Post on 29-Jul-2020
THE meeting point for investors, designers, providers, operators and decision makers from the hospital industry!
Organization:
3 – 4 September 2013, Congress Center Hamburg
CongreSS-ProgrAM
Leaders in Healthcare: International experts from the fields of health, real estate, politics and finance discuss current developments in the hospital market
Design Build & Upgrade: Renowned architects and hospital operators will present their groundbreaking projects. Functional and patient-friendly design, Green Hospitals and sustainable interiors
Process-Optimization & Facility Management: The focus are solution-oriented approaches to the life cycle of the real estate process optimization, cost-cutting and the clinical work-optimizing strategies
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
2013
2013
2013
2013
EXhibit ion and CongrEssEs
REY JUAN CARLOS HOSPITAL (Madrid, Spain), © RAFAEL DE LA-HOZ ARQUITECTOS
3 C O N G R E S S E S
Simultaneous translation:german/english
english/german
Who will you meet at Hospital Build and Infrastructure Europe?
Hospital Directors and Department Heads from public and private Hospitals
Real Estate Developers and Architects focusing on the healthcare sector
Hospital Controllers
Representatives of the healthcare service sector and Service Providers
Experts from the following fields: hospital technology, logistics, infrastructure development and financing
HBIE 2013 – International Trade Fair and Congresses for the Construction, Operation and Equipment of Hospitals
Gold Sponsors:
Global Partner:
ARCHITECTS& ENGINEERS
www.vkgroup.be
A recent trend or innovation in healthcare facilities design has been a requirement for “future flexibility” or “future proofing” the entire hospital or lab building.
As the medical and hospital design science advances by leaps and bounds, new diagnostic and treatment procedures are developed for clinical administration. The product life cycle for medical equipment becomes shorter, replacing bigger, bulkier and inefficient energy hungry machines by smaller, more efficient and environmentally friendly ones.
That is all great news for the clinicians and the patients alike. However, that also means that the current design, layout and services provision of our hospitals and within them theatres, surgeries and many other departments become obsolete quicker and need to be redesigned.
Find out on our 3 congresses how to design or renovate your hospital to become competitive and sustainable. Benefit from the experience of numerous international projects and inform yourself in compact form on ways and means to survive with your clinic in a fast flexible and innovative market.
Is your hospital flexible enough?
m e e t y o u r c o l l e a g u e s a t H B I E i n H a m b u r g
EuropeanCentre of Expertisefor the Health Care Industry
2
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
Meet the leaders and pioneers of the European hospital market and keep up todate with the latest and most important developments!
3 Congresses:
Congress 1: Leaders in Healthcare Here, you will receive an overview of the key challenges in the healthcare sector of today. Renowned experts from various backgrounds will illustrate how the imminent changes in the healthcare sector also hold new opportunities. Learn from these leaders in healthcare how you can safely and successfully position your department in the face of competition.
Congress 2: Design, Build & UpgradeBased on numerous international sample projects, senior managers of healthcare institutions as well as architects, service providers and related industries will see how an interdisciplinary approach can help create an effective, humane yet cost-efficient healing environment. Learn how hospital planning can contribute to the implementation of a lean management approach, thus saving costs and increasing efficiency.
Congress 3: Process Optimization & Facility Management The cost aspect is becoming increasingly important in the hospital. To avoid losses, times, processes, and resources need to be optimized. In addition to Process Optimization, it is also a task of Facility Management to reduce the cost pressures in hospitals as well as to improve the energy balance and sustainability. At this congress the requirements and opportunities of the professional Process Optimization and the FM will be presented and discussed on the basis of already successful models.
