Post on 30-Apr-2020
FEASIBILITY/DETAILED PROJECT REPORTS(COAL / LIGNITE / BAGASSE BASED)
STATUS AS ON AUGUST 25, 2009
Sl. No.
Name of Project Capacity Scope of Work Date of Award
Present Status
1. Colgong Super Thermal Power Station
3000 MW
Preparation of Techno-economic Project Feasibility Report
March 1976
Completed
2. Ray Super Thermal Power Station
2400 MW
Preparation of Techno-economic Project Feasibility Report
March 1976
Completed
3. Indraprastha Thermal Power Station Extension at DESU/ I.P. Station
1x200 MW
Preparation of Techno-economic Project Feasibility Report
June1986
Completed
4. Ramagundam Thermal Power Station Extension
2x210 MW
Preparation of Detailed Project Report
Nov. 1988
Completed
5. Delhi Electric Supply Undertaking
200 MW Preparation of Techno-economic Project Feasibility Report
Nov. 1977
Completed
6. Coast based Thermal Power Station at Krishnapatnam in Andhra Pradesh
2x500 MW
Preparation of Feasibility Report
Aug. 1989
Completed
7. Muddanur Thermal Power Station Stage-II in Andhra Pradesh
2x210 MW
Preparation of Feasibility Report
Aug. 1989
Completed
8. Singareni Collieries Co. Ltd. – Captive Power Plant
60 MW Preparation of Feasibility Report
May 1989
Completed
9. Muzaffarpur Thermal Power Station
2x110 MW
Preparation of Detailed Project Report and site investigations
Feb. 1978
Completed
Sl. No.
Name of Project Capacity Scope of Work Date of Award
Present Status
10. Captive Power Plant of Heavy Engineering Corpn. Ltd.
2x20 MW Preparation of Detailed Project Report
Aug. 1981
Completed
11. Hindustan Zinc Limited
Preparation of Feasibility-cum-Project Report for power generation by utilising system steam Pressure difference between generation and process utility in the Waste Heat Boiler of Roaster Plants
Aug. 1985
Completed
12. Tuticorin Thermal Power Station Stage-IV
1x500 MW
Preparation of Feasibility Report
Aug. 1991
Completed
13. Barsingsar Lignite Thermal Power Station in Rajasthan of Neyveli Lignite Corporation
2x120 MW
Preparation of Detailed Project Report
Aug. 1991
Draft Report Submitted. Project offered for privatisation
14. Captive Power Plant of M/s Raymond Woollen Mills Ltd., Chhindwara, U.P.
5 MW Preparation of Feasibility Report
Dec. 1991
Completed
15. Muzaffarpur Thermal Power Station Extension Stage-II
2x250 MW
Preparation of Detailed Project Report
Dec.1992 Completed
16. Lignite based Power Station Near Ghogha in Bhavnagar Distt., Gujarat
250 MW Preparation of Feasibility Report and Project Report
April 1992
Completed
17. Lignite based Power Station at Mangrol in Surat Distt., Gujarat
250 MW Preparation of Feasibility Report and Project Report
May 1992
Completed
18. Korba West Thermal Power Station by Mukand Ltd.
2x210 MW
Updating of Feasibility Report
June 1992
Completed
Sl. No.
Name of Project Capacity Scope of Work Date of Award
Present Status
19. Gouripore Thermal Power Station by Birla Technical Services
2x67.5 MW
Preparation of Project Report
June 1992
Completed
20. Mangalore Thermal Power Station by Jaiprakash Industries
2x150 MW
Preparation of Project Report
Dec. 1992
Completed
21. Singareni Collieries Co. -Captive Power Plant
2x110 MW
Preparation of Feasibility Report
Sept. 1992
Completed
22. Ramagundam Thermal Power Station Extension Stage-II
2x250 MW
Preparation of Detailed Project Report
April 1993
Completed
23. Kothagudem Thermal Power Station Extension Stage-V
2x250 MW
Preparation of Detailed Project Report
May 1993
Completed
24. DLF Energy Systems – Captive Power Plant for Coal Washery
1x10 MW Preparation of Feasibility Report
Dec. 1992
Completed
25. Metdist Limited, UK – Captive Thermal Power Station for Smelter Complex in Gujarat
75 MW Preparation of Feasibility Report
Aug. 1993
Completed
26. Ramagundam Thermal Power Station Extension Stage-II by GVK Industries
2x250 MW
Preparation of Detailed Project Report
Oct. 1993
Completed
27. Krishnapatnam Coast based Thermal Power Station Stage-II
4x500 MW
Preparation of Feasibility Report
Dec. 1993
Draft Report
submitted; Project
offered for Privatisatio
n
Sl. No.
