EAST ORANGE SCHOOL DISTRICT
ECOLE T. LOUVERTURE SCHOOL
290 CENTRAL AVENUE EAST ORANGE, NEW JERSEY
FACILITY ENERGY REPORT
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 1 of 39
TABLE OF CONTENTS
I. HISTORIC ENERGY CONSUMPTION/COST ................................................................. 2
II. FACILITY ENERGY USE INDEX (EUI) .......................................................................... 7
III. FACILITY DESCRIPTION ................................................................................................ 9
IV. MAJOR EQUIPMENT LIST ............................................................................................ 11
V. ENERGY CONSERVATION MEASURES ..................................................................... 12
VI. ADDITIONAL RECOMMENDATIONS ......................................................................... 39
Appendix A – ECM Cost & Savings Breakdown
Appendix B – New Jersey Smart Start® Program Incentives
Appendix C – Portfolio Manager “Statement of Energy Performance”
Appendix D – Major Equipment List
Appendix E – Investment Grade Lighting Audit
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 2 of 39
I. HISTORIC ENERGY CONSUMPTION/COST The energy usage for the facility has been tabulated and plotted in graph form as depicted within this section. Each energy source has been identified and monthly consumption and cost noted per the information provided by the Owner. Electric Utility Provider: PSE&G Electric Utility Rate Structure: GLP Third Party Supplier: Direct Energy Natural Gas Utility Provider: PSE&G Utility Rate Structure: GSG (HTG) Third Party Supplier: SJI The electric usage profile represents the actual electrical usage for the facility. The electric utility measures consumption in kilowatt-hours (KWH) and maximum demand in kilowatts (KW). One KWH usage is equivalent to 1000 watts running for one hour. One KW of electric demand is equivalent to 1000 watts running at any given time. The basic usage charges are shown as generation service and delivery charges along with several non-utility generation charges. Rates used in this report reflect the historical data received for the facility. The gas usage profile within each facility report shows the actual natural gas energy usage for the facility. The gas utility measures consumption in cubic feet x 100 (CCF), and converts the quantity into Therms of energy. One Therm is equivalent to 100,000 BTUs of energy.
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 3 of 39
Table 1 Electricity Billing Data
Utility Provider: PSE&GRate: GLP
Meter No: 9199466Account No: 69 594 564 01
Third Party Utility Provider: Direct EnergyTPS Meter / Acct No: -
MONTH OF USE CONSUMPTION KWH TOTAL BILL
Apr-14 10,800 $1,740
May-14 27,480 $4,878
Jun-14 19,200 $3,804
Jul-14 10,920 $2,099
Aug-14 15,480 $3,383
Sep-14 18,960 $2,901
Oct-14 18,840 $2,885
Nov-14 21,720 $3,272
Dec-14 19,440 $2,966
Jan-15 20,280 $3,064
Feb-15 22,440 $3,386
Mar-15 18,840 $3,002
Totals 224,400 96.0 Max $37,379
AVERAGE DEMAND 77.7 KW average
AVERAGE RATE $0.167 $/kWh
DEMAND KW
61.2
79.2
84.0
81.6
79.2
80.4
80.4
80.4
76.8
88.8
44.4
96.0
ELECTRIC USAGE SUMMARY
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 4 of 39
Figure 1 Electricity Usage Profile
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 5 of 39
Table 2 Natural Gas Billing Data
Utility Provider: PSE&GRate: GSG (HTG)
Meter No: 3497118Account No: 69 594 564 01
Third Party Utility Provider: SJITPS Meter No:
MONTH OF USECONSUMPTION
(THERMS)TOTAL BILL
Apr-14 55.94 $63.73
May-14 61.04 $69.84
Jun-14 35.65 $40.75
Jul-14 22.00 $28.10
Aug-14 50.42 $50.80
Sep-14 76.91 $71.68
Oct-14 62.16 $59.45
Nov-14 87.44 $85.42
Dec-14 72.83 $80.43
Jan-15 79.24 $81.41
Feb-15 94.12 $92.23
Mar-15 64.57 $63.83
TOTALS 762.32 $787.67
AVERAGE RATE: $1.03 $/THERM
-
NATURAL GAS USAGE SUMMARY
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 6 of 39
