Post on 12-Mar-2018
ENGINEERING AND DEVELOPMENT CORPORATION OF THE PHILIPPINES
1
2
3
POWER R & INDUSTRIALNDUSTRIALSYSTEMS
WATER RESOURCES TRANSPORT SYSTEMS
CIVILCIVILINFRASTRACTURES
GEO ENVIRONMENTAL AGRIAGRIINFRASTRUCTURES
4
Bryan A. Richards (Chairman)- Power
Eriberto R. Calubaquib- Water
Rogelio C. Lombos- Civils
Angel M. Santiago, Jr.
Angel M. Santiago, Jr.
President
Noel M. Ortigas
Executive Vice President
Asst. Vice PresidentOperations Center
Restituto A. Arbolente
Vice PresidentPower & Industrial Systems
Senior Vice PresidentAgri- Infrastructures
Rolando P. Amper
Vice PresidentFinance & Administration
Alfredo R. Liwanag
Senior Vice PresidentQuality Assurance & Marketing
Henry A. Muallil
Vice PresidentCivils &Transport
Asst. Vice PresidentWater Resources
Special Projects
1. Globe Permitting –lobe e itti– RR Ravalo
2. Globe Structural & Integrity –lobe St uctu al– RJ Carbonilla
Tessie Leticia L. Marcelo
Asst. Vice PresidentController
Orlando M. Cablayan
Lito G. Ambion
Linieta P. Masayon
ASEAN Projects
1. Bryan A. Richards1.2.
Bryan A. RichardsBBEriberto R. Calubaquib
Rogelio C. Lombos (Chairman)Bryan A. RichardsAnthony P. KortegastEriberto R. CalubaquibAngel M. Santiago, Jr.Noel M. OrtigasAlfredo R. Liwanag
5
BRYAN A. RICHARDSChairman, Executive Committee
6
7
8
9
10
The Tonkin & Taylor Group of Companies include:
11
We are here!
12
ENGINEERING AND DEVELOPMENT CORPORATION OF THE PHILIPPINES
13
14
Completed Projects1. 360-MW Magat River Hydropower Plant, San Ramon, Isabela2. Agus-Hydroelectric Power Stations, Iligan City3. 238-MW Angat Hydropower Plant, Bulacan4. 218-MW Pulangi River No. V Hydropower Plant, Lumbayao,
Bukidnon5. 255-MW Pulangi River No. IV Hydropower Plant, Maramag,
Bukidnon6. 345-MW San Roque Multipurpose Hydropower Plant, San
Manuel, Pangasinan7. 100-MW Upper Pampanga Hydropower Plant, Pantabangan,
Nueva Ecija8. 600-MW Batangas Coal – Fired Thermal Power Plant, Calaca, Batangas9. 650-MW Malaya Thermal Power Plant Rehabilitation Program,
Pililia, Laguna10. 200-MW, 54-MW & 50-MW Naga II Coal – Fired Thermal Power
Plant, Naga, Cebu11. 193.5-MW Apayao – Abulog River Hydropower Plant, Kalinga, Apayao
12. 12-MW Masiway Power Plant, Pantabangan, N. Ecija13. 215-MW Bauang Power Plant Fuel Handling Facilities, Bauang, La Union14. 455-MW Chico River Hydropower Plant II, III & IV, Kalinga,
Apayao15. 18-MW Kulaman River Hydropower Plant, Bukidnon16. 8-MW Catuiran Small Hydropower Plant (DE), Oriental Mindoro17. 44-MW Balintingon Hydropower Project, Nueva Ecija18. 8-MW Catuiran Mini- Hydropower Plant (CS), O. Mindoro19. 42.5-MW Sibulan Hydropower Plants (PMS), Davao del Sur20. 5-MW Mat-I Hydropower Project, Misamis Oriental21. 8-MW Cabulig Mini- Hydropower Plant, Misamis Oriental 22. 69-MW Manolo Fortich 1 and 2 Hydropower Project , Bukidnon23. 14-MW Sabangan Hydropower Project, Mt. Province24. Casecnan-Taan Hydropower Project (Sites 1&2), Nueva Vizcaya
Prospective Projects1. 16-MW Mangima River Hydroelectric Power, Bukidnon2. Tamugan Hydroelectric Power Project, Davao3. 90-MW Amburayan Hydroelectric Power Plant A & C,
