22/11/2013 Stakeholders' Day
European Network Codes
Pascale Fonck - ELIAFrank Wellens - ELIAWim Michiels - ELIAEmeline Spire - ELIA
Quote
« First and foremost in the extremely technical work of draftingnetwork codes. This is very much work in progress, but it is
very simple: without the TSOs no network codes, and withoutnetwork codes, no functioning wholesale markets”.
(Günther Oettinger, European Commissioner for Energy at theFlorence Forum on 24 September 2013)
22/11/2013 Stakeholders' Day 2
Connection codesFrank Wellens
• Requirements for Generators
• Demand Connection Code
• High Voltage Direct Current
Further explanations onhttp://networkcodes.entsoe.eu
22/11/2013 Stakeholders' Day 3
Operational CodesWim Michiels
• Operational security
• Operational planning & scheduling
• Load Frequency Control and Reserves
Further explanations onhttp://networkcodes.entsoe.eu
More info on : http://networkcodes.entsoe.eu
22/11/2013 Stakeholders' Day 4
Market-related codesEmeline Spire
• Electricity Balancing
• Capacity Allocation and Congestion Management
• Forward Capacity Allocation
Further explanations onhttp://networkcodes.entsoe.eu
22/11/2013 Stakeholders' Day 5
22/11/2013 Stakeholders' Day
European Market Evolution
Pascale FonckEuropean Market Integration - ELIA
NWE Day-Ahead Price Coupling
AS IS- Two separate Market Couplings (CWE & Nordic) linked by
a volume coupling (ITVC organised by EMCC)
- Sequential calculation approach
- No common algorithm applied
22/11/2013 Stakeholders' Day 7
TO BE- Full coupling with GB
- One single price coupling based on a single calculation
- One single common algorithm EUPHEMIA
- First implementation of PCR solution(PCR = Price Coupling of Regions)
NWE Day-Ahead Price Coupling – Status- All NWE procedures were established in close cooperation with the PCR project
and the regional projects.
- Partial coupling scenarios were introduced to allow as many as possible bordersand interconnectors to remain coupled in case an issue occurs in NWE.
- The Day-ahead Operational Contract between all the parties was agreed uponand the signing process is ongoing. Regional and local agreements are about tobe finished and signed
- Market participants were informed and prepared via 2 fora and through the NWEmember test, which was successfully performed in October.
- The project is now in the last stages and final versions of IT- systems aredelivered requesting one more round of testing to assure stability.
22/11/2013 Stakeholders' Day 8
Target launch date NWE DA Market Coupling:February 4, 2014
(to be confirmed before Christmas)
9
CWE Flow Based Market Coupling - Project StatusParallel run results
- Parallel run (more than 10 months): increased welfare and improved priceconvergence
- Approval package sent to regulators- Engagement with Market Parties based on the outcomes of the Public
Consultation- Go Live foreseen end of June 2014 subject to external dependencies
CWE Flow-Based market Coupling - Project StatusNext steps
22/11/2013 Stakeholders' Day 10
- Moving from ATC to Flow Based is a paradigm shiftboth for market parties and TSO operators whichmust be carefully managed
- Project Partners’ objective for the coming months is to progress on thefollowing key topics:– Robustness: shift to the industrialized IT tool, improve operators’ experience– Transparency: provide MPs with appropriate capacity calculation inputs for price
predictability => Bilateral meetings with MPs in order to better understand their concreteneeds– FB vs. FB Intuitive: in cooperation with NRAs, the Project aims at a clear proposal to MPs– Operational process and timings: Fallback and Rollback decisions and procedures;
timing for daily publications– Smooth transition between ATC based processes (yearly/monthly auctions, Intraday) and
FB daily process
CWE Flow-Based Market Coupling
22/11/2013 Stakeholders' Day 11
Please consult the poster session at lunch time
Elia and Belpex experts on flow-based market couplingwill be happy to answer your questions
22/11/2013 Stakeholders' Day
Intraday capacity allocation
SCOPETarget Model for intraday timeframe= a continuous implicit cross-border trading mechanism
22/11/2013 Stakeholders' Day 13
Geographical scope
22/11/2013 Stakeholders' Day 14
22/11/2013 Stakeholders' Day
Innovation@Elia
Hubert LemmensInnovation & Knowledge Management - ELIA
22/11/2013 Stakeholders' Day