Figure 2 Natural Gas Usage Profile
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 7 of 39
II. FACILITY ENERGY USE INDEX (EUI) Energy Use Index (EUI) is a measure of a building’s annual energy utilization per square foot of building. This calculation is completed by converting all utility usage consumed by a building for one year, to British Thermal Units (BTU) and dividing this number by the building square footage. EUI is a good measure of a building’s energy use and is utilized regularly for comparison of energy performance for similar building types. Building Benchmarking data is collected and analyzed within the Commercial Building Energy Consumption Survey (CBECS), performed by the Energy and Information Administration (EIA). Building data is grouped by function types and tabulated, from which a median site and source energy intensity is determined. The national median or PEER Group Comparable in this instance is the middle value of the national population meaning half the buildings use more energy, and half use less. The PEER Group EUI allows us to compare the relative efficiency of the audited building to that of an average building with the same or similar primary function (i.e. group type). Source use differs from site usage when comparing a building’s energy consumption with the national average. Site energy use is the energy consumed by the building at the building site only. Source energy use includes the site energy use as well as all of the losses to create and distribute the energy to the building. Source energy represents the total amount of raw fuel that is required to operate the building. It incorporates all transmission, delivery, and production losses, which allows for a complete assessment of energy efficiency in a building. The type of utility purchased has a substantial impact on the source energy use of a building. The EPA has determined that source energy is the most comparable unit for evaluation purposes and overall global impact. Both the site and source EUI ratings for the building are provided to understand and compare the differences in energy use. The site and source EUI for this facility is calculated as follows:
BuildingSiteEUIElectricUsageinkBtu FuelUsageinkBtu
BuildingSquareFootage
BuildingSourceEUIElectricUsageinkBtu SSRatio FuelUsageinkBtu SSRatio
BuildingSquareFootage
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 8 of 39
Table 3 Energy Use Index Summary
kWh Therms Gallons kBtu kBtu
ELECTRIC 224,400.0 766,102 3.140 2,405,559
NATURAL GAS 762.3 76,232 1.050 80,043
FUEL OIL 36,124.0 5,021,236 1.010 5,071,448
TOTAL 5,863,569 7,557,051
BUILDING TYPE
BUILDING AREA 60,000 SQUARE FEET
BUILDING SITE EUI 97.73 kBtu/SF/YR 58.2 kBtu/SF/YR
BUILDING SOURCE EUI 125.95 kBtu/SF/YR 141.4 kBtu/SF/YR
11%
*Site - Source Ratio data is provided by the Energy Star Performance Rating Methodology for Incorporating Source Energy Use document.
AUDITED BUILDING PEER COMPARISON
K-12 School K-12 School
More Efficient than PEER Comparison
ENERGY USE INTENSITY CALCULATION
ENERGY TYPEBUILDING USE
SITE ENERGY
SITE-SOURCE RATIO
SOURCE ENERGY
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 9 of 39
III. FACILITY DESCRIPTION
The Ecole T. Louverture Elementary School is located at 290 Central Avenue in East Orange, New Jersey. This 60,000 SF facility was originally built in 1898. The school presently has approximately (317) Pre-Kindergarten - 5th grade students. The building is four stories and consists of classrooms, main office, media center, gymnasium, auditorium, art room, teacher workroom, computer lab, boiler room, kindergarten classrooms, faculty room, and storage/utility rooms.
Occupancy Profile
The Ecole T. Louverture Elementary School typical hours of operations are Monday through Friday between 7:00 am and 4:00 pm. Maintenance staff is present in the building as early as 6:00 am, and nighttime cleaning staff present until 10:00 pm.
