EatonVirtualization, Connectivity and the Cloud — Trends Driving the Future of Power Protection

Post on 06-Nov-2014

1.075 views 0 download

Tags:

description

Power infrastructure is no longer a standalone item in your IT toolkit. Virtualization, connectivity and the cloud are having a profound impact on how power management is being integrated into the IT environment. Join Eaton to learn more about how these trends are shaping the future of power protection.

Transcript of EatonVirtualization, Connectivity and the Cloud — Trends Driving the Future of Power Protection

© 2011 Eaton Corporation. All rights reserved.

This is a photographic template – your photograph should fit precisely within this rectangle.

Virtualization, Connectivity and the Cloud Trends driving the future of power protection

SpiceWorld - 2011

Austin, TX

John McIlwain & Brian Cox

2 2

Agenda

• Customer Needs and Market Drivers

• Virtualization As a Game Changer

• Connectivity, Manageability and Useful Information

• The “CLOUD”

• Questions

3 3

Key Customer Needs

Key Needs Why It Matters?

Budgetary ConcernsConstrained IT budgets are reality and IT managers are constantly being driven for better utilization of existing

assets, especially in dynamic, virtual environments.

Green InitiativesGreen Initiatives are becoming the norm. IT managers are looking for ways to conserve energy and extend the useful life of equipment.

Ease of Use / Time

Simply things just need to work and not require a lot of setup. Additionally, time is one of the most limited assets an IT manager has. Anything that can be done to provide quick and pertinent information is key.

Protection / Peace of mindThe last thing an IT manager wants to worry about is power.

Integrated Total Solution

Gone are the days when a UPS can stand alone. Power protection is no longer about a battery in a box. It has to provide a way to operate as a integrated power management solution.

TC

O

4 4

Market Drivers

Drivers Why It Matters?

Virtualization

New requirements to manage multiple virtual servers during power events.

More systems are riding on a single piece of hardware - single point of failure.

Need to be able to balance loads and move virtual servers in the case of a power event.

ManageabilityNeed to remotely manage networks.

Need alerts and updates when things go wrong or need maintenance

Cloud Computing

With the shift in resource demands inherent with cloud computing, the availability of networking equipment will be even more critical in order to access resources in the cloud.

Integrated Total Solution

Gone are the days when a UPS can stand alone. Power protection is no longer about a battery in a box. It has to provide a way to operate as a integrated power management solution.

© 2011 Eaton Corporation. All rights reserved.

This is a photographic template – your photograph should fit precisely within this rectangle.

Virtualization As A Game Changer

6 6

What is virtualization?

Virtualized world Physical world

Traditional x86 Architecture• Single OS image per machine• Software and hardware tightly coupled • Multiple applications often conflict• Underutilized resources

Traditional x86 Architecture• Single OS image per machine• Software and hardware tightly coupled • Multiple applications often conflict• Underutilized resources

Virtualization: • Separation of OS and hardware• OS and application contained in single file• Applications are isolated from one another• Hardware independence and flexibility

Virtualization: • Separation of OS and hardware• OS and application contained in single file• Applications are isolated from one another• Hardware independence and flexibility

These images are courtesy of VMware.

7 7

Virtualization Value Proposition

Increase productivity, operationalflexibility and responsiveness3

Reduce data center operating cost (e.g. power & cooling)

2

Reduce physical infrastructure cost1

These images are courtesy of VMware.

8 8

Virtualization Environment

• Several physical servers running VMs can be managed as a group to enable:

• Live Migration:• Move VMs from one server to the

other in case of problems (like a power failure)

• Cluster operation• Each VM can run concurrently on

multiple physical servers for High Availability

9 9

So what does virtualization have to do with power?

