brook
6268 2027 Bridge Group 46NA
Pavement Capital Program Rt 44/Putnam Pike (Rt 104/Waterman Ave to I-295 )
9548 Rt 44/Putnam Pike from Rt 104/Waterman Ave to I-295
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18‐27 STIP Project Funding Status Report ‐ Post SolicitationNorth Smithfield
STIP Program Category Project Name STIP ID Project Limits Bridge Group DRAFT FFY 18‐27
STIP
Current FFY 17‐25
STIP
Pavement Capital Program Rt 146, Eddie Dowling Hwy (I‐295 to Rt 146A)
1292 I‐295 to Rt 146A 2022 Non‐Bridge2022
Pavement Capital Program Rt 146 (Rt 146A to Massachusetts S/L)1293 Rt 146A to Massachusetts S/L 2023 Non‐Bridge2022
Pavement Capital Program Statewide Resurfacing 20171316 Mechanic St (Nichols Ln to Rt 3), Woodville‐Alton Rd (Rt 3 to Townsend Rd), Rt 2 Bald Hill Rd (West Natick to WB Mason U‐turn), Rt 5/104 Greenville Rd (Rt 7 to Rt 5), Middle Rd (Union St to Schoolhouse Ln)
NA Non‐Bridge2017
Pavement Capital Program School St (Green St to Rt 146)1369 Green St to Rt 146 2024 Non‐Bridge2024
Pavement Capital Program Rt 5, Greenville Rd (Rt 5 to Rt 146)1370 Rt 5 to Rt 146 2024 Non‐Bridge2024
Pavement Capital Program Sayles Hill Rd (Rt 146 to Rt 126)1371 Rt 146 to Rt 126 2022 Non‐Bridge2022
Pavement Capital Program Rt 146A (Park Ave to Rt 104)1372 Park Ave to Rt 104 2023 Non‐Bridge2023
Traffic Safety Capital Program
Route 146 Guide Sign and Sign Structure Replacement ‐ MA S/L to Route 146A
1455 NA Non‐Bridge2017
Traffic Safety Capital Program
Roadway Departure Mitigation ‐ Guardrail and Median Improvements to I‐95 Warwick and Route 146 North Smithfield
1456 Interstate 95 between Cowesett Road and Route 4; Route 146 between School Street and Great Road overpass.
NA Non‐Bridge2017
Traffic Safety Capital Program
Intersection Safety Improvements to Route 146 corridor North Smithfield ‐ Signal Improvements
1459 Rout 146 (Route 99 to Route 146A) 2019 Non‐Bridge2017
Pavement Capital Program Rt 7 ‐ Douglas Pike (Whipples Pond to Joslin Rd)
1578 Whipples Pond to Joslin Rd 2024 Non‐Bridge2024
Transportation Alternatives Blackstone River Bikeway ‐ Segment 8B‐1
5318 Truman Dr. in Woonsocket to Market Square
NA Non‐Bridge2017
Transportation Alternatives Blackstone River Bikeway ‐ Segment 8B‐2
5319 Market St. to Cold Spring Park 2023 Non‐Bridge2023
FFY 18‐27 STIP Project Funding Status Report ‐ Post SolicitationNorth Smithfield
STIP Program Category Project Name STIP ID Project Limits Bridge Group DRAFT FFY 18‐27
STIP
Current FFY 17‐25
STIP
Transportation Alternatives Blackstone River Bikeway ‐ Segment 8C5320 Cold Spring Park to MA border NA Non‐Bridge2017
Bridge Capital Program Forestdale Bridge, RI 146 N Smithfield Exp at Branch River
6269 2018 Bridge Group 13A2017
Bridge Capital Program Great Road Bridge, RI 146 A Great Rd at RI 146 N Smithfield Exp
6270 2018 Bridge Group 13A2017
Bridge Capital Program Great Road Culvert at Cherry Brook6271 2018 Bridge Group 13A2017
Bridge Capital Program Old Great Road Bridge at RI 146 N Smithfield Exp
6272 2018 Bridge Group 13A2017
Bridge Capital Program Pound Hill Rd Bridge at Cherry Brook6361 2018 Bridge Group 13A2017
Bridge Capital Program Spring Brook Bridge, RI 146 NB at RI 146A N Smithfield Exp
6362 2018 Bridge Group 13A2017
Bridge Capital Program Tow Path Road, Canal St at canal6363 2018 Bridge Group 13A2017
Bridge Capital Program Farnum Bridge, RI 104 and RI 5 Greenville at Crystal Lake Brook
6364 2018 Bridge Group 172018
Bridge Capital Program Branch River Bridge at RI 146A Great Rd6365 2018 Bridge Group 38A2017
Bridge Capital Program Farnum Pike NB ramp at RI 146 NB6366 2018 Bridge Group 38T (L)2017
Bridge Capital Program Farnum Pike SB Bridge at RI 146 SB6367 2018 Bridge Group 38T (L)2017
Bridge Capital Program Pound Hill Road Bridge at RI 146 N Smithfield Exp
6368 2018 Bridge Group 382017
Bridge Capital Program Woonsocket Hill Road Bridge at RI 146 N Smithfield Exp
6369 2018 Bridge Group 382017
Bridge Capital Program Union Village RR Bridge, 146A Great Rd at Slatersville Sec RR
6370 NA Bridge Group 532017
Bridge Capital Program Slatersville Stone Arch Bridge, RI 5 Providence Pk at Branch River
6718 2018 Bridge Group 70C2017
Bridge Capital Program Central Street Bridge No. 4496825 2018 Bridge Group 70BNA
FFY 18‐27 STIP Project Funding Status Report ‐ Post SolicitationNorth Smithfield
STIP Program Category Project Name STIP ID Project Limits Bridge Group DRAFT FFY 18‐27
STIP
Current FFY 17‐25
STIP
Pavement Capital Program Rt 102/Bronco Highway (Main St to Rt 5/Providence Pike)
9531 Rt 102/Bronco Highway from Main St to Rt 5/Providence Pike
2026 Non‐BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17‐25 STIP or not funded in DRAFT FFY 18‐27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17‐25 STIP column and the earliest funded year listed as 2018 in the Draft 18‐27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
‐
‐
‐
FFY 18-27 STIP Project Funding Status Report - Post SolicitationPawtucket
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program I-95 (Barbara Leonard Way to Mulberry St)
1270 Barbara Leonard Way to Mulberry St 2021 Non-Bridge2021
Pavement Capital Program I-95 (Rt 15 to Mass.)1271 Rt 15 to Mass. 2018 Non-Bridge2017
Pavement Capital Program Rt 122, Lonsdale Ave (Dexter St to US-1)1306 Dexter St to US-1 2023 Non-Bridge2022
Pavement Capital Program Rt 114, Broad St (Cumberland T/L to Exchange St)
1307 Cumberland T/L to Exchange St NA Non-Bridge2022
Pavement Capital Program Rt 114, Broad St (Mendon Rd to Central Falls C/L)
1317 Mendon Rd to Central Falls C/L NA Non-Bridge2023
Pavement Capital Program Rt 1A, Newport Ave (Federal St to Massachusetts S/L)
1373 Federal St to Massachusetts S/L 2018 Non-Bridge2017
Pavement Capital Program Rt 1A, Newport Ave (Federal St to Pawucket Ave)
1375 Federal St to Pawucket Ave 2023 Non-Bridge2022
Pavement Capital Program US-1, Pawtucket Ave and North Main St (Garden St to Rochambeau Ave)
1386 Garden St to Rochambeau Ave 2022 Non-Bridge2022
Traffic Safety Capital Program
Roadway Departure Mitigation - Systemic High Friction Surface Treatments
1498 2018 Non-Bridge2017
Traffic Safety Capital Program
Intersection Safety Improvements to Waterman and Pawtucket Avenue - Left Turn Lanes
1522 NA Non-Bridge2019
Transit Capital Program - RIDOT
Pawtucket/Central Falls Transit Center5011 Conant Street to Dexter Street 2018 Non-Bridge2017
Traffic Safety Capital Program
Railroad At-Grade Crossing - Roosevelt Ave
5133 PW RR Mile Post .94 2018 Non-Bridge2018
Traffic Safety Capital Program
Railroad At-Grade Crossing - Beverage Hill Rd
5134 PW RR Mile Post 3.4 2020 Non-Bridge2020
Traffic Safety Capital Program
Railroad At-Grade Crossing - John Street5135 PW RR Mile Post 1.18 2023 Non-Bridge2023
Traffic Safety Capital Program
Railroad At-Grade Crossing - Coyle Ave5136 PW RR Mile Post 1.24 2023 Non-Bridge2023
Traffic Safety Capital Program
Railroad At-Grade Crossing - Webster Ave
5137 PW RR Mile Post 1.3 2024 Non-Bridge2024
FFY 18-27 STIP Project Funding Status Report - Post SolicitationPawtucket
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Traffic Safety Capital Program
Railroad At-Grade Crossing - Cottage St5138 PW RR Mile Post 1.61 2024 Non-Bridge2024
Traffic Safety Capital Program
Railroad At-Grade Crossing - Central Ave5139 PW RR Mile Post 1.69 2025 Non-Bridge2025
Traffic Safety Capital Program
Railroad At-Grade Crossing - Armistice Blvd
5140 PW RR Mile Post 2.03 2025 Non-Bridge2025
Transportation Alternatives Slater Mill Phase II5155 Roosevelt Ave. from Main to Leather Ave.
