Elm StreetBusiness District:

Streetscape and

Signage Plan

VILLAGE OF WINNETKA DOWNTOWN MASTER PLAN | TASK FORCE MTG #4

Final Streetscape & Signage Planning | Teska Associates | 26 February 2018

2-26-18 DMP Task Force Agenda Packet - Page 11

Attachment C

PHASE 2 |

prelim master plan

PHASE 3 |

final master plan

tf

tf

p

Oct

No

v

Dec

Jan

Feb

Mar

Ap

r

May

PHASE 1 |

analysis

vc

10. 30.17

12.04.17

tf01.15.18 02.06.18

tf p vcTask

Force

Public Village

Council

tf02.26.18

tf04.24.18

vc05.15.18

p

vc04.03.18

2-26-18 DMP Task Force Agenda Packet - Page 12

REPORTING BACK:

VILLAGE COUNCIL MEETING (02/06/18)KEY THEMES AND COMMENTS

1. Interest in narrowing crosswalk at Green Bay Road – emphasis on IDOT coordination and evaluation of traffic impacts;

2. Support for focus on trees and seating areas at bumps outs;3. Support for separating specialty lighting (apart from tree plantings);4. Concur with maintaining outdoor café spaces with clear sidewalk passing

area;5. Interest in incorporating community postings at kiosks;6. Consider how community events may benefit from or be impacted by

proposed streetscape; and7. Address costs and budget concerns in planning.

IDOT COORDINATION MEETING (02/23/18)KEY THEMES AND COMMENTS

2-26-18 DMP Task Force Agenda Packet - Page 13

Standard Bike Rack

custom graphics

Bike Bollard Bike repair

station

SITE FURNISHINGS: ELEMENTS

Clustered seating at

planters

Precast Concrete

Planters

Benches

2-26-18 DMP Task Force Agenda Packet - Page 14

LIGHTING - PREVIOUS EFFORTS TO CARRY FORWARD

Sternberg

Pedestrian Fixture

on 11’-3” fluted

pole with Augusta

base

Kim

Roadway

Fixture on 30’ ht

Valmont pole

Sternberg

Lighted

Bollard

2-26-18 DMP Task Force Agenda Packet - Page 15

Decorative poles and festoon lighting Street light décor

LIGHTING – NEW ELEMENTS

2-26-18 DMP Task Force Agenda Packet - Page 16

7

Sternberg

Festoon

Pole

Sternberg

Combination

Pole

Sternberg

Standard Pole

(existing)

LIGHTING HIERARCHY

Kim / Valmont

Roadway Pole

(existing)

2-26-18 DMP Task Force Agenda Packet - Page 17

COMMUNITY IDENTITYGATEWAY & WAYFINDING SIGNAGE

Gateway Sign

Optional stone baseOptional internal illumination

Gateway Sign

Optional internal illumination

Directional Sign

4” letter ht(IDOT ROW)

Directional Sign

3” letter ht(local ROW)

2-26-18 DMP Task Force Agenda Packet - Page 18

COMMUNITY IDENTITYGATEWAY & WAYFINDING SIGNAGE

Identity Banner

Fabric or Metal Options

Parking Identifier

Custom bracket options

Parking

Directional

Sign

Business

Directory Kiosk

Bicycle Route

Directional Sign

2-26-18 DMP Task Force Agenda Packet - Page 19

Shopping / Dining Street

Transitional Street

Throughfare Street

Bridge Crossing

STREETSCAPE CHARACTER TYPOLOGIES

2-26-18 DMP Task Force Agenda Packet - Page 20

SHOPPING AND DINING STREET TYPOLOGYChestnut Street

8’ MIN.

13.5’ MIN.

