www.earthsparkinternational.orgRFP17ES0407 1

EarthSparkInternational

REQUESTFORPROPOSALS

Tiburon,HaitiMicrogridPowerGenerationSystemandAdditionalTwoGrids

President: AllisonArchambault EarthSparkInternationalPreparedBy: AdamEberwein, WendySanassee EarthSparkInternational 1616HSt.NWSuite900 Washington,DC20006 USAIssued: April7,2017Updated:April28,2017

www.earthsparkinternational.orgRFP17ES0407 2

ACKNOWLEDGEMENTSEarthSparkwouldliketothankthefollowingpeoplefortheirhelpinpreparinganddisseminatingthisRFP:DanielSchnitzer,PhD,ArthurJacquiau-Chamski,andDougDanley.ThisRFPwouldnothavebeenpossiblewithoutthegeneroussupportforthegridinTiburonfromtheOPECFundforInternationalDevelopment(OFID).OFIDisthedevelopmentfinanceinstitutionofOPECMemberStates,establishedtoprovidefinancialsupportforsocio-economicdevelopment,particularlyinlow-incomecountriesFinally,EarthSparkwouldliketothankthemunicipalityofTiburonfortheirsupportandcollaboration.

LEGALNOTICEAcontractmaybeawardedtothebidderhavingsubmittedthequotationrepresentingthebestvalueforEarthSparkInternational.However,EarthSparkInternationalreservestherighttoacceptorrejectanyquotation,andtocanceltheprocessandrejectallquotations,atanytimepriortotheawardofcontract,withouttherebyincurringanyliabilitytotheBiddersoranyobligationtoinformtheBiddersofthegroundsforsuchaction.EarthSparkInternationalreservestherighttomakemultiplearrangementsforanyitemoritems.Textandimagescopyright©2017EarthSparkInternational

www.earthsparkinternational.orgRFP17ES0407 3

ReferencesBaring-GouldI,BurmanK,EsterlyS.QualityAssuranceFrameworkforMini-Grids[Internet].GoldenCO:NationalRenewableEnergyLaboratory;2016[cited2016Nov].58p.NREL/TP-5000-67374.Availablefromwww.nrel.gov/publicationsCotterA,DanleyD,KirkT.TechnologyAdvisory,ElectricalEnergyStorage–ALexicon.NationalRuralElectricCooperativeAssociation;2016[cited2016Jan].13p.IEC62257-2Recommendationsforrenewableenergyandhybridsystemsforruralelectrification–Part2:FromrequirementstoarangeofelectrificationsystemsIEC62257-3Recommendationsforrenewableenergyandhybridsystemsforruralelectrification–Part3:Projectdevelopmentandmanagement

www.earthsparkinternational.orgRFP17ES0407 4

AbbreviationsandAcronymsAC: AlternatingCurrentAh: Amp-hourANSI: AmericanNationalStandardsInstituteAPI: ApplicationProgrammingInterfaced: dayDAT: DeliveryatTerminalDC: DirectCurrentDR: DemandResponseGPRS: GeneralPacketRadioServiceGSM: GlobalSystemforMobileCommunicationHz: HertzIEEE: InstituteofElectricalandElectronicsEngineers“Interalia”: amongotherthingsKm: kilometerkV: kilovoltkVA: kilovolt-ampkW: KilowattkWh: kilowatt-hourm2: metersquaredMLC: MicrogridLoadControllermph: milesperhourNFPA: NationalFireProtectionAssociationNo.: NumberO&M: OperationsandMaintenanceOSHA: OccupationalSafetyandHealthAdministrationP-SAIFI: PlannedSystemAverageInterruptionFrequencyIndexP-SAIDI: PlannedSystemAverageInterruptionDurationIndexPV: PhotovoltaicRF: RadioFrequencyRFP: RequestforProposalSAIFI: SystemAverageInterruptionFrequencyIndexSAIDI: SystemAverageInterruptionDurationIndexSCADA: SupervisoryControlandDataAcquisitionUSD: UnitedStatesdollarV: VoltW: Watt

www.earthsparkinternational.orgRFP17ES0407 5

FiguresFigure1:LayoutofcurrentEarthSparkmicrogridinLesAnglais,Haiti...................................................................17Figure2:Actual4-dayloadcurveforexisting450customersinLesAnglais..........................................................18Figure3:ProjectedDailyLoadCurve2018-Tiburon..............................................................................................19Figure4:ProjectedDailyLoadCurve2023-Tiburon..............................................................................................20Figure5:PlannedTiburongridfootprint,toberefined..........................................................................................22Figure6:Projecteddailyloadcurvein2018forTown1.........................................................................................24Figure7:Projecteddailyloadcurvein2023forTown1.........................................................................................25Figure8:Projecteddailyloadcurvein2018forTown2.........................................................................................25Figure9:Projecteddailyloadcurvein2023forTown2.........................................................................................26

TablesTable1:PowerQualityGoals..................................................................................................................................15Table2:Customercompositionbyservicelevel.....................................................................................................19Table3:AverageandMaxDailyLoadCurveDatafor2018(PowerinkW)............................................................20Table4:AverageandMaxDailyLoadCurveDatafor2023(PowerinkW)............................................................21Table5:DistributionSystemSpecifics(AsseenpriortoHurricaneMatthew).......................................................22Table6:MeteringSpecifics.....................................................................................................................................22Table7:MonthlyAverageInsolationData..............................................................................................................23Table8:LoadCurveDatafor2018forTown1(powerinkW)................................................................................26Table9:LoadCurveDatafor2023forTown1(powerinkW)................................................................................27Table10:LoadCurveDatafor2018forTown2(powerinkW)..............................................................................27Table11:LoadCurveDatafor2023forTown2(powerinkW)..............................................................................28Table12:NumberofcustomersbytarifflevelforTown1.....................................................................................29Table13:NumberofcustomersbytarifflevelforTown2.....................................................................................29Table14:MonthlyAverageInsolationData............................................................................................................29

www.earthsparkinternational.orgRFP17ES0407 6

TableofContentsANNEX1 REQUIREMENTSFORTIBURONGENERATIONSYSTEM...........................................................................81.1 ProjectGoal...................................................................................................................................................81.2 GeneralRequirements..................................................................................................................................81.3 PVsiting........................................................................................................................................................81.4 Technologychoice.........................................................................................................................................81.5 Interconnectiontype.....................................................................................................................................91.6 Generationsystemsizing..............................................................................................................................91.7 Generationsystemoperations......................................................................................................................9

ANNEX2 SUBMISSIONREQUIREMENTSFORTIBURONSYSTEM..........................................................................102.1 GeneralSubmissionRequirements.............................................................................................................102.2 Layoutdiagram...........................................................................................................................................102.3 One-Lineelectricaldiagram........................................................................................................................102.4 Communicationsdiagramsanddescriptionsrequirements.......................................................................102.5 DescriptionofOperationRequirements.....................................................................................................112.6 Microgridcontrollerfunctionalitydiagramanddescriptions.....................................................................112.7 Microgridexpandabilitydescription...........................................................................................................112.8 Descriptionofresistancetoextremeweathereventsandclimate............................................................122.9 Considerationandadherencetooperationalsafetyrequirements............................................................122.10GeneratorInformationanddescriptionifapplicable.................................................................................122.11PVarrayinformationanddescription.........................................................................................................122.12Energystorageandpowerelectronicsdescription.....................................................................................122.13BillofMaterialsanditemizedquotation(provideintableformat)............................................................132.14Financialinformation(provideintableformat)..........................................................................................132.15ProjectSchedule.........................................................................................................................................14

ANNEX3 MINIMUMVIABLEPRODUCTOBLIGATIONOVERVIEW.........................................................................153.1 Two-yearperformanceguarantee..............................................................................................................153.2 RequiredPlannedPerformanceRequirements..........................................................................................15

ANNEX4 DESCRIPTIONOFTHETIBURONMICROGRIDSYSTEM...........................................................................174.1 LesAnglaisMicrogridcontext.....................................................................................................................174.2 TiburonMicrogridcontext..........................................................................................................................184.3 TiburonPlannedDistributionsystem..........................................................................................................214.4 Projectscheduleconsiderations.................................................................................................................234.5 Othermodelingconsiderations..................................................................................................................23