2018 Non-Bridge2017
Transportation Alternatives Ten Mile Mile River Greenway5157 North End of Parkside Ave. & Parkside Ave. South of Armistice Blvd
2024 Non-Bridge2024
Bridge Capital Program Broadway Bridge at I-95 NB & SB, Pawtucket
6380 2018 Bridge Group 032018
Bridge Capital Program Central Ave Bridge at I-95 NB & SB6381 2018 Bridge Group 032018
Bridge Capital Program East Street NB at I-95 NB6382 2018 Bridge Group 03T (F)2017
Bridge Capital Program East Street SB ramp at I-95 SB6383 2018 Bridge Group 03T (F)2017
Bridge Capital Program Exchange Street Bridge at I-95 NB & SB6384 2018 Bridge Group 032018
Bridge Capital Program Fountain Street Bridge at I-95 NB & SB6385 2018 Bridge Group 032018
Bridge Capital Program Lonsdale Ave Bridge at I-95 NB & SB6386 2018 Bridge Group 032018
Bridge Capital Program Main Street Bridge at I-95 NB & SB6387 2018 Bridge Group 032018
Bridge Capital Program Moshassuck River Culvert, I-95 NB & SB at Moshassuck River
6388 2018 Bridge Group 032018
Bridge Capital Program Pleasant View RR NB, I-95NB at Pleasant View Street & Amtrak
6389 2018 Bridge Group 032018
Bridge Capital Program Pleasant View RR SB ramp at I-95 SB6390 2018 Bridge Group 032018
Bridge Capital Program Roosevelt Ave NB at I-95 NB6391 2018 Bridge Group 03T (F)2017
Bridge Capital Program Roosevelt Ave SB at I-95 SB6392 2018 Bridge Group 03T (F)2017
Bridge Capital Program Slater Street Bridget at I-95 NB & SB6393 2018 Bridge Group 032018
Bridge Capital Program Underwood Street Bridge at I-95NB & SB6394 2018 Bridge Group 032018
Bridge Capital Program Walcott Street Bridge at I-95 NB & SB6395 2018 Bridge Group 032018
FFY 18-27 STIP Project Funding Status Report - Post SolicitationPawtucket
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Water Street Bridge, I-95 NB & SB6396 2018 Bridge Group 032018
Bridge Capital Program Lebanon Bridge, Central Ave at Ten Mile River
6397 2023 Bridge Group 242023
Bridge Capital Program Lonsdale Ave RR Bridge6398 2023 Bridge Group 242023
Bridge Capital Program Main Street Stringer Span at Blackstone River
6399 2023 Bridge Group 242023
Bridge Capital Program Roosevelt Ave Bridge at Blackstone River
6400 2023 Bridge Group 242023
Bridge Capital Program Pine Street Bridge at I-95 NB & SB6401 2018 Bridge Group 312019
Bridge Capital Program Cole Street RR Bridge6402 2023 Bridge Group 482023
Bridge Capital Program Grotto Ave Bridge at Moshassuck River6403 2023 Bridge Group 482023
Bridge Capital Program Main Street Bridge at Blacktsone River6404 2023 Bridge Group 482023
Bridge Capital Program Mineral Spring Ave Bridge at Moshassuck River
6405 2023 Bridge Group 482023
Bridge Capital Program Morris Nathanson Bridge (Exchange Street) at Blackstone River
6406 2023 Bridge Group 482023
Bridge Capital Program Weeden Street Bridge at Moshassuck River
6407 2023 Bridge Group 482023
Bridge Capital Program Division Street Bridge at Seekonk River6408 NA Bridge Group 53B2017
Bridge Capital Program Pawtucket Bridge, I-95 at Taft St & Pawtucket River
6719 NA Bridge Group 53B2017
Bridge Capital Program Broad Street RR Bridge, RI 114 Broad St at Amtrak & P&W RR
6771 2018 Bridge Group 56DNA
Bridge Capital Program Barton St6772 2018 Bridge Group 56DNA
Stops, Stations & Terminals - RIPTA
Pawtucket Transit Center7024 2018 Non-BridgeNA
Pavement Capital Program Broad Street Regeneration Project9007 Broad Street (Rt. 114) (Mendon Rd, Cumberland to Exchange St, Pawtucket)
2018 Non-Bridge2018
FFY 18-27 STIP Project Funding Status Report - Post SolicitationPawtucket
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Transportation Alternatives Blackstone River Bikeway - Segment 3A-1
9012 Town Landing to Exchange St., Pawtucket
2019 Non-Bridge2023
Transportation Alternatives Blackstone River Bikeway - Segment 3A-2
9013 Exchange St. to Branch St./Amtrack Bridge/Blackstone River, Pawtucket
2023 Non-Bridge2023
Pavement Capital Program I-95 (Exchange St to Garden St)9505 I-95 from Exchange St to Garden St 2024 Non-BridgeNA
Pavement Capital Program Central Ave (George Bennett Highway to Mass S/L)
9513 Central Ave from George Bennett Highway to Mass Stateline
2027 Non-BridgeNA
Pavement Capital Program Rt 126/Smithfield Ave (Rt 15/Mineral Spring Ave to Lincoln T/L)
9541 Rt 126/Smithfield Ave from Rt 15/Mineral Spring Ave to Lincoln Townline
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationPortsmouth
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Rt 24 (Rt 114 to Hummocks Ave)1286 Rt 114 to Hummocks Ave 2018 Non-Bridge2017
Pavement Capital Program Statewide Resurfacing 20171316 Mechanic St (Nichols Ln to Rt 3), Woodville-Alton Rd (Rt 3 to Townsend Rd), Rt 2 Bald Hill Rd (West Natick to WB Mason U-turn), Rt 5/104 Greenville Rd (Rt 7 to Rt 5), Middle Rd (Union St to Schoolhouse Ln)
NA Non-Bridge2017
Pavement Capital Program Rt 114, West Main Rd (John Kesson to Mill Ln)
1360 John Kesson to Mill Ln 2022 Non-Bridge2019
Pavement Capital Program Rt 114, West Main Rd (Rt 24 to Turnpike Ave)
1376 Rt 24 to Turnpike Ave 2023 Non-Bridge2022
Pavement Capital Program Sprague St (East Main Rd to Bristol Ferry Rd/Turnpike Ave)
1377 East Main Rd to Bristol Ferry Rd/Turnpike Ave
2023 Non-Bridge2022
Pavement Capital Program Rt 138, East Main Rd & Park Ave (East Main - Turnpike Ave to Boyds Ln and Park Ave - Rt 138 to Norseman Drive)
1378 East Main Rd (Turnpike Ave to Boyds Ln)
2018 Non-Bridge2017
Pavement Capital Program Rt 138, East Main Rd (Turnpike Ave to Hedley Ave)
1379 Turnpike Ave to Hedley Ave 2019 Non-Bridge2019
Pavement Capital Program Rt 138, East Main Rd (Hedly St to Middletown T/L)
1380 Hedly St to Middletown T/L 2021 Non-Bridge2021
Drainage Capital Program Newport/ Middletown/ Portsmouth2038 2018 Non-BridgeNA
Transportation Alternatives Aquidneck Island Bikeway - Melville Connector
5161 West Main Road to Burma Road 2024 Non-Bridge2024
Transportation Alternatives Mount Hope Bay Bicycle Improvements5162 Anthony Road (Boyds Lane to Mt. Hope Bridge)
2023 Non-Bridge2023
Transportation Alternatives East Main Road Sidewalks5164 Turnpike Avenue to Boyd's Lane 2021 Non-Bridge2021
Transportation Alternatives Sprague Street Sidewalks5166 East Main Road to Bristol Ferry Road 2018 Non-Bridge2017
Transportation Alternatives Stone Bridge Rehabilitation Study - Island Park
5171 Park Avenue/Point Road 2022 Non-Bridge2022
Bridge Capital Program Barker Bridge, RI 24 Ramp C at Ramp B6409 2018 Bridge Group 15B2017
Bridge Capital Program Freeborn Street NB at RI 24 NB6410 2018 Bridge Group 15B2017
FFY 18-27 STIP Project Funding Status Report - Post SolicitationPortsmouth
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Freeborn Street SB at RI 24 SB6411 2018 Bridge Group 15B2017
Bridge Capital Program Lawton Valley Bridge at RI 114 W Main Rd
6412 2018 Bridge Group 15B2017
Bridge Capital Program Lawton Valley Brook Bridge at RI 114 W Main Rd
6413 2018 Bridge Group 15B2017
Bridge Capital Program Mint Water Brook Culvert at RI 138 E Main Rd
6414 2018 Bridge Group 15B2017
Bridge Capital Program Motts Brook NB Bridge at RI 24 NB6415 2018 Bridge Group 15B2017
Bridge Capital Program Motts Brook SB Bridge, RI 24 SB & 1146416 2018 Bridge Group 15B2017
Bridge Capital Program Sprague Street Bridge at RI 246417 2018 Bridge Group 15B2017
Bridge Capital Program The Cove Bridge, Hummocks Point Rd at tidal inlet
6418 2021 Bridge Group 442021
Bridge Capital Program Boyd Lane NB at RI 24 NB6828 2027 Bridge Group 81ANA
Bridge Capital Program Boyd Lane SB at RI 24 SB6829 2027 Bridge Group 81ANA
Bridge Capital Program Turnpike Ave NB at RI 24 NB6830 2027 Bridge Group 81ANA
Bridge Capital Program Turnpike Ave SB at RI 24 SB6831 2027 Bridge Group 81ANA
Maintenance Capital Program
Portsmouth Facility7904 2018 Non-Bridge2017
Transportation Alternatives East Main Road Shared Use Path - Hedly St to Enterprise Drive
9005 East Main Road (RI-138) corridor, from Turnpike Rd to Hedley St, including signal improvements to the intersections of Union Rd and Sandy Point Rd at East Main Road.
2021 Non-Bridge2021
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationProvidence
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program I-95 (US-1 to Eddy St)1269 US-1 to Eddy St NA Non-Bridge2017
Pavement Capital Program I-95 (Barbara Leonard Way to Mulberry St)
1270 Barbara Leonard Way to Mulberry St 2021 Non-Bridge2021
Pavement Capital Program US-6 (I-295 to Rt 10)1280 I-295 to Rt 10 2024 Non-Bridge2024
Pavement Capital Program US-6 (Rt 10 to I-95)1281 Rt 10 to I-95 2023 Non-Bridge2023
Pavement Capital Program Rt 10 (US-6 to Park Ave)1285 US-6 to Park Ave 2024 Non-Bridge2023
Pavement Capital Program Rt 146 (I-95 to 0.6 miles south of Sherman Ave)
1291 I-95 to 0.6 miles south of Sherman Ave 2018 Non-Bridge2017
Pavement Capital Program Gano St (India St to Trenton)1381 India St to Trenton 2019 Non-Bridge2019
Pavement Capital Program US-44, Smith St (Lyndhurst Ave to I-95)1384 Lyndhurst Ave to I-95 2018 Non-Bridge2018
Pavement Capital Program US-1, Pawtucket Ave and North Main St (Garden St to Rochambeau Ave)
1386 Garden St to Rochambeau Ave 2022 Non-Bridge2022
Pavement Capital Program Dudley St Connector (Eddy St to Allens Ave)
1425 Eddy St to Allens Ave 2018 Non-Bridge2017
Transportation Alternatives Kennedy Plaza1460 Washington St. to Railroad St. 2018 Non-Bridge2018
Traffic Safety Capital Program
Pedestrian and Bicycle Safety Improvements - Exchange Street
1461 2018 Non-BridgeNA
Transportation Alternatives Providence Bicycle Master Plan1488 Citywide 2019 Non-BridgeNA
Traffic Safety Capital Program
Roadway Departure Mitigation - Systemic High Friction Surface Treatments
1498 2018 Non-Bridge2017
Traffic Safety Capital Program
Arterial Traffic Signal Improvements - Allens Avenue
1510 2019 Non-Bridge2019
Traffic Safety Capital Program
RISTARS - Localized Bottleneck Improvements to I-95
1535 NA Non-Bridge2020
Traffic Safety Capital Program
Route 146 Guide Sign and Sign Structure Replacement -Route 246 to I-95
1540 2021 Non-Bridge2021
FFY 18-27 STIP Project Funding Status Report - Post SolicitationProvidence
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Improvements to Downtown Providence C-3
2002 Portions of Westminster St, Exchange St., Weybosset St., Dorrance St, Richmond St., Washington St., and Adrian Hall Way (West Side).
NA Non-Bridge2017
Drainage Capital Program Roger Williams Park Ponds2036 2018 Non-BridgeNA
Transportation Alternatives SanSouci/Woony (Green Economy Bond)
5131 SanSouci 2018 Non-BridgeNA
Traffic Safety Capital Program
Railroad At-Grade Crossing - Terminal Rd
5174 PW RR 2019 Non-Bridge2019
Traffic Safety Capital Program
Railroad At-Grade Crossing - Harborside Blvd
5175 PW RR 2020 Non-Bridge2020
Traffic Safety Capital Program
Railroad At-Grade Crossing - Fields Point Dr
5176 PW RR 2021 Non-Bridge2021
Transportation Alternatives NBT/WRG: Providence Woonasquatucket Greenway Enhancements
5178 Park Street to Aleppo Street 2018 Non-Bridge2017
Transportation Alternatives Cathedral Square Enhancement Project5182 2023 Non-Bridge2023
Transportation Alternatives CityWalk Providence Pedestrian and Bicycle Enhancement Project
5183 2018 Non-Bridge2017
Transit Capital Program - RIDOT
Downtown Providence Enhanced Bus Circulator Project
5184 Washington, Exchange St, Chestnut, Richmond, Eddy
2018 Non-Bridge2017
Transportation Alternatives Providence Bicycle Infrastructure Enhancements
5199 2023 Non-Bridge2023
Transportation Alternatives Downtown Providence Pedestrian Wayfinding Project
5200 Smith Street to Point Street 2025 Non-Bridge2025
Transportation Alternatives Providence Waterplace and Riverwalk Repairs and Walkway Improvements
5202 2022 Non-Bridge2022
Transit Capital Program - RIDOT
Providence Station Transit Center5204 2018 Non-BridgeNA
Transportation Alternatives Washington Secondary Bike Path Extension
5215 From Depot Ave (Cranston) to Broadway (Providence
2022 Non-Bridge2022
FFY 18-27 STIP Project Funding Status Report - Post SolicitationProvidence
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Oxford Street Bridge at I-95 N & S Ramp WS
6349 2018 Bridge Group 02T (D)2017
Bridge Capital Program Park Row A - West Bridge, Finance Way at Parking Garage
6350 2023 Bridge Group 192023
Bridge Capital Program Park Row B - Exchange St Bridge at Parking Garage