2-26-18 DMP Task Force Agenda Packet - Page 21

SHOPPING AND DINING STREET TYPOLOGYChestnut Street

2-26-18 DMP Task Force Agenda Packet - Page 22

13 ELM ST

SPRUCE ST

OAK ST

CH

ES

TN

UT

ST

LIN

CO

LN

AV

E

SHOPPING & DINING STREETS /ELM STREET BRIDGE

BIR

CH

ST

2-26-18 DMP Task Force Agenda Packet - Page 23

14 ELM ST

SPRUCE ST

OAK ST

CH

ES

TN

UT

ST

LIN

CO

LN

AV

E

STERNBERG

FESTOON POLE

STERNBERG

COMBINATION POLE

STERNBERG

STANDARD POLE

KIM / VALMONT

ROADWAY POLE

LIGHTING HIERARCHY

BIR

CH

ST

2-26-18 DMP Task Force Agenda Packet - Page 24

15 ELM ST

SPRUCE ST

OAK ST

CH

ES

TN

UT

ST

LIN

CO

LN

AV

E

GATEWAY SIGNS, BUSINESS DIRECTORY KIOSKS& SCULPTURE PADS

GATEWAY SIGN

NEW COMMUNITY

EVENTS

SIGN

BUSINESS

DIRECTORY KIOSK

SCULPTURE PAD

BIR

CH

ST

2-26-18 DMP Task Force Agenda Packet - Page 25

16 ELM ST

SPRUCE ST

OAK ST

CH

ES

TN

UT

ST

LIN

CO

LN

AV

E

NW QUADRANT

SW QUADRANT

NE QUADRANT

SE QUADRANT

BIR

CH

ST

2-26-18 DMP Task Force Agenda Packet - Page 26

NW QUADRANT

ELM ST

SPRUCE ST

CH

ES

TN

UT

ST

2-26-18 DMP Task Force Agenda Packet - Page 27

18

SPRUCE ST

CH

ES

TN

UT

ST

NW QUADRANT

The Hudson

Company

Chamber of

Commerce

Starbucks

Scissors Edge

Marian Michael

Avli Estiatorio

Avli Rotisserie

Classic Kids

Marlene’s Nail

Emporium

Caffe Buon Giorno

Neopolitan

Zia Gallery

Sparkly

Nails

Little Ian’s

True Juice

Cry

sta

l

Cle

an

ers

Bo

tan

ic N

ails

& S

pa

Ell

en

so

n E

lm

Ath

en

e

No

ah

sA

rk

Pe

t S

up

ply

Be

rks

hir

e

Ha

tha

wa

y

Fred’s

Garage

Doyle

Optician

Denim &

Soul

Bleachers

Sports &

Training

Kaehler

Luggage

Classic

Stitch

Chestnut

Florist

Peet’s

Coffee Bo

ok

Sta

ll

Vil

lag

e T

oy

Sh

op

Mic

he

lle

’s

Cle

an

ers

Ch

as

e J

P

Mo

rga

n

PARKING EXISTING PROPOSED

Chestnut St (north of Elm)

44 37 {-7}

Elm St (east of Chestnut)

23 18 {-5}

Elm St (west of Chestnut)

15 11 {-4}

2-26-18 DMP Task Force Agenda Packet - Page 28

NW QUADRANT

SPRUCE ST

CH

ES

TN

UT

ST

Starbucks

Fred’s

Garage

Planter Pots / Bollards

Kim/Valmont Pole

Business Directory Kiosk

In Ground Planter

(Existing Tree, Benches,

Litter/Recycling, Bike Racks)

Café Seating

Decorative Paving

Sidewalk with Paving Ribbon

2-26-18 DMP Task Force Agenda Packet - Page 29

NW QUADRANT

ELM ST

CH

ES

TN

UT

ST

Berkshire

Hathaway

Peet’s

CoffeeMichelle’s

Cleaner

Bliss

Salon

Cit

iba

nk Lakeside

Foods

Alley

Alley

Chase JP

Morgan

Ch

ris

tia

n

Scie

nce

Re

ad

ing

Ro

om

True Juice

Combination Sternberg Light / Festoon Pole

Seating Cluster (Optional Sculpture Pad or Fireplace)

Bike Racks

In Ground Planter

(Ex Tree, Benches, Litter/Recycling, Bike Racks)

