Everest Base Camp_Ranjan Sood

Post on 07-Apr-2017

308 views 0 download

Transcript of Everest Base Camp_Ranjan Sood

GREAT HYDERABAD ADVENTURE CLUB

EXPEDITION EBC,MAY-2011

• MISSION ACCOMPLISHED

TEAM GHAC @EBC 5364 Mtrs / 17,500 feet

Standing left : Kiran(Sherpa), Ranjan, Sanjeev, Priyanka, Ali, Tanveer, Inder, Nathalia, Manisha, Sunil & Narsi

How we did it?

• GHAC has reached 5550 meters above the sea level again for the 5th time to Everest Base Camp on 9th May 2011. While many of the routes through the mountains are arduous and the most toughest, there are places to rest and enjoy a meal (Dal Bhat) -, After 9days of Hiking daily 10-12hours we all reach the Base Camp…the team was physically and mentally fit.

EBC

• Strict, month-long fitness regime that the team did before the trek, initially I use wake up everybody by 5.30am and then they use to wake me up by 5.00am…the training alternates between rigorous walking (KBR Park) and climbing around 1500steps (Ammuguda) each day.

Preparations before the trek

ROUTE MAP

ARRIVE PHADKING (2700METERS)

MOUNTAINS AROUND NAMCHE BAZAAR