6351 2023 Bridge Group 192023
Bridge Capital Program Park Row Bridge at Moshassuck River6352 2023 Bridge Group 192023
Bridge Capital Program Park Row C - East Bridge at Parking Garage
6353 2023 Bridge Group 192023
Bridge Capital Program Park Street Bridge at Woonasquatucket River
6354 2018 Bridge Group 75T 5B 2017
Bridge Capital Program Point Street Bridge at Providence River6355 2023 Bridge Group 192023
Bridge Capital Program Providence Viaduct, I-95 NB & SB at US 6 Woonasquatucket River, Amtrak
6357 2018 Bridge Group 75T 5B NA
Bridge Capital Program Public Street Bridge at I-95 NB & SB6358 2020 Bridge Group 022020
Bridge Capital Program Ramp BC Civic Center at West Exhange St
6359 2023 Bridge Group 192023
Bridge Capital Program Ramp BD Civic Center, I-95 Ramp at US 6W Exchange St Ramps
6360 2018 Bridge Group 062018
Bridge Capital Program Acorn Street Bridge at Woonasquatucket River
6423 2022 Bridge Group 202022
Bridge Capital Program Admiral Street Bridge at RI 146 Louisquisset Pike
6424 2018 Bridge Group 13B2017
Bridge Capital Program Allens Ave Ramp at I-95 Ramp BR-76425 2020 Bridge Group 022020
Bridge Capital Program Ashburton Street Bridge, I-95 NB & SB6426 2018 Bridge Group 75T 5B 2017
Bridge Capital Program Atwells Ave Bridge at I-95 Ramps BC & CA
6427 2018 Bridge Group 75T 5B 2017
Bridge Capital Program Atwells Ave Bridge at US 6 Connector & Amtrak
6428 2022 Bridge Group 202022
Bridge Capital Program Atwells Ave Ramp East, Ramp BR-4 at I-95 Ramp BC
6429 2018 Bridge Group 75T 5B 2017
FFY 18-27 STIP Project Funding Status Report - Post SolicitationProvidence
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Bath Street East Bridge at Woonasquatucket River
6430 2023 Bridge Group 402023
Bridge Capital Program Blackstone Street Bridge at I -95 NB & SB
6431 2018 Bridge Group 77NA
Bridge Capital Program Branch Ave Bridge at I-95 NB & SB6432 2018 Bridge Group 062018
Bridge Capital Program Branch Ave Culvert at West River6433 2018 Bridge Group 212018
Bridge Capital Program Branch Ave RR Bridge6434 2018 Bridge Group 212018
Bridge Capital Program Broad Street Bridge at I-95 A, B, C, D6435 2018 Bridge Group 012018
Bridge Capital Program Broad Street South Bridge at I-95 NB & SB andP & W RR
6436 2018 Bridge Group 302017
Bridge Capital Program Broadway Bridge at I-95 NB & SB6437 2018 Bridge Group 012018
Bridge Capital Program Broadway RR Bridge6438 2018 Bridge Group 212018
Bridge Capital Program CAUNOUNICUS Bridge, Cladrash Ave at Pleasure Lake
6439 2023 Bridge Group 402023
Bridge Capital Program Chalkstone RR Bridge at I-95 NB & SB6440 2018 Bridge Group 75T 5B 2017
Bridge Capital Program Charles Street Bridge at I-95 NB & SB6441 2018 Bridge Group 75T 5B 2017
Bridge Capital Program Charles Street RR Bridge6442 2018 Bridge Group 212018
Bridge Capital Program College Street Bridge at Providence River
6443 2023 Bridge Group 192023
Bridge Capital Program Concord Street Bridge at RI 126 Smithfield Ave
6444 2018 Bridge Group 13A2017
Bridge Capital Program Crawford Street Bridge, South Water Street at Providence River
6445 2023 Bridge Group 192023
Bridge Capital Program Culvert A, I-95 NB & SB at West River6446 2018 Bridge Group 062018
Bridge Capital Program Culvert BC, I-95 N Service Rd at Moshassuck River
6447 2018 Bridge Group 062018
Bridge Capital Program Dean Street Bridge at US 6 Harris Ave & Amtrak
6448 2023 Bridge Group 20A2022
Bridge Capital Program Delaine Street Bridge at Woonasquatucket River
6449 2022 Bridge Group 202022
FFY 18-27 STIP Project Funding Status Report - Post SolicitationProvidence
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Eagle Street Bridge at Woonasquatucket River
6450 2022 Bridge Group 202022
Bridge Capital Program Eddy Street Bridge at I-95 NB & SB6451 2018 Bridge Group 012018
Bridge Capital Program Eddy Street South Bridge at I-95 and P & W RR
6452 2020 Bridge Group 022020
Bridge Capital Program Elmwood Ave Bridge, I-95 NB & SB at US 1 Elmwood Ave
6453 2018 Bridge Group 302017
Bridge Capital Program Elmwood Ave South Bridge at RI 10 Huntington Exp
6454 2022 Bridge Group 222022
Bridge Capital Program Exchange Street Bridge at Woonasquatucket River
6455 2023 Bridge Group 402023
Bridge Capital Program Francis Street North Bridge at Amtrak6456 2023 Bridge Group 192023
Bridge Capital Program Francis Street South Bridge at Woonasquatucket River
6457 2023 Bridge Group 192023
Bridge Capital Program Frankfort Street Bridge at RI 10 Huntington Exp
6458 2022 Bridge Group 222022
Bridge Capital Program Geneva Pond Bridge, RI 7 Douglas Ave at West River
6459 2018 Bridge Group 38A2017
Bridge Capital Program Gladrastis Ave Bridge, Cladrash Ave at Williams Lake
6460 2022 Bridge Group 222022
Bridge Capital Program Glenbridge Ave Bridge at US 66461 2018 Bridge Group 162018
Bridge Capital Program Hamlin Bridge, Temple Ave at RI 10 Huntington Exp
6462 2022 Bridge Group 222022
Bridge Capital Program Harbor Junction Bridge, US 1 Elmwood Ave at Har Junc Bridge line P & W RR
6463 2018 Bridge Group 57ENA
Bridge Capital Program Harris Ave Bridge at Mall Ramp RV-AD6464 2022 Bridge Group 202022
Bridge Capital Program Hawkins Street Bridge at RI 146 Lousiquisset Pike
6465 2018 Bridge Group 13B2017
Bridge Capital Program Hawkins Street Bridge at West River6466 2023 Bridge Group 402023
Bridge Capital Program Industrial Drive Bridge at I-95 NB & SB6467 2018 Bridge Group 062018
FFY 18-27 STIP Project Funding Status Report - Post SolicitationProvidence
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Industrial Drive Bridge at Moshassuck River
6468 2022 Bridge Group 202022
Bridge Capital Program Killingly Street Bridge at US 6 EB & WB6469 2018 Bridge Group 16B2018
Bridge Capital Program Louisquisset Pike at I-95 NB & SB6470 2018 Bridge Group 752017
Bridge Capital Program Magnan Road RR Bridge6471 2018 Bridge Group 212018
Bridge Capital Program Memorial Blvd Bridge at Roosevelt Lake6472 2022 Bridge Group 222022
Bridge Capital Program Memorial Blvd North Bridge at Providence River
6473 2023 Bridge Group 192023
Bridge Capital Program Memorial Blvd Pedestrian Underpass6474 2023 Bridge Group 192023
Bridge Capital Program Memorial Blvd South Bridge at Providence River
6475 2023 Bridge Group 192023
Bridge Capital Program Memorial Boulevard Bridge at Polo Lake6476 2022 Bridge Group 222022
Bridge Capital Program Merino Pond Bridge, US 6 EB & WB at Woonasquatucket River
6477 2018 Bridge Group 16B2018
Bridge Capital Program MIANTUNNOMU Bridge, Cladrash Ave at Cunliffs Lake
6478 2023 Bridge Group 402023
Bridge Capital Program Moshassuck South Bridge at I-95 Ramp BR-2
6479 2018 Bridge Group 062018
Bridge Capital Program O'Connell Street at I-95 N & S Ramp WS6481 2020 Bridge Group 022020
Bridge Capital Program Orms Street RR Bridge6482 2018 Bridge Group 172018
Bridge Capital Program Ramp CA Civic Center, I-95 Ramp CA at Ramp CC, W Exchange St
6483 2020 Bridge Group 022020
Bridge Capital Program Ramp CB-1 Civic Center at Ramp CC6484 2023 Bridge Group 192023
Bridge Capital Program Ramp CB-2 Civic Center at Amtrak, City Streets
6485 2018 Bridge Group 75T 5B 2017
Bridge Capital Program Ramp DA Civic Center, I-95 at US 6, W Exchange St, Ramps CB, AC, CC
6486 2020 Bridge Group 022020
Bridge Capital Program Ramp DB Civic Center at Amtrak, City STS, Woonasquatucket River
6487 2018 Bridge Group 75T 5B 2017
FFY 18-27 STIP Project Funding Status Report - Post SolicitationProvidence
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Ramp WS, I-195 W to I-95 SB at Ramp SE, US-1, I-95 NB & SB
6488 NA Bridge Group 56B2018
Bridge Capital Program Reservoir Ave RR Bridge6489 2018 Bridge Group 59C2017
Bridge Capital Program Smith Street Bridge at I-95 NB & SB6490 2018 Bridge Group 75T 5B 2017
Bridge Capital Program Smith Street RR Bridge6492 2018 Bridge Group 16B2018
Bridge Capital Program Smithfield Ave Bridge at I-95 NB & SB6493 2018 Bridge Group 062018
Bridge Capital Program Smithfield Ave RR Bridge6494 2018 Bridge Group 13A2017
Bridge Capital Program Steeple Street East Bridge at Moshassuck River
6495 2022 Bridge Group 202022
Bridge Capital Program Steeple Street West Bridge at Woonasquatucket River
6496 2022 Bridge Group 202022
Bridge Capital Program Stevens Street Bridge at Moshassuck River
6497 2022 Bridge Group 202022
Bridge Capital Program Tar Bridge, Manton Ave at Woonasquatucket River
6498 2023 Bridge Group 402023
Bridge Capital Program Thurbers Ave Bridge at I-95 NB & SB6499 2020 Bridge Group 022020
Bridge Capital Program Union Ave RR Bridge6500 2018 Bridge Group 212018
Bridge Capital Program Valley Street Bridge at Woonasquatucket River
6501 2022 Bridge Group 202022
Bridge Capital Program Veazie Street Bridge at West River6502 2018 Bridge Group 212018
Bridge Capital Program Wanskuck Bridge, RI 146 Eddie Dowling Highway at Branch Ave
6503 2018 Bridge Group 13B2017
Bridge Capital Program Washington Street Bridge at I-95 BR-36504 2018 Bridge Group 012018
Bridge Capital Program Washington Street Bridge at Providence River
6505 2023 Bridge Group 192023
Bridge Capital Program West River Street Bridge at West River6506 2018 Bridge Group 212018
Bridge Capital Program Westminster RR Bridge6507 2018 Bridge Group 212018
Bridge Capital Program Westminster Street Bridge at I-95 NB & SB
6508 2018 Bridge Group 012018
FFY 18-27 STIP Project Funding Status Report - Post SolicitationProvidence
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Woonasquatucket River Bridge at US 6 EB & WB
6509 2018 Bridge Group 16T (M2017
Bridge Capital Program NEW Providence Viaduct I-95 NB at US 6 Woonasquatucket River Amtrak
6665 2018 Bridge Group 75T 5B NA
Bridge Capital Program Seekonk River RR Bridge (Crook Point)6707 2026 DemolitionNA
Bridge Capital Program Narragansett Electric Co Bridge, I-95 NB & SB at Narragansett Electric Co Siding
6709 2020 Bridge Group 022020
6/10 Project Plainfield St Bridge, US 6 Olneyville Exp at Plainfield St
6720 2018 6/10 Project2017
6/10 Project Huntington Ave Viaduct, US 6 Olneyville Exp at Westminster, Troy & Amtrak
6721 2018 6/10 Project2017
6/10 Project Westminster St Underpass 1, Westminster St at Olneyville Exp Lane H
6722 2018 6/10 Project2017
6/10 Project Westminster St Underpass 2, Westminster St at Olneyville Expwy
6723 2018 6/10 Project2017
6/10 Project Broadway Overpass, US 6 Olneyville Exp at Broadway
6724 2018 6/10 Project2017
6/10 Project Broadway Underpass, Broadway at Olneyville Exp Lane B
6725 2018 6/10 Project2017
6/10 Project Broadway Ramp Overpass, US 6 Ramp BD at US 6, Amtrak & P&W RR
6726 2018 6/10 Project2017
6/10 Project Harris Ave RR Bridge, US 6 Lanes A & B at Harris Ave, Amtrak & P&W RR
6727 2018 6/10 Project2017
6/10 Project Hartford Ave East Bridge, US 6 EB & WB at US 6A Hartford Ave
6728 2018 6/10 Project2017
Bridge Capital Program Clifford Street Bridge, Clifford St at Ramp SE, I-95S, Ramp PN
6741 NA Bridge Group 56B2017
Bridge Capital Program South Main Street Bridge, I-195 EB & WB at South Main St
6742 NA Bridge Group 56B2017
Bridge Capital Program Ramp EI, I-195 Ramp EI at I-195 Ramp SME
6743 NA Bridge Group 56A2017
FFY 18-27 STIP Project Funding Status Report - Post SolicitationProvidence
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Providence Viaduct I-95 SB at US 6 Woonasquatucket River Amtrak
6827 2018 Bridge Group 75T 5B NA
Transit Corridors - RIPTA East Side Tunnel7019 East Side Transit Tunnel 2019 Non-BridgeNA
Transit Corridors - RIPTA Downtown Transit Connector7020 Washington, Exchange St, Chestnut, Richmond, Eddy
2018 Non-BridgeNA
Transit Operations - RIDOT Providence to Green Airport Service7108 2018 Non-Bridge2017
Drainage Capital Program Drainage - Providence Division9305 NA Non-Bridge2017
Pavement Capital Program I-95 (Exchange St to Garden St)9505 I-95 from Exchange St to Garden St 2024 Non-BridgeNA
Pavement Capital Program I-195 (I-95 to East Providence T/L)9519 I-195 from I-95 to East Providence Townline
2026 Non-BridgeNA
Pavement Capital Program I-95 (Route 10 to I-195)9521 I-95 from Route 10 to I-195 2027 Non-BridgeNA
Pavement Capital Program North Main Street Providence (Mill St. to Colonial Rd.)
9524 North Main Street Providence from Mill St. to Colonial Rd.
2027 Non-BridgeNA
Pavement Capital Program Randall Street (Charles St. to North Main St.)