ANNEX5 ADDITIONALTWOSMALLGRIDS........................................................................................................245.1 ‘StarterGrid’Microgridcontext..................................................................................................................245.2 NextTwo‘StarterGrids’..............................................................................................................................245.3 PlannedDistributionsystem.......................................................................................................................295.4 Othermodelinginputs................................................................................................................................29

ANNEX6 DELIVERYDATAFORM.........................................................................................................................30ANNEX7 PREVIOUSEXPERIENCEFORM.............................................................................................................31

www.earthsparkinternational.orgRFP17ES0407 7

EarthSparkInternationalispleasedtoinviteyoutosubmitaproposalforprovidingandinstallingapowergenerationsystemforitsmicrogridinthetownofTiburon,Haitiand,optionally,fortwoadditionalsmallergenerationsystemsfortwoothertownsinHaiti’sSouthernPeninsula.ThisRFPdescribesinputsnecessaryforbidderstocreateaproposalforthedesignandinstallationofoneorthreemicrogridsolarphotovoltaic(PV)hybridgenerationsystems.Foreachgrid,thegenerationsystemisdefinedasallgenerationandcontrolresourcesuptotheconnection(s)tostep-uptransformersinterconnectingthedistributionsystem.AllbiddersshouldsubmitadiscreteproposalfortheTiburongenerationsystemalone,andbiddersareencouragedtosubmitanadditionalbidincludingtheTiburonsystemandthetwoadditionalsmallsystems.Bidsthatonlyproposesolutionsforthetwoadditionaltownswillalsobeaccepted.Biddersshouldnotsubmitanyproposalrelatedtothemicrogriddistributionsystems.ProposalDeadline:May22nd,2017at5PMEST.Proposalsshouldbesubmittedelectronicallytoinfo@earthsparkinternational.org.Updatesandanswerstoquerieswillbepostedat:www.earthsparkinternational.org/RFP.Submissionrequirements:AllitemslistedinAnnexII,“SubmissionRequirements”mustbeincludedinthebidder’sproposal.AnnexVI,“DeliveryDataForm”andAnnexVII,“PreviousExperienceForm”mustbecompletedandsubmittedwiththeproposal.EarthSparkrecognizesthatbiddersmaynotbeabletoprovidefinedetailsofthesystemandinstallationgiventheamountofinformationincludedinthisRFP.Assuch,bidderswillworkwithEarthSparkonaniterativeconsultationoveraperiodofafewweekstorefinetheirproposalstowardsanidealsystem.Anyrequestsforclarificationshouldbesubmittedbyemailtoinfo@earthsparkinternational.org.EarthSparkevaluatesquotationsbasedonbestvalue,i.e.bestqualityandcost-effectivenessoftheproposedoffers.Thefollowingaspectswillbeconsideredfortheevaluation:

§ CompliancewithallrequirementsasspecifiedinAnnexI.§ Bidderunderstandingandcommitmenttofuturecontractualagreementitems,asspecifiedinAnnex

III.§ Deliverytimeandcost,asspecifiedinAnnexV.§ Previousexperience,asspecifiedinAnnexVI.§ EnthusiasmtoworkwithEarthSparkInternationalonexemplarymicrogridsinHaititowardsthegoal

ofareplicablemicrogridmodeltounlockruralpotential.Foraddedcontext,thisRFPisforthe2nd(andoptionally3rdand4th)microgrid(s)implementedandoperatedunderthedirectionofEarthSpark.EarthSparkhas,withitspartners,conductedanationalmicrogridmarketstudyandidentifiedatleast80currentlyunelectrifiedtownsthatcouldsupportacommunity-scalemicrogridtobringenergyaccessandeconomicopportunity.ThethreegridsdescribedinthisRFPwillserveasreferencepointsasEarthSparkputsinplacethesolicitationforitsnext20gridsinHaiti,approximately2MWofinstalledcapacity.ThesuccessfulbidfortheoneorthreegridsdescribedinthiscurrentRFP,withsuccessfulimplementation,willbetothebenefitofthechosenbidderduringconsiderationoffutureRFPsubmittals.Welookforwardtoreceivingyourproposal.Yourssincerely,AdamEberweinDirectorofMicrogridOperations,EarthSparkInternational

www.earthsparkinternational.orgRFP17ES0407 8

ANNEX1 REQUIREMENTSFORTIBURONGENERATIONSYSTEM

1.1 ProjectGoal1.1.1 EarthSparkissolicitingbidsforinstallersofa“turnkey”microgridgenerationsystemwithsolarPVand

batterystorage.Bidsmustnotincludeanyproposeddistributionsystem,whichisbeingdesignedthroughaparallelRFPprocess.

1.2 GeneralRequirements1.2.1 Systemsmustprovideatleast95%ofeachmonth’sprojectedloadsoverthecourseofatypicalyear

fromsolarPV(directlyorstored).Theremainingdemandwillbemanagedthroughoneoftwooptions:(1)aseparatedemandresponse(DR)programimplementedandmanagedbyEarthSparkattheloador(2)throughabackupdieselgenerationsource.

1.2.2 Ifbidderchoosestoprioritizedesigningtooption1fromsubsection1.2.1(DRmanagement),pleaseprovideoption2aswellfromsubsection1.2.1(backupdieselgenerationsource)asaseparatelypricedoffer.

1.2.3 Biddersmayincludetwo(2)systemarchitecturesintheirproposal,asfollows:§ Centrallylocatedsystemwithground-levelPVconnectedtoathree-phasedistributionsystem.§ Centrallylocatedsystemwithground-levelPVconnectedtoasingle-phasedistributionsystemif

deemedpreferable.1.2.4 Biddersmustprovideaninstallationschedule.Exampleofanappropriatescheduleandspecificson

Tiburonaccessibilityareprovidedinsection4.4.1.2.5 SystemCommissioningandAcceptance:Thebidderwillfullycommissionthesystemtomeetallstarting

pointspecificationsrequiredtomeetthecontractualagreement.BidderinstallationcompletionwillbeconsideredPhase1Commissioning.UponcompletionofPhase1Commissioning(determinedbyemailconfirmationfrominstallertoEarthSpark),Phase2commissioningwillconsistofaperiodofthreeweeksofcontinuedoperationbyEarthSparkordesignatedgridoperationspersonnel.OnceEarthSparkagreesthatallitemswithinthecontractualagreementregardingcommissioninghavebeenmetafter3weeks,EarthSparkwillconfirmviawrittenacceptanceoremailtobidderthatcommissioningiscomplete.

1.3 PVsiting1.3.1 CandidatePVsiteshavebeenidentifiedbutarenotyetfinalized.1.3.2 Sitesunderconsiderationareopenfields(minimalvegetation)requiringlevelinganderosioncontrol

consideration.1.3.3 AsperthesubmissionrequirementslistedinAnnexII,biddersneednottailorproposalsaroundspecific

sitesinTiburon,butshouldratherusegenericassumptionsforground-levelPVsystems.However,forthecaseofinterestorneed,sitespecificsunderstoodatthistimeareprovidedinsection4.3.ThewinningbidderwillworkwithEarthSparktorefinetheproposalastheparalleldistributionsystemRFPprogresses,providinggreaterclarityonsitespecifics.

1.3.4 Thewinningbidderwillberequiredtoundertakesoilsurveysandconsidersitewindloadprofiles.ForthisinitialRFP,considerinformationonsitelocationprovidedinthisRFP.

1.3.5 Finalstructuraldrawingswillrequiresignaturefromalicensedprofessionalcivilengineer.1.3.6 Finalelectricaldrawingswillrequiresignaturefromalicensedprofessionalelectricalengineer.

1.4 Technologychoice1.4.1 PV:BiddersmayproposeanytypeofcommerciallyavailablesolarPVtechnology.1.4.2 Storage:Biddersmayproposeanytypeofbatterystoragetechnology.1.4.3 Communications:Remotesystemmonitoringcapabilitiesarerequestedatthistime.Thereisnoexisting

communicationsinfrastructureinTiburonotherthanGSM/GPRScellularservice;therefore,anyremotecommunicationsproposedbythebiddermustbecapableoftransmittingandreceivingdataoverthis

www.earthsparkinternational.orgRFP17ES0407 9

connectiononverylowbandwidth.Criticalsystemoperationmustbecapableofoperatingonlossincommunicationforextendedperiodsoftime.