Amburayan, Ilocos Sur4. 16.7-MW Siguil Mini-Hydropower Project, Sarangani5. 25-MW Laiban Hydropower Component, Tanay, Rizal6. 90-MW Agos River Power Component, Infanta, Quezon7. 225-MW Agus III Hydropower, Lanao del Sur8. 110-MW Kabulnan Hydroelectric Power Project, Maguindanao
Ongoing Projects1. 20-MW Pasil B & 24-MW Saltan B Hydropower Projects in
Kalinga Province2. 5-MW Cantakoy Hydropower Plant Project , Bohol3. 5-MW Tinoc 3 Hydropower Plant Project (PMS), Benguet4. Redondo 230-kV Double Circuit Transmission Line, Zambales5. 11-MW Siaton and 5.4 MW Okoy Hydropower Projects, Negros Oriental6. 45-MW Nalatang-B Hydropower Project, Kabayan, Benguet7. 25-MWLake Mainit Hydropower Project, Agusan del Norte8. 19-MW Ilaguen Hydropower Project (Site 1), Isabela Province9. Tarlac Hydropower Projects (Upper and Lower Camiling), Tarlac10. Asin Hydropower Plant 1A, B, 2 & 3 Project, Benguet11. Langaran Hydropower Project (Phase I), Misamis Occ.12. 455 MW Supercritical Coal-Fired Power Plant, Mauban, Quezon13. Preliminary Concept Design of Ilaguen Hydroelectric Power
Project - Site 2, Isabela
15
16
17
18
19
20
Completed Projects1. Angat Dam Water Supply Optimization, Bulacan2. Clark Waste Water Treatment Plant Expansion Study, Clark,
Pampanga3. Umiray-Angat Transbasin Tunnel Rehabilitation Project,
Norzagaray, Bulacan4. Malubog Dam AquaAtlas Cebu Bulk Water Supply Study, Cebu5. Magat River Multipurpose Project, Ramon, Isabela6. Boracay Environment Infrastructure Project, Boracay Island,Aklan7. Culion Water Supply Project, Culion, Palawan8. Bohol Bulk Water Supply Project (FS), Tagbilaran, Bohol9. Laiban Dam Project, Tanay, Rizal10. Kanan Dam Project, Rizal11. Fort Bonifacio Water Treatment Plant/Wastewater Treatment
Plant, Taguig City, Metro Manila12. Metro Baler Water Supply & Sanitation System, Baler, Quezon13. Maguey Water System Project (PMS), Rizal14. Sumag and Alia Diversion Works, Gen. Nakar, Quezon Province15. Pampanga Bulk Water Supply Project, Pampanga16. Pasig City Flood Control Project, Pasig City17. Distribution Mains of Rodriguez Water Treatment Plant Project,
Rodriguez, Rizal18. Angat Water Utilization and Aqueduct Improvement Project, Phase 2
(CS), Bicti-Novaliches, Quezon City19. South East Transmission Mains, Taytay, Rizal
On-going Projects1. Bulacan Bulk Water Supply Project, Bulacan2. Bohol Water and Sanitation Project, Bohol3. Marimla River Source Project, Pampanga4. UATP & Ipo Dam Safety, Bulacan5. Hydropower Development in SPUG/Missionary Areas, Nationwide6. Updating of Maragondon Bulk Water Supply & Pre-Feasibility
Study of the Distribution System of Maragondon, Ternate, Naic, Tanza
7. Bulk Water Study for Lubao Water District, Pampanga
Prospective Projects*1. Agos River Basin, Infanta, Quezon2. Puerto Princesa City Bulk Water Supply, Palawan3. Pangasinan Bulk Water Supply, Dagupan, Pangasinan4. Metro Cebu Bulk Water Supply, Cebu City5. Atlas Pump Storage Project, Toledo, Cebu City
Others
1. Formulation of Watershed Master Plan and Preparation of Watershed Management Plans for NPC-Managed Watershed Areas, Nationwide
2. LWUA Projects, Nationwide
* Please call us for details.
21
22
23
24
25
26
27
28
29
30
31