9526 Randall Street from Charles St. to North Main St.
2027 Non-BridgeNA
Pavement Capital Program Rt 1/Elmwood Ave (Cranston T/L to Roger Williams Ave)
9529 Rt 1/Elmwood Ave from Cranston Townline to Roger Williams Ave
2026 Non-BridgeNA
Pavement Capital Program Rt 128/Killingly Street (Hartford Ave to Greenville Ave)
9542 Rt 128/Killingly Street from Hartford Ave to Greenville Ave
2026 Non-BridgeNA
Pavement Capital Program Rt 6A/Hartford Ave (Rt 14/Plainfield St to Killingly Street)
9552 Rt 6A/Hartford Ave from Rt 14/Plainfield St to Killingly Street
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationRichmond
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Woodville Rd (Rt 3 to Switch Rd)1335 Rt 3 to Switch Rd 2018 Non-Bridge2017
Pavement Capital Program Old Switch Rd (Mechanic St to Switch Rd)
1387 Mechanic St to Switch Rd 2025 Non-Bridge2024
Traffic Safety Capital Program
Roundabout at Intersection of Rt. 138 and Rt. 112
5219 190 Kingstown Rd to 215 Kingstown Rd 2018 Non-Bridge2018
Bridge Capital Program Baker Pines Bridge, I-95 NB & SB at Route 3
6510 2018 Bridge Group 05TB (2017
Bridge Capital Program Heaton Orchard Bridge, RI 2 So County Tr at Usquepaug River
6511 2018 Bridge Group 122017
Bridge Capital Program Miantonomi Bridge, RI 2 So County Tr at Amtrak
6512 2018 Bridge Group 122017
Bridge Capital Program Kings Factory Rd Bridge at Pawcatuck River
6513 2026 Bridge Group 45NA
Bridge Capital Program Kings Factory Road RR Bridge6514 2026 Bridge Group 45NA
Bridge Capital Program Kingston Road Bridge, I-95 NB & SB at RI 138 Kingston Rd
6515 2018 Bridge Group 54ANA
Bridge Capital Program First Carolina North Bridge, RI 112 Carolina at Mill Canal
6516 2018 Bridge Group 57F2017
Bridge Capital Program Second Carolina Bridge, RI 112 Carolina at Mill Canal
6517 2018 Bridge Group 57F2017
Bridge Capital Program Third Carolina South Bridge, RI 112 Carolina at Pawcatuck River
6518 2018 Bridge Group 57F2017
Bridge Capital Program Wyoming6775 2018 Bridge Group 69DNA
Bridge Capital Program Usquepaug River6788 2027 Bridge Group 07NA
Bridge Capital Program Heath's Brook6789 2027 Bridge Group 07NA
Bridge Capital Program Canal Brook Shannock Mill6793 2027 Bridge Group 07NA
Bridge Capital Program Beaver River6795 2027 Bridge Group 07NA
Bridge Capital Program Kenyon Arch6797 2027 Bridge Group 07NA
Bridge Capital Program Meadowbrook Sluiceway6801 2027 Bridge Group 07NA
Bridge Capital Program Alton Trench6802 2027 Bridge Group 07NA
FFY 18-27 STIP Project Funding Status Report - Post SolicitationRichmond
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Mechanic Street6803 2027 Bridge Group 07NA
Bridge Capital Program Biscuit City Road6813 2027 Bridge Group 07NA
Bridge Capital Program Wood River Road6814 2027 Bridge Group 07NA
Pavement Capital Program I-95 (Connecticut S/L to Rt. 138)9520 I-95 from Connecticut Stateline to Rt. 138
2027 Non-BridgeNA
Pavement Capital Program Rt. 2, South County Trail (Charlestown T/L to South Kingstown T/L)
9557 Rt. 2, South County Trail from Charlestown Townline to South Kingstown Townline
2026 Non-BridgeNA
Pavement Capital Program Shannock Road (Rt 112/Carolina Back Rd to Rt 2/South County Trail)
9562 Shannock Road from Rt 112/Carolina Back Rd to Rt 2/South County Trail
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationScituate
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Winsor Ave (Rt 116 to Greenville Ave)1338 Rt 116 to Greenville Ave 2019 Non-Bridge2019
Pavement Capital Program Rockland Rd (Central Pk to Danielson Pk)1388 Central Pk to Danielson Pk 2018 Non-Bridge2018
Pavement Capital Program Central Pk & Battey Meeetinghouse Rd1389 Central Pk (Trimtown Rd to Battery Meetinghouse Rd) and Battey Meeetinghouse Rd (Central Pk to Danielson Pk)
2018 Non-Bridge2018
Pavement Capital Program US-6, Scituate Bypass and Hartford Pike (Rt 102 to Danielson Pk)
1390 Rt 102 to Danielson Pk 2019 Non-Bridge2019
Pavement Capital Program Rt 115, Main St (Rt 116 to Jackson Flat Rd)
1391 Rt 116 to Jackson Flat Rd 2019 Non-Bridge2019
Pavement Capital Program Danielson Pk (Rt 102 to West Greenville Rd)
1392 Rt 102 to West Greenville Rd 2024 Non-Bridge2023
Pavement Capital Program US-6, Hartford Pike and Hartford Ave (Danielson Pk to I-295)
1393 Danielson Pk to I-295 2018 Non-Bridge2017
Traffic Safety Capital Program
Intersection Safety Improvements to Route 6 at Route 116 Scituate - Intersection Widening
1491 NA Non-Bridge2019
Traffic Safety Capital Program
Intersection Safety Improvements to Route 6 – Scituate/Johnston
1509 Intersections of Route 6 with Route 101 and Route 102 and Danielson Pike with Route 102.
2018 Non-Bridge2018
Pavement Capital Program US-6 - Danielson Pike (Connecticut S/L to Rt 102)
1579 Connecticut S/L to Rt 102 2022 Non-Bridge2023
Bridge Capital Program Ashland Bridge, RI 14 Plainfield Pike at Scituate Reservoir
6535 2018 Bridge Group 162018
Bridge Capital Program Clayville Arch, RI 14 Plainfield Pike at Clayville Brook
6536 2018 Bridge Group 162018
Bridge Capital Program Colvin Street Bridge at Pawtuxet River N Branch
6537 2018 Bridge Group 16B2018
Bridge Capital Program Gleaner Chapel Rd Bridge at US 66538 2018 Bridge Group 162018
Bridge Capital Program Gleaner Chapel Road Bridge at Rush Brook
6539 2018 Bridge Group 162018
FFY 18-27 STIP Project Funding Status Report - Post SolicitationScituate
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Great Oak Bridge, RI 14 Plainfield Pike at Cork Brook
6540 2018 Bridge Group 162018
Bridge Capital Program Harrisdale Pond Bridge, Elmdale Rd at Peeptoad Brook
6541 2018 Bridge Group 162018
Bridge Capital Program Hope Bridge, RI 116 Main St at Pawtuxet River
6542 2018 Bridge Group 16B2018
Bridge Capital Program Hope Hill Trench Bridge, RI 116 North Rd at Kent Brook
6543 2018 Bridge Group 16B2018
Bridge Capital Program Jackson Flat Rd Bridge at Clark Brook6544 2018 Bridge Group 162018
Bridge Capital Program Moswansicut River Bridge at RI 6 Harford Pike
6545 2018 Bridge Group 162018
Bridge Capital Program North Scituate Bridge, US 6A Danielson Pike at Moswaniscut River
6546 2018 Bridge Group 162018
Bridge Capital Program Peeptoad Brook Bridge at RI 101 Hartford Pike
6547 2018 Bridge Group 16B2018
Bridge Capital Program Ponagansett River Bridge at RI 102 Victory Hwy
6548 2018 Bridge Group 162018
Bridge Capital Program Rockland Culvert, RI 12 Tunk Hill Rd at brook
6549 2018 Bridge Group 162018
Bridge Capital Program Rockland Mill Bridge, RI 12 Tunk Hill Rd at Clayville Brook
6550 2018 Bridge Group 162018
Bridge Capital Program Saundersville Culvert, RI 116 East Rd at Saundersville Brook
6551 2018 Bridge Group 16B2018
Bridge Capital Program Wilbur Brook Bridge at RI 12 Tunk Hill Rd
6552 2018 Bridge Group 162018
Bridge Capital Program Blanchard Saw Mill Bridge, Winsor Ave at Moswansicut Brook
6553 2025 Bridge Group 432025
Bridge Capital Program Cork Brook Bridge at Rockland Rd6554 2025 Bridge Group 432025
Bridge Capital Program Elmdale Rd Bridge at Rush Brook6555 2025 Bridge Group 432025
Bridge Capital Program Hartford Pike Bridge, RI 101 Hartford Pk at Rush Brook
6556 2025 Bridge Group 432025
FFY 18-27 STIP Project Funding Status Report - Post SolicitationScituate
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Knights Brook Bridge at RI 12 Tunk Hill Rd
6557 2025 Bridge Group 432025
Bridge Capital Program Ponagansett Road Bridge at Ponagansett River
6558 2025 Bridge Group 432025
Bridge Capital Program Rockland Bridge, RI 102 Victory Hwy at Clayville Brook
6559 2025 Bridge Group 432025
Bridge Capital Program Rush Brook Bridge at Danielson Pike6560 2025 Bridge Group 432025
Bridge Capital Program Wilbur Brook Bridge at Old Plainfield Pike
6561 2025 Bridge Group 432025
Pavement Capital Program Rt. 116, North Road (Rt 12/Scituate Ave to Clarke Rd)
9554 Rt. 116, North Road from Rt 12/Scituate Ave to Clarke Rd
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationSmithfield
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program I-295 (Rt 5 to Rt 146)1275 Rt 5 to Rt 146 2024 Non-Bridge2024
Pavement Capital Program US-44, Putnam Pike (RIDOT Maintenance to West Greenville Rd)
1328 RIDOT Maintenance to West Greenville Rd
2018 Non-Bridge2017
Pavement Capital Program Rt 5, Greenville Ave and Sanderson Rd (Atwood Ave to US-44)
1341 Atwood Ave to US-44 2024 Non-Bridge2024
Pavement Capital Program Rt 123, Jenckes Hill Rd (Albion to Rt 246)1350 Albion to Rt 246 2024 Non-Bridge2024
Pavement Capital Program Rt 104, Farnum Pk and Waterman Ave (Rt 116 to Rt 15)
1394 Rt 116 to Rt 15 2024 Non-Bridge2024
Traffic Safety Capital Program
Intersection Safety Improvements to Route 44/Smithfield Commons Smithfield - Dual Left Turn Lanes
1476 2018 Non-Bridge2017
Traffic Safety Capital Program
Intersection Improvements to Douglas Pike at Branch Pike Smithfield - Roundabout
1525 2020 Non-Bridge2020
Pavement Capital Program Rt 7 - Douglas Pike (Whipples Pond to Joslin Rd)
1578 Whipples Pond to Joslin Rd 2024 Non-Bridge2024
Transportation Alternatives Safe Routes to School Infrastructure Improvements for Gallagher Middle and McCabe Elementary Schools
5224 Pleasant View Ave, Tunmore Rd, Cedar Swamp Rd, Spragueville Rd, Indian Run Tr
2018 Non-Bridge2017
Pavement Capital Program US-44, Putnam Pike (Commerce St. to I-295)
5227 I-295 to Commerce Street 2019 Non-Bridge2019
Transportation Alternatives Old County Road Sidewalk Installation Project
5229 Wolf Hill Road to Dean Avenue 2026 Non-BridgeNA
Bridge Capital Program Douglas Pike North Ramp Bridge, Ramp RI 7 to I-295
6562 2020 Bridge Group 102020
Bridge Capital Program Douglas Pike South Ramp Bridge, Ramp RI 7 to I-295
6563 2020 Bridge Group 102020
Bridge Capital Program Farnum Pike NB at I-295 NB6564 2020 Bridge Group 102020
Bridge Capital Program Farnum Pike SB, RI 104 Farnum Pike at I-295 SB
6565 2020 Bridge Group 102020
Bridge Capital Program George Washington Hwy Bridge at I-295 NB & SB
6566 2020 Bridge Group 102020
FFY 18-27 STIP Project Funding Status Report - Post SolicitationSmithfield
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Georgiaville Pond Bridge, I-295 NB & SB at Woonasquatucket River
6567 2020 Bridge Group 102020
Bridge Capital Program Mountaindale Road NB at I-2956568 2020 Bridge Group 102020
Bridge Capital Program Mountaindale Road SB at I-2956569 2020 Bridge Group 102020
Bridge Capital Program Mowry Road NB at I-295 NB6570 2020 Bridge Group 102020
Bridge Capital Program Mowry Road SB, I-295 SB at Stillwater Rd
6571 2020 Bridge Group 102020
Bridge Capital Program Longhouse Bridge, US 44 Putnam Pike at Mill Canal
6572 2018 Bridge Group 162018
Bridge Capital Program Angell Brook Bridge, RI 7 Douglas Pike at Harris Brook
6573 2018 Bridge Group 172018
Bridge Capital Program Douglas Pike North at I-295 SB6574 2018 Bridge Group 172018
Bridge Capital Program Douglas Pike South at I-295 NB6575 2018 Bridge Group 172018
Bridge Capital Program Esmond - Georgiaville Bridge, RI 104 Farnum Pike at Woonasquatucket River
6576 2018 Bridge Group 172018
Bridge Capital Program Smithfield Bridge, RI 104 Farnum Pike at Woonasquatucket River
6577 2018 Bridge Group 172018
Bridge Capital Program Stillwater Reservoir Bridge at RI 5 & 116 Pleasant View
6578 2018 Bridge Group 172018
Bridge Capital Program Esmond Street Bridge at Woonasquatucket River
6579 2022 Bridge Group 262022
Bridge Capital Program Mountaindale Rd Bridge at Stillwater River
6580 2022 Bridge Group 262022
Bridge Capital Program Putnam Pike Culvert at Reaper Brook6581 2022 Bridge Group 262022
Bridge Capital Program Spragueville Bridge, RI 116 Pleasant View Ave at Greenville Brook
6582 2022 Bridge Group 262022
Bridge Capital Program Steers Bridge, W Greenville Rd at Waterman Reservoir
6583 2022 Bridge Group 262022
Bridge Capital Program Watermans Reservoir Bridge at W Greenville Rd
6584 2022 Bridge Group 262022
FFY 18-27 STIP Project Funding Status Report - Post SolicitationSmithfield
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program West Greenville Rd Bridge at Mill Canal6585 2022 Bridge Group 262022