Building Envelope
Exterior walls for the building are masonry brick faced with block construction. The windows throughout the facility are in very poor condition. Typical windows are single-pane with aluminum frames. The roof is sloped with asphalt shingles.
HVAC Systems The Louverture School has no central air conditioning system, however many classrooms and offices are cooled by window air conditioning units. Heating is provided to the building by a single steam boiler plant that is distributed out to radiators and unit ventilators. The main boiler plant consists of a Continental Model F104A125LS oil-fired, steam boiler rated at 5,000 pounds of steam using 37.5 gallons of #2 fuel oil per hour with a thermal efficiency of 68%. The other steam boiler was being installed during the site survey and is a Smith Cast Iron Sectional Boiler Model 28HE-S/W-13 with a dual fuel capable burner for oil and natural gas and a rating of 3,978 MBH using 27.5 GPH of #2 fuel oil per hour and rated at a thermal efficiency of 83.1%. A 1 HP fuel pump delivers oil to each boiler. The heating system distributes steam to various radiators and steam coils. There is a building condensate return station with three (3) ¾ HP pumps and a lower level condensate receiver/pump skid with two (2) ⅓ HP pumps. The classrooms have Nesbitt horizontal unit ventilators with steam coils coupled with radiators. The steam units also have pneumatic actuator controls. The stairwells and entrances have steam radiators with pneumatic valve controls. The various offices and some of the classrooms have window air conditioning units with capacities of 9,000 to 12,000 BTUH and efficiencies of between 9.4 and 9.6 EER.
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 10 of 39
Exhaust System
The school facility has some general exhaust fans located on the roof with fractional horsepower motors. The food prep kitchen exhaust fan is a Greenheck inline square fan with a ¼ HP motor. HVAC System Controls
The building is controlled by a pneumatic system operating off a time clock. Rooms have pneumatic thermostats with limited occupant controllability. The building has a MEG Model DD-10-M700X single-stage, air compressor in the boiler room with an air dryer and a ¾ horsepower WEG motor. Domestic Hot Water
Domestic hot water for the building is supplied by a single natural gas-fired Rheem water heater. The unit is rated at 199 MBH with a 76 gallon storage tank. The unit has an estimated efficiency of 80% based on input and recovery ratings. Plumbing System The Louverture School utilizes sinks rated at 2.2 gallons per minute. Additionally, water closets located in the restrooms are rated at 1.6 gallons per flush. The men’s restroom in the basement, utilizes urinals that are waterless by design.
Kitchen Equipment
The kitchen equipment at the facility consists of a Continental Model 2R reach-in refrigerator, a Continental Model 2F reach-in refrigerator, two (2) warming cabinets and a single tray washer with a Hatco Model C-36 electric water booster heater.
Lighting
Refer to the Investment Grade Lighting Audit Appendix for a detailed list of the lighting throughout the facility and estimated operating hours per space.
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 11 of 39
IV. MAJOR EQUIPMENT LIST
The equipment list contains major energy consuming equipment that through implementation of energy conservation measures could yield substantial energy savings. The list shows the major equipment in the facility and all pertinent information utilized in energy savings calculations. An approximate age was assigned to the equipment in some cases if a manufactures date was not shown on the equipment’s nameplate. The ASHRAE service life for the equipment along with the remaining useful life is also shown in the Appendix.
Refer to the Major Equipment List Appendix for this facility.
