ECC PLAN & EDD PLAN IN ORACLE ASCP

Transcript of Ecc plan & edd plan in Oracle ASCP

ASCP – EDD & ECC

summary

• These slides are try to illustrate below points:– basic Set up for a running a capacity constrained

ASCP plan– Critical components– the different behavior for EDD & ECC

Item/BOM

• TLA_01 – TOP LEVEL ASSEMBLY• SA1 – SUBASSEMBLY 1• SA2 - SUBASSEMBLY 1• RM – Raw material

resource

• PL01

Resource calendar

This means the availability is 8 hrs / day

Department /resource assignment

Routing

This means it’s with 100 ea / hour

Routing

BOM

Critical Component

Demand - forecast

ASCP plan option – critical component

ASCP plan option – ECC plan enabled

Only critical component appearing in output

Plan output with ECC

Plan output with ECC – exceoption

Plan output with ECC - capacity plan

ASCP Plan – EDD without resource constrarints

Plan output with EDD without resource constraints

Plan output with EDD without resource constraints - exception

Plan output with EDD without resource constraints – capacity load

Plan output with EDD and resource constraints

Plan output with EDD and resource constraints - exception

Plan output with EDD and resource constraints – capacity load