1.4.4 Loadcontrol:EarthSparkwillbedeployingtheSparkMetersmartmeteringsystemfortheTiburoncustomers.Thissystemiscapableofhighresolutiondatamonitoringandfine-grainedcontrolofindividualcustomerloads.Biddersshouldnotprovideproposalsforloadcontroltechnology,butmayprovidesuggestionsonhowtheirproposedsolutionwouldmakerelevantinformationeasilyavailabletoaloadcontroltechnology,locallyorintheCloud.

1.4.5 Endoflifereclamation/recycling:technologychoiceshouldconsiderandexplainendoflifereclamationandrecyclingprocessesandrelatedcosts.

1.5 Interconnectiontype1.5.1 Primarydistributionsystemforthemicrogridwillbeat13.2kV.1.5.2 WhilethereispresentlynocentralgridinthevicinityofTiburon,themicrogridmayatsomepointinthe

futurebeconnectedtoaregionaltransmissionline.Generationsystemsshouldbeconfiguredtoenablesuchgridconnectioninthefuture.Gridconnectionsshouldprovidetheabilitytoswitchtoandfrom“grid-connected”and“islandmode.”

1.6 Generationsystemsizing1.6.1 BiddersshouldconducttheirownmodelingtodeterminethesizesandcapacitiesofthePVsystem,

batterystorage,invertersandgenerator,ifapplicable.1.6.2 AnnexIV:DescriptionoftheMicrogridSystemcontainsusefulinputsformicrogridmodeling.Theload

curveandassumptionstobeusedbythebidderforsolarPVinsolation,dieselfuelpriceandotherinputsareprovided.Loadcurvesfor2018and2023areprovidedonanhourlybasisandshouldbeinputintoanymodelingsoftwareassuch.Table3providesanexampleofatypical2018Tiburonloadcurvebutbiddersshouldutilizethefull2023yearprojectedloadcurveonanhourlybasisasprovidedbytxtfile.

1.6.3 Thebatterybankmustbesizedtomeetaminimumof5yearsofcontinuoususe,basedonmanufacturerrecommendationsandtheprovidedhourlyloadprofiledata.The5-yeartimeintervalwillbeginonceallpartiesagreeandsignoffthatcommissioningofthegenerationsystemhascompleted(atotalofatleast5yearsand3weeksofcontinueduse).Batterieswillbeconsideredinneedofreplacementbasedonmanufacturerecommendationsandpredictedusetomeetsubsection1.2.1requirements.Abatterybankthatexceedstheselifetimerequirementswillbeviewedfavorably,butBidderwillneedtojustifyanyincreasedup-frontcosts.

1.7 Generationsystemoperations1.7.1 Generationsystemsshouldminimizeoperationandmaintenancecosts.Accesstoreplacementpartsis

limitedinHaitiingeneralandevenmoresoinTiburon.1.7.2 Systemsshouldbedesignedsuchthatincaseofmaintenance,thereisaminimalimpactoncustomers.

Maintenanceroutinesshouldensurethat–ataminimum–powerwillstillbesuppliedonanuninterruptedbasisat97%uptime,commencingaftercompletionofsystemcommissioningasdefinedinthisRFPinsubsection1.2.5.

1.7.3 Batteryandinverterlosses(kWh)maynotexceed105%ofthepredictedlossesforthefirst2yearsofoperations.

1.7.4 Chargeanddischargeprofilesmustautomaticallyremainwithinmanufacturerrecommendations,keepingwithprojectedcapacitydegradationsdiscussedinsubsection1.6.3.

1.7.5 Atthepointofcommoncouplingtodistribution,generationshouldmeettherequirementsasoutlinedinTable1.Statedlevelsofserviceareprovidedasreferencedin“QualityAssuranceFrameworkforMini-grids”.

www.earthsparkinternational.orgRFP17ES0407 10

ANNEX2 SUBMISSIONREQUIREMENTSFORTIBURONSYSTEM

2.1 GeneralSubmissionRequirements2.1.1 IfbidderchoosestosubmittwosystemarchitectureproposalsfortheTiburongridbasedonsubsection

1.2.3,eachofthetwomustincludetheinformationrequestedbelow.Someinformationmaybesimilarorthesameforthetwoproposalswheresystemarchitecturedoesnothavesignificantbearing.

2.1.2 Similarly,ifbidderchoosestosubmitaproposaltoincludethetwoadditionalsmallgrids,thesystemarchitectureforthesmallgridsmust,whereapplicable,includetheinformationrequestedbelow.

2.2 Layoutdiagram2.2.1 Layoutdiagramshouldbedrawntoscaleelectronicallyonanarbitraryarea.Layoutdiagramshould

NOTbedrawntoscaleonamapofTiburon.2.2.2 Showthelocationofallequipment,includinggeneratingfacilities,fuelcontainers,storagefacilities,

powerelectronics,andswitches.Becausetheproposaldoesnotincludedistributionsystemdesign,andbiddersareonlybeingprovidedwithinitialassumptionsofdistributionsystemdesign,donotcreateasophisticatedrepresentationofthedistributionsystem.

2.2.3 Allequipmentandfacilitiesshouldbeproperlylabeledforclearcross-referencewiththeone-lineelectricaldiagram.

2.2.4 Showtheproposedroutingofwiresandcablesamongstgeneratingfacilitiesandequipment,includingestimateddistancesinfeet.

2.3 One-Lineelectricaldiagram2.3.1 One-lineelectricaldiagramshouldbedrawnelectronically.2.3.2 UseANSI/IEEEstandardelectricalsymbolsthatshowthecompletemicrogridgenerationsystem

includingallfacilitiesandequipment.Becausetheproposaldoesnotincludedistributionsystemdesign,andbiddersarenotbeingprovidedwithfinedetailsofthedistributionsystem,donotcreateasophisticatedrepresentationofthedistributionsystem.

2.3.3 Protectionandcontrolschemesincludingcircuitbreakers,switchesandfuses.2.3.4 ProtectiverelayingwithallactiveANSI/IEEEprotectionfunctionsshownusingnumericaldesignation.2.3.5 Clearlylabelstateofallswitchpositionswheninutility-connectionmode.2.3.6 Locationandtypeofisolationswitchforisland-mode.2.3.7 Allprotectionschemesshouldbedepictedincludingbutnotlimitedtothefollowing:2.3.8 Instrumenttestandisolationswitches;2.3.9 Allprotectionandcontrolrelays;2.3.10 Utilityrevenuemetersandinstrumenttransformersincludingratioandpolarity(note:theproposed

systemshouldnotincludetheequipmentnecessaryforinterconnection,butitmustbeclearthatthebidderhasconsideredfutureinterconnection.Pleaseindicateclearlywhatequipmentisincludedintheproposalandwhatequipmentwouldbenecessarytoaddintheeventofgridinterconnection);

2.3.11 Panelmeters,synchroscopesandsynchronizinglights;2.3.12 SCADAtransducerconnectionsandlocations;2.3.13 Locationofthemicrogridlocalcontroller(MLC)anditsconnectionstogenerationandswitchingdevices.

2.4 Communicationsdiagramsanddescriptionsrequirements2.4.1 Communicationschematicshouldbedrawnelectronically.2.4.2 Applicationprogramminginterface(API)madeavailableforthegenerationsystem2.4.3 Layoutdiagramshowingphysicaldevicelocationcablingand/orantennamounting.Drawingsmust

includeallinterconnecteddevices,physicaltransfermedium(copper,fiber,radio),protocols,andinformationbeingtransferred.

2.4.4 Securityandauthenticationproceduresandpractices.

www.earthsparkinternational.orgRFP17ES0407 11

2.5 DescriptionofOperationRequirements2.5.1 Descriptionofblackstartsequence.2.5.2 Providefailuremodesandeffectsanalysisonallcriticalequipmentandeffortstakentomitigate

medium-highriskcontingencies.2.5.3 Descriptionofcapabilitiestoregulatevoltageandsupportreactivepowerdemand.2.5.4 Descriptionofregularlyscheduledmaintenancerequirements.2.5.5 Providemanufacturer’srequirementsforscheduledmaintenanceintervalsforallfacilitiesand

equipment.2.5.6 Providetestobjectivesforperiodicsystemmaintenanceandintegritytestingaccordingtomanufacturer

recommendations.2.5.7 Descriptionofwhatmaintenancefunctionswillresultinlimitedsupplyofpower.2.5.8 Descriptionoffuturetransmissioninterconnectionswitching.2.5.9 Descriptionofhowtheislandisformedandtransformstoanisland-modemicrogridwithoutadversely

affectingmicrogridcustomers.2.5.10 Descriptionofhowthesystemreturnstoutilityparallelmodewithoutadverselyaffectingmicrogrid

customersorothergrid-connectedentitiesoutsidethemicrogrid.2.5.11 Descriptionindicatingequipmentandlogic,conceptually,formicrogridprotectionandcontrolinisland

modeandincoordinationwithutilityinparallelmode.ProvidedocumentationofallprotectiverelayingshowingcompliancewithIEEE-1547,UL-1741,IEEE-C62.41andIEEE-C62.45standards.