Name of Project Capacity Scope of Work Date of Award
Present Status
28. Raigarh Thermal Power Station for Jindal Strips Ltd.
2x500 MW
Preparation of Pre-Feasibility Report
March 1994
Completed
29. Captive Power Plant for Nava Bharat Ferro Alloys Ltd.
30 MW Preparation of Feasibility and Project Report
April 1994
Completed
30. Captive Power Plant for Orient Paper Mills at Amlai, M.P.
1x67.5 MW
Preparation of Pre-Feasibility Report
April 1994
Completed
31. Sabarmati Thermal Power Station of Ahmedabad Electricity Co. Ltd.
1x120 MW
Preparation of Detailed Project Report
Oct. 1994
Completed
32. Captive Power Plant for Binani Cement
25 MW Preparation of Feasibility Report considering lignite/coal or naphtha/ HSD or furnace oil/ diesel as fuel and new or old plant
May 1995
Completed
33. Kothagudem Thermal Power Station Extension Stage-VI
2x250 MW
Preparation of Project Report
Aug. 1995
Completed
34. Captive Power Plant at Garhwa works for Bihar Caustic & Chemicals Ltd.
1x25 MW Preparation of Feasibility Report
Oct. 1995
Completed
35. North Madras Thermal Power Station of Tri-Sakthi Energy Private Ltd.
1x500 MW
Preparation of Detailed Project Report
Oct. 1995
Completed
36. Captive Power Plant at Rajmundhry for A.P. Paper Mills Ltd.
1x60 MW Preparation of Feasibility Report
Dec. 1995
Completed
Sl. No.
Name of Project Capacity Scope of Work Date of Award
Present Status
37. Yamunanagar Thermal Power Station of United Development Inc., Member of Eisenburg Group of Companies, Israel
2x350 MW
Preparation of Project Report
Feb. 1996
Completed
38. Naraj Thermal Power Station of India Power Partners Pvt.Ltd.
2x250 MW
Preparation of Detailed Project Report
Aug. 1995
Completed
39. Lignite based Power Station near Ghogha in Bhavnagar Distt., Gujarat
3x120 MW
Preparation of Detailed Project Report
May Completed
40. Sabarmati Thermal Power Station ‘C’ Phase I & II of The Ahmedabad Electricity Co. Ltd.
2x30 MW Preparation of Feasibility Report
March 1996
Completed
41. Vijayawada Thermal Power Station of APSEB
1x500 MW
Preparation of Detailed Project Report
June 1996
Completed
42. Power Plant at Hazira for KRIBHCO
10 MW Preparation of Feasibility Report
Oct. 1997
Completed
43. Goindwal Thermal Power Station of GVK Industries
2x250 MW
Preparation of Detailed Project Report
March 1998
Completed
44. Sanjay Gandhi Thermal Power Station of MPEB
1x500 MW
Preparation of Feasibility/ Project Report
May 1999
Completed
45. Coal based Thermal Power Project at Maithon Right Bank, Dhanbad for BSES Limited
4x250 MW
Preparation of Detailed Project Report
July 2000 Completed
46. Bagasse based Cogeneration Plant at
24 MW Preparation of Detailed June Completed
Sl. No.
Name of Project Capacity Scope of Work Date of Award
Present Status
Sameerwadi in Karnataka for Godavari Sugar Mills Ltd.
Project Report 2001
47. Coal based Green field Thermal Power Project at Kodarma in Jharkand for Damodar Valley Corporation
2x500 MW
Preparation of Detailed Project Report
Dec. 2001
Completed
48. Coal based Green field Thermal Power Project at Maithon Left Bank area in West Bengal for Damodar Valley Corporation
2x500 MW
Preparation of Detailed Project Report
Dec. 2001
Completed
49. Coal based Captive Power Plant in Orissa for Jindal Steel & Power Limited
100 MW Preparation of Techno-commercial Feasibility Report
Dec. 2001
Completed
50. Coal based Thermal Power Station at Amarkantak Chachai, Dist. Shahdol for Madhya Pradesh State Electricity Board
210 MW Preparation of Feasibility Report
Dec. 2001
Completed
51 Coal based Power Plant at Binani Zinc, Binanipuram, Kochi – Binani Industries Limited
50 MW Preparation of Feasibility Report
Feb. 2002
Completed
52. IGCC Demonstration Plant at Dadri Station of Nexant, USA
100 MW Preparation of Feasibility Report
May 2002
Completed
53. Yamunanagar Thermal Power Project for Haryana Power Generation Corporation Limited
2x250 MW
Preparation of Detailed Project Report
July 2002 Completed
Sl. No.