Bridge Capital Program Putnam Pike Bridge at I-295 NB & SB6586 2020 Bridge Group 352020
Bridge Capital Program Greenville Bridge, US 44 Smith St at Slack Reservoir Brook
6587 2025 Bridge Group 432025
Bridge Capital Program Mountaindale Rd Bridge at Reaper Brook
6588 2025 Bridge Group 432025
Bridge Capital Program Capron Road Bridge, Capron Rd at Woonasquatucket River
6739 2018 Bridge Group 70A2017
Maintenance Capital Program
Truck Wash Facilities - RICAP7905 2022 Non-Bridge2022
Maintenance Capital Program
Salt Brine Facilities7907 2022 Non-Bridge2022
Pavement Capital Program Rt 116/Smith Ave (Orchard Ave to Rt 44/Putnam Pike)
9535 Rt 116/Smith Ave from Orchard Ave to Rt 44/Putnam Pike
2026 Non-BridgeNA
Pavement Capital Program Rt 44/Putnam Pike (Rt 104/Waterman Ave to I-295 )
9548 Rt 44/Putnam Pike from Rt 104/Waterman Ave to I-295
2026 Non-BridgeNA
Pavement Capital Program Twin River Road (Rt 7/Douglas Pike to Lincoln Woods State Park entrance)
9563 Twin River Road from Rt 7/Douglas Pike to Lincoln Woods State Park entrance
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18‐27 STIP Project Funding Status Report ‐ Post SolicitationSouth Kingstown
STIP Program Category Project Name STIP ID Project Limits Bridge Group DRAFT FFY 18‐27
STIP
Current FFY 17‐25
STIP
Pavement Capital Program US‐1, Commodore Perry Hwy (550 ft east of Charlestown T/L to Succotash Rd)
1277 550 ft east of Charlestown T/L to Succotash Rd
2018 Non‐Bridge2017
Pavement Capital Program US‐1, Tower Hill Rd (Government Center to Rt 4)
1279 Government Center to Rt 4 2020 Non‐Bridge2020
Pavement Capital Program Old Tower Hill Rd (Rt 108 to US‐1)1395 Rt 108 to US‐1 2018 Non‐Bridge2018
Pavement Capital Program Rt 138, Kingstown Rd Contract‐2 (Route 2 to Fairgrounds)
1397 Route 2 to Fairgrounds 2020 Non‐Bridge2020
Pavement Capital Program Flagg Rd (Plains Rd to Old North Rd)1398 Plains Rd to Old North Rd 2020 Non‐Bridge2019
Pavement Capital Program Rt 138, Kingstown Rd Contract‐1 (Railroad Ave to Rt 108)
1399 Railroad Ave to Rt 108 2018 Non‐Bridge2017
Pavement Capital Program Post Rd (US‐1 to US‐1) ‐ Camp Fuller area
1400 US‐1 to US‐1 2023 Non‐Bridge2023
Pavement Capital Program Bridgetown Rd (US‐1 to Rt 1A)1401 US‐1 to Rt 1A 2019 Non‐Bridge2019
Traffic Safety Capital Program
Roadway Departure Mitigation ‐ Guardrail and Median Improvements to Route 1
1469 2018 Non‐Bridge2017
Pavement Capital Program Rt 2 ‐ South County Trail (Rt 138 to Rt 102)
1576 Rt 138 to Rt 102 2024 Non‐Bridge2024
Pavement Capital Program Rt 108, Kingstown Rd & High St2007 Route 108, Kingstown Road and High Street
NA Non‐Bridge2017
Transportation Alternatives URI/South County Bike Path Connector and Extension
5245 Connection from Flagg Rd. to the South County Bike Path
2018 Non‐BridgeNA
Pavement Capital Program Upper College Road Complete Streets Reconstruction
5324 Rt 138 to Flagg Rd 2018 Non‐BridgeNA
Bridge Capital Program Asa Pond Bridge, RI 108 Kingstown Rd at Rocky Brook
6519 2022 Bridge Group 25B2022
Bridge Capital Program Chickasheen Brook Bridge at RI 1386520 2022 Bridge Group 25B2022
FFY 18‐27 STIP Project Funding Status Report ‐ Post SolicitationSouth Kingstown
STIP Program Category Project Name STIP ID Project Limits Bridge Group DRAFT FFY 18‐27
STIP
Current FFY 17‐25
STIP
Bridge Capital Program Chipuxet River Bridge at RI 138 Kingstown Rd
6521 2022 Bridge Group 25B2022
Bridge Capital Program Church Street Bridge at Saugatucket River
6522 2022 Bridge Group 25B2022
Bridge Capital Program Dugway Bridge Road at Queen River6523 2022 Bridge Group 25B2022
Bridge Capital Program Fiske Flat Bridge, High St at Rocky Brook6524 2022 Bridge Group 25B2022
Bridge Capital Program Indian Run Bridge at RI 108 Kingstown Rd
6525 2022 Bridge Group 25B2022
Bridge Capital Program Middle Bridge at Pettaquamscutt River6526 2022 Bridge Group 25B2022
Bridge Capital Program Mitchell Brook Bridge at RI 138 Moresfield Rd
6527 2022 Bridge Group 25B2022
Bridge Capital Program Peacedale Mills Sluiceway, RI 108 Kingstown Rd at Mill Canal
6528 2022 Bridge Group 25B2022
Bridge Capital Program Peacedale Stone Arch, RI 108 Kingstown Rd at Saugatucket River
6529 2022 Bridge Group 25B2022
Bridge Capital Program Rocky Brook Bridge at RI 108 Kingstown Rd
6530 2022 Bridge Group 25B2022
Bridge Capital Program Saugatucket Rd Culvert at Saugatucket River
6531 2022 Bridge Group 25B2022
Bridge Capital Program Usquepaug River Bridge at Old Usquepaugh Rd
6532 2022 Bridge Group 25B2022
Bridge Capital Program Wakefield Cut‐Off, Old Tower Hill Rd at US 1
6533 2022 Bridge Group 25B2022
Bridge Capital Program Silver Lake Ave Bridge at Saugatucket River
6534 2026 Bridge Group 45NA
Bridge Capital Program Kingston Station RR Bridge, RI 138 Kingstown Rd at Amtrak & Access Rd
6729 2018 Bridge Group 54BNA
Maintenance Capital Program
Train Station Maintenance and Repairs ‐ RICAP
7901 2018 Non‐Bridge2017
FFY 18‐27 STIP Project Funding Status Report ‐ Post SolicitationSouth Kingstown
STIP Program Category Project Name STIP ID Project Limits Bridge Group DRAFT FFY 18‐27
STIP
Current FFY 17‐25
STIP
Pavement Capital Program Rt 108/Kingstown Road (Rt. 138/Mooresfield Rd to Saugatucket Rd/Curtis Corner Rd)
9509 Rt 108/Kingstown Road from Rt. 138/Mooresfield Rd to Saugatucket Rd/Curtis Corner Rd
2018 Non‐BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17‐25 STIP or not funded in DRAFT FFY 18‐27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17‐25 STIP column and the earliest funded year listed as 2018 in the Draft 18‐27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
‐
‐
‐
FFY 18-27 STIP Project Funding Status Report - Post SolicitationStatewide
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Traffic Maintenance Signage, Lighting Repair1116 2018 Non-Bridge2017
Traffic Maintenance Permits1117 2018 Non-Bridge2017
Traffic Maintenance Immediate Action - RISTARS1118 2018 Non-Bridge2017
Pavement Capital Program Pavement Projects Currently Under Construction
1264 2018 Non-Bridge2017
Pavement Capital Program Pavement Program Planning1265 2018 Non-Bridge2017
Contingency - Inflation Contingency - Inflation1427 2020 Non-Bridge2017
Traffic Safety Capital Program
Projects Currently Under Construction1430 2021 Non-BridgeNA
Traffic Safety Capital Program
State Traffic Commission Support1431 2018 Non-Bridge2017
Traffic Safety Capital Program
Limited Access Roadway Guide Sign Replacement
1432 2020 Non-BridgeNA
Traffic Safety Capital Program
Guardrail Improvements1433 2019 Non-BridgeNA
Traffic Safety Capital Program
Highway Lighting1434 2021 Non-BridgeNA
Traffic Safety Capital Program
Exit Renumbering - Limited Access Facilities
1435 2018 Non-BridgeNA
Traffic Safety Capital Program
Traffic Safety Capital Program Planning Support
1436 2020 Non-BridgeNA
Traffic Safety Capital Program
Strategic Highway Safety Plan1445 2018 Non-Bridge2017
Traffic Safety Capital Program
On-Call Highway Safety Improvement Program Engineering Support Services
1446 2018 Non-Bridge2017
Traffic Safety Capital Program
Roadway Departure Mitigation - Systemic Horizontal Curve Delineation and High Friction Surface
1457 NA Non-Bridge2017
Traffic Safety Capital Program
Roadway Departure Mitigation - Systemic Bridge Blunt End Treatments Phase 2
1470 NA Non-Bridge2017
FFY 18-27 STIP Project Funding Status Report - Post SolicitationStatewide
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Traffic Safety Capital Program
Roadway Departure Mitigation - Systemic Roadway Delineation
1478 NA Non-Bridge2017
Transportation Alternatives GEB Bicycle Improvements Contingency Account
1492 2018 Non-BridgeNA
Transportation Alternatives TAP Program General Contingency Account
1493 2026 Non-BridgeNA
Traffic Safety Capital Program
2021 Traffic Signal Improvements1521 2020 Non-Bridge2019
Traffic Safety Capital Program
Statewide Traffic Signal Improvements1538 2019 Non-Bridge2023
Drainage Capital Program Immediate Needs2033 2018 Non-BridgeNA
Drainage Capital Program Lower Woonasquatucket2034 2018 Non-BridgeNA
Drainage Capital Program Upper Woonasquatucket2035 2018 Non-BridgeNA
Drainage Capital Program Greenwich Bay (A)2039 2018 Non-BridgeNA
Drainage Capital Program Greenwich Bay (B)2040 2018 Non-BridgeNA
Drainage Capital Program Kickemuit/ Mount Hope Bay2041 2019 Non-BridgeNA
Drainage Capital Program Saugatucket/ South Kingstown2042 2019 Non-BridgeNA
Drainage Capital Program Millers River2043 2019 Non-BridgeNA
Drainage Capital Program Blackstone/Peters River to mouth2044 2020 Non-BridgeNA
Drainage Capital Program Ten MileRiver2045 2020 Non-BridgeNA
Drainage Capital Program Lower West Passage2046 2020 Non-BridgeNA
Drainage Capital Program Pettaquamscutt River2047 2021 Non-BridgeNA
Drainage Capital Program Moshassuck River2048 2021 Non-BridgeNA
Drainage Capital Program Flat River Reservior2049 2021 Non-BridgeNA
Drainage Capital Program Pocassett River2050 2022 Non-BridgeNA
Drainage Capital Program Pawtucket River2051 2022 Non-BridgeNA
Drainage Capital Program Barrington and Warren Rivers2052 2022 Non-BridgeNA
Drainage Capital Program Seekonk & Providence Rivers2053 2023 Non-BridgeNA
FFY 18-27 STIP Project Funding Status Report - Post SolicitationStatewide
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Drainage Capital Program Hunt River2054 2023 Non-BridgeNA
Drainage Capital Program Upper Moossup River2055 2023 Non-BridgeNA
Drainage Capital Program Branch River2056 2024 Non-BridgeNA
Drainage Capital Program Quechan River2057 2024 Non-BridgeNA
Drainage Capital Program Upper Wood River2058 2024 Non-BridgeNA
Drainage Capital Program Lower Wood River2059 2025 Non-BridgeNA
Drainage Capital Program Upper Pawcatuck River2060 2025 Non-BridgeNA
Drainage Capital Program Pawcatuck River Mainstream2061 2025 Non-BridgeNA
Drainage Capital Program Ashaway River2062 2026 Non-BridgeNA
Drainage Capital Program Lower Pawcatuck River2063 2026 Non-BridgeNA
Drainage Capital Program Southeast Coastal Waters2064 2026 Non-BridgeNA
Drainage Capital Program Future Projects2066 2027 Non-BridgeNA
Transportation Alternatives Urban bike route markings & amenities (Green Economy Bond)
5023 Statewide in Urban Areas 2018 Non-BridgeNA
Transit Operations Service & Support- RIPTA
T-Link5074 2018 Non-BridgeNA
Transportation Alternatives Recreational Trails Program5253 2018 Non-Bridge2017
Transit Corridors - RIPTA Transit Corridor Development5254 Statewide 2021 Non-BridgeNA
Transit Capital Program - RIDOT
RIPTA Passenger Infrastructure Enhancement
5256 2020 Non-Bridge2020
Bridge Capital Program Bridge Capital Projects Currently Under Construction
6000 2018 Projects Currently U2017
Bridge Capital Program Immediate Action6999 2018 Immediate Action2017
Toll Operations Toll Operations7000 2018 Non-Bridge2018
Rolling Stock - RIPTA Fixed Route Vehicle Replacement7001 2018 Non-Bridge2017
Rolling Stock - RIPTA Paratransit Vehicle Replacement7002 2018 Non-Bridge2017
Transit Operations Service & Support- RIPTA
Transportation for Individuals with Disabilities (Complimentary ADA)
7004 2018 Non-Bridge2017
FFY 18-27 STIP Project Funding Status Report - Post SolicitationStatewide
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Transit Operations Service & Support- RIPTA
Rural Operations/Intercity Bus7005 2018 Non-Bridge2017
Transit Operations Service & Support- RIPTA
Rural Technical Assistance Program (RTAP)
7006 2018 Non-Bridge2017
Transit Operations Service & Support- RIPTA
Job Access and Reverse Commute Program (JARC)
7007 2018 Non-Bridge2017
Transit Operations Service & Support- RIPTA
ITS/Computers7008 2018 Non-Bridge2017
Transit Operations Service & Support- RIPTA
Replacement/Upgrade of Equipment7009 2018 Non-Bridge2017
Transit Operations Service & Support- RIPTA
Preventative Maintenance7010 2018 Non-Bridge2017
Transit Operations Service & Support- RIPTA
Admin/Maintenance Facilities7011 2018 Non-Bridge2017
Stops, Stations & Terminals - RIPTA
Passenger Facilities7012 2018 Non-Bridge2017
Transit Operations Service & Support- RIPTA
Planning, Training & Program Management
7013 2018 Non-Bridge2017