Your schedule:
Congresses
3 September 2013 4 September 2013
Room 1: Room 2: Room 3: Room 1: Room 2: Room 3:
10.00 – 13.00
Leaders inHealthcare
10.00 – 14.00
Process Optimi-zation & Facility Management
10.00 – 13.00
Leaders inHealthcare
10.00 – 13.30
Design, Build & Upgrade
10.00 – 13.00
Process Optimi-zation & Facility Management
10.30 – 13.30
Design, Build & Upgrade
14.00 – 16.00
Workshop: Long-Term Archiving of Data in the Healthcare Sector
14.00 – 16.00
Workshop: Funding Advice
14.00 – 16.00
Architects@ Display – Architects present their ongoing or recently completed projects
+ Exhib itor Night
3
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
4 September 2013
INvESTINg AND FINANCINg
10.00 – 10.30
Public Private Partnership Projects in the Healthcare of Russia: Perspective Options for InvestorsFarit Kadyrov, Deputy Director, Ministry of Healthcare,
Moscow
10.30 – 11.00
Health PPPs in the context of European austerity and the economic crisisSteve Wright, Executive Director, European Centre For
Healthcare Assets and Architecture (ECHAA)
11.00 – 11.30
Going Green? But where are the Budgets? Innovative OffBalance Financing Solutions for Energy Efficiency (health care sector)Dr. Rolando Gennari, Senior Adviser, Energy Savings
Bond/CUT POWER
11.30 – 12.00 Coffee Break
12.00 – 12.30
Modern Financing Schemes for Hospital Projects You can still apply for this Speaking Slot.
12.30 – 13.00
Discussion Round: Resilience of European private Hospitals to the Financial Crisis Paul Garassus, Member of the Board, European Private
Hospital Union (UEHP)
Vladimir Kukushkin, CEO, Association of Private
Clinics, Moscow
13.00
Visit of the Hospital Build & Infrastructure Exhibition
3 September 2013
WELCOME NOTE
10.00 – 10.30
Welcome Note and Opening Session
MEgA-TRENDS IN HEALTHCARE
10.30 – 11.00
Green Hospitals: An Example for Quality and SustainabilityDr. Wolfgang Sittel, Head of Architecture and
Construction, Asklepios Kliniken
11.00 – 11.30
Towards Zero Carbon Hospitals with Renewable Energy SystemsProf. Simona Ganassi Agger, RES-Hospital Projects
11.30 – 12.00 Coffee Break
12.00 – 12.30
Healthcare Reforms and new Management Models in RussiaMichael Yugay, Senior Lecturer, Moscow Higher School
of Economics
12.30 – 13.00
How to plan and build a new Hospital in Compliance with international Standards and Safety Goals?You can still apply for this Speaking Slot.
13.00
Visit of the Hospital Build & Infrastructure Exhibition
Leaders in Healthcare
4
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
4 September 2013
10.00 – 10.30
Building a new hospital in the regional Capital of DenmarkHenrik Schødts, vice President, New North Zealand
Hospital
10.30 – 11.00
New Aalborg University Hospital – Designing a Hospital with maximum Attention on the individual UserKasper Heiberg Frandsen, Associate Partner,
schmidt/hammer/lassen architects
11.00 – 11.30
Healing Environment – The innovative Combination of Hospital and City on the Example of Albert Schweitzer Hospital Dordrecht Rob Kanbier, Architect, Kuiper Compagnons,
Jasper Meijer, Corporate Real Estate Manager,
Albert Schweitzer Ziekenhuis Dordrecht
11.30 – 12.00 Coffee Break
12.00 – 12.30
Happy Hospital: Innovation in Healing Environment requires new MaterialsProf. Ir. Bas Molenaar, EgM architecten
3 September 2013
DESIgN FOR THE FUTURE
10.30 – 11.00
Hospital Design for the FutureProf. Alan Dilani, general Director, International Academy
for Design and Health (IADH)
BEST PRACTICES IN HOSPITAL DESIgN – DESIgN FOR TODAY AND TOMORROW
11.00 – 11.30
University Hospitals Leuven – Designing a Health Sciences CampusDr. Wim Tambeur, COO, University Hospitals Leuven,
Belgium
11.30 – 12.00 Coffee Break
12.00 – 12.30
Building Information Modeling for Healthcare Properties Dirk Schaper, CEO, HOCHTIEF viCon gmbH and
Dr. Roland Mörmel, Executive Director,
HOCHTIEF Solutions Ag
12.30 – 13.00
A public private partnership that works! A new campus for the Hospital Network AntwerpStéphane Vermeulen, Director Healthcare,
vK Architects & Engineers
13.00 – 13.30
StartupPlanning and Implementation on the Example of the New Surgery, University Hospital UlmThomas MeierKramm, Head of Division, Management
Consultancy and Operational Planning, HWP
Planungsgesellschaft mbH and
Dirk Mörbitz, Architect Structural Engineering and
Security, University Hospital Ulm
13.30
Visit of the Hospital Build & Infrastructure Exhibition
Design, Build & Upgrade
C ont inued on page 6
Design, Build & Upgrade is sponsored by
ARCHITECTS& ENGINEERS
www.vkgroup.be
5
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
4 September 2013
DESIgN FOR SUSTAINABILITY
12.30 – 13.00
Efficient Management of Sustainability of Construction and Modernization Projects Markus Sauer, Stabsstelle Nachhaltiges Bauen,
Landschaftsverband Rheinland
13.00 – 13.30
Sustainable Healthcare Buildings – Sustainability as a measurable Factor for Hospital BuildingsMark Daub, Teamleader green Building,
Drees & Sommer
13.30
Visit of the Hospital Build & Infrastructure Exhibition
Design, Build & Upgrade
Do you have questions regarding the Congresses?