10 10

Virtualization As Driving Force Behind Power Management Paradigm Shift

Legacy Eaton

UPS Monitoring

Outlet control

Server Shutdown

Virtual Host Shutdown

Cluster Shutdown

VM Live Migration

VM Fail-over Coming soon

Power Management has to be Virtualization-centric

Brian D Cox
Should we change Eaton to Future and remove reference to Eaton is the only UPS vendor with virtualiztion centric power management offering

11 11

Live Migration – to avoid power disruption

Moves applications from server facing imminent power disruption to server with good powerNomenclature: vMotion – VMware, XenMotion – Citrix, Live Migration – Microsoft

12 12

VM Consolidation – Extends Run Time

Suspend non-critical Virtual machines, Consolidate critical virtual machinesShut down un-used servers

13 13

VM Fail-over – Continual Uptime

Suspend non-critical Virtual Machines“Fail-over” critical Virtual machines to an available cloud

14 14

The Virtualization Wave

• Virtualization marketplace continues red-hot growth• Data Centers invest

• Standardization essential

• Eaton’s IPSS is “Virtualization Centric”• IPSS migrates IT applications, extends battery runtime

• Server shut-down becomes last resort

15 15

Eaton’s Numerous Industry Firsts for Virtualization

1st on Open-Source Virtualization Solutions

Eaton has released industry first integration Solution for Power Management and Protection on CITRIX XenServer and XenCenter, OpenSource Xen and RedHat Enterprise Virtualization (RHEV)

On-going introductions of VMware integration “Firsts”

1st to provide Physical host graceful shutdown on vSphere – 2009

1st with Power Infrastructure Plug-in to vCenter Server – 2010

1st UPS able initiate vMotion – 2010

First to support vSphere 5 – 2011

16 16

Integration with vCenter

• Saves customers time and resourcesMonitor and manage power and network devices from the same application

• Enables live migration of VMs on power eventsZero downtime

• Enables server cluster shutdownSaves time: No need to install and setup one shutdown software per VM and/or Host.

© 2011 Eaton Corporation. All rights reserved.

This is a photographic template – your photograph should fit precisely within this rectangle.

Connectivity, Manageability and Useful Information

18 18

Why Power Management Software?

• Without communication, a UPS will perform its tasks …

• but your IT system could still be at risk:• If you are not warned of the remaining battery time in case of an extended power failure,

• Or if the UPS gets overloaded for too long.

• Communication can provide:• Real time notification of the UPS status …

• And lets you assign automatic actions to perform in case of any power event.

• Up to complete power sequences:• Application shutdown after a preset time on battery backup

• Operating system & server shutdown

• UPS shutdown

• UPS reboot on power restoration

• Server & operating system reboot

• Application reboot

Critical for systems running unattended at night!

19 19

Power Management History… So Far!

Milestones Date APC Eaton

First server shutdown command 1988 First UPS Monitoring software 1990 First switched outlet control software 1991 First network-based shutdown 1994 First OpenSource software endorsement 2004 First virtual host shutdown 2008 First live migration on power events 2010 First OpenSource virtualization integration 2011 First UPS with segment level power consumption 2011

Eaton has been innovating and leading the power management software industry for the last 20 years

20 20

• Monitor and manage power devices over the entire network

• Automated Alerts

• Auto discovery

• Mass upgrade

• Mass configuration

• Virtualization Centric

• Asset management

• Useful Information

• Definable views

• Vendor Neutral

What you should look for in a power management software

See all devices, even globally, from any PC on the network

Receive date- and time-stamped event notifications

21 21

Support Third Party / Open Source Access

• Third Party

• Spiceworks

• Open Source• NUT Protocol (Network UPS Tools)

VMWare – VSphere Spiceworks – UPS Supervisor

22 22

Integrated Total Solution

Managed UPS Managed ePDU Management Software

23 23

So what is next?

24 24

Key Customer Needs

Key Needs

Budgetary Concerns

Green Initiatives

Ease of Use / Time

Protection / Peace of mind

Integrated Total Solution

25 25

Energy Analysis

Provide information in order to:

•Cost Avoidance

•Power Optimization

•Maximize Efficiency

•Accurate allocation of power costs to customers / departments

•PUE – Power usage effectiveness

© 2011 Eaton Corporation. All rights reserved.

This is a photographic template – your photograph should fit precisely within this rectangle.

The “Cloud” – Creating two avenues for power

27 27

Data Centers

• Creating ultra high density environments• Significantly greater rack-level power requirements

than conventional data centers.