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 12 of 39
V. ENERGY CONSERVATION MEASURES Energy Conservation Measures are developed specifically for this facility. The energy savings and calculations are highly dependent on the information received from the site survey and interviews with operations personnel. The assumptions and calculations should be reviewed by the owner to ensure accurate representation of this facility. The following ECMs were analyzed:
Table 1 ECM Financial Summary
ECM #1 Interior Lighting Upgrade $49,325 $7,246 6.8 120.4%
ECM #2 Lighting Controls $860 $48 17.9 -16.3%
ECM #3Fuel Oil to Natural Gas
Conversion$10,000 $30,633 0.3 4495.0%
ECM #4Domestic Hot Water Heater
Upgrade$19,600 $670 29.3 -48.7%
ECM #5 EC Motor Upgrade $6,400 $413 15.5 -3.2%
ECM #6 Premium Efficiency Motors $1,030 $44 23.3 -35.7%
ECM #7 Window AC Replacement $7,875 $470 16.8 -10.5%
ECM #8 Toilet Water Conservation $6,300 $91 69.2 -78.3%
ECM #9 Automatic Flow Sink Faucets $7,680 $340 22.6 -33.6%
Notes:
NET INSTALLATION
COSTA
ANNUAL
SAVINGSB
A. Cost takes into consideration applicable NJ Smart StartTM incentives.B. Savings takes into consideration applicable maintenance savings.
ECM NO.
DESCRIPTIONSIMPLE
PAYBACK (Yrs)
SIMPLE LIFETIME
ROI
ENERGY CONSERVATION MEASURES (ECM's)
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 13 of 39
Table 2 ECM Energy Summary
ECM #1 Interior Lighting Upgrade 29.8 46,153 0 0
ECM #2 Lighting Controls 0.0 303 0 0
ECM #3Fuel Oil to Natural Gas
Conversion0.0 0 -50,574 36,124
ECM #4Domestic Hot Water Heater
Upgrade0.0 0 650 0
ECM #5 EC Motor Upgrade 0.0 2,472 0 0
ECM #6 Premium Efficiency Motors 0.1 264 0 0
ECM #7 Window AC Replacement 1.9 2,817 0 0
ECM #8 Toilet Water Conservation 0.0 0 0 0
ECM #9 Automatic Flow Sink Faucets 0.0 0 142 0
ELECTRIC DEMAND
(KW)
ELECTRIC CONSUMPTION
(KWH)
ECM NO.
DESCRIPTION NATURAL GAS (THERMS)
FUEL OIL (GALLONS)
ENERGY CONSERVATION MEASURES (ECM's)
ANNUAL UTILITY REDUCTION
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 14 of 39
Table 3 ECM Emissions Summary
ECM #1 Interior Lighting Upgrade 70,153 129 300
ECM #2 Lighting Controls 461 1 2
ECM #3Fuel Oil to Natural Gas
Conversion217,462 (465) 0
ECM #4Domestic Hot Water Heater
Upgrade7,605 6 0
ECM #5 EC Motor Upgrade 3,757 7 16
ECM #6 Premium Efficiency Motors 402 1 2
ECM #7 Window AC Replacement 4,282 8 18
ECM #8 Toilet Water Conservation 0 0 0
ECM #9 Automatic Flow Sink Faucets 1,661 1 0
Notes: A. Emissions Reduction based on NJCEP published factors for electric & gas.
ENERGY CONSERVATION MEASURES (ECM's)
ECM NO.
DESCRIPTION
GREENHOUSE GAS EMISSIONS REDUCTION
CO2
EMISSIONS (LBS)
NOX
EMISSIONS (LBS)
SO2
EMISSIONS (LBS)
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 15 of 39
Table 4 Facility Project Summary
Note the measure totals in this table do not take into account interactive effects of measures; see Method of Analysis Section III in Executive Report for further explanation. This project does not qualify for additional incentives through the Pay for Performance Program; please see the Installation Funding Options section for additional program options.