Name of Project Capacity Scope of Work Date of Award
Present Status
54. Biomass based Power Plant at Bellary, Karnataka – Shiv Sai Power Systems Pvt. Limited
7.5 MW Preparation of Detailed Project Report
Sept. 2003
Completed
55. Biomass Power Plant at Bangalore of Mangalam Energy Pvt. Ltd.
6 MW Preparation of Feasibility Report
Sept. 2003
Completed
56. Captive Power Plant at Korba of Aryan Coal Benefications Pvt. Ltd.
10 MW Preparation of Feasibility Report
Dec. 2003
Completed
57. Independent Power Plant at Choudwar of Indian Charge Chrome Ltd.
2x60 MW Preparation of Feasibility Report
Feb. 2004
Completed
58. Power Plant at Mundra SEZ, Dist. Kutch for Mundra Special Economic Zone Limited
1x60 MW Preparation of Feasibility Report
Feb. 2004
Completed
59. Biomass based Power Plants in Karnataka for Karnataka Renewable Energy Development Ltd.
5x7.5 MW
Preparation of Project Report
March 2004
Completed
60. Power Plant at Mundra SEZ, Dist. Kutch for Mundra Special Economic Zone Limited
250 MW Preparation of Detailed Project Report
June 2004
Completed
61. Super Thermal Power Project at Bhaiyathan for Chhattisgarh State Electricity Board
2x500 MW
Preparation of Feasibility Report
June 2004
Completed
62. Captive Power Plant at Raigarh for Jindal Steel & Power Ltd.
3x25 MW Preparation of Detailed Project Report
June 2004
Completed
Sl. No.
Name of Project Capacity Scope of Work Date of Award
Present Status
63. Captive Power Plant at Korba of Aryan Coal Benefications Pvt. Ltd.
30 MW Preparation of Feasibility Report
July 2004 Completed
64. Coal/Flue Gas based Power Plant at Choudwar, Dist. Cuttack in Orissa of Indian Charge Chrome Limited
10 MW Preparation of Detailed Project Report
Sept. 2004
Completed
65. Coal/Flue Gas based Power Plant at Choudwar, Dist. Cuttack in Orissa of Indian Charge Chrome Limited
25 MW Preparation of Detailed Project Report
Oct. 2004
Completed
66. Thermal Power Plant at Marwa of Chhattisgarh State Electricity Board
2x500 MW
Preparation of Feasibility Report
Dec. 2004
Completed
67. Power Project in Rajasthan of Ranhill (India) Private Limited
330 MW Preparation of Pre-feasibility Report
Jan. 2005
Completed
68. Thermal Power Plant in Talcher area of Ferro Alloys Corporation Ltd.
100 MW Preparation of Detailed Project Report
Feb. 2005
Completed
69. Combined Cycle Gas based Power Plant at Jhajjar for Tata Power Co. Ltd.
2x500 MW
Preparation of Pre-feasibility Report
Feb. 2005
Completed
70. Captive Power Plant of Rawmet Ferrous Ind. Pvt. Ltd.
3x25 MW Preparation of Techno-economic feasibility report
May, 2005
71. Coal based Cogeneration Plant at Baddi of Mahavir Spinning Mills Ltd.
6-8 MW Preparation of Pre-feasibility Report
June, 2005
Completed
Sl. No.
Name of Project Capacity Scope of Work Date of Award
Present Status
(Vardhman Acrylics Ltd.)