28 28

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

PowerEdge M1000e

9 101 2

11 123 4

13 145 6

15 167 8

0

1

00

1

0 0

1

00

1

0 0

1

00

1

0 0

1

00

1

0

0

1

00

1

0 0

1

00

1

0 0

1

00

1

0 0

1

00

1

0

PowerEdge M1000e

9 101 2

11 123 4

13 145 6

15 167 8

0

1

00

1

0 0

1

00

1

0 0

1

00

1

0 0

1

00

1

0

0

1

00

1

0 0

1

00

1

0 0

1

00

1

0 0

1

00

1

0

PowerEdge M1000e

9 101 2

11 123 4

13 145 6

15 167 8

0

1

00

1

0 0

1

00

1

0 0

1

00

1

0 0

1

00

1

0

0

1

00

1

0 0

1

00

1

0 0

1

00

1

0 0

1

00

1

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

PowerEdge M1000e

9 101 2

11 123 4

13 145 6

15 167 8

0

1

00

1

0 0

1

00

1

0 0

1

00

1

0 0

1

00

1

0

0

1

00

1

0 0

1

00

1

0 0

1

00

1

0 0

1

00

1

0

PowerEdge M1000e

9 101 2

11 123 4

13 145 6

15 167 8

0

1

00

1

0 0

1

00

1

0 0

1

00

1

0 0

1

00

1

0

0

1

00

1

0 0

1

00

1

0 0

1

00

1

0 0

1

00

1

0

PowerVault

530F

P ow erV au lt210S

6

7

5

3

41

2

0

P o we r E d g e 2 9 5 0

6

7

5

3

41

2

0

P o we r E d g e 2 9 5 0

P ow erV au lt210S

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

PowerVault530F

P ow erV au lt210S

6

7

5

3

41

2

0

P o we r E d g e 2 9 5 0

6

7

5

3

41

2

0

P o we r E d g e 2 9 5 0

P ow erV au lt210S

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

PowerVault530F

P ow erV au lt210S

6

7

5

3

41

2

0

P o we r E d g e 2 9 5 0

6

7

5

3

41

2

0

P o we r E d g e 2 9 5 0

P ow erV au lt210S

PowerEdge2900

PowerEdgeR200

PowerEdge2900

PowerEdge2900

PowerEdge2900

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerEdgeR200

PowerVault

530F

PowerVault530F

+12kW

Modular power and power distribution

•Eaton BladeUPS and RPM (rack power module) enable a small initial UPS deployment can be easily expanded over time.

• 12kW power building blocks

• 12kW power distribution building blocks

• All power distribution in the racks

• Extra battery capacity can go in any cabinet

• Reduced need for electrical contractors

• Increase power and distribution on the fly

• Customers can change out power distribution

Alarm

Power

100%

50%

0%

Output Left Output RightInput

Rack Power Module

1 2 3 4 5 6 7 8 9 10 11 12

TVSS A BSERVICE ONLY

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

BladeUPS

BladeUPS

BladeUPS

Total load 12kW 24kW 48kW

12kW

N+

1

Re

du

nd

an

t U

PS

Po

we

r

24k

48k

Alarm

Power

100%

50%

0%

Output Left Output RightInput

Rack Power Module

1 2 3 4 5 6 7 8 9 10 11 12

TVSS A BSERVICE ONLY

BladeUPS

BladeUPS

Alarm

Power

100%

50%

0%

Output Left Output RightInput

Rack Power Module

1 2 3 4 5 6 7 8 9 10 11 12

TVSS A BSERVICE ONLY

Alarm

Power

100%

50%

0%

Output Left Output RightInput

Rack Power Module

1 2 3 4 5 6 7 8 9 10 11 12

TVSS A BSERVICE ONLY

BladeUPS

+24kWRPM “ePDU”

Avoid “power traps” – Build Modularly

29 29

Local / On-site

• NetworkThe network is more critical than ever. Without a constant uptime you have no access to your applications or data hosted in the cloud.

• Critical FunctionsMission critical functions and sensitive or proprietary data still have a tendency to stay on site and need to maintain protection and support

© 2011 Eaton Corporation. All rights reserved.

This is a photographic template – your photograph should fit precisely within this rectangle.

Celebrating Our 100th Anniversary

Founded October 21st 1911

US Based and Owned

Come have some cake!!!

31 31