2.5.12 Parametersettingsmustbefieldadjustableandaccessibleforadjustmentbyfieldoperationsstaffwiththeassistanceofinstaller.

2.5.13 Parametersettingscapableofadjustmentbyfieldoperationsstaffmusthaveaprocessavailablefordocumentationofchangesmadetoparametersettings.

2.6 Microgridcontrollerfunctionalitydiagramanddescriptions2.6.1 ThelogicdiagramshouldbedrawnelectronicallyusingANSIstandardlogicsymbolstoshowinjectionof

powerintogridfromPV,dieselgeneratorandbatterystorage,interalia.2.6.2 Thelogicdiagramshouldincludeblackstartsequence.2.6.3 Whileloadcontroltechnologyisnotrequired,biddersmayprovidesuggestionsforloadcontrollogic

thatEarthSparkcanprogramintoitssmartmeteringsystem.2.6.4 Descriptionoffuturetransmissioninterconnectionswitching,ifapplicable.2.6.5 Controlofgenerationcapacityduringislandmode.2.6.6 Re-transferofloadandinjectionoflocalgenerationtotransmissiongrid,ifapplicable.2.6.7 Descriptionofbackupdieselgenerationtieintogenerationsystem,whenapplicable.

2.7 Microgridexpandabilitydescription2.7.1 Generationsystemshouldbesizedtomeetthe2018projectedloadcurveincludedinyearlengthof

hourlydatainincludedtxtfile(Figure2onlyprovidedforavisualrepresentation),butshouldbedesignedtoenablegenerationsystemgrowthandadaptationtotheloadcurveevolutionasprojectedinTable4,projectedloadcurvefor2023(yearlengthofhourlydatanotprovidedfor2023projection).

2.7.2 Providedescriptionofsystemconfiguration,operationandmanagementthatdemonstratestheabilitytosupportexistingmicrogridloads.

2.7.3 DescriptionshouldhighlightmechanicalandelectricalmeansofaddingcapacitytomeettheincreaseinpeakloadandtotalenergydescribedinTable4,projectedloadcurvefor2023.Inotherwords,biddersshouldfocustheirresponsetoexpandabilityondescribinghowtheconfigurationandplannedO&Moftheirsystemwillenableanexpansiontomeettheloaddescribedin2023.Thebiddershoulddescribethemeanstomodifythesystemtoaccommodatetheprojectedloadgrowth.

2.7.4 InthecaseofDRmanagementtomanagecustomerloadwithoutuseofbackupdieselgeneration,explainhowdieselgeneratorsetcanbetiedintoDRmanagedsystematalaterdate.

www.earthsparkinternational.orgRFP17ES0407 12

2.8 Descriptionofresistancetoextremeweathereventsandclimate2.8.1 Providedescriptionandtechnicalcharacteristicsoffacilitiesconstructionandtheirabilitytowithstand

extremeweathereventssuchascategory4hurricanes.2.8.2 Identifythetypesofweatherconditionsduringwhichproposedmicrogridcriticalfacilitiesand

interconnectionfacilitiesarecapableofcontinuouslyoperating.2.8.3 Systemmustberesistanttocorrosionandabletooperateunderconsistentconditionsofextremeheat,

humidityandhighairbornesalinitycontent,suchasthosefoundinthelocalclimateofTiburon.

2.9 Considerationandadherencetooperationalsafetyrequirements2.9.1 Providedescriptionofpersonnelprotectiveequipment(PPE)requiredand/orrecommendedpertaining

tosafetyrisksposedtomicrogridoperationspersonnelwhileoperatingequipmentunderstandardoperatingconditions,aswellasduringmaintenanceortroubleshootingconditions.

2.9.2 Providelocationsofemergencyshutoffswitches,aswellastechnicaldescriptionofhowemergencyshutdownisimplementedanddescriptionofuse-cases.

2.9.3 Providefiresuppressionstrategyforbothinvertersandbatteries,ifappropriate.2.9.4 Provideequipmentnecessaryintheeventofabatteryspill,harmfulgasbuilduporotherhazardous

malfunction.2.9.5 Anyadditionalsafetyconsiderations,asrecommendedbyequipmentmanufacturesand/orUScode

adherence(OSHA,NFPA,etc.).

2.10 GeneratorInformationanddescriptionifapplicable2.10.1 Generatorinformation(Provideintableformat)

§ Makeandmodel§ Power(kW)rating§ Loadramprate(kW/second)§ Unloadramprate(kW/second)§ Maximumblockloadacceptance(inkW)§ Fuelconsumptionrate

2.10.2 Genericdescriptionofrequiredcivilworks2.10.3 Generatormanufacturer’sspecificationsheet2.10.4 Warranty

2.11 PVarrayinformationanddescription2.11.1 PVarrayinformation(provideinatabularformat)

§ PVmodulemakeandmodel§ Power(kW)ratingofarray§ Numberofmodulesperstring§ Numberofstrings§ Stringvoltage§ Stringcurrent§ Totalarea§ Totalweight

2.11.2 Descriptionofground-levelrackingsystems§ Genericdescriptionofrequiredcivilworks

2.11.3 PVmanufacturer’sspecificationsheet2.11.4 Warranty

2.12 Energystorageandpowerelectronicsdescription2.12.1 Storageinformation(provideinatabularformat).

www.earthsparkinternational.orgRFP17ES0407 13

§ Batterychemistrytype§ Batterymakeandmodel§ Batterymodulevoltage§ Batterymodulecapacity(Ah)§ BatteryarraykWhstoragecapacity§ BatterycyclelifedependingonDepthofDischarge§ Impactoftemperatureonperformance/capacity§ Numberofbatteriesperstring§ Numberofstrings§ Stringvoltage§ Stringcapacity(Ah)§ Maximumchargerate(maximumkWloadacceptance)-Y§ Invertercapacity(kW)§ InverterACvoltage§ ACkWmaximumrate§ Maximumshortcircuitcurrent

2.12.2 Descriptionofmethodofcharge/dischargecontrol.2.12.3 Descriptionofanyrequiredbatteryequalizing,ifappropriate.2.12.4 Descriptionofbatterysystemspecificmaintenancepractices.2.12.5 DescriptionofBatteryManagementSystem

§ Numberofpointsofcontrol§ StatewhetherBMSismaintainedbybattery/inverter/chargecontrollermanufacturerordeveloped

specifically2.12.6 Statebatteryreplacementtimeintervalandexplainintervalchoicebasedonmanufacturer

recommendationsandtechnologybestpractices.Timeintervalmustbegreaterthan5years,commencingattheagreeduponpointofcompletionofcommissioning.

2.12.7 Explainstepsrequiredtochangebatteries,whennecessarytodoso.Includeanyapplicableendoflifereclamationandrecyclingprocessesandrelatedcosts.

2.12.8 Genericdescriptionofrequiredcivilworks.2.12.9 Invertermanufacturer’sspecificationsheet.2.12.10 Chargecontrollermanufacturer’sspecificationsheet.2.12.11 Storagemanufacturer’sspecificationsheet.2.12.12 Warrantyforstorage,inverterandallotherrelevantcomponents.

2.13 BillofMaterialsanditemizedquotation(provideintableformat)2.13.1 Unit2.13.2 Quantity2.13.3 Manufacturer2.13.4 CatalogNo.2.13.5 Unitprice2.13.6 Totalitemprice2.13.7 Lead-timeestimate2.13.8 Warrantyinformation

2.14 Financialinformation(provideintableformat)

2.14.1 PercentofenergyandkWhinatypicalyeardrawnfrom:

§ SolarPVtomeetloaddemand§ Dieselgeneratororloadcurtailmentfromload-sidedemandresponseprogramtomeetload

demand

www.earthsparkinternational.orgRFP17ES0407 14

2.14.2 PercentofenergyandkWhinatypicalyearlostto:§ Batteryround-trip-efficiency§ Inverterlossesandotherlossesofsignificance

2.14.3 25-yearassetreplacementscheduleforPV,batterystorage,inverterandothermajorcomponents

2.15 ProjectSchedule2.15.1 Duringassessmentandinstallationphases,EarthSparkwillprovidereasonablelogisticssupportfor

personnelintheformoflocalcoordinationforin-countrytravel,lodgingandotherincidentallogisticssupportinHaiti.

