Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Foundation• Concrete w spread footing

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Backfill• Foundation damp proofing• Drain tile• Under slab plumbing

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Structural Framing 1• Conventional 2x4• ½” ecoboard sheathing• Conventional floor joists• Joist hangers (no rim joist)

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Structural Framing 2• 2x4 w ecoboard sheathing

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Framing Inner Wall• Ecofoam 2x4 non structural• Ecofoam 6” for sub slab

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Slabs & Opening• 4” slab on grade• 1-1/2” topping on 2nd floor• Hydronic in floor heat• ½” ecoboard boxing windows

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Window• 3x glaze fibreglass (Cascadia)• Nail flange mount• Mount to outer wall• (Could be centre mounted)

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Spray Foam• 4” at foundation• 10” in wall

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Finishes• Drywall and baseboard trim• Wood window trims• Exterior rainscreen and

claddding

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Roof Assembly

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Floor Joists

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Structural Framing

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Roof Framing• Parallel chord truss (~15”)• 2x4 eave tails

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Inner Wall• Ecofoam 2x4 non structural

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013

Spray Foam• 10” wall• 15” roof

Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013