Café Seating

Business Directory Kiosk

Planter Pots / Bollards

Kim/Valmont Light Pole

Decorative Paving

ELM ST

2-26-18 DMP Task Force Agenda Packet - Page 30

SW QUADRANT

ELM ST

OAK ST

CH

ES

TN

UT

ST

2-26-18 DMP Task Force Agenda Packet - Page 31

22

OAK ST

CH

ES

TN

UT

ST

SW QUADRANT

Bli

ss

Sa

lon

Cit

iba

nk

He

ffe

rna

n

Ch

ris

tia

n

Sc

ien

ce

Re

ad

ing

Ro

om

La

ke

sid

e F

oo

ds

BM

O H

arr

is

Post Office

Winnetka

Village Hall

H Gary Frank

Architects

Good Grapes Hair Couture

Bellas Day

Spa

Trifecta

GrillS

pyn

erg

y

Ho

me

Ic

e

Bra

tsc

hii

Plu

mb

ing

PARKING EXISTING PROPOSED

Chestnut St (south of Elm)

26 18 {-8}

CHESTNUT CT

2-26-18 DMP Task Force Agenda Packet - Page 32

23

SW QUADRANT

CH

ES

TN

UT

ST

RE

ET

CHESTNUT CT

Good

Grapes

Sternberg Light

Seating Cluster

Café Seating

Sidewalk / Curb Replacement

Existing trees in open pits

New Benches

Business Directory Kiosk

Sculpture Pad

Decorative Paving

Sidewalk with Paving Ribbon

2-26-18 DMP Task Force Agenda Packet - Page 33

24

SW QUADRANT

OAK STREET

Trifecta

GrillSternberg Light / Planter Pots

Combination Light / Planter Pots

Garden Wall & Plantings

Bench

Planter Pot

Litter/Recycling

Crosswalk

2-26-18 DMP Task Force Agenda Packet - Page 34

SE QUADRANT

ELM ST

LIN

CO

LN

AV

E

GR

EE

N B

AY

RO

AD

2-26-18 DMP Task Force Agenda Packet - Page 35

26L

INC

OL

N A

VE

GR

EE

N B

AY

RO

AD

SE QUADRANT

Future One

Winnetka Site

Metra

Station

Ca

fé A

rom

a

Ma

ize

Ho

me

Ne

w T

rie

r T

ow

ns

hip

Elm

Cle

an

ers

Tru

em

an

Ca

teri

ng

On

e W

inn

etk

a O

ffic

e

(pe

nd

ing

)

Win

ne

tka

De

nta

l

Gro

up

Arb

orv

ita

e

Pa

rk

PARKING EXISTING PROPOSED

Elm St (east of Lincoln)

38 31 {-7}

Lincoln Ave (south of Elm, east side)

20 15 {-5}

2-26-18 DMP Task Force Agenda Packet - Page 36

SE QUADRANT

LIN

CO

LN

AV

EN

UE

Little Ricky’s

Rib Joint

Bump Outs / Mid Block Crossing

Planter Pots

Festoon Light

Bollards / Planter Pots

Bike Racks

Sculpture Pad / Plantings

Benches

2-26-18 DMP Task Force Agenda Packet - Page 37

SE QUADRANT

LIN

CO

LN

AV

EN

UE

Little Ricky’s

Rib Joint

Café Aroma

Future One

Winnetka Site

ELM STREET

AL

LE

Y

Business Directory Kiosk

Festoon Light

Kim / Valmont Pole

Seating Cluster (Optional

Fireplace or Sculpture Pad)

Combination Pole / Festoon

Decorative Paving

2-26-18 DMP Task Force Agenda Packet - Page 38

29

NE QUADRANT

LIN

CO

LN

AV

E

2-26-18 DMP Task Force Agenda Packet - Page 39

ELM ST

LIN

CO

LN

AV

E

NE QUADRANT

Beauty Lash

Elm St Pediatrics

Coldwell Banker

TJ Cullen Jeweler

N Shore Frugal

Fashionista

Blow Dry Boutique

Your Loss Your Gain

Body Gear Physical

Therapy

Oui Madame

Spa Nail City

Fitness Together

Bake 425

Face Forward Spa

Little Ricky’s

Rib Joint

Donald Stuart Antiques

M. Stephanich Antiques

Mirani’s at Home

J. McLaughlin

Conlon Christies Real

Estate

Sara Campbell

KMK Consignment

Optique

AJ Retreat

Orrington Jewelers

Stacked & Folded

Mark Beard LTD

Ca

fé A

rom

a

Ma

ize

Ho

me

Elm

Cle

an

ers

Tru

ma

n C

ate

rin

g

Arb

orv

ita

e

Pa

rk

PARKING EXISTING PROPOSED

Lincoln Ave (north of Elm)