2.15.2 TheImplementationprocessshouldincludethefollowingsteps(timelinesonlyprovidedforassistanceinestimatingprojectschedule;therefore,alterasneeded):§ Round1RFPSubmission:CompletionoffirstroundofRFPsubmissionwithintheallottedtimeframe.

Timeinterval:RFPannouncementtoMay22,2017.§ Round2RFPSubmission:Topinstallersunderconsiderationwillbe“short-listed”andconsideredfor

asecondroundofdesignconsiderations.AdjustmentswilllikelyberequestedbyEarthSparkatthistimeandadjustmentsmadeinaniterativeprocessbyshort-listedpotentialinstallers.Timeinterval:~mid-Maytomid-June2017.

§ ContractSigned:Installerdeterminedandcontractsigned.Completiondate:midtolateJune,2017.§ Assessmenttrip:Assessmenttripmadebyselectedinstallertofinalizedesignconditions;including

soilcontentforgenerationsystemfoundations,environmentalriskanalysis(windloadanalysis,flooding,erosionetc.)andotherdesignconsiderations.Timeinterval:~earlyJulytomid-August,2017.

§ DesignFinalized:Installerfinalizesdesign.Timeinterval:lateJulytoearlySeptember,2017.§ Shipping:EquipmentshippedtoPort-au-Prince,Haiti,keepinginmindleadtimesfordifferent

materials.Timeinterval:AugusttoearlyOctober,2017.§ ImplementationandCommissioningPhase1:Implementationtripmadebyinstallertocomplete

installationandcommissioningofturnkeygenerationsystem.Timeinterval:earlySeptembertolateOctober,2017.

§ CommissioningPhase2:GraceperiodofthreeweeksofoperationafterstatedcompletedofcommissioningbyinstallerforEarthSparkInternationaltosignoffonfullcompletionofcommissioningofsystem.Timeinterval:earlyOctobertoNovember,2017.

§ Follow-up:Follow-updiscussionscompletedwithEarthSparkcompletedonamonthlybasisataminimumforthefirstsixmonthsofpost-commissionoperationandquarterlyforthefollowing18monthsorscheduledbasedoncriticalneed,determinedbyEarthSpark.Discussionswillbegearedtowardsconfirmationthatsystemmeetsrequirementsasstatedincontract.Approximatetimeinterval:earlyNovember2017toearlyNovember2018.

§ ProjectCompletion:Atthecompletionof1yearafterconfirmationofcompletedcommissioning,contracttermshavebeenmetandcontractobligationsarecomplete.

www.earthsparkinternational.orgRFP17ES0407 15

ANNEX3 MINIMUMVIABLEPRODUCTOBLIGATIONOVERVIEW

EarthSparkwillworkwiththesuccessfulbiddertorefinethesystemthatwillbeinstalledinTiburonandadditionaltownsifapplicable.Thiswillensureareplicable,sustainablemodelwithminimaloversight.Asanoverview,contractingwillbebasedonthefollowingguidelinesforaminimumviableproduct.Minimaloversightincludesseamlessandautomatedoperationthatdoesnotrequirehumaninterventiononadailybasis.Remotemonitoringandcontrolaremandatory.Paymentschedulewillbeagreeduponduringcontractingandwillbebasedonmilestoneapprovaluptoandincludingfinalcommissioning.Minimumperformanceguaranteeisbelow.

3.1 Two-yearperformanceguarantee3.1.1 Systemuptime:

§ Powermustbesuppliedtothecommunityonanuninterruptedbasisat97%uptimeforthefirst2yearsofoperations,commencingaftercompletionofsystemcommissioningasdefinedinthisRFP.

3.1.2 Load-matching:§ Systemmustadequatelymeetthedemandsoftheusersbasedontheprojecteddailyloadcurve

presentedinFigure3forthefirst2yearsofoperations.

3.2 RequiredPlannedPerformanceRequirements3.2.1 Powerqualitygoalscanbefoundbelow:

Table1:PowerQualityGoals

IssuePowerQualityRequirement

(LevelofService)

ACPowerQualityPhenomena

VoltageImbalance <2%(high)

Transients SurgeProtection(standard–high)

ShortVoltageDurationVariations <1/week(high)

LongVoltageDurationVariations <1/day(high)

FrequencyVariations 58Hz<f<62Hz(base)

FaultsAllowedperDay <1/day(high)

3.2.2 PowerReliabilitywillbedeterminedandtrackedbasedontheSystemAverageInterruptionFrequency

Index(SAIFI),theSystemAverageInterruptionDurationIndex(SAIDI),thePlannedSystemAverageInterruptionFrequencyIndex(P-SAIFI)andthePlannedSystemAverageInterruptionDurationIndex(P-SAIDI).Equationsandrequirementscanbefoundbelow:

𝑆𝐴𝐼𝐹𝐼 =Total Number of Customer InterruptionsTotal Number of Customers Served

𝑆𝐴𝐼𝐷𝐼 =Total Minutes of 𝑈𝑛𝑝𝑙𝑎𝑛𝑛𝑒𝑑 Customer Interruption

Total Number of Customers Served

www.earthsparkinternational.orgRFP17ES0407 16

NorequirementwillbedefinedbytheinstallerforSAIFI,SAIDI,P-SAIFIorP-SAIDIandwillinsteadbeheldaccountabletothemetricsdefinedinthisRFP.

3.2.3 Systemsmustprovideatleast95%ofcustomerprojectedloadsoverthecourseofatypicalyearfromsolarPV,determinedundercontractualobligationcommencingaftercompletionofsystemcommissioningasdefinedinthisRFP.

3.2.4 Thebatterybankmustbesizedtomeetaminimumof5yearsofcontinuoususe,basedonmanufacturerrecommendationsandtheprovided1-yearlengthofhourlyloadprofiledata.The5-yeartimeintervalwillbeginonceallpartiesagreeandsignedoffthatcommissioningofthegenerationsystemhascompleted(atotalof5yearsand3weeksofcontinueduse).Batterieswillbeconsideredinneedofreplacementbasedonmanufacturerecommendationsorsystemrequirementsfalloutsideofsubsection1.2.1requirements.

3.2.5 Maintenanceroutinesshouldensurethat–ataminimum–powerwillstillbesuppliedonanuninterruptedbasisat97%uptime,commencingaftercompletionofsystemcommissioningasdefinedinthisRFPinsubsection1.2.5.

3.2.6 Batteryandinverterlosses(kWh)maynotexceed105%ofthenominallossesforthefirst2yearsofoperations.

www.earthsparkinternational.orgRFP17ES0407 17

ANNEX4 DESCRIPTIONOFTHETIBURONMICROGRIDSYSTEM

4.1 LesAnglaisMicrogridcontext4.1.1 Forthepastyearandahalf,EarthSparkInternationalhasbeenoperatingamicrogridservingroughly

450householdandbusinesscustomersinthetownofLesAnglais(Suddepartment,Haiti).PriortoHurricaneMatthew,thegridwaspoweredby93kWsolarPV,410kWhdeepcycleleadacidbatterybankanda30kWdieselgenerator.Figure1below,depictsLesAnglaisgeneration(bluecircleandX),distributionandutilitypolegenerallayout.

4.1.2 OneofthekeycharacteristicsoftheLesAnglaisgridistheutilizationofsmartload-limitingmeterswithbi-directionalcommunicationtomanagedemand.Thissameload-limitingstrategywillbeusedfortheTiburongrid.

4.1.3 TheLesAnglaisandTiburongridswillshareanumberofcharacteristicsbuttheprimarydifferencesinclude:(1)back-updieselgenerationmayormaynotbeincludedfortheTiburongenerationsystem,(2)energymanagementsystemandstoragetechnologyforTiburonmaydifferfromthoseusedinLesAnglais,and(3)theTiburonloadcurvewillhavedifferentcharacteristics,asestimatedinthisRFP.