Please contact:
Aleksandra Kreplin
Phone: +49 (0)2 11 / 96 86 – 37 57
e-Mail: aleksandra.kreplin@informa.com
6
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
4 September 2013
FACILITY MANAgEMENT
10.00 – 10.30
Comparative Study on the JCI and CBAHI Healthcare Accreditation Standards of Facility Management and Safety Zuber Shaik, Quality Director, Dr. Sulaiman Al
Habib Medical group Riyadh
10.30 – 11.00
Recent Developments in the DRG equitable FM Costs: GEFMA Work Report of the Working Group FM in Hospitals Andreas Göcke, Senior Consultant, Dr. Odin gmbH
11.00 – 11.30 Coffee Break
11.30 – 12.00
How can Medical Technology and FM increase the Efficiency and Customer Satisfaction?Frank Dzukowski, Managing Director,
Klinik-Medizintechnik Eppendorf gmbH,
Universitäts-Klinikum Hamburg-Eppendorf (UKE)
12.00 – 12.30
Indoor Hygiene – the fundamental component for recovery Peter Bachmann, Managing Director, Sentinental
Haus Institute
12.30 – 13.00
Insourcing versus Outsourcing of FM Services in HospitalsYou can still apply for this Speaking Slot.
13.00
Visit of the Hospital Build & Infrastructure Exhibition
3 September 2013
PROCESS OPTIMIZATION
10.00 – 10.30
Planning of medical Manpower for a 500 bedded urban Hospital in India Sujata Malik, Director Medical Services, Ruby Hall Clinic Pune
10.30 – 11.00
Success Story: “Quality Improvement with limited Resources in a Healthcare Organization” Kashif Jassani, Head of Quality Assurance,
Aga Khan Health Service
11.00 – 11.30 Coffee Break
11.30 – 12.00
Minimal Design Interventions in order to positively influence shorter Stays of PatientsMaurice Codourey, Head of Communication and Marketing,
Stadtspital Waid
12.00 – 12.30
How to integrate a Hybrid Operation Room successfully into an existing Hospital Structure
Norbert Helmus and Tobias Rechen berger,
Managing Directors, ATP APF,
Klaus Christian, Director Business Management
HBRID OR, MAQUET gmbH and
Berim Pruthi, Healthcare Sector, Siemens Ag
12.30 – 13.00
The Hospital within a Hospital – eNabled Standardized Unit for intelligent Theatre Excellence – eNsuiteNicole Pollack, Prozess Manager, Hospital for MIC Berlin
13.00 – 13.30
Process Optimization with BIM/DatabaseSabine Steinert, Senior Architect, OBERMEYER
Planen+Beraten gmbH
13.30 – 14.00
Virtual to Reality – Simulation Modeling in Health FacilitiesBrandy Olson, Director of Healthcare Operational
Engineering, HDR Inc. Architects, USA
Process Optimization & Facility Management
Process Optimization & Facility Management is sponsored by
7
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
4 September, 14.00–16.00, Room 1
Funding Advice –
Financial Resources ensure
your Project‘s Success!