70 58 {-12}

Jameson/Sotheby’s

International Realty

North Shore Community

Bank and Trust

Brady & Ford

Orthodontics

S&A Chiropractic

2-26-18 DMP Task Force Agenda Packet - Page 40

NE QUADRANT

LIN

CO

LN

AV

EN

UE

Jameson/

Sotheby’s

International

Realty

North Shore

Community

Bank and

Trust

Brady & Ford

Orthodontics

S&A Chiropractic

Decorative Paving at Crosswalk

Planter / Seating Cluster

Combination Pole / Planter Pots

Planter / Bike Racks

2-26-18 DMP Task Force Agenda Packet - Page 41

PARKING EXISTING PROPOSED

{#} represents existing parking

spaces converted to landscaped

bump out / seating areas.

Chestnut St (north of Elm) 44 37 {-7}

Chestnut St (south of Elm) 26 18 {-8}

Elm St (east of Chestnut) 23 18 {-5}

Elm St (west of Chestnut) 15 11 {-4}

Elm St (east of Lincoln) 38 31 {-7}

Lincoln Ave (south of Elm, east side) 20 15 {-5}

Lincoln Ave (north of Elm) 70 58 {-12}

TOTALS 236 188 {-48}

Conceptual parking quantities are calculated for Shopping and Dining Street areas only and are based on aerial photography and past planning studies.

PARKING SUMMARY

2-26-18 DMP Task Force Agenda Packet - Page 42

33 ELM ST

SPRUCE ST

OAK ST

CH

ES

TN

UT

ST

LIN

CO

LN

AV

E

GR

EE

N B

AY

RO

AD

WEST 1

WEST 2

WEST 3

WEST 3

EAST 1

EAST 2

TREE IMPACT AREAS

WEST 1

Tree preservation

3

Tree removals

20

New trees 18

WEST 2

Tree preservation

0

Tree removals

13

New trees 5

WEST 3

Tree preservation

15

Tree removals

12

New trees 14

EAST 1

Tree preservation

0

Tree removals

23

New trees 14

EAST 2

Tree preservation

1

Tree removals

22

New trees 8

TOTAL TREE IMPACTS

Tree plantings are relocated from sidewalks to landscaped bump out / seating areas

Tree preservation 19

Tree removals 90

New trees 59

Net decrease 31

2-26-18 DMP Task Force Agenda Packet - Page 43

STREETSCAPE BUDGET COSTS:

PROJECT CATEGORIES & ELEMENTS

Roadway & Drainage Site mobilization; curb & gutter remove and replace; pavement resurfacing; tree protection & removals; pavement marking; detectable warning plates; drainage allowance.

Lighting & Support Infrastructure

Kim/ Valmont pole remove and replace, Sternberg standard poles; Sternberg combination poles, Sternberg festoon poles, fest and décor elements; bollards; underground utility allowance.

Hardscape & Furnishings Clay brick pavers, jointed concrete sidewalk, benches, planter pots, litter & recycling.

Signage Gateway signs (not illuminated), business directory kiosks, community events sign.

Plantings Trees, shrubs, perennials/groundcover, soils, mulches.

Streetscape budget costs are provided for Village planning purposes. Costs are derived based on past planning efforts, aerial photography and site reviews. Final design and engineering is required to produce final cost estimates.