4.1.4 Theloadcurvefor450ofthecustomersmonitoredwithsmartmetersinLesAnglaisisshowninFigure2.Customersaredifferentiatedbyenergytarifflevel.Presently,thereare372customersontarifflevelsconsideredtobesmallresidential(upto120W),68customersontarifflevelsconsideredtobebiggerresidential(upto600W),4customersconsideredtobebusinessleveland2customersconsideredtobeanchorloads.Individualpeakconsumptionfrommostcustomersisintherangeof15to60W,astheselow-incomecustomerstypicallyonlyusegridpowerforlighting,cellphonechargingandpoweringsmallentertainmentdevices(televisions,laptopsorDVDplayers).Largerloadcustomerscouldoperatefans,refrigerators,freezers,powerequipmentorotherinductionmotor-basedappliances.TiburoncanbeexpectedtohaveequipmentofsimilartypeandsizeasisinoperationinLesAnglais.

Figure1:LayoutofcurrentEarthSparkmicrogridinLesAnglais,Haiti

www.earthsparkinternational.orgRFP17ES0407 18

Figure2:Actual4-dayloadcurveforexisting450customersinLesAnglais

4.2 TiburonMicrogridcontext4.2.1 TheplannedinitialphaseoftheTiburoninstallationwillservethewholedowntownareaofTiburon,

whichencompassesroughly300customers,includingresidential,smallbusinessesandcommercialclients.

4.2.2 PriortothearrivalofHurricaneMatthew,afunctioningdistribution/transmissionnetworkwasinplacebutassuggestedinFigure5,asubstantialportionofthisnetworkwillrequirerework.AseparateRFPwillbedistributedinparallelforthisreconstructionwork.

4.2.3 Figure3andFigure4showprojecteddailyloadcurvesin2018and2023,respectively.Thestackedportionofthegraphshowscustomerusage,determinedthroughaveragedhourlydatafromtheprovidedyear-longprojectedTiburonloadprofile,whilethelineaboveshowsmaximumhourlyprojectedusage.ProjecteddailyloadcurvedataaregiveninTable8andTable9.Figure3andFigure4andTable8andTable9areprovidedasavisualrepresentationandshouldnotbeusedformodeling,asidefrommicrogridexpandabilitydiscussedinsection2.7.Useprovidedfullyearofhourlyprojectedloadformodelingpurposes.

4.2.4 Soilconditions,forinitialestimate,canbeconsideredamixtureofsoilandrock,withindividualitemsranginginsizefrom1inchto16inches.

4.2.5 DuringHurricaneMatthew,whichtookplaceinOctober2016,category4windspeedsreachedlevelsashighasroughly150mph.Protectivebarriersforhighwindsandprojectileconsiderationshouldbeconsideredinthedesignofallcriticalequipmentatdesignconditionsequivalenttoacategory4hurricane.Ifpossible,pleaseincludeadescriptionofthecostsassociatedwithhurricaneprotection/mitigationaswellasanestimateofcostsforbuildingtoCategory5protectionlevel.

4.2.6 In2010,a7.0magnitudeearthquakecausedconsiderabledamageinthecapitolofPortauPrince.Thesamefaultlinepertainingtothe2010earthquakepassesthroughtheTiburonregion.Theoccurrenceofa7.0earthquaketakingplaceinTiburonshouldbeconsideredinthedesignofcriticalequipment.Pleaseincludeadescriptionofthecostsassociatedwithearthquakeprotection/mitigation.

4.2.7 Relevanttosub-section4.2.6,Tiburon’slocationasacoastaltownwithfaultlinepassingthroughtheTiburonregionandouttoseaprovidesatsunamirisk.Plansareunderwaytoconsidergenerationlocationsatelevatedgroundlevelbutitisstillimportanttoconsidertsunami-likeimpactsandflooding

www.earthsparkinternational.orgRFP17ES0407 19

intheconsiderationofthedesignofcriticalequipment.Emergencyshutoffequipmentandprotocolsshouldtakethesepointsintoconsideration.

4.2.8 Duringstormconditions,thetownofTiburonhasbeenknowntoflood.Asdiscussedinsub-section4.2.7,generationsitelocationisbeingconsideredforelevatedlocationsbutfloodingprotectionshouldbeconsidered,pertainingtosub-section4.2.7.Pleaseincludeadescriptionofthecostsassociatedwithfloodingprotection/mitigation.

4.2.9 CustomercompositionisshowninTable2.

Table2:Customercompositionbyservicelevel

2018Load 2023LoadSmallresidential(upto120W) 200 280Biggerresidential(upto600W) 50 80Businessandinstitutional(upto600W) 11 25Electriccooking(~1000W) 50 50Streetlights(~30W) 70 70Diaspora(upto1000W) 10 25

Figure3:ProjectedDailyLoadCurve2018-Tiburon

www.earthsparkinternational.orgRFP17ES0407 20

Figure4:ProjectedDailyLoadCurve2023-Tiburon

Table3:AverageandMaxDailyLoadCurveDatafor2018(PowerinkW)

HourSmall

residential(upto60W)

Biggerresidentialandsmallbusiness(60W

to600W)Streetlights Diaspora

ElectricCooking(1000W)

MaxHourlyTotalLoad

0:00 0.104 2.238 1.890 2.686 0 14.3141:00 0.075 2.106 1.890 2.527 0 13.2542:00 0.069 2.009 1.890 2.411 0 12.4373:00 0.086 1.959 1.890 2.351 0 12.1774:00 0.133 1.970 1.890 2.364 0 12.4305:00 0.286 2.102 1.890 2.522 0 13.0386:00 0.297 2.159 1.890 2.591 0 13.2977:00 0.220 2.358 0 2.830 0 11.3028:00 0.193 2.593 0 3.112 0 10.9299:00 0.184 2.863 0 3.436 10.0 22.11710:00 0.181 3.079 0 3.695 20.0 33.06511:00 0.183 3.295 0 3.954 20.0 36.08812:00 0.181 3.359 0 4.031 20.0 34.53113:00 0.179 3.407 0 4.088 20.0 34.41814:00 0.178 3.405 0 4.086 10.0 23.67515:00 0.182 3.403 0 4.084 0 15.57216:00 0.188 3.278 0 3.934 0 15.17317:00 0.235 3.134 0 3.761 0 14.38518:00 0.896 3.553 0 4.264 0 16.70619:00 1.896 4.437 1.890 5.324 0 20.91820:00 1.878 4.489 1.890 5.387 0 21.702

www.earthsparkinternational.orgRFP17ES0407 21

21:00 1.284 3.873 1.890 4.648 0 20.47822:00 0.561 3.048 1.890 3.658 0 18.27423:00 0.203 2.495 1.890 2.994 0 16.184

Table4:AverageandMaxDailyLoadCurveDatafor2023(PowerinkW)

HourSmall

residential(upto60W)

Biggerresidentialandsmallbusiness(60W

to600W)Streetlights Diaspora

ElectricCooking(1000W)

MaxHourlyTotalLoad

0:00 0.177 4.384 1.890 4.371 0 22.3921:00 0.150 3.522 1.890 4.034 0 19.2762:00 0.150 3.854 1.890 4.118 0 19.5213:00 0.190 4.003 1.890 3.780 0 19.1074:00 0.239 4.004 1.890 3.877 0 19.5735:00 0.432 3.830 1.890 3.877 0 19.2276:00 0.444 3.598 1.890 4.085 0 19.2037:00 0.344 4.184 0 5.974 0 21.9478:00 0.290 4.888 0 6.223 0 21.1279:00 0.373 5.160 0 6.596 10 29.69410:00 0.367 5.977 0 7.163 20 41.10311:00 0.323 5.571 0 7.585 20 44.04412:00 0.411 6.024 0 7.364 20 42.33213:00 0.274 5.980 0 8.092 20 42.71514:00 0.276 6.307 0 7.691 10 32.52615:00 0.303 5.964 0 7.997 0 28.96616:00 0.362 5.879 0 7.703 0 28.59217:00 0.353 6.306 0 7.602 0 28.77118:00 1.461 7.238 0 8.266 0 32.52919:00 2.901 7.163 1.890 9.673 0 33.39220:00 2.754 7.515 1.890 9.577 0 34.57321:00 2.112 7.116 1.890 8.533 0 34.41222:00 0.873 5.912 1.890 6.386 0 30.05823:00 0.381 4.449 1.890 5.052 0 25.129

4.3 TiburonPlannedDistributionsystem4.3.1 Thegridwillcoverapproximately4.1kmofstreetsindowntownTiburon.4.3.2 DistributionwillincludeMedium(13.2kV)primarylinesandLow-Voltage(240/120V)secondarylines.

