Dallas TOD: HUD Challenge Grant Planning Update

Economic Development

Committee September 17, 2012

1

Background • City was awarded a $2.225 million grant

under the HUD Sustainable Communities Challenge Grants program in 2010.

• Grant funds are available for planning and pre development assistance related to affordable housing and TOD during a three-year period

• Fregonese Associates was selected from 12 firms to carry out the planning activities related to the grant.

2

Grant Study Areas

There are five separate plans being developed:

1. Vickery Meadow

(Walnut Hill and Park Lane Stations)

2. MLK 3. Hatcher 4. Lancaster Corridor (VA

Medical and Kiest Stations)

5. Buckner

3

Project Process

Existing Conditions

and Visioning

January - May

Plan Development and Strategies

April - August

Draft and Final Plan

September - December

Implementation

1 2 3 4 1

4

First Phase (Completed) January – May 2012

• Draft the Public Engagement Plan • Create Public Involvement Toolkit • Conduct Stakeholder Interviews • Conduct Developer and Broker Interviews • Evaluate Station Area Existing Conditions • Develop Guiding Principles • Develop Library of Feasible Buildings and

Development Prototypes • Evaluate Policy Framework and Local Market

5

Second Phase May – December 2012

• Conduct a Community Visioning Workshop • Workshop Results and Major Ideas Open House

Events • Existing Conditions Analysis, Findings and

Market Feasibility Study Findings • Develop and Compare Draft Scenarios • Create 2-D and 3-D Visualizations to

Communicate the Scenarios • Redevelopment Feasibility Analysis • Develop Station Area Visions • First Five Year Implementation Strategy

6

Overview of Approach for Each Station Area

–Land Use Concept Plan –Strategic Near-Term Opportunities –Catalytic Projects

• Conceptual Site Plans • Visualizations • Development Programs and Proforma

Analysis 7

8

Draft

9

Draft

Draft

10

VA Med Center Station

Kiest Station

Adaptive Reuse Concept

Lancaster Urban Village

Opal TOD Concept

Draft

11

Catalyst Sites

Catalytic Projects in the Lancaster Corridor

1. Lancaster Opal TOD Concept

2. Adaptive Reuse Concept

12

Lancaster Opal TOD

Mixed-income apartments, housing for veterans, housing for special needs, neighborhood retail, service office and restaurants. A: 3 and 4 Story Phase One Mixed-Use Building B: 2 and 3 Story Phase Two Residential Units 13

Existing Building

Draft 14

Lancaster Opal TOD Concept

15 Draft

Adaptive Reuse Concept – Old Payless Shoe Store

Adaptive Reuse Opportunity - Before

16

Draft

Lancaster Adaptive Reuse Opportunity– After

17

Draft

18

Draft

19

Draft 20

Hatcher Station

Hatcher Square

Adaptive Reuse Concept

Draft

21

Scyenne Road

Catalyst Sites

Catalytic Projects in Hatcher

1. Hatcher Square

2. Adaptive Reuse Concept on Second Avenue

22

23 Draft

Hatcher Square Conceptual Site Plan

24 Draft

Adaptive Reuse Concept Opportunity

Hatcher 2nd Ave Catalyst Development Opportunity Site - Before

25

Hatcher 2nd Ave Catalyst Development Opportunity Site - After

26

Draft

27

Draft

28

Draft

29

MLK Station

Station Development Concept

Adaptive Reuse Concept

30

Catalyst Sites

Catalytic Projects in MLK

1. MLK Station Area Development Concept– artist lofts, apartments and small retail

2. Adaptive Reuse Concept

31

32 Draft

MLK Station Concept

33 Draft

Adaptive Reuse Concept

MLK Adaptive Reuse Concept - Before

34

Draft

35

Draft

MLK Adaptive Reuse Concept - After

36

Draft

37

Draft

38

DART Station

New Commercial Development Concept

Commercial and Residential Development Concept

39

Catalyst Sites

Catalytic Projects in Buckner

1. DART Station parking lot redevelopment concept

2. Residential and Commercial Development concept at Buckner and Elam

40

41 Draft

Residential and Commercial Development Concept

42 Draft

Buckner and Elam Mixed Use Development Concept

43 Draft

Buckner Station Retail Development Concept

DART Parking Lot Development Catalyst Development Concept – Before

44

Draft

DART Parking Lot Development Catalyst Development Opportunity – After (Phase A)

45

Draft

46

Draft

47

Draft

48

Walnut Hill Station

Site Plan Concept for old Sam’s Club Area

Adaptive Reuse Concept

Park Lane Station

49

Mixed Use Library Concept

Catalyst Sites

Catalytic Projects in Vickery Meadow

1. Mixed Use Library Development Concept

2. Site Plan concept for old Sam’s Club site and surrounding area

3. Adaptive reuse concept of liquor store building at Five Points

50

51

Conceptual Drawing for Mixed Use Library Project - draft

Draft

Mixed Use Library Concept

52

53 Draft

Site Plan Concept for old Sam’s Club site and surrounding area

54

Draft

Adaptive Reuse Concept

Next Steps • Developer roundtable in later this week to obtain Dallas

developer feedback on catalyst project feasibility • Focus groups planned for October for additional

community input • Catalyst projects will be designed to be complete

development proposals with financial and design considerations

• Present opportunity sites, transportation enhancements for better DART access and area plans to public in October meetings – Obtain additional feedback prior to presentation to

Dallas City Council in December/January • Upon completion of area plans, City will issue Call for

Projects to solicit study area projects seeking grant funding for preconstruction and land acquisition

55

October – Roll out the Projects to the Public

56

Visit the project website: www.dallastod.com