Interior Lighting Upgrade $7,246 $56,535 $7,210 $49,325 6.8
Lighting Controls $48 $900 $40 $860 17.9
Fuel Oil to Natural Gas Conversion
$30,633 $10,000 $0 $10,000 0.3
Domestic Hot Water Heater Upgrade
$670 $20,000 $400 $19,600 29.3
EC Motor Upgrade $413 $6,400 $0 $6,400 15.5
Premium Efficiency Motors $44 $1,030 $0 $1,030 23.3
Window AC Replacement $470 $7,875 $0 $7,875 16.8
Toilet Water Conservation $91 $6,300 $0 $6,300 69.2
Automatic Flow Sink Faucets
$340 $7,680 $0 $7,680 22.6
Total Project $39,955 $116,720 $7,650 $109,070 2.7
FACILITY PROJECT SUMMARY TABLE
ENERGY CONSERVATION
MEASURES
ANNUAL ENERGY
SAVINGS ($)
PROJECT COST ($)
CUSTOMER COST
SIMPLE PAYBACK
SMART START
INCENTIVES
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 16 of 39
ECM #1: Interior Lighting Upgrades Description: The majority of the interior lighting throughout the Louverture School is provided by 1x4 and 2x4 fluorescent fixtures with newer generation 700 Series 32W T8 lamps and T12 lamps in addition to various CFL and incandescent A-lamp bulbs. It is recommended that all fixtures within the building be replaced with LED equivalent tube lamps and screw-in bulbs due to their efficiency and low power usage. On the rear exterior of the building, there are 2 (two) HID wall-mounted floodlights which will also be replaced with LED equivalent floodlights. This ECM includes replacing and retrofitting all of the interior lighting and exterior lighting throughout the school with new LED type lamps and fixtures. It is recommended that the School District consult with a lighting engineer prior to retrofitting or replacing interior fixtures to ensure code required minimum light levels will be met. Energy Savings Calculations: The Investment Grade Lighting Audit Appendix outlines the hours of operation, proposed new fixtures/retrofits, costs, savings, and payback periods for each set of interior fixtures in the school.
Maintenance Savings and Project Costs: No maintenance cost savings were estimated for this measure. Project Costs are based off RS Means Unit Cost Data and Vendor quotes.
DESCRIPTION SAVINGSElectric Demand Savings (kW) 29.8Electric Usage Savings (kWh) 46,153
Electric Cost Savings ($) $7,246
LIGHTING UPGRADE SAVINGS SUMMARY
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 17 of 39
Energy Savings Summary:
Installation Cost ($): $56,535
NJ Smart Start Equipment Incentive ($): $7,210
Net Installation Cost ($): $49,325
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $7,246
Total Yearly Savings ($/Yr): $7,246
Estimated ECM Lifetime (Yr): 15
Simple Payback 6.8
Simple Lifetime ROI 120.4%
Simple Lifetime Maintenance Savings $0
Simple Lifetime Savings $108,690
Internal Rate of Return (IRR) 12%
Net Present Value (NPV) $37,177.28
ECM #1 - ENERGY SAVINGS SUMMARY
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 18 of 39
ECM #2: Interior Lighting Controls Upgrade Description: Sometimes lights in a school are left on unnecessarily. In many cases the lights may be left on because of the inconvenience to manually switch lights off when a room is left or on when a room is first occupied. In some instances lights might be left on due to the misconception that it is better to keep the lights on rather than to continuously switch lights on and off. Although increased switching reduces lamp life, the energy savings outweigh the lamp replacement costs. The payback timeframe for when to turn the lights off is approximately two minutes. If the lights are expected to be off for at least a two minute interval, then it pays to shut them off.
Lighting controls come in many forms. Sometimes an additional switch is adequate to provide reduced lighting levels when full light output is not needed. Occupancy sensors detect motion and will switch the lights on when the room is occupied. Occupancy sensors can either be mounted in place of a current wall switch, or on the ceiling to cover large areas. In addition, daylight control systems can be implemented using daylighting control systems that dim the electric lighting in response to interior daylight levels. The light output of the fluorescent lamps (T8) is varied by using electronic dimming ballasts. Photosensors, typically mounted in the ceiling, are used to measure the quantity of daylight in the space then determine the amount of dimming required to maintain adequate lighting levels in the total space. The U.S. Department of Energy sponsored a study to analyze energy savings achieved through various types of building system controls. The referenced savings is based on the “Advanced Sensors and Controls for Building Applications: Market Assessment and Potential R&D Pathways,” document posted for public use April 2005. The study has found that buildings have the potential to achieve significant energy savings through the use of building controls. The average energy savings are as follows based on the report:
Occupancy Sensors for Lighting Control 20% - 28% energy savings.