Transit Operations Service & Support- RIPTA
Mobility Management7014 2018 Non-Bridge2017
Transit Operations Service & Support- RIPTA
Transit Service Initiatives7015 2018 Non-Bridge2017
Mobility & Innovation - RIPTA
Passenger Initiatives7016 2018 Non-Bridge2017
Mobility & Innovation - RIPTA
Mobility Technology7017 2018 Non-Bridge2017
Mobility & Innovation - RIPTA
Commuter Resources7018 2018 Non-Bridge2017
Transit Operations Service & Support- RIPTA
Vanpools7023 2019 Non-BridgeNA
Transit Operations - RIDOT AMTRAK Access Fee7101 2018 Non-Bridge2017
Transit Operations - RIDOT RI Liability Insurance7102 2018 Non-Bridge2017
FFY 18-27 STIP Project Funding Status Report - Post SolicitationStatewide
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Transit Operations - RIDOT Wickford Junction Operations7103 2018 Non-Bridge2017
Transit Operations - RIDOT Other Operating Expenses7105 2018 Non-Bridge2017
Transit Operations - RIDOT SCCR Capital Maintenance7106 2018 Non-Bridge2017
Transit Operations - RIDOT MBTA Operations (Capital for Operations)
7107 2018 Non-Bridge2017
Transit Operations - RIDOT Summer Service7109 2018 Non-Bridge2017
Pass Throughs RIPTA CMAQ7110 2018 Non-BridgeNA
Transit Capital Program - RIDOT
State of Good Repair Capital7150 2019 Non-Bridge2019
Transit Capital Program - RIDOT
Long Term Transit Projects7151 2022 Non-Bridge2021
Bridge Maintenance Bridge Inspection7201 2018 Non-Bridge2017
Bridge Maintenance Expansion Joint Cleaning/Spot Painting7202 2018 Non-Bridge2017
Bridge Maintenance Bridge Permits7203 2018 Non-Bridge2017
Pavement Maintenance Crack Sealing7301 2018 Non-Bridge2017
Pavement Maintenance Immediate Action7302 2018 Non-Bridge2017
Pavement Maintenance Inspection7303 2018 Non-Bridge2017
Pavement Maintenance Permits7304 2018 Non-Bridge2017
Pavement Maintenance Chip Seal, Surface Seal7305 2018 Non-Bridge2017
Drainage Maintenance 2015 and Prior Level7401 2018 Non-Bridge2017
Drainage Maintenance Street Sweeping Beyond Current Level7402 2018 Non-Bridge2017
Drainage Maintenance Catch Basin Cleaning, Inspection, and Repair
7403 2018 Non-Bridge2017
Drainage Maintenance Immediate Action and IDDE Investigations
7404 Various 2018 Non-Bridge2017
Maintenance Operations Winter Maintenance7501 2018 Non-Bridge2017
Maintenance Operations Vehicle Maintenance (includes fuel)7502 2018 Non-Bridge2017
Maintenance Operations Maintenance7503 2018 Non-Bridge2017
FFY 18-27 STIP Project Funding Status Report - Post SolicitationStatewide
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Maintenance Operations Pothole Repair7504 2018 Non-Bridge2017
Maintenance Operations Transportation Management Center7505 2018 Non-Bridge2017
Maintenance Operations Safety Hardware Replacement (Guardrail, Fencing, Impact Attenuators)
7506 2018 Non-Bridge2017
Maintenance Operations Immediate Action7507 2018 Non-Bridge2017
Headquarters Operations Director's Office - 3850101 & 38601017601 2018 Non-Bridge2017
Headquarters Operations Press Office - 38501017602 2018 Non-Bridge2017
Headquarters Operations Legal - 38501027603 2018 Non-Bridge2017
Headquarters Operations Human Resources - 38501037604 2018 Non-Bridge2017
Headquarters Operations Property Management - 38501057605 2018 Non-Bridge2017
Headquarters Operations Office of Highway Safety - 38501067606 2018 Non-Bridge2017
Headquarters Operations External Audit - 3860103 & 38501047607 2018 Non-Bridge2017
Headquarters Operations Financial Management - 38601047608 2018 Non-Bridge2017
Headquarters Operations Technology - 38601067609 2018 Non-Bridge2017
Headquarters Operations DOA Purchasing Centralization Costs7610 2018 Non-Bridge2017
Headquarters Operations DOA DBE Staff Member7611 2018 Non-Bridge2017
Headquarters Operations Health & Safety Programs - 38701187612 2018 Non-Bridge2017
Headquarters Operations Design (Legacy Consultant with Staff) Bridge
7613 2018 Non-Bridge2017
Headquarters Operations Design (Legacy Consultant with Staff) Traffic
7614 2018 Non-Bridge2017
Headquarters Operations ICR/Overhead Recoveries7615 2018 Non-Bridge2017
Debt Service GO Bond Debt Service7701 2018 Non-Bridge2017
Debt Service GARVEE Debt Service7702 2018 Non-Bridge2017
Debt Service Motor Fuel Bond Debt Service - GARVEE Match
7703 2018 Non-Bridge2017
Planning - Program Development
Capital Program Planning-38701017801 2018 Non-Bridge2017
FFY 18-27 STIP Project Funding Status Report - Post SolicitationStatewide
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Planning - Program Development
Design Oversight - 38701047802 2018 Non-Bridge2017
Planning - Program Development
Construction Oversight - 38701057803 2018 Non-Bridge2017
Planning - Program Development
Materials Section - 38701177804 2018 Non-Bridge2017
Planning - Program Development
RI SHPO7805 2018 Non-Bridge2017
Planning - Program Development
Narragansett Indians7806 2018 Non-Bridge2017
Planning - Program Development
RI Department of Environmental Management
7807 2018 Non-Bridge2017
Planning - Program Development
Asset Management - Data Collection - Mapping
7808 2018 Non-Bridge2017
Planning - Program Development
LTAP7809 2018 Non-Bridge2017
Planning - Program Development
DBE - Title VI - Workforce Development7810 2018 Non-Bridge2017
Planning - Program Development
Program Planning7811 2018 Non-Bridge2017
Maintenance Capital Program
Maintenance - Capital Equipment Replacement - Total
7902 2018 Non-Bridge2017
Maintenance Capital Program
Salt Storage Facilities7903 2018 Non-Bridge2017
Maintenance Capital Program
Maintenance Facility Asset Protection7906 2018 Non-Bridge2017
Toll Capital Program Gantry Costs8000 NA Non-Bridge2017
Transportation Alternatives ADA Plan Project Implementation9011 2019 Non-Bridge2019
Drainage Capital Program Drainage - Bristol Division9301 NA Non-Bridge2019
Drainage Capital Program Drainage - Kent Division9302 NA Non-Bridge2020
Drainage Capital Program Drainage - Newport Division9303 NA Non-Bridge2020
FFY 18-27 STIP Project Funding Status Report - Post SolicitationStatewide
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Drainage Capital Program Drainage - Northwest Division9304 NA Non-Bridge2021
Drainage Capital Program Washington North Drainage9306 NA Non-Bridge2017
Drainage Capital Program Washington South Drainage9307 NA Non-Bridge2018
Drainage Capital Program Drainage Repairs9308 NA Non-Bridge2017
Traffic Maintenance Statewide Pavement Striping - Central9401 2018 Non-Bridge2017
Traffic Maintenance Statewide Pavement Striping - East Bay9402 2018 Non-Bridge2017
Traffic Maintenance Statewide Pavement Striping - Limited Access
9403 2018 Non-Bridge2017
Traffic Maintenance Statewide Pavement Striping - North9404 2018 Non-Bridge2017
Traffic Maintenance Statewide Pavement Striping - South9405 2018 Non-Bridge2017
Pavement Capital Program 2026 Pavement Capital Program Immediate Needs Set-Aside (5% of $120M for construction/0.75% for design)
9511 2026 Non-BridgeNA
Pavement Capital Program 2027 Pavement Capital Program Immediate Needs Set-Aside (5% of $120M for construction/0.75% for design)
9512 2026 Non-BridgeNA
Pavement Capital Program Design Set-Aside for Remainder of FY 2028 Program (Assume approximately $120M FY2028 program cap with approximately 15% set asside for design in 2028)
9515 2027 Non-BridgeNA
Traffic Safety Capital Program
Intersection Safety Improvements9601 2018 Non-Bridge2017
Traffic Safety Capital Program
Traffic Signal Optimization9602 2018 Non-Bridge2017
Traffic Safety Capital Program
Local Safety Improvements - Contracts 1, 2, 3, and Newport/Providence
9603 2019 Non-Bridge2017
Traffic Safety Capital Program
Safety Corridor Improvements - Statewide Road Diet Installation
9604 2021 Non-Bridge2017
FFY 18-27 STIP Project Funding Status Report - Post SolicitationStatewide
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Traffic Safety Capital Program
State Traffic Commission Improvements9605 2018 Non-Bridge2017
Traffic Safety Capital Program
RISTARS - East Bay - Near-Term Signing, Striping, & Signal Safety Improvements
9607 2018 Non-Bridge2017
Traffic Safety Capital Program
Roadway Departure Mitigation - Horizontal Curve Enhancements
9608 2018 Non-Bridge2017
Traffic Safety Capital Program
Roadway Departure Mitigation - Non-Freeway Roadside Improvements
9609 2018 Non-Bridge2017
Traffic Safety Capital Program
State Traffic Commission - Pedestrian and Intersection Safety Improvements
9610 2018 Non-Bridge2018
Traffic Safety Capital Program
2019 Interchange Safety Improvements9611 2018 Non-Bridge2017
Traffic Safety Capital Program
Wrong Way Driving Mitigation - Geometric Improvements to Ramp Facilities
9612 2018 Non-Bridge2017
Traffic Safety Capital Program
Safety Data Improvements9613 2021 Non-Bridge2019
Traffic Safety Capital Program
2020 Roadway Departure Mitigation9614 NA Non-Bridge2017
Pass Throughs NHTSA Program Grants11001 2018 Non-Bridge2017
Pass Throughs Planning Statewide11003 2018 Non-Bridge2017
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationTiverton
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Rt 24 (Rt 138 to Massachusetts S/L)1287 Rt 138 to Massachusetts S/L 2025 Non-Bridge2024
Pavement Capital Program Fish Rd (Rt 177 to Mass. S/L)1402 Fish Rd (Rt 177 to Mass. S/L) 2023 Non-Bridge2022
Pavement Capital Program East Rd (Rt 179 to Rt 81)1403 Rt 179 to Rt 81 2022 Non-Bridge2020
Pavement Capital Program Bridgeport Rd & Highland Rd1404 Highland Rd (Rt 77 to Rt 77) and Bridgeport Rd (Rt 77 to Highland Rd)
2020 Non-Bridge2020
Pavement Capital Program Rt 77, Main Rd (Central Ave to Fairfield Ave)
1405 Central Ave to Fairfield Ave 2023 Non-Bridge2023
Traffic Safety Capital Program
Intersection Safety Improvements to Canning Boulevard at Stafford Road Tiverton - Roundabout
1484 2018 Non-Bridge2017
Bridge Capital Program Adamsville Fall River Bridge, RI 81 Crandall Rd at Adamsville Brook
6589 2018 Bridge Group 15B2017
Bridge Capital Program Eagleville Road NB at RI 24 NB6590 2018 Bridge Group 15B2017
Bridge Capital Program Eagleville Road SB at RI 24 SB6591 2018 Bridge Group 15B2017
Bridge Capital Program Eight Rod Way, Fish Rd NB at RI 24 NB6592 2018 Bridge Group 15B2017
Bridge Capital Program Nannaquaket Pond Bridge at RI 77 Main Rd
6593 2018 Bridge Group 15B2017
Bridge Capital Program Sin & Flesh Brook Bridge at Old Main Rd6594 2018 Bridge Group 15B2017
Bridge Capital Program Tiverton Four Corners Bridge, RI 77 West Main Rd at Borden Brook
6595 2018 Bridge Group 15B2017
Bridge Capital Program Beattie Brook Bridge at Nannaquaket Rd6596 2021 Bridge Group 442021
Bridge Capital Program Nannaquaket Rd Bridge at Nannaquaket River
6597 2021 Bridge Group 442021
Bridge Capital Program Nonquit Pond Bridge at Pond Bridge Rd6598 2021 Bridge Group 442021
Bridge Capital Program Old Crandall Rd 1 Bridge at Adamsville Brook
6599 2021 Bridge Group 442021
Bridge Capital Program Old Crandall Rd 2 Bridge at Adamsville Brook
6600 2021 Bridge Group 442021
Bridge Capital Program Eight Rod Way, Fish Rd SB at RI 24 SB6832 2027 Bridge Group 81ANA
FFY 18-27 STIP Project Funding Status Report - Post SolicitationTiverton
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Sousa Road (Rt 138/Main Rd to Fish Rd)9506 Sousa Road from Rt 138/Main Rd to Fish Rd
2024 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18‐27 STIP Project Funding Status Report ‐ Post SolicitationWarren
STIP Program Category Project Name STIP ID Project Limits Bridge Group DRAFT FFY 18‐27
STIP
Current FFY 17‐25
STIP
Pavement Capital Program Rt 114, Hope St and Main St (Washington St to Dyer Ave)
1300 Washington St to Dyer Ave 2022 Non‐Bridge2019
Pavement Capital Program Birch Swamp Rd and Schoolhouse Rd (Market St to Long Ln)
1406 Market St to Long Ln 2024 Non‐Bridge2024
Pavement Capital Program Vernon St (Rt 114 to Rt 136)1407 Rt 114 to Rt 136 2024 Non‐Bridge2024
Pavement Capital Program Rt 114, Main St (Warren Bridge to Child St)
1408 Warren Bridge to Child St 2021 Non‐Bridge2023
Pavement Capital Program Rt 136, Market St/Kickemoit St/Metacom Ave (Bristol T/L to Massachusetts S/L). Also, Market St from Rt 114 to Rt 136.