72. Thermal Power Station at Kothagudem, Stage-VI of Andhra Pradesh Power Generation Corporation Limited
1x250 MW
Preparation of Detailed Project Report
July 2005 Completed
73. Thermal Power Project at Marwa of Chhattisgarh State Electricity Board
2x500 MW
Preparation of Detailed Project Report
July 2005 Completed
74. Thermal Power Station at Vijayawada, Unit-7 of Andhra Pradesh Power Generation Corporation Limited
1x210 MW
Preparation of Detailed Project Report
July 2005 Completed
75. Captive Power Plant for the New Expansion Project in Madhya Pradesh of Hindalco Industries Ltd.
4x150 MW
+
1x150 MW
Preparation of Detailed Project Report
Sept. 2005
Completed
76. Thermal Power Station at Kothagudem, Stage-VI of APGENCO
1x500 MW
Preparation of Detailed Project Report
Completed
77. Thermal Power Project at Akrimota, Phase-II of Gujarat Mineral Development Corporation Limited
1x250 MW
Preparation of Feasibility Report
Oct. 2005
Completed
78. Lignite based Power Plant at Merta Road, Rajasthan of D S Constructions Ltd.
500 MW Preparation of Feasibility Report
Oct. 2005
Completed
79. Coal based Power 500 MW Preparation of Feasibility Oct. Completed
Sl. No.
Name of Project Capacity Scope of Work Date of Award
Present Status
Plant at Chupperbita, Jharkhand of D S Constructions Ltd.
Report 2005
80. Parichha Thermal Power Station Extn. of UP Rajya Vidyut Utpadan Nigam Ltd.
2x250 MW
Preparation of Detailed Project Report
Oct. 2005
Completed
81. Power Plant at Panipat of Weizmann Limited
2x330 MW
Preparation of Feasibility Report
Oct. 2005
Completed
82. Sasan Ultra Mega Project at Sasan, Madhya Pradesh by M/s Sasan Power Ltd.
5x800 MW
Preparation of Feasibility Report
Feb. 2006
Completed
83. Thermal Power Project at Hisar, Haryana
1000/ 1200 MW
Preparation of Detailed Project Report
Mar. 2006
Completed
84. Coal based Mega Power Project at Matanhel-Jhajjar, Haryana of North Delhi Power Ltd. (Tata Power Co. Ltd.)
Preparation of Pre-feasibility Report
April 2006
Completed
85. Cogeneration Plant at Sameerwadi of The Godavari Sugar Mills Ltd.
30 MW Preparation of Detailed Project Report
May 2006
Completed
86. Power Plant at Vill. & Mouza – Palan & Harin Singha of Durgapur Power Limited
4x250 MW
Preparation of Detailed Project Report
June 2006
Completed
87. Coal based Power Plant of Shri Ramrupuai Balaji Steels Limited
5x250 MW
Preparation of Feasibility Report
Aug. 2006
Completed
88. Coal based Coastal 2x500 Preparation of Detailed Sept. Completed
Sl. No.
Name of Project Capacity Scope of Work Date of Award
Present Status
TPP in Maharashtra of Sunflag Iron & Steel Co. Ltd.
MW/ 4x250 MW
Project Report 2006
89. Coal based Power Plant at Chandrapur, Maharashtra of B.S. Ispat Ltd.
2x35 MW Preparation of Project Report
Oct. 2006
Completed
90. Coal based Power Plant at Chandrapur, Maharashtra of Gondwana Ispat Ltd.
2x50 MW Preparation of Project Report
Oct. 2006
Completed
91. Coal based Power Plant at Chandrapur, Maharashtra of Baidhyanath Power & Mining Ltd.
2x135 MW
Preparation of Project Report
Oct. 2006
Completed
92. Coal based Power Plant at Chandrapur, Maharashtra of Central Collieries Co. Ltd.
2x135 MW
Preparation of Project Report
Oct. 2006
Completed
93. Coal based Power Plant of Bhaskar Group of Publications
2x500 MW
Preparation of Feasibility Report
Dec. 2006
Completed
94. Tilaiya Ultra Mega Project at Tilaiya, Jharkhand by M/s Jharkhand Integrated Power Ltd.
5x800 MW
Preparation of Feasibility Report and Project Report
Dec. 2006
Completed
95. Coal based Power Plant at Nagpur of Grace Industries Limited
100 MW Preparation of Detailed Project Report
Jan. 2007
Completed
96. Coal based Thermal Power Plant at Rayalaseema Stage-III of APGENCO
1X210 MW
Preparation of Detailed Project Report
Feb. 2007
Completed
97. Coal based Thermal 2x660 Preparation of Detailed March Completed
Sl. No.