Savings resulting from the implementation of this ECM for energy management controls are estimated to be 20% of the total light energy controlled by occupancy sensors. This ECM includes installation of ceiling or switch-mount sensors for the offices, and restrooms. Sensors shall be manufactured by Sensorswitch, Watt Stopper or equivalent. The Investment Grade Lighting Audit Appendix of this report includes the summary of lighting controls which can be implemented in this ECM and outlines the proposed lighting/daylighting controls, costs, savings, and payback periods. The calculations adjust the lighting power usage by the applicable percent savings for each area that includes lighting controls.
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 19 of 39
Energy Savings Calculations:
kWh/YrEnergyLightControlledSavings%SavingsEnergy
kWh
$CostElecAvekWhSavingsEnergySavings.
Maintenance Savings and Project Costs: No maintenance cost savings were estimated for this measure. Project Costs are based off RS Means Unit Cost Data and Vendor quotes. Energy Savings Summary:
DESCRIPTION SAVINGSElectric Demand Savings (kW) 0.0Electric Usage Savings (kWh) 303
Electric Cost Savings ($) $48
LIGHTING CONTROLS SAVINGS SUMMARY
Installation Cost ($): $900
NJ Smart Start Equipment Incentive ($): $40
Net Installation Cost ($): $860
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $48
Total Yearly Savings ($/Yr): $48
Estimated ECM Lifetime (Yr): 15
Simple Payback 17.9
Simple Lifetime ROI -16.3%
Simple Lifetime Maintenance Savings $0
Simple Lifetime Savings $720
Internal Rate of Return (IRR) -2%
Net Present Value (NPV) ($286.98)
ECM #2 - ENERGY SAVINGS SUMMARY
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 20 of 39
ECM #3 – Fuel Conversion to Natural Gas Description: The Louverture School currently uses fuel oil to fire the boiler at the facility. Concord Engineering recommends converting to natural gas. While the conversion of existing equipment over to natural gas may not save energy, it will reduce energy costs. This ECM would replace the fuel oil used to fire the boilers with natural gas at the Louverture School. The existing steam boiler is already fitted with a dual fuel burner and could easily be switch to natural gas by extending piping from the service meter to the boiler. The District will need to consult with the utility to ensure adequate gas pressure is available to operate the boilers. Energy Savings Calculations: Fuel conversion does not take into account any change in boiler efficiency.
FuelUsage kbtu FuelUsage Units FuelConversionFactorBtuUnit
NaturalGasUsage therm FuelUsage kBtu1therm100kBtu
ECM INPUTS EXISTING PROPOSED SAVINGS
Description Fuel Oil
Natural Gas Conversion
Existing Fuel Oil Usage (Gallons) 36,124 0
Fuel Oil Conversion (Btu/Gal) 140,000 140,000
Natural Gas (Btu/therm) 100,000 100,000
Fuel Usage (kBtu) 5,057,360 5,057,360
Fuel Oil #2 ($/Gallon) $2.290 $2.290Natural Gas ($/therm) $1.030 $1.030
Fuel Oil #2 Usage (Gallons) 36,124 0 36,124
Natural Gas Usage (Therm) 0 50,574 (50,574)
Energy Cost ($) $82,724 $52,091 $30,633
COMMENTS:
FUEL CONVERSION ANALYSIS
ENERGY SAVINGS CALCULATIONS
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 21 of 39
Energy Savings Summary:
Installation Cost ($): $10,000
NJ Smart Start Equipment Incentive ($): $0
Net Installation Cost ($): $10,000
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $30,633
Total Yearly Savings ($/Yr): $30,633
Estimated ECM Lifetime (Yr): 15
Simple Payback 0.3
Simple Lifetime ROI 4495.0%