1409 Bristol T/L to Massachusetts S/L 2023 Non‐Bridge2023
Traffic Safety Capital Program
Intersection Safety Improvements to Metacom Avenue (RI 136) ‐ Signal Upgrades and Left Turn Lanes
1458 RI 136 2018 Non‐Bridge2017
Traffic Safety Capital Program
Intersection Safety Improvements to Main Street (RI 114) at Market Street/Miller Street.
1466 RI 114 2018 Non‐Bridge2018
Transportation Alternatives Safe Routes to School Infrastructure Improvements for Hugh Cole Elementary School and Kickemuit Middle School
5267 Orchard Ave, Hugh Cole Rd, Child St, Asylum Rd
2018 Non‐Bridge2017
Transportation Alternatives East Bay Bike Path Extension (Warren Bike Path)
5271 East Bay Bike Path to Kickemuit River/Broken Bridge.
2022 Non‐Bridge2022
Bridge Capital Program Belchers Cove Bridge at Market St6620 2018 Bridge Group 152017
Bridge Capital Program Kickamuit River Bridge at RI 103 Child St6621 2018 Bridge Group 152017
FFY 18‐27 STIP Project Funding Status Report ‐ Post SolicitationWarren
STIP Program Category Project Name STIP ID Project Limits Bridge Group DRAFT FFY 18‐27
STIP
Current FFY 17‐25
STIP
Bridge Capital Program South Warren Bridge at South Main St at brook
6622 2018 Bridge Group 152017
Where shown: NA = Not Applicable (project is not in Current 17‐25 STIP or not funded in DRAFT FFY 18‐27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17‐25 STIP column and the earliest funded year listed as 2018 in the Draft 18‐27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
‐
‐
‐
FFY 18-27 STIP Project Funding Status Report - Post SolicitationWarwick
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program I-95 Contract-1 (Rt 2 to Rt 113)1267 Rt 2 to Rt 113 2019 Non-Bridge2019
Pavement Capital Program I-95 Contract-2 (Rt 113 to Service Ave)1268 Rt 113 to Service Ave 2018 Non-Bridge2018
Pavement Capital Program I-295 (I-95 to Rt 5)1274 I-95 to Rt 5 2024 Non-Bridge2023
Pavement Capital Program Rt 4 (Rt 403 to I-95)1284 Rt 403 to I-95 NA Non-Bridge2017
Pavement Capital Program Airport Connector (I-95 to TF Green Airport)
1294 I-95 to TF Green Airport 2025 Non-Bridge2024
Pavement Capital Program Statewide Resurfacing 20171316 Mechanic St (Nichols Ln to Rt 3), Woodville-Alton Rd (Rt 3 to Townsend Rd), Rt 2 Bald Hill Rd (West Natick to WB Mason U-turn), Rt 5/104 Greenville Rd (Rt 7 to Rt 5), Middle Rd (Union St to Schoolhouse Ln)
NA Non-Bridge2017
Pavement Capital Program Rt 117, West Shore Rd (Long St to Oakland Beach Ave)
1410 Long St to Oakland Beach Ave 2025 Non-Bridge2023
Pavement Capital Program Rt 2, Bald Hill Rd and New London Ave (West Natick Ave to Rt 37)
1411 West Natick Ave to Rt 37 2021 Non-Bridge2021
Pavement Capital Program Rt 113, East Ave (Rt 2 to Rt 5)1412 Rt 2 to Rt 5 2024 Non-Bridge2024
Pavement Capital Program Rt 113, Main Ave (Rt 5 to Rt 117)1413 Rt 5 to Rt 117 2023 Non-Bridge2024
Pavement Capital Program US-1, Post Rd (Coronado to Rt 1A)1414 Coronado to Rt 1A 2021 Non-Bridge2020
Pavement Capital Program Rt 5, Lambert Lind Hwy (Mayfield Ave to I-95)
1415 Mayfield Ave to I-95 2019 Non-Bridge2019
Pavement Capital Program Rt 117, Centerville and Legris Ave (Rt 33 to Quaker Ln)
1416 Rt 33 to Quaker Ln 2020 Non-Bridge2020
Traffic Safety Capital Program
Intersection Safety Improvements to I-295 NB at Route 6 Johnston and Jefferson Boulevard at Main Avenue Warwick
1451 NA Non-Bridge2017
Traffic Safety Capital Program
Roadway Departure Mitigation - Guardrail and Median Improvements to I-95 Warwick and Route 146 North Smithfield
1456 Interstate 95 between Cowesett Road and Route 4; Route 146 between School Street and Great Road overpass.
NA Non-Bridge2017
FFY 18-27 STIP Project Funding Status Report - Post SolicitationWarwick
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Traffic Safety Capital Program
Arterial Traffic Signal Improvements - Warwick Ave
1537 2021 Non-Bridge2021
Traffic Safety Capital Program
Interchange Safety Improvements to I-95 at Route 37 Warwick - Frontage Road
1544 2021 Non-Bridge2021
Drainage Capital Program Warwick Ponds2037 2018 Non-BridgeNA
Pavement Capital Program Improvements to Rt. 2 (Rt. 401 to Rt. 113)
5273 Bald Hill Road (Rte 113 to Division St) 2020 Non-Bridge2021
Bridge Capital Program Box Culvert, RI 95 NB & RI 4 ramp at Maskerchugg River
6623 2018 Bridge Group 052017
Bridge Capital Program Box Culvert, RI 95 NB & SB at Maskerchugg River
6624 2018 Bridge Group 052017
Bridge Capital Program Box Culvert, RI 95 SB at Maskerchugg River
6625 2018 Bridge Group 052017
Bridge Capital Program Centerville Road Bridge at I-95 NB & SB6626 2018 Bridge Group 05TC (2017
Bridge Capital Program Greenwich Ave Bridge at I-95 NB & SB6627 2018 Bridge Group 052017
Bridge Capital Program Hardig Brook Culvert 3 at I-95 NB & SB6628 2018 Bridge Group 052017
Bridge Capital Program Knight Bridge, I-295 NB at I-95 SB6629 2018 Bridge Group 052017
Bridge Capital Program Tollgate Road Bridge at I-95 NB & SB6630 2018 Bridge Group 05TC (2017
Bridge Capital Program Bald Hill Ramp, I-295 at Pawtuxet River6631 2022 Bridge Group 082022
Bridge Capital Program Pawtuxet River So. (NB) at I-295 NB6632 2022 Bridge Group 082022
Bridge Capital Program Pawtuxet River So. (SB) at I-295 SB6633 2022 Bridge Group 082022
Bridge Capital Program Boston Post Road Bridge at RI 37 EB & WB
6634 2018 Bridge Group 51ANA
Bridge Capital Program Hillsgrove RR North Bridge at RI 37 WB6635 2018 Bridge Group 51ANA
Bridge Capital Program Hillsgrove RR South Bridge at RI 37 EB6636 2018 Bridge Group 51ANA
Bridge Capital Program Jefferson Blvd North Bridge at RI 37 WB6637 2018 Bridge Group 51ANA
Bridge Capital Program Lincoln Park Ramp North, RI 37 WB at Ramp B
6638 2018 Bridge Group 51ANA
FFY 18-27 STIP Project Funding Status Report - Post SolicitationWarwick
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Lincoln Park Ramp South, RI 37 EB at Ramp A
6639 2018 Bridge Group 51ANA
Bridge Capital Program Apponaug Mill, Rt 117 Centerville Rd at Maskerchugg River
6640 NA None Indicated2017
Bridge Capital Program Box Culvert RI 2, RI 2 Quaker Lane at Maskerchugg River
6641 2018 Bridge Group 122017
Bridge Capital Program Buckeye Brook Bridge at RI 117 W Shore Rd
6642 2018 Bridge Group 122017
Bridge Capital Program Carpenters Corner Bridge, RI 117 Centerville Rd at Tuscatucket River
6643 2018 Bridge Group 122017
Bridge Capital Program Cottage Home Bridge, RI 117A Warwick Ave at Buckeye Brook
6644 2018 Bridge Group 122017
Bridge Capital Program Hardig Brook Culvert 2, RI 117 Centerville Road
6645 2018 Bridge Group 122017
Bridge Capital Program Natick Bridge, RI 33 Providence St at Pawtuxet River
6646 2018 Bridge Group 122017
Bridge Capital Program Airport Elevated Rdwy at Arrival Rd6647 2020 Bridge Group 232020
Bridge Capital Program Coronardo Road Bridge at Amtrak6648 2020 Bridge Group 232020
Bridge Capital Program Gorton RR SB Bridge, US 1 SB By-pass at Amtrak
6649 2020 Bridge Group 232020
Bridge Capital Program Hardig Brook Bridge at RI 115 Tollgate Rd
6650 2020 Bridge Group 232020
Bridge Capital Program Old Warwick Ave Bridge at Buckeye Brook
6651 2020 Bridge Group 232020
Bridge Capital Program Pontiac Bridge, RI 5 Greenwich Ave at Pawtuxet River
6652 2020 Bridge Group 232020
Bridge Capital Program Airport Elevated Rdwy North at Terminals, Parking
6653 2022 Bridge Group 252022
Bridge Capital Program Pettaconsett Ave Bridge, I-95 NB & SB at Jefferson Blvd
6654 2024 Bridge Group 332024
Bridge Capital Program Warwick Mall Bridge, Jug Handle Rd at Meshanticut Brook
6655 2021 Bridge Group 422021
FFY 18-27 STIP Project Funding Status Report - Post SolicitationWarwick
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program West Natick Road Bridge at Meshanticut Brook
6656 2021 Bridge Group 422021
Bridge Capital Program Jefferson Blvd South Bridge, RI 37 EB6657 2018 Bridge Group 51ANA
Bridge Capital Program Airport Bridge, Airport Connector at US 1 Post Rd
6659 2018 Bridge Group 672017
Bridge Capital Program Jefferson Blvd Bridge, Airport Connector at Jefferson Blvd
6660 2018 Bridge Group 672017
Bridge Capital Program Pawtuxet River So East Bridge, RI 2 NB Bld Hill Rd at Pawtuxet River
6661 2018 Bridge Group 672017
Bridge Capital Program Pawtuxet River So West Bridge, RI 2 NB Bald Hill Rd at Pawtuxet River
6662 2018 Bridge Group 672017
Bridge Capital Program Pawtuxet River West Bridge, RI 2 SB Bald Hill Rd at Pawtuxet River
6663 2018 Bridge Group 672017
Bridge Capital Program Westcott Bridge, Metro Center Dr at Airport Connector
6664 2018 Bridge Group 672017
Bridge Capital Program Lincoln Park North, RI 37 WB at I-95 NB & SB
6671 2018 Bridge Group 51ANA
Bridge Capital Program Lincoln Park South Bridge, RI 37 EB at I-95 NB & SB
6672 2018 Bridge Group 51ANA
Bridge Capital Program Centerville Road Bridge at RI 2 Bald Hill Rd
6673 2018 Bridge Group 59B2017
Bridge Capital Program Pawtuxet River East Bridge, RI 2 SB Bald Hill Rd at Pawtuxet River
6676 2018 Bridge Group 672017
Bridge Capital Program Collingwood RR Bridge, Airport Connector at Amtrak
6740 2020 Bridge Group 232020
Bridge Capital Program Gorton RR NB Bridge US 1 NB By Pass at Amtrak
6745 2020 Bridge Group 232020
Transit Operations - RIDOT Commuter Rail Marketing7104 2018 Non-Bridge2017
Transit Operations - RIDOT Providence to Green Airport Service7108 2018 Non-Bridge2017
Pavement Capital Program I-95 NB (160' south of Jefferson Blvd to 320' north of Laurens St overpass)
9522 I-95 NB (160' south of Jefferson Blvd to 320' north of Laurens St overpass)
2026 Non-BridgeNA
FFY 18-27 STIP Project Funding Status Report - Post SolicitationWarwick
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program I-95 SB (140' south of Service Ave to 90' North of Milford St overpass)
9523 I-95 SB (140' south of Service Ave to 90' North of Milford St overpass)
2027 Non-BridgeNA
Pavement Capital Program Rt 117, Centerville Road (Quaker Lane to Diamond Hill Rd)
9536 Rt 117, Centerville Road from Quaker Lane to Diamond Hill Rd
2026 Non-BridgeNA
Pavement Capital Program Rt 1A/Post Rd (Rt 1/Elmwood Ave to Rt 117/Warwick Ave)
9543 Rt 1A/Post Rd from Rt 1/Elmwood Ave to Rt 117/Warwick Ave
2026 Non-BridgeNA
Pavement Capital Program Rt 5, Greenwich Ave (Rt. 113/Main Ave to Rt 117/Centerville Road)
9551 Rt 5, Greenwich Ave from Rt. 113/Main Ave to Rt 117/Centerville Road