Name of Project Capacity Scope of Work Date of Award
Present Status
Power Plant at Jhajjar of HPGCL
MW Project Report 2007
98. Coal based Thermal Power Plant in Dist. Sidhi of Aryan Coal Benefications Pvt. Ltd.
2x250 MW
Preparation of Feasibility Report
April 2007
Completed
99. Talwandi Sabo Thermal Power Project at Talwandi Sabo, Punja by M/s Talwandi Sabo Power Ltd.
4x500 MW/
3x660 MW/
3x600 MW
Preparation of Feasibility Report and Project Report
May 2007
Completed
100. Rajpura Thermal Power Project at Rajpura, Punjab by M/s Nabha Power Ltd.
2x660 MW
Preparation of Feasibility Report and Project Report
May 2007
Completed
101. Captive Power Plant in Orissa of Visa Steel Limited
200 MW Preparation of Techno-economic Feasibility Report
July 2007 Completed
102. Kakatiya TPP, Stage-II of APGENCO
1x500 + 20% MW
Preparation of Detailed Project Report
Aug. 2007
Completed
103. Rayalaseema TPP, Stage-III of APGENCO
1x500 + 20% MW
Preparation of Detailed Project Report
Aug. 2007
Completed
104. Coal based Power Plant in Karnataka of Jewagri Power Private Limited
1320 MW
(2x660 MW)
Preparation of Detailed Project Report
Aug. 2007
Completed
105. Coal based Power Plant at Ghatikhalllage in Athagarh Tehsil in Cuttack of Aarti Steels Limited
4x125 MW
Preparation of Pre-feasibility Report
Aug. 2007
On going
106. Washery Rejects based TPP at Korba District, Chhattisgarh of Maruti Clean Coal & Power Ltd.
2x135 MW
Preparation of Detailed Project Report
Sept. 2007
Completed
Sl. No.
Name of Project Capacity Scope of Work Date of Award
Present Status
107. Coal based Captive Power Plant at Ras Al Khimah Cement Plant in UAE of Star Cement Co. L.L.C, UAE
35 MW Preparation of Techno-Economic Feasibility Report
Sept. 2007
Completed
108. Coal based Power Plant in Dist. Shadol,Madhya Pradesh of Prakash Industries Limited
4x350 MW
Preparation of Techno Economic Feasibility Report and Detailed Project Report
Dec. 2007
Completed
109. IPP at Champa-Janjgir, Chhattisgarh of Prakash Industries Limited
4x350 MW
Preparation of Techno Economic Feasibility Report and Detailed Project Report
Feb. 2008
On going
110. CPP at Champa, Chhattisgarh of Prakash Industries Limited
3x350 MW
Preparation of Techno Economic Feasibility Report and Detailed Project Report
Feb. 2008
Completed
111. Merchant Power Plant of SCCL of The Singareni Collieries Company Ltd.
2x250 MW
Preparation of Detailed Project Report
March 2008
Completed
112. Chandrapura Thermal Power Station of M/s Damodar Valley Corpn.
3x140 MW
Preparation of Detailed Feasibility Report
March 2008
On going
113. Durgapur Thermal Power Station of M/s Damodar Valley Corporation
1x210 MW +
1x140MW
Preparation of Detailed Feasibility Report
March 2008
On going
114. Mejia TPS Phase-I & II of M/s Damodar Valley Corporation
Preparation of Feasibility Report, DPR
March 2008
On going
115. Coal fired Power Project in UAE of M/s Emirates Trading Agency L.L.C
2x300 MW
Preparation of Feasibility Report
May 2008
Completed
116. Cogeneration Power Plant at Sakarwadi of M/s Somaiya Organo-Chemicals
10-12 MW
Preparation of Detailed Project Report
July 2008 Completed
Sl. No.
Name of Project Capacity Scope of Work Date of Award
Present Status
117. Captive Power Plant at Village Padore, Distt. Anuppur, Madhya Pradesh of M/s Prakash Mega Power Limited
2x660 MW
Preparation of Detailed Project Report
Aug. 2008
Draft Report
submitted
118. Power Plant in Karnataka of M/s Atlas Power India Private Limited
2x660 MW
Preparation of Detailed Project Report
Aug. 2008
Draft Report
submitted
1119.