2-26-18 DMP Task Force Agenda Packet - Page 44

35 ELM ST

SPRUCE ST

OAK ST

CH

ES

TN

UT

ST

LIN

CO

LN

AV

E

WEST 1

WEST 2

WEST 3

WEST 3

EAST 1

EAST 2

BRIDGE

STREETSCAPE BUDGET COSTS:PROJECT AREAS

2-26-18 DMP Task Force Agenda Packet - Page 45

36

SPRUCE ST

OAK ST

CH

ES

TN

UT

ST

WEST 1

WEST 2

WEST 3

WEST 3

WEST 1

Roadway & Drainage $456,000

Lighting & Support Infrastructure $862,000

Hardscape & Furnishings $655,000

Signage $ 80,000

Plantings $ 54,000

TOTAL $2,107,000

WEST 2

Roadway & Drainage $223,000

Lighting & Support Infrastructure $315,000

Hardscape & Furnishings $183,000

Signage --

Plantings $ 23,000

TOTAL $744,000

WEST 3

Roadway & Drainage $244,000

Lighting & Support Infrastructure $498,000

Hardscape & Furnishings $524,000

Signage $115,000

Plantings $ 48,000

TOTAL $1,429,000

2-26-18 DMP Task Force Agenda Packet - Page 46

ELM ST

LIN

CO

LN

AV

E

GR

EE

N B

AY

RO

AD

EAST 1

EAST 2

BRIDGE

BRIDGE

Roadway & Drainage $ 90,000

Lighting & Support Infrastructure $ 5,000

Hardscape & Furnishings $199,000

Signage $ 50,000

Plantings $ 6,500

TOTAL $350,500

EAST 1

Roadway & Drainage $610,000

Lighting & Support Infrastructure $795,000

Hardscape & Furnishings $659,000

Signage $ 65,000

Plantings $ 68,000

TOTAL $2,197,000

EAST 2

Roadway & Drainage $356,000

Lighting & Support Infrastructure $374,000

Hardscape & Furnishings $380,000

Signage $ 15,000

Plantings $ 36,000

TOTAL $1,161,000

STREETSCAPE

SUMMARY

WEST 1 $2,107,000

WEST 2 $ 744,000

WEST 3 $1,429,000

BRIDGE $ 350,500

EAST 1 $2,197,000

EAST 2 $1,161,000

TOTAL $7,988,500

2-26-18 DMP Task Force Agenda Packet - Page 47

COMMUNITY IDENTITYWAYFINDING SIGNAGE

WAYFINDING SIGNAGE

Roadway Directional Signs $155,000

Bike Route Directional Signs $100,000

Parking Identifiers & Directional Signs $130,000

Fabric Banners $8,000

TOTAL $393,000

Gateway signs, business directory kiosks & community events signs accounted for in the streetscape budgets

2-26-18 DMP Task Force Agenda Packet - Page 48

IMPLEMENTATION PRINCIPLES

1. Streetscape should live within a budget & funding sources to be determined by the

Council;

2. Streetscape improvements that benefit Winnetka’s residents should be higher priority;

3. Streetscape improvements to shopping/dining streets & intersections should be higher

priority;

4. Streetscape improvements should coordinate public & private improvements with

proposed streetscape improvements to maximize implementation efficiency;

5. Streetscape improvements should be phased so as to minimize disruption to businesses;

6. When phasing streetscape improvements, minimize disruption to streetscape

improvements made in previous phases.2-26-18 DMP Task Force Agenda Packet - Page 49

40 ELM ST

SPRUCE ST

OAK ST

CH

ES

TN

UT

ST

LIN

CO

LN

AV

E

WEST 1

WEST 2

WEST 3

WEST 3

EAST 1

EAST 2

BRIDGE

PHASING DISCUSSION

FUTURE POST

OFFICE

REDEVELOPMENT

ONE WINNETKA

DEVELOPMENT

2-26-18 DMP Task Force Agenda Packet - Page 50

NEXT STEPS:

Teska advances the Final Streetscape & Signage Plan

March 31 Public Outreach - Egg Hunt Event

April 3 Village Council Meeting

April 24 Task Force Meeting

May 15 Village Council Meeting

Help us spread the word!

WWW.WINNETKADOWNTOWNPLAN.COM

2-26-18 DMP Task Force Agenda Packet - Page 51