2027 Non-BridgeNA
Pavement Capital Program Rt. 117A, Warwick Ave (Sandy Lane to Airport Rd)
9555 Rt. 117A, Warwick Ave from Sandy Lane to Airport Rd
2026 Non-BridgeNA
Pavement Capital Program West Shore Rd (Warwick Ave to Delwood Road)
9565 West Shore Rd from Warwick Ave to Delwood Road
2027 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationWest Greenwich
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Hopkins Hill Road Bridge at I-95 NB & SB6602 2018 Bridge Group 052017
Bridge Capital Program Hungry Hill Bridge, I-95 NB & SB at Big River
6603 2018 Bridge Group 052017
Bridge Capital Program New London Turnpike Bridge at I-95 NB & SB
6604 2018 Bridge Group 052017
Bridge Capital Program Nooseneck River Bridge at I-95 NB & SB6605 2018 Bridge Group 052017
Bridge Capital Program Nooseneck Hollow Bridge, RI 3 Noosneck Hill Rd at Nooseneck River
6606 2018 Bridge Group 122017
Bridge Capital Program Big River Bridge at Rt 3 Nooseneck Hill Rd
6607 2018 Bridge Group 57KNA
Bridge Capital Program Victory Highway Bridge, RI 102 Victory Hwy at I-95 NB & SB
6736 2018 Bridge Group 712017
Pavement Capital Program I-95 SB (140' south of Service Ave to 90' North of Milford St overpass)
9523 I-95 SB (140' south of Service Ave to 90' North of Milford St overpass)
2027 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationWest Warwick
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program I-295 (I-95 to Rt 5)1274 I-95 to Rt 5 2024 Non-Bridge2023
Pavement Capital Program Rt 3, Cowesett Ave and Tiogue Ave (Pilgrim Ave to Rt 2)
1313 Pilgrim Ave to Rt 2 2024 Non-Bridge2024
Pavement Capital Program Rt 117, Centerville and Legris Ave (Rt 33 to Quaker Ln)
1416 Rt 33 to Quaker Ln 2020 Non-Bridge2020
Pavement Capital Program Rt 33, Providence St (Tollgate Rd to East Ave)
1417 Tollgate Rd to East Ave 2022 Non-Bridge2022
Traffic Safety Capital Program
Intersection Safety Improvements to I-295 NB at Route 6 Johnston and Jefferson Boulevard at Main Avenue Warwick
1451 NA Non-Bridge2017
Traffic Safety Capital Program
Arterial Traffic Signal Improvements to Route 1 and Route 3
1536 2021 Non-Bridge2021
Bridge Capital Program West Natick Road NB, I-295 NB at Washington Secondary Bike Path and W Natick Rd
6608 2022 Bridge Group 082022
Bridge Capital Program West Natick Road SB, I-295 SB6609 2022 Bridge Group 082022
Bridge Capital Program Centerville Bridge, RI 117 Main St at Pawtuxet River
6610 2018 Bridge Group 122017
Bridge Capital Program Quidnick RR Bridge, RI 117 Centerville Rd at Washington Secondary Bike Path
6611 2018 Bridge Group 122017
Bridge Capital Program Royal Mills Bridge, RI 33 Providence St at Pawtuxet River
6612 2018 Bridge Group 122017
Bridge Capital Program Clyde Bridge, RI 115 Main St at Pawtuxet River
6613 2022 Bridge Group 252022
Bridge Capital Program Francis J. LaChapelle Bridge, Factory St at Pawtuxet River S Branch
6614 2022 Bridge Group 252022
Bridge Capital Program Pulaski Street Bridge at Pawtuxet River6615 2022 Bridge Group 252022
Bridge Capital Program Providence Street Bridget at I-295 NB & SB
6616 2024 Bridge Group 332024
Bridge Capital Program Artic Mill Bridge, Factory St at Mill Tail Race
6617 2021 Bridge Group 422021
FFY 18-27 STIP Project Funding Status Report - Post SolicitationWest Warwick
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Fairview Ave Bridge at Pawtuxet River6618 2021 Bridge Group 422021
Bridge Capital Program Red Brook Bridge, RI 3 Tiogue Ave6619 2021 Bridge Group 422021
Pavement Capital Program I-95 SB (140' south of Service Ave to 90' North of Milford St overpass)
9523 I-95 SB (140' south of Service Ave to 90' North of Milford St overpass)
2027 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationWesterly
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Rt 78 (US-1 to Connecticut S/L)1289 US-1 to CT S/L 2023 Non-Bridge2022
Pavement Capital Program Cross St (Main St to Granite St)1419 Main St to Granite St NA Non-Bridge2017
Pavement Capital Program US-1, Granite St and Fanklin St (Tower St to Rt 78)
1420 Tower St to Rt 78 2024 Non-Bridge2024
Pavement Capital Program Potter Hill Rd (High St to Hopkinton T/L)1421 High St to Hopkinton T/L 2019 Non-Bridge2019
Pavement Capital Program US-1, Post Rd (Robin Hollow Rd to Prosser Tr)
1423 Robin Hollow Rd to Prosser Tr 2023 Non-Bridge2023
Traffic Safety Capital Program
Roadway Departure Mitigation - Guardrail and Median Improvements to Route 1
1469 2018 Non-Bridge2017
Transportation Alternatives Langworthy Road Sidewalks1479 Post Rd to Shore Rd 2026 Non-BridgeNA
Transportation Alternatives Westerly loop (Green Economy Bond)5123 2018 Non-BridgeNA
Transportation Alternatives Safe Routes to School Infrastructure Improvements for State Street Elementary School
5285 Westminster St, Champion St, Hollis St, Emerald St, State St, Fairview Ave
2018 Non-Bridge2017
Transportation Alternatives Bay Street Streetscape Improvements5286 200' East Int. Wauwinnet Ave/Sunset Ave to 400' east of int. Bay st./Larkin Rd
2019 Non-Bridge2022
Bridge Capital Program Granite Quarry Bridge, RI 78 West By-pass at RI 3 Ashaway Rd
6677 2018 Bridge Group 122017
Bridge Capital Program High Street RR Bridge6678 2018 Bridge Group 122017
Bridge Capital Program Cottrell Bridge, RI 91 West Brad Rd at McGowan Brook
6679 2026 Bridge Group 45NA
Bridge Capital Program Water Works Bridge, RI 78 West By-pass at Pawcatuck River
6680 2026 Bridge Group 45NA
Bridge Capital Program Pawcatuck6787 2027 Bridge Group 07NA
Bridge Capital Program Chapman6798 2027 Bridge Group 07NA
Bridge Capital Program Bradford RR6808 2027 Bridge Group 07NA
Bridge Capital Program White Rock Road6819 2027 Bridge Group 07NA
Bridge Capital Program Potter Hill Road6820 2027 Bridge Group 07NA
FFY 18-27 STIP Project Funding Status Report - Post SolicitationWesterly
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program Old Hopkinton Road6821 2027 Bridge Group 07NA
Bridge Capital Program Hopkinton Road RR6822 2027 Bridge Group 07NA
Maintenance Capital Program
Train Station Maintenance and Repairs - RICAP
7901 2018 Non-Bridge2017
Pavement Capital Program Rt. 3, High Street (Ashaway Rd. to Oak St)
9559 Rt. 3, High Street from Ashaway Rd. to Oak St
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-
FFY 18-27 STIP Project Funding Status Report - Post SolicitationWoonsocket
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Pavement Capital Program Rt 146A (Park Ave to Rt 104)1372 Park Ave to Rt 104 2023 Non-Bridge2023
Pavement Capital Program Rt 122, Mendon Rd and Cumberland Hill Rd (Eaton St to Hamlet Ave)
1424 Eaton St to Hamlet Ave 2018 Non-Bridge2018
Traffic Safety Capital Program
Intersections Safety Improvements to Diamond Hill Road at Mendon Road - Additional Turning Lanes
1453 NA Non-Bridge2017
Transportation Alternatives Blackstone River Bikeway - Segment 8A5293 Divison St. to Truman Dr. in Woonsocket
2018 Non-Bridge2018
Transportation Alternatives Safe Routes to School Infrastructure Improvements for Citizens and Pothier Elementary Schools
5294 Robinson St, Winthrop St, Yolande Pl, Chalapa Ave, Morin Heights Blvd, All Saints St
2018 Non-Bridge2017
Traffic Safety Capital Program
Railroad At-Grade Crossing - River St, Slatersville
5296 PW RR Mile Post 1.3 2022 Non-Bridge2022
Transportation Alternatives Woonsocket River Landing5307 2023 Non-Bridge2023
Transportation Alternatives Main Street Improvements5309 Main St. Overlay District, and Main St. from Prospect to Arnold
2019 Non-Bridge2019
Pavement Capital Program Social Street (Main St. to Mass S/L)5312 Main Street to MA S/L 2018 Non-Bridge2018
Transportation Alternatives Blackstone River Bikeway - Segment 8B-1
5318 Truman Dr. in Woonsocket to Market Square
NA Non-Bridge2017
Transportation Alternatives Blackstone River Bikeway - Segment 8B-2
5319 Market St. to Cold Spring Park 2023 Non-Bridge2023
Transportation Alternatives Blackstone River Bikeway - Segment 8C5320 Cold Spring Park to MA border NA Non-Bridge2017
Bridge Capital Program Bernon Street Bridge at Blackstone River6683 2022 Bridge Group 26B2022
Bridge Capital Program Blackstone Street RR Bridge6684 2022 Bridge Group 26B2022
Bridge Capital Program Diamond Hill Road Bridge at Peters River6685 2022 Bridge Group 26B2022
Bridge Capital Program East School Street Bridge at Mill River6686 2022 Bridge Group 26BNA
Bridge Capital Program Elm Street Bridge at Peters River6687 2022 Bridge Group 26BNA
Bridge Capital Program Fairmount Street Bridge at Blackstone River
6688 2022 Bridge Group 26B2022
Bridge Capital Program Mill Street Bridge at Peters River6689 2022 Bridge Group 26B2022
FFY 18-27 STIP Project Funding Status Report - Post SolicitationWoonsocket
STIP Program Category Project Name STIP ID Project Limits Bridge Group
DRAFT FFY 18-27
STIP
Current FFY 17-25
STIP
Bridge Capital Program River Street Bridge at Blackstone River6690 2022 Bridge Group 26B2022
Bridge Capital Program Sayles Street Bridge at Blackstone River6691 2022 Bridge Group 26B2022
Bridge Capital Program Singleton St Bridge at Blackstone River6692 2022 Bridge Group 26B2022
Bridge Capital Program Social Street Bridge at Mill River Conduit6693 2022 Bridge Group 26B2022
Bridge Capital Program Wood Ave Bridge at Peters River6694 2022 Bridge Group 26B2022
Bridge Capital Program Harrison Ave RR Bridge6695 2023 Bridge Group 482023
Bridge Capital Program Privilege Street Bridge at Mill RIver6696 2023 Bridge Group 482023
Bridge Capital Program South Main Street North Arch at Blackstone River
6697 2023 Bridge Group 482023
Bridge Capital Program South Main Street South Arch at Blackstone River
6698 2023 Bridge Group 482023
Maintenance Capital Program
Train Station Maintenance and Repairs - RICAP
7901 2018 Non-Bridge2017
Pavement Capital Program Rt 122, Mendon Rd (Cumberland Hill Rd to Massachusetts S/L)
9538 Rt 122, Mendon Rd from Cumberland Hill Rd to Massachusetts Stateline
2026 Non-BridgeNA
Where shown: NA = Not Applicable (project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
Bridge Group: Rhode Island has followed FHWA best practices by grouping bridges into corridors of work. These corridors of work are identified as bridge groups. Initial and earliest funding years represent the year work is anticipated on the bridge group as a whole; individual bridge start dates may vary.
-
-
-