Cogeneration Plant at Mirwah Gorchani Mirpurkhas, Pakistan of M/s Al.abbas Sugar Mills Ltd., Pakistan
1x60 MW Preparation of Detailed Project Report
Aug. 2008
In progress
120. Gidderbaha Thermal Power Project in District Muktsar, Punjab of M/s PFC Consulting Limited
4x660 MW
Preparation of Feasibility Report and Project Report
Sept. 2008
In progress
121. Barsingsar TPS Extension of M/s Neyveli Lignite Corporation Limited
1x250 MW
Preparation of Feasibility Report
Sept. 2008
Draft Report
submitted
122. Orissa Ultra Mega Power Project of M/s Orissa Integrated Power Ltd.
5x800 MW
Preparation of Feasibility Report and Project Report
Dec. 2008
In progress
123. Sanjay Gandhi TPS Units at Birsingpur, Umaria of M/s M.P. Power Generating Co. Ltd.
2x500 MW/
1x500 MW/
2x250 MW
Preparation of Feasibility Report and Detailed Project Report
Dec. 2008
Draft Report submitted
124. Amarkantak TPS Extn. Unit-6 at Chachai, Anuppur of M/s M.P. Power Generating Co. Ltd.
1x250 MW
Preparation of Feasibility Report and Detailed Project Report
Dec. 2008
Draft Report submitted
125. Akaltara Ultra Mega Power Project of M/s
5x800 MW
Preparation of Feasibility Report and Project
Jan. 2009
In progress
Sl. No.
Name of Project Capacity Scope of Work Date of Award
Present Status
Akaltara Power Limited
Report
126. Coal based Power Plant in Uttar Pradesh of M/s MOSER BAER
150-200 MW
Preparation of Feasibility Report
Feb. 2009
In progress
127. Bansagar Super Thermal Power Station of M/s M.P. Power Generating Co. Ltd.
2x800 MW
Preparation of Feasibility Report and Detailed Project Report
March 2009
In progress
128. Power Plant at Village Joratarai, Tahsil & Dist. Rajnandgaon, Chhattisgarh of M/s Akshay Ispat Udyog Pvt. Ltd.
40 MW Preparation of Feasibility Report
March 2009
In progress
129. Captive Power Plant at Jharsuguda, Orissa of M/s Action Ispat & Power (P) Ltd.
2x40 MW Preparation of Detailed Project Report
April 2009
In progress
130. Additional 3rd Unit at DCRTPP, Yamuna Nagar of M/s HPGCL
1x(250-300) MW
Preparation of Detailed Project Report
April 2009
In progress
131. Kothapeta Ultra Mega Power Project in Andhra Pradesh of M/s PFC Consulting Limited
5x800 MW
Preparation of Feasibility Report and Project Report
June 2009
In progress
132. Power Plant at Village Sakharwahi, Dist. Chandrapur, Maharashtra of M/s B.S. Ispat Ltd.
3x150 MW
Preparation of Detailed Project Report
June 2009
In progress
133. Power Plant at Raigarh, Chhattisgarh of M/s Monnet Ispat & Energy Ltd.
1x80 MW Preparation of Detailed Project Report
July 2009 In progress
FEASIBILITY/DETAILED PROJECT REPORTS(COMBINED CYCLE GAS BASED)
Feasibility/Detailed Project Reports (Combined Cycle Gas based):
Sl. No.
Name of Project Capacity
Scope of Work Date of Award
Present Status
1. 600 MW Gas based Combined Cycle Power Station at Gandhinagar
600 MW Preparation of Feasibility study and Project Report
June 1988
Completed
2. 30 MW Gas based Combined Cycle Power Station at Ankleshwar
30 MW Preparation of a Project Report
June 1988
Completed
Sl. No.
Name of Project Capacity
Scope of Work Date of Award
Present Status
3. 210 MW Gas based Combined Cycle Power Station at Jagdishpur
210 MW Preparation of Detailed Project Report
Feb. 1989
Completed
4. 600 MW Gas based Combined Cycle Power Station in Western U.P.
600 MW Preparation of Detailed Project Report
Feb. 1989
Completed
5. Gas based Combined Cycle Power Station at Ankleshwar
135 MW Preparation of Feasibility Report
Nov. 1989
Completed
6. Utran Gas based Combined Cycle Power Station Extn.
135 MW Preparation of a Project Report
Nov. 1989
Completed
7. Gas based Combined Cycle Power Station at Gandinagar
200 MW Preparation of a Project Report
Jan. 1990
Completed
8. Gas based Combined Cycle Power Station in North Gujarat
300 MW Preparation of Feasibility Report and Detailed Project Report
May 1990
Completed
9. Gas based Combined Cycle Power Station at Pipavav
615 MW Preparation of a Project Report
June 1990
Completed
10. Gas based Combined Cycle Power Station at Shahjahanpur
600 MW Preparation of Feasibility Report and Detailed Project Report
July 1990 Completed
11. Gas based Combined Cycle Power Station at Aonla
600 MW Preparation of Feasibility Report and DPR
July 1990 Completed
12. Gas based Combined Cycle Power Station at Sinor
2x615 MW
Preparation of Feasibility Report and DPR
Aug. 1990
Completed
13. Gas based Combined Cycle Power Station at Jegurupadu near Rajahmundry
400 MW Preparation of Detailed Project Report
Aug. 1990
Completed
14. Delhi Electric Supply Undertaking
2x60 MW
Preparation of techno-economic Feasibility Report for 2x60 MW Gas Turbines
Nov. 1977
Completed
15. Delhi Electric Supply 3x60 Preparation of techno- May Completed
Sl. No.
Name of Project Capacity
Scope of Work Date of Award
Present Status
Undertaking MW economic Feasibility Report for 3x60 MW Gas Turbines
1984
16. Gas based Power Plant at Ramgarh in Rajasthan
3 MW Preparation of Feasibility Report
Sept. 1989
Completed
17. Gas based Captive Power Station for Sodium Metal Pvt. Ltd., Gujarat
3 MW Preparation of Feasibility Report
April 1991
Completed
18. Gas based Combined Cycle Power Station at Jegurupadu
400 MW Updating of Project Report for setting up the Project by GVK Industries
March 1992
Completed
19. Gas based Combined Cycle Power Station at Jegurupadu
200 MW Project Report for setting up the Project by GVK Industries Ltd.
Oct. 1992
Completed
20. Gas based Combined Cycle Power Station at Pipavav
615 MW Preparation of Project Report
April 1993
Completed
21. Naphtha based Combined Cycle Power Station at Khandwa of Subhash Projects & Marketing Ltd.
120-150 MW
Preparation of Detailed Project Report
April 1995
Completed
22. Gas based Combined Cycle Power Station Extension at Vijjeswaram
160 MW Preparation of Detailed Project Report
Oct. 1995
Completed
23. Naphtha based Combined Cycle Power Station at Jhabua of Kedia Power Ltd.
330 MW Preparation of Detailed Project Report
Jan. 1995
Completed
24. Gas based Combined Cycle Power Station at Amguri of India Power Partners Pvt. Ltd.
286 MW Preparation of Detailed Project Report
Nov. 1994
Completed
25. Naphtha based Combined Cycle Power Station at Mandya of India Power Partners Pvt. Ltd.
130 MW Preparation of Detailed Project Report
Aug. 1995
Completed
Sl. No.
Name of Project Capacity
Scope of Work Date of Award
Present Status
26. Naphtha based Combined cycle Power Plant at Bahadurgarh of SUL Power Partners
2x25 MW
Preparation of Detailed Project Report
March 1996
Completed
27. Naphtha based Combined Cycle Power Plant at Kuttapalli of Kedia Power Ltd.
1000 MW
Preparation of Pre-Feasibility Report
Feb. 1996
Completed
28. Utran Gas based Combined Cycle Power Station Extension
300 MW Preparation of Detailed Project Report
May 1998
Completed
29. Power Project in Gujarat for KRIBHCO
200 MW Preparation of Pre-Feasibility Report
May 1998
Completed
30. Gas based Combined Cycle Power Project at Hazira for Gujarat State Petroleum Corporation
160 MW Preparation of Detailed Project Report
May 1998
Completed
31. Gas based Combined Cycle Power Project at Pipavav for KRIBHCO
615 MW Preparation of Pre-Feasibility study Report
Sept. 1998
Completed
32. Gas based Combined Cycle Power Project at Dhuvaran of Gujarat State Electricity Corporation Ltd.
100 MW Preparation of Detailed Project Report
Nov. 1999
Completed
33. Combined Cycle Power Project at Ago-Oja, IIorin, Nigeria of BC Projects Ltd., UK
105 MW Preparation of Detailed Project Report
April 2001
Completed
34. LNG/Natural Gas based Combined Cycle Power Project Expansion at Hazira of Guj.State Energy Gen. Ltd.
156 MW Preparation of Project Report
March 2001
Completed
35. Gas based Power Plants at Hazira, Vaghodia & Khera for Gas Authority
10-15 MW
Preparation of Detailed Feasibility Reports
July 2002 Completed
Sl. No.