SeeTable5forprojectedconductorlengths.4.3.3 GenerationsystemwilllikelybelocatednearthebaseofFigure5;potentiallynearthetag

“GoogleMyMaps”.4.3.4 Step-uptransformerswillbepositionedonaground-levelconcretefoundationnearthegeneration

systemandsurroundedbyprotectivebarrier.4.3.5 Insulatedmediumvoltagethreephaseorsinglephaseconductor(3runsoftransmissionconductorin

eithercase)willpassupanadjacent35footutilitypoleandwilllikelypasstotransmissionlinesthatbeginatthesouthernend(bottomofFigure5)ofTiburonandextendnorthalongthewesterncoastal

www.earthsparkinternational.orgRFP17ES0407 22

mainroad(leftsideofFigure5)inTiburon.Singletransmissionlineswillthenpasseast(lefttoright)totransformers(indicatedwithredcirclesinFigure5)locatedoneachmajorstreet.

4.3.6 Everythirddistributionutilitypolewillbeneutralgrounded.4.3.7 Subsystemsfinallayoutandwireratingsarebeingcurrentlydefined.4.3.8 Below,Figure5providestheTiburongridfootprintwithsomeoftheeffectsofHurricaneMatthew.

PoleswithoutanXindicatepolesthatsurvivedHurricaneMatthew.PoleswithanXdidnotsurvive.Redindicatespoleswithtransformers.Yellowindicatespoleswithstreetlightspreviouslyinstalled.Brownindicatesstandardutilitypoles.Blue(phaseA),red(phaseB)andgreen(phaseC)linesindicate240/120VdistributionsysteminplacepriortoHurricaneMatthew(tobereplaced).

Figure5:PlannedTiburongridfootprint,toberefined

Table5:DistributionSystemSpecifics(AsseenpriortoHurricaneMatthew)

Type Voltage DistanceLowVoltage–PhaseA 240/120V 1,450mLowVoltage–PhaseB 240/120V 1,000mLowVoltage–PhaseC 240/120V 1,500mMediumVoltage–PhaseA 13.2kV 2,000mMediumVoltage–PhaseB 13.2kV 1,400mMediumVoltage–PhaseC 13.2kV 1,700m

Number/TypeofTransformers:7x15kVAsinglephase13.2kVto240/120V

Table6:MeteringSpecifics

MeterParameters Specifics#ofMeters ~300LocationofMeters PoletopPrepaidMeter YesMeterCommunications MeshRFMeterAccuracy 1%RemoteDisconnectIncluded Yes

www.earthsparkinternational.orgRFP17ES0407 23

OtherFeatures Powerlimiting,energylimiting,demandresponsemanagement

4.4 Projectscheduleconsiderations4.4.1 TiburonislocatedatthewesterntipofthesouthernHaitipeninsula.4.4.2 Transportrequires~6hoursofsingle-lanepavedroads(speedbumps,potholesapplicable)and~2.5

hoursofsingle-lanedirtroads,requiringpassageover/arounddamagedbridgesandthroughoneorseveralriversdependingonbridgeconditions.Riverlevelswillbeconsideredwhentimingthelocaltransittoensurethatriverdepthdonotexceed2feet.4-wheeldriveisrequiredandaftersustained,heavyrain,inaccessibilityofrivercrossingmightcausedelaysuntilriversubsides.

4.4.3 Potentialforlandslidesduringstormconditionsarepresentatcertainlocationsalongaccessroadbutpathistypicallyclearedwithindays.

4.4.4 HurricaneseasonofficiallytakesplacebetweenJune1standNovember30thandmustbetakenintoconsiderationduringplanning.

4.4.5 Duringprojectassessmentandimplementationphases,EarthSparkwillprovidereasonablelogisticssupportforpersonnelintheformoflocalcoordination.

4.5 Othermodelingconsiderations4.5.1 Monthlyaverageinsolationdata.4.5.2 Biddersshouldassumeapriceof$1perliterofdieselfuel.

Table7:MonthlyAverageInsolationData

ClearnessIndex

DailyRadiation

(kWh/m2/d)

January 0.58 6.4February 0.61 7.1March 0.6 7April 0.53 5.8May 0.48 4.9June 0.56 6.3July 0.59 6.7August 0.54 5.8September 0.52 5.5October 0.52 5.6November 0.51 5.3December 0.54 5.8

www.earthsparkinternational.orgRFP17ES0407 24

ANNEX5 ADDITIONALTWOSMALLGRIDS

5.1 ‘StarterGrid’Microgridcontext5.1.1 InadditiontotheTiburongrid,EarthSparkissolicitingproposalsforsmall‘startergrids’fortwo

additionalsmalltownsinHaiti.A‘startergrid’issmallerinfrastructuredevelopmentthatdeliverssmallerlevelsofpowerthantheLesAnglaisgridandtheprojectedgridinTiburon.Asmall‘startergrid’stillservesanimportantroleindeliveringprimaryenergyaccesstoacommunityandmayserveasavanguardforalargergridinthatcommunityifalargerinstallationisjustifiedandpossible.

5.2 NextTwo‘StarterGrids’EarthSparkhasselected,butnotconfirmedthesetowns.ForpurposesofthisRFP,pleaseconsiderthefollowing:5.2.1 Theplannedexpansionwillservethedowntownareasoftwotownswithapproximately100customers

each,includingresidential,smallbusinessesandcommercialclients.5.2.2 Biddersmaysubmitsolutionsthatareeitherexpandable,orintheeventofexpansionareportableand

maybemovedtoanother‘startergrid’location.5.2.3 ThesegridsshouldbeACandshouldmeetthereliabilitycriteriasetforthforTiburoninANNEX4aswell

astheminimumviableproductobligationssetoutinANNEX3.Figure6throughFigure9showprojecteddailyloadcurvesin2018and2023,respectively.Thestackedportionofthegraphshows50thpercentilevaluesofaveragecustomerusage,whilethelineaboveshowstotalusageatthe95thpercentile.DailyloadcurvedataaregiveninTable8throughTable11.

5.2.4 CustomercompositionisshowninTable12andTable13.

Figure6:Projecteddailyloadcurvein2018forTown1

www.earthsparkinternational.orgRFP17ES0407 25

Figure7:Projecteddailyloadcurvein2023forTown1

Figure8:Projecteddailyloadcurvein2018forTown2

www.earthsparkinternational.orgRFP17ES0407 26

Figure9:Projecteddailyloadcurvein2023forTown2

Table8:LoadCurveDatafor2018forTown1(powerinkW)Hour Averagesmall

residential(<120W)

Bigresidentialandsmallbusinesses(upto600W)

Streetlights(25W)

Biggerbusinesses(upto1000W)

Total50thPercentile

Total95thPercentile

0:00 0.09 1.53 0.30 2.70 4.62 5.161:00 0.05 1.76 0.30 2.65 4.76 5.322:00 0.05 1.70 0.30 2.60 4.65 5.193:00 0.03 1.60 0.30 2.70 4.63 5.174:00 0.05 1.59 0.30 2.60 4.53 5.065:00 0.07 1.92 0.30 2.65 4.94 5.526:00 0.06 1.94 0.30 2.65 4.96 5.547:00 0.06 1.85 0.00 4.10 6.02 6.728:00 0.08 1.58 0.00 4.20 5.86 6.559:00 0.09 1.46 0.00 4.10 5.65 6.3110:00 0.07 1.32 0.00 4.20 5.59 6.2511:00 0.07 1.21 0.00 4.15 5.43 6.0712:00 0.09 1.18 0.00 4.20 5.47 6.1113:00 0.07 1.16 0.00 4.15 5.38 6.0114:00 0.07 1.19 0.00 4.15 5.40 6.0415:00 0.08 1.24 0.00 4.20 5.52 6.1716:00 0.07 1.26 0.00 4.15 5.49 6.1317:00 0.09 1.26 0.00 4.20 5.54 6.2018:00 0.12 1.22 0.00 4.15 5.49 6.13

www.earthsparkinternational.orgRFP17ES0407 27

19:00 0.81 1.35 0.30 2.65 5.12 5.7220:00 0.88 1.46 0.30 2.65 5.29 5.9121:00 0.71 1.81 0.30 2.75 5.57 6.2222:00 0.39 1.69 0.30 2.70 5.08 5.6723:00 0.12 1.59 0.30 2.65 4.66 5.21