Healthcare institutions and SMEs often face great challenges in the implementation of new project initiatives. Federal, state and the EU provide comprehensive annual budgets for project funding in the health sector in their financial planning. Research & Development and Innovation enjoy special attention, especially in the ICT sector. But companies can finance with government support far more: For other funding purposes in the health industry high priority is given.
The speakers at our workshop will introduce the comprehensive funding opportunities and requirements for an application.
The workshop is aimed at companies based within or without the EU to market their products or to set up in business in Germany or other EU Member States
3 September, 14.00–16.00, Room 1
Longterm Archiving of Data in
Healthcare – Ways out of the
Liability Trap
The revision-proof long-term archiving of patient data (up to 30 years) provides hospitals with major challenges:
Improve accessibility of data
Reduce legal and technical risks
The rapid growth of data master
The speakers at our workshops draw on the current challenges and provide you with a vivid idea of solution paths and strategies to avoid liability.
The workshop is aimed at managers, executives and IT managers of private and public health care facilities
powered by
Workshops – free of charge for all visitors
Please contact:
Klaus Aulenbacher,
Managing Director EBKZGW
Phone: +49 (0)30 / 25 89 – 40 16
Please register for the free workshops by EMail: mareike.zeisig@informa.com
EuropeanCentre of Expertisefor the Health Care Industry
8
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
2 September 2013 – Exclusive Study Tours
Hospital Build & Infrastructure Europe offers you the day before the event, 2 September 2013, Excursions to the University Medical Center Hamburg-Eppendorf (UKE) and ASKLEPIOS clinic at St. george.
A. University Medical Center HamburgEppendorf (UKE)
The excursion takes you to the University Medical Center Hamburg-Eppendorf, one of the most modern Hospitals in Europe. Our building is proc-ess oriented built with a focus on interdisciplinary and co-aligned working. The 2-bed-rooms on the stations have the most modern equipment and are entirely adjusted to the needs of our patients. Our paperless Hospital allows anywhere electronic patient records and access to patient data – whether in the interdisciplinary Emergency Room or on the wards.This excellent with IT HIMSS Stage 7 awarded electronic patient record sets standards throughout Europe. Even with its logistics, based in part on a driverless transport system, and with the use of the unit box system in the drug treatment of patients is the UKE one of the pioneers in Europe. In addition, the use of the latest medical technology supports our specialists in the optimal care of patients. With the help of the UKE Consult and Management gmbH (UCM), these innovative management concepts were provided to customers all over the world.We look forward to introducing you to the UKE on a tour.
B. Asklepios Clinic St. Georg
This studies visit “illuminates” one of the trends in Facility Management: volker Müller, Head of Facility Management, will lead you through the innovative inside and outside lighting concept of St. georg, like fire protection ceiling with integrated LED lighting.
Study Tours – free of charge for all visitors
Please register for the free Study Tours by EMail: mareike.zeisig@informa.com
9
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
ExhibitorNight
Architects@Display
Within this display you can admire the best current hospital reference projects Healthcare specialized architects have achieved. Next to the display in the dedicated architects area, interested architectural bureaus can present themselves within the show catalogue, contribute to the Hospital Build & Infrastructure newsletter and take part in the congress.
SAINT JOSEPH HOSPITAL FOUNDATION (Paris, France), © AIA – Architectes Ingénieurs Associés
REY JUAN CARLOS HOSPITAL (Madrid, Spain), © RAFAEL DE LA-HOZ ARQUITECTOS
Architects, who wish to participate in the exhibition, please contact until the 15 August 2013:
Vera Nysetvold
Phone: +49 (0)2 11 / 96 86 – 36 22
e-Mail: vera.nysetvold@informa.com
We offer you numerous opportunities for networking, for example our reception for exhibitors and visitors: a unique “ice-breaking” opportunity where you can socialize with colleagues and clients.
So don t forget your business cards!
example projects of the Hospital Build Architects 2012.