Simple Lifetime Maintenance Savings $0
Simple Lifetime Savings $459,495
Internal Rate of Return (IRR) 306%
Net Present Value (NPV) $355,694.77
ECM #3 - ENERGY SAVINGS SUMMARY
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 22 of 39
ECM #4: Domestic Hot Water Heater Replacement
Description:
Domestic hot water for the Louverture School is provided by a single Rheem Model G76-200, gas hot water heater rated at 200,000 btuh. This unit has a rated thermal efficiency of only 80% and a recovery of 181.8 gallons per hour. This ECM will replace this existing gas domestic water heater with a gas water heater with a 96% thermal efficiency. Energy Savings Calculations:
ECM INPUTS EXISTING PROPOSED SAVINGS
ECM INPUTSExisting Gas Hot Water Heaters
High Efficiency Water Heater
Building Type Education
Building Square-foot 60,000 60,000
Domestic Water Usage, kBtu 312,000.00 312,000.00
DHW Heating Fuel Type Gas Gas
Heating Efficiency 80% 96% 16%
Total Usage (kBTU) 390,000 325,000 65,000
Nat Gas Cost ($/Therm) $ 1.030 $ 1.030
ECM RESULTS EXISTING PROPOSED SAVINGS
Electric Usage (kWh) 0 0 0
Natural Gas Usage (Therms) 3,900 3,250 650
Energy Cost ($) $4,017 $3,348 $670
COMMENTS: Savings are based on Energy Information Administration Commercial Building Energy Consumption Survey 2003 Information
ENERGY SAVINGS CALCULATIONS
DOM. HOT WATER HEATER CALCULATIONS
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 23 of 39
Energy Density for “Education” type building = 5.2 kBtu / SF / year
DHWHeatUsage EnergyDensitykBtu yr
SFBuildingSquareFootage SF
DHWTotalUsageDHWHeatUsage
%
EnergyCost HeatingFuelUsage FuelUnits FuelCost$
Unit
Maintenance Savings and Project Costs: No maintenance cost savings were estimated for this measure. Project Costs are based off RS Means Unit Cost data. Energy Savings Summary:
Installation Cost ($): $20,000
NJ Smart Start Equipment Incentive ($): $400
Net Installation Cost ($): $19,600
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $670
Total Yearly Savings ($/Yr): $670
Estimated ECM Lifetime (Yr): 15
Simple Payback 29.3
Simple Lifetime ROI -48.7%
Simple Lifetime Maintenance Savings $0
Simple Lifetime Savings $10,050
Internal Rate of Return (IRR) -7%
Net Present Value (NPV) ($11,601.58)
ECM #4 - ENERGY SAVINGS SUMMARY
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 24 of 39
ECM #5: EC Motors Description: Electronically Commutated Motors (ECM) are proven to generate substantial savings on small motor applications. These motors currently are available in sizes up to 1 horsepower, and provide efficiencies similar to how NEMA premium efficiency motor would at a large horsepower. The motor works much like a direct current (DC) motor and is without mechanical brushes and the commuter reduces friction losses in the motor. The motors are programmable and can be used for a wide range of applications. This measure would replace the condensate pump motors that have fractional horsepower. In total there are three 3/4 HP motors and two 1/3 HP motors. Energy Savings Calculations: Measured savings for ECM motors has proven that up to 65% reduction in power can be realized through the installation these motors.
ElectricEnergy kWhAmps Volts Phase /
1000 PowerFactor OperatingHours
EnergySavings ElectricEnergy PowerReduction 40%
DESCRIPTION SAVINGSElectric Demand Savings (kW) 0.0Electric Usage Savings (kWh) 2,472
Electric Cost Savings ($) $413
EC MOTOR SAVINGS SUMMARY
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 25 of 39
ECM INPUTS EXISTING PROPOSED SAVINGSECM INPUTS PSC ECM
Quantