Fall 2013 release webinar

Post on 22-Jun-2015

114 views 0 download

description

Watch the recording here: http://www.arenasolutions.com/support/fall-13-webinar/ Arena pioneered cloud PLM applications. The company’s products, including BOMControl, PartsList and PDXViewer, enable engineering and manufacturing teams and their extended supply chains to speed prototyping, reduce scrap, and streamline supply chain management. Arena cloud PLM applications simplify bill of materials and change management for companies of all sizes, and offer the right balance of flexibility and control at every point in the product lifecycle—from prototype to full-scale production.

Transcript of Fall 2013 release webinar

FALL 2013 RELEASESEPTEMBER 25, 2013

Steve Chalgren, VP Product Management & Strategy

Kathy Davies, Product Manager

Paul Welch, Product Manager

Roy Stafford, Product Manager

AGENDA

• Introductions• Fall 2013 Product Previews

API Supply Chain Exchange Project Collaboration Demand Analysis

• How to get more information• Questions

FALL 2013 PRODUCTS

• API

• Supply Chain Exchange

• Project Management

• Cost Analysis

APPLICATION PROGRAMMING INTERFACE (API)

WHAT DOES IT DO?

Provides the ability to develop lightweight and flexible programmatic integrations

Arena Confidential

Samples:• ERP Integration

• Cost Data• Inventory Data

• CRM Integration• SKU’s automatically added to PLM

• CAD Integration• Custom integrations• Add functionality to existing integrations

WHY SHOULD YOU CARE

• Eliminates the manual ‘push’ of data amongst systems

Business Impact: TTM, Product Quality

• Improved organizational communication, collaboration, etc.

Business Impact: TTM

Leverage Your PLM Investment!

SUPPLY CHAIN EXCHANGE

Technical

ARCHITECTURE

• RESTful (REpresentational State Transfer)

• Authentication: session ID

• Protocol: Secure, encrypted https protocol

• Data Transport: JSON (JavaScript Object Notation)

Arena Confidential

SUPPORTED CAPABILITY

• Secure Authentication

• Items – Specs, BOM, Sourcing, Files, etc. Read Create Modify Delete

• Additional Arena objects in future releases

Arena Confidential

EXAMPLE – CREATE AN ITEM

Arena Confidential

url

Authentication

Data

Request

WANT MORE?

October 1st, 2013:

Supply Chain Exchange

SUPPLY CHAIN EXCHANGE

• Multi-tiered supplier collaboration

• Invite unlimited suppliers to view, approve and comment on build packages

• Low cost, low overhead approach to supplier collaboration

OEM

Other Suppliers

Contract Manufacturer

SupplierA

SupplierC

SupplierB

SupplierD

SupplierE

WHY SHOULD YOU CARE

• Ground Breaking - Easily involve your Supplier’s Supplier…End Tier

Business Impact: Competitive advantage to

include your entire supply chain

• More Timely Decision Making – all the way to the manuf. Floor

Business Impact: Less scrap & rework

• Better feedback from Supply Chain

Business Impact: DFM, Fewer Errors

affecting TTM, Product Cost & Quality

OEM

Other Suppliers

Contract Manufacturer

SupplierA

SupplierC

SupplierB

SupplierD

SupplierE

Leverage Your PLM Investment!

SAMPLE USE CASES

Arena Confidential

OEM

Other Suppliers

Contract Manufacturer

SupplierA

SupplierC

SupplierB

SupplierD

SupplierE

• Procurement for quoting

Send a build package

Receive a quote

• Collaborate with CM during NPI

DFM, DFQ

• Many OEMs include CM in change

Approval on ECOs

Implementation tracking

SUPPLY CHAIN EXCHANGE

Demonstration

WANT MORE?

October 2nd, 2013:

PROJECT MANAGEMENT

PROJECT MANAGEMENT

• High level project management in the context of the product record

• Collaborate globally with easy to use projects:

Use projects for new product introductions

Detailed manufacturing and engineering efforts

Targeted quality initiatives

• See real time product record information in the context of your schedule for accurate assessment of project progress

• Evaluate metrics for projects across your workspace with comprehensive reporting to maximize company efficiency.

Arena Confidential

WHY SHOULD YOU CARE

• Gives Mgmt Team the information necessary to make better strategic decisions

Business Impact: Invest in appropriate projects early, kill those that

are not

• Better visibility into Project Status’s for everybody involved – not just PMs

Business Impact: Affects TTM – projects completed on-time, on-

budget

• Less time in administrative tasks: meetings (CCBs), emails, chasing information, etc.

Business Impact: Affects TTM – projects completed on-time, on-

budget

Leverage Your PLM Investment!

SUPPLY CHAIN EXCHANGE

Demonstration

WANT MORE?

October 8th, 2013:

COST ANALYSIS

CUSTOMER PROBLEM

• No easy way to do forecast based planning

• Export BOM data from Arena – AML, cost

• Spend many hours in Excel doing merge and rollup across multiple BOMs

• Results in: Poor visibility into material requirements

Disadvantage when negotiating component prices

Contract Manufacturer often has a better picture on volume

Money left on the table

Arena Confidential

COST ANALYSIS

• Enter a forecast against multiple product BOMs

• Calculate total demand for required materials

• Aggregates across multiple products or product lines

• Include cost and sourcing information from Arena

Arena Confidential

=Total Materials Demand

Forecast Qty.

Product BOM

Product BOM +n

WHY SHOULD YOU CARE

• Reduction in Direct Material Spend

Business Impact: Product Cost reduction and MBO incentives realized!

• You’re living in Excel for forecasting

Business Impact: Significant reduction in manual effort to build and maintain

Future forecasting: Better predictability for negotiating future demand

• Take control back from your CM!

Business Impact: Affects Product Costs

Leverage Your PLM Investment!

SUPPLY CHAIN EXCHANGE

Demonstration

TYPICAL USE-CASE

Arena Confidential

Product 1

Forecast

Product 3Product 2

Period Q1 Q2 Q3 Q4

Product 1 100,000 100,000 150,000 200,000

Product 2 50,000 80,000 100,000 120,000

Product 3 80,000 120,000 150,000 200,000

CALCULATE TOTAL MATERIAL DEMAND

Arena Confidential

Qty. 4 Qty. 2 Qty. 1

Total Demand for Capacitor P/N 1001

Product 1 Product 3Product 2

Capacitor P/N 1001

Qty 4* Forecast Qty 2 * Forecast

Qty 1 * Forecast

++

=

Total 3.45M Pieces Required

Qty used per assembly

WANT MORE?

October 2nd, 2013:

UPCOMING ACTIVITIES

• Training:

• Topic Specific Webinars: October 1st: API

October 2nd: Supply Chain Exchange & Cost Analysis

October 8th: Project Management

www.arenasolutions.com

866.937.1438

THANK YOU