Architects@Display
10
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
The Exhibition – diverse, innovative and professional
Here you will find tailor-made solutions for your requirements and challenges. Exchange in the exhibition with competent contacts from companies that are specialized in products and services for the successful operation, construction or reconstruction of your hospital or clinic.
Due to the clear focus and the niche nature of the event, only relevant and experienced companies which can offer real added value to your projects take part as exhibitors.
The compact event concept guarantees you sufficient time for further discussions.
If you would like to contact our exhibitors in advance for an appointment, you will find the list of exhibitors here: www.hospitalbuildeurope.com/Exhibitors/Exhibitorslist2013
Our exhibitors are looking forward to your visit!
Here are some confirmed exhibitors (non-exhaustive list) :
EuropeanCentre of Expertisefor the Health Care Industry
Interested in more and detailed sponsoringinformation or in developing an individual concept?
Please contact: Vera Nysetvold
Phone: +49 (0)2 11 / 96 86 – 36 22
e-Mail: vera.nysetvold@informa.com
“
“This is a highly
targeted show –
don’t expect great
numbers but expect
the right target
customers.”
Phil Jones,
Marketing Manager, Lasermet
”
11
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
You will find the current Exhibitors list online: www.hospitalbuildeurope.com/exhibitorlist2013
Design Build & Upgrade
Congress Room 2
Process Optimization
& Facility Management
Congress Room 3
Architects@DisplayEntrance
Leaders in Healthcare +Workshops
Congress Room 1
Rooms
Exhibition Plan
E x h i b i t i o n A r e a
12
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
Extract of Visitors 2012
Vice President, vice President, French Association of Health Economics, France
Commercial Director, Capio Klinik im Park, germany
President, Association of Technical Hospital Directors, germany
Medical Director, Paul Stradins Clinical University Hospital, Latvia
Strategic purchaser IT, Sana Kliniken Ag, germany
Director, Spital Limmattal, Switzerland
Director, Association of Private Clinics, Russia
Principal Architect, Architektura i Budownictwo, Poland
Purchasing Manager, East Tallinn Central Hospital, Estonia
Principal, HKS Architects Ltd., United Kingdom
Vice President of Hospital, Jiulongshan Hospital of Qinhuangdao, China
Head of Clinical Consulting, Siemens Ag Healthcare Sector, germany
Director, King Abdoul Aziz University Hospital, Saudi-Arabia
CEO, global Medical group, Netherlands
Deputy Medical Director, Yeditepe University Hospital, Turkey
Division Manager, Business Unit Facilities, Universitätsklinikum Freiburg, germany
Civil Engineer, greek Health Ministry, greece
Founding Chairman, Turkish Healthcare Tourism Development Council, Turkey
Chief Executive, Abdul Rashid Enterprises, Pakistan
Visitors 2012
DACH 38 %
Eastern-Europe 15 %
Scandinavia 10 %
Benelux 10 %
Rest of Europe 9 %
Asia-Pacific 7 %
Africa 5 %
EMEA 5 %
South America 2 %
Russia and Baltics 1 %
USA 1 %
Germany, Austria, Switzerland
Bulgaria, Croatia, Macedonia, Poland, Romania, Hungary, Slovenia, Ukraine, Czech Republic
Finland, Norway, Sweden, Denmark
Belgium, Netherlands, Luxemburg
France, Greece, UK, Ireland, Italy, Liechtenstein
Bangladesh, China, Georgia, India, Japan, Pakistan, Taiwan, Turkmenistan
Egypt, Ghana, Morocco, Nigeria, South-Africa
Algeria, Iraq, Jordan, Israel, Lebanon, Libya, Saudi Arabia, Turkey, United Arab Emirates
Brazil, Mexico, Peru
Russia, Estonia, Belarus
Who will you meet?
Congress Delegates
Hospitals 45 %
Architects 25 %
Construction & Engineering 15 %
Suppliers 10 %
Service Providers 5 %
13
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
Enjoy Hamburg!
Congress Center Hamburg
Dammtor
Alsterfleet housing
Reeperbahn/St. Pauli
Michel
Asklepius Barmbek
University Medical Center HamburgEppendorf
Hamburg has everything the heart desires!