Name of Project Capacity
Scope of Work Date of Award
Present Status
of India Ltd.
36. Natural Gas/ LNG based Combined Cycle Power Project at Utran of Gujarat State Electricity Corporation Ltd.
370 MW Preparation of Detailed Project Report & Comprehensive Report for Railway siding and approach Road
Oct. 2002
Completed
37. Natural Gas/ LNG based Combined Cycle Power Project at Utran of Gujarat State Electricity Corporation Ltd.
107 MW Preparation of Feasibility Report & Detailed Project Report
June 2003
Completed
38. Gas based Power Station (s) at Katargam Water Works, Head Water Works & Sarthana Water Works of Surat Municipal Corporation
6 MW Preparation of Feasibility Report
July 2003 Completed
39. Natural Gas based CPP at DLF City, Gurgaon of DLF Universal Ltd.
60 MW Preparation of Feasibility Report
Nov. 2003
Completed
40. Dhuvaran CCPP Stage-II for Gujarat State Electricity Corporation Ltd.
395 MW Preparation of Pre-feasibility Report, Detailed Project Report & EIA Studies
May 2005/ Oct. 2007
Completed
41. Gas based Combined Cycle Power Plant at Panipat of Weizmann Limited
600 MW Preparation of Feasibility Report
Oct. 2005
Completed
42. Gas based CCPP near Kakinada, A.P. of Suryachakra Power Corpn. Ltd.
1000 MW
Preparation of Project Report
April 2006
Completed
43. Gas based Simple Cycle Power Plant at Sharourah in Saudi Arabia – Saudi Electricity Company
51 MW Preparation of Detailed Project Report
April 2007
Completed
44. Gas based Simple Cycle Power Plant at Tihama in Saudi Arabia – Saudi
131 MW Preparation of Detailed Project Report
April 2007
Completed
Sl. No.
Name of Project Capacity
Scope of Work Date of Award
Present Status
Electricity Company
45. Gas based Simple Cycle Power Plant at Jazan in Saudi Arabia – Saudi Electricity Company
263.084 MW
Preparation of Detailed Project Report
April 2007
Completed
46. Gas based Combined Cycle Power Plant at Rithala, New Delhi – North Delhi Power Ltd.
108 MW Preparation of Feasibility Report
Sept. 2007
Completed
47. Basin Bridge Gas Turbine Power Station of Tamil Nadu Electricity Board
4x30 MW
Preparation of Detailed Project Report
April 2008
Completed
FEASIBILITY/DETAILED PROJECT REPORTS (DIESEL / HYDEL)
Sl.No.
Name of Project Capacity Scope of Work Date of Award
Present Status
1. Diesel based Power Station in Andhra Pradesh
100 MW Preparation of detailed project report
May 1989
Completed
2. Fertiliser Corporation of India Ltd.
Preparation of pre-feasibility report for captive power plants at Gorakhpur (60 MW), Ramagundam (60 MW) and Talcher (30 MW)
March 1988
Completed
3. Installation of 13 300 kW Preparation of detailed Decembe Completed
Mini/Micro Hydel Power Stations on Miyagam and Vadodara Branch Canal of Narmada Main Canal
to 750 Kw
project reports for 13 schemes of sizes varying from 300 kW to 750 Kw
r 1988
4. Diesel based Captive Power Station at Talanagari, U.P.
30 MW Preparation of feasibility report and market survey
March 1992
Completed
5. Diesel Power Plant at Ghaziabad of Modi Rubber Ltd.
100 MW Preparation of detailed project report
June 1995
Completed
6. Diesel Power Plant at Mandya of India Power Partners Pvt. Ltd.
130 MW Preparation of detailed project report
April 1995
Completed
7. Diesel Power Plant at Chandausi of India Power Partners Pvt. Ltd.
130 MW Preparation of detailed project report
Completed
8. Diesel Power Plant at Gwalior of Tomen Corporation
100 MW Preparation of detailed project report
November 1994
Completed