Table9:LoadCurveDatafor2023forTown1(powerinkW)

Hour Averagesmallresidential(<120W)

Bigresidentialandsmallbusinesses(upto600W)

Streetlights(25W)

Biggerbusinesses

(upto1000W)

Total50thPercentile

Total95thPercentile

0:00 0.22 3.97 0.3 4.44 8.92 10.62

1:00 0.11 4.72 0.3 4.42 9.55 11.37

2:00 0.08 4.10 0.3 4.19 8.67 10.32

3:00 0.05 4.24 0.3 4.46 9.05 10.78

4:00 0.10 4.06 0.3 4.48 8.94 10.65

5:00 0.26 5.50 0.3 4.32 10.38 12.36

6:00 0.17 5.31 0.3 6.69 12.47 14.85

7:00 0.15 3.52 0 6.48 10.15 12.09

8:00 0.19 3.17 0 6.60 9.96 11.86

9:00 0.19 3.05 0 6.48 9.71 11.56

10:00 0.14 2.72 0 6.62 9.48 11.28

11:00 0.14 2.54 0 6.45 9.12 10.86

12:00 0.17 2.61 0 6.57 9.36 11.14

13:00 0.18 2.35 0 6.48 9.01 10.72

14:00 0.17 2.54 0 6.52 9.23 10.99

15:00 0.17 2.53 0 6.62 9.32 11.10

16:00 0.14 2.58 0 6.46 9.18 10.93

17:00 0.24 2.49 0 6.57 9.30 11.07

18:00 0.42 2.51 0 6.52 9.45 11.25

19:00 2.44 3.00 0.3 4.36 10.11 12.04

20:00 2.43 3.33 0.3 4.26 10.32 12.29

21:00 1.73 3.97 0.3 4.59 10.60 12.61

22:00 1.11 3.95 0.3 4.50 9.86 11.74

23:00 0.22 3.91 0.3 4.24 8.68 10.33

Table10:LoadCurveDatafor2018forTown2(powerinkW)

Hour Averagesmallresidential(<120W)

Bigresidentialandsmallbusinesses(upto600W)

Streetlights(25W)

Biggerbusinesses(upto1000W)

Total50thPercentile

Total95thPercentile

0:00 0.99 1.55 0.38 2.70 5.62 6.281:00 0.81 1.81 0.38 2.70 5.69 6.36

www.earthsparkinternational.orgRFP17ES0407 28

2:00 0.77 1.57 0.38 2.60 5.31 5.933:00 0.72 1.20 0.38 2.70 5.00 5.584:00 0.90 1.50 0.38 2.70 5.48 6.125:00 2.84 1.89 0.38 2.65 7.75 8.666:00 2.88 2.06 0.38 4.10 9.42 10.527:00 1.30 1.45 0.00 4.20 6.95 7.768:00 1.25 1.39 0.00 4.20 6.84 7.649:00 0.99 2.00 0.00 4.20 7.19 8.0310:00 1.13 1.80 0.00 4.20 7.13 7.9611:00 0.86 1.84 0.00 4.15 6.85 7.6512:00 1.31 1.84 0.00 4.20 7.35 8.2113:00 1.31 1.84 0.00 4.15 7.30 8.1514:00 1.17 1.46 0.00 4.20 6.82 7.6215:00 1.04 1.41 0.00 4.20 6.64 7.4216:00 1.01 1.49 0.00 4.15 6.64 7.4217:00 1.22 1.47 0.00 4.20 6.89 7.6918:00 1.05 1.31 0.00 4.20 6.56 7.3319:00 2.61 1.30 0.38 2.65 6.93 7.7420:00 2.75 2.24 0.38 2.60 7.96 8.8921:00 2.43 1.97 0.38 2.75 7.52 8.4122:00 2.61 1.86 0.38 2.70 7.54 8.4323:00 0.86 1.70 0.38 2.60 5.53 6.17

Table11:LoadCurveDatafor2023forTown2(powerinkW)

Hour Averagesmallresidential(<120W)

Bigresidentialandsmallbusinesses(upto600W)

Streetlights(25W)

Biggerbusinesses

(upto1000W)

Total50thPercentile

Total95thPercentile

0:00 0.20 4.03 0.38 4.44 9.04 10.761:00 0.12 4.84 0.38 4.42 9.76 11.622:00 0.10 3.78 0.38 4.19 8.45 10.063:00 0.06 3.18 0.38 4.46 8.07 9.614:00 0.10 3.85 0.38 4.48 8.81 10.495:00 0.17 5.41 0.38 4.32 10.28 12.246:00 0.18 5.64 0.38 6.69 12.88 15.347:00 0.15 2.75 0.00 6.48 9.38 11.178:00 0.20 2.78 0.00 6.60 9.59 11.419:00 0.22 4.17 0.00 6.48 10.88 12.9510:00 0.16 3.72 0.00 6.62 10.50 12.5011:00 0.17 3.84 0.00 6.45 10.46 12.4612:00 0.23 4.07 0.00 6.57 10.87 12.9413:00 0.16 3.72 0.00 6.48 10.36 12.3314:00 0.15 3.11 0.00 6.52 9.78 11.6415:00 0.20 2.88 0.00 6.62 9.69 11.54

www.earthsparkinternational.orgRFP17ES0407 29

16:00 0.18 3.04 0.00 6.46 9.68 11.5317:00 0.18 2.91 0.00 6.57 9.66 11.5018:00 0.23 2.71 0.00 6.52 9.47 11.2719:00 2.32 2.88 0.38 4.36 9.94 11.8420:00 2.78 5.12 0.38 4.26 12.53 14.9221:00 1.83 4.32 0.38 4.59 11.12 13.2422:00 0.94 4.34 0.38 4.50 10.15 12.0923:00 0.33 4.16 0.38 4.24 9.10 10.84

Table12:NumberofcustomersbytarifflevelforTown1

2018Load 2023LoadSmallresidential(upto120W) 94 117Bigresidentialandsmallbusiness(upto600W) 10 16Streetlights 10 10Biggerbusinesses(upto1000W) 1 2

Table13:NumberofcustomersbytarifflevelforTown2

2018Load 2023LoadSmallresidential(upto30W) 102 164Bigresidentialandsmallbusiness(upto600W) 8 18Streetlights 10 10Biggerbusinesses(upto1000W) 1 2

5.3 PlannedDistributionsystem5.3.1 Thegridswillcoverapproximately1.0kmofstreetsindowntownTown2andabout0.7kmofstreetsin

Town1.5.3.2 Itwillincludelow-voltage(120V)primarylinesonly.5.3.3 Subsystemslayoutandwireratingsarebeingcurrentlydefined.

5.4 Othermodelinginputs5.4.1 Forthissection,usesamemodelinginputsasthosefortheTiburonmicrogridRFP.

Table14:MonthlyAverageInsolationData

ClearnessIndex DailyRadiation(kWh/m2/d)January 0.65 5.07February 0.66 5.84March 0.65 6.48April 0.64 6.84May 0.60 6.62June 0.64 7.00July 0.64 6.99August 0.63 6.75September 0.62 6.24October 0.62 5.63November 0.62 4.98December 0.63 4.72

www.earthsparkinternational.orgRFP17ES0407 30

ANNEX6 DELIVERYDATAFORM

RFP17ES0407–Bidder’sdeliverydata

QuotationsareunderstoodtobeunderDeliveryAtTerminal(DAT)conditions,withproposalsforseafreight.

DATpointforofferedproducts Port-au-Prince,Haiti

Countryoforiginofofferedproducts

Deliverytime(DATfromtimeoforder)

TotalDATprice

Shipmentdimensionsofofferedproducts(includingpackage)

Grossweight TotalvolumeContainers(ifapplicable)

Number Size

NOTE: please note that under DAT (Delivery At Terminal) Incoterms 2010, vendor is responsible todeliverthegoodsatnamedport(meaning:allfeesrelatedtofreight,insuranceandunloadingatportshallbeincludedinyourquote).

Authorizedsignature:________________________________________________

Date:_____________________________________

www.earthsparkinternational.orgRFP17ES0407 31

ANNEX7 PREVIOUSEXPERIENCEFORM

Authorizedsignature:________________________________________________

Date:_____________________________________

DescriptionofContract Country Contractvalue(USD)

Contractname

ContactdetailsofClient(Name,Country,Telephone,Email)

Year