Next to various theaters, the historical city center and the beautiful parks, the northern city provides also an impres-sive harbor. At the so-called “gateway to the World”, you can admire giant container and cruise ships or go on a discovery trip by boat. Another highlight is the famous nightlife on and around the Reeperbahn. Music and cocktail bars, clubs and midnight theaters.
Elysée Hotel AG Hamburgwww.grand-elysee.com[0.2 km from CCH]
Radisson Blu Hotel, Hamburgwww.radissonblu.com/hotel-hamburg[0.2 km from CCH]
Mercure Hotel Hamburgwww.mercure.com[0.7 km from CCH]
Scandic Hamburg Emporiowww.scandichotels.com[0.9 km from CCH]
Hotels
14
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
Media Partners
Our Partners
EuropeanCentre of Expertisefor the Health Care Industry
Connect worldwide with decision makers in the healthcare facility industry!
Hospital Build & Infrastructure – A Global Brand
2013
2013
2013
2013
3 – 4 SePteMBer 2013CCH HAMBurg, gerMAny
12 – 14 DeCeMBer 2013PrAgAtI MAIDAn, neW DeLHI, InDIA
24 - 26 OCTOBER 2013ICC ISTANBUL CONGRESS CENTRE, ISTANBUL, TURKEY
HOSPITAL BUILD& INFRASTRUCTURETURKEY
19 – 21 MAy 2014
HOSPITAL BUILD& INFRASTRUCTURECHINA
MAY 2014NANJING INTERNATIONAL EXPO CENTER, JIANGSU, CHINA
HOSPITAL BUILD& INFRASTRUCTURECHINA
MAY 2014NANJING INTERNATIONAL EXPO CENTER, JIANGSU, CHINA
15
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
Organized by
Informa ExhibitionsEUROFORUM Deutschland SEPostfach 11 12 34, 40512 Düsseldorf, germanywww.hospitalbuildeurope.com hospitalbuildeurope@informa.com
Date & Venue
3 – 4 September 2013 } CCH HamburgOpening hours: 10.00 am – 5.00 pmCongress Center Hamburg Am Dammtor/Marseiller Straße, 20355 Hamburg, germany
Exhibitors 2012
Exhibitions Space: 4.000 sqmNumber of Exhibitors: 64Exhibiting countries: 13
Visitors 2012
Participants: 2.425visitors Exhibition: 1.988Congress Delegates: 437
Congress: Aleksandra Kreplin, Conference ManagerPhone: +49 (0) 211/96 86-37 57E-Mail: aleksandra.kreplin@informa.com
Organization: Stefanie Kluckhuhn, Operations ManagerPhone: +49 (0) 211/96 86-37 54E-Mail: stefanie.kluckhuhn@informa.com
Sponsoring & Exhibition:Vera Nysetvold, Sales ManagerPhone: +49 (0) 211/96 86-36 22E-Mail: vera.nysetvold@informa.com
Marketing: Male Walbrecht, Marketing ManagerPhone: +49 (0) 211/96 86-35 37E-Mail: male.walbrecht@informa.com
Price listExhibition Ticket Early Bird(Early Bird available until 2 September 2013!) free
Exhibition Ticket(for on-site bookings, 3 – 4 September 2013) € 30.00
Congress + Exhibition Ticket2 Days: 3 – 4 September 2013 € 499.00
Congress + Exhibition Ticket1 Day: 3 September 2013 € 399.00
Congress + Exhibition Ticket1 Day: 4 September 2013 € 399.00
3 – 4 September 2013, Hamburg
2013
2013
2013
2013
EXhibi t ion and CongrEssEs
www.hospitalbuildeurope.com/Anmeldung
Euroforum Deutschland SE, Postfach 11 12 34, 40512 Düsseldorf, Germany
Register online for the congresses:
www.hospitalbuildeurope.com/tickets
Ticket-Code
Register now onl ine !
www.hospitalbuildeurope.com 3 – 4 September 2013, Hamburg
H B I E - B O R 2 0 1 3