Egyptian Power Transmission Project

E P T P

What is EPTP ? EPTP is a Project consists of 21 components

– Substations and its Interconnections –for the 500 & 220kV Egyptian transmission network.

The Project sub-components are independent and geographically dispersed.

The priority of the components is in line with the comprehensive Power Transmission Network Master plan

The project can be categorised into [3] main components.

Egyptian Power Transmission Project

Project Components Component Description

C [1]: Investments to reinforce the Egyptian National Grid & enabling Saudi Arabia Interconnection

C [2]: Investments to evacuate power from wind farms planned in the Red Sea

C [3]: Investments to Strengthen the Egyptian Grid along North Sinai to interconnect with Gaza Strip

European Development Partners [EDPs]

World Bank [WB]

Egyptian Electricity Transmission Company [EETC]

Presenter
Presentation Notes
Ty

Egyptian Electricity Sector

Egyptian Electricity Holding Company

[EEHC] [7]

Production Companies

[9] Distribution Companies

Egyptian Electricity Transmission

Company [EETC]

No. Financier Share Eq. MEUR

1 EDPs EUR380 million 380

2 WB USD220 million 170

3 EETC EGP1,821 million 232

Total 782

N Financing Institution MEUR

1 European Investment Bank [EIB] 260

2 Agence Française de Développement [AFD] 50

3 Kreditanstalt für Wiederaufbau [KfW] 50

4 Neighbourhood Investment Facility [NIF] [G] 20

Total 380

No. Financing Institution MUSD Eq.

MEUR

1 International Bank for Reconstruction and Development [IBRD]

70 54

2 Clean Technology Fund [CTF] 150 116

Total 220 170

No. Sub-Project

1 3x500MVA, 500/220kV, Bader GIS Substation

2 2X500MVA, 500/220kV, 6th of October GIS Substation,

3 3x125MVA, 220/66kV, Manshiat Nasser GIS Substation

4 2x125MVA, 220/66kV ,Abu-Ghaleb GIS Substation

5 Total3x125MVA, 220/66kV,Ashmoon GIS Substation

No. Sub-Project

6 3x125MVA, 220/66kV,Sohag East AIS Substation

7 Tibbeen Substation Ext. (500MVA, transformer + bays)

8 12x 125+ 10x 175MVA, 220/66kV power transformers

9 Saudi- Egyptian Interconnection

Under final approval from EDPs

No. Sub-Project

1 1x500MVA, 500/220kV, Suez Gulf GIS Substation

2 Samalaut Substation Ext. (500MVA, transformer + bays)

No. Sub-Project

1 2x125MVA, 220/66kV, Massaed AIS Substation

Consultants Short Term Technical Advisor

Local Consultant

Long Term Technical Advisor

EPS

Where are we now?

3x 500MVA, 500/220kV Badr GIS Substation

PACKAGE [A] 500 & 220kV GIS Equipments + Civil Works

Contractor:

Date of signing: November 12, 2012

3x 500MVA, 500/220kV Badr GIS Substation

PACKAGE [B] 10x167MVA, 500/220kV

Auto Transformers Contractor: Korea

Date of signing: December 13, 2012

3x 125MVA, 220/66kV Ashmoon GIS Substation

PACKAGE [A] 220kV GIS Equipments

+ Civil Works Contractor:

Date of signing: July 1, 2012

3x125MVA, 220/66kV Ashmoon GIS Substation

PACKAGE [B] 3x125MVA, 220/66kV

Power Transformers Contractor: Bulgaria

Date of signing: March 26, 2012

2x 125MVA, 220/66kV Abu-Ghaleb GIS Substation

PACKAGE [A] 220kV GIS Equipments

+ Civil Works Contractor: Egypt

Date of signing: June 26, 2012

2x125MVA, 220/66kV Abu-Ghaleb GIS Substation

PACKAGE [B] 2x125MVA, 220/66kV

Power Transformers Contractor: Bulgaria

Date of signing: March 26, 2012

220kV, 4-Circuits, UGC Giza North/ Abu-Ghaleb

4x 2.5km

1200mm2 XLPE

Turn-Key Job Contractor: Egyptian Chinese Company

Date of signing: September 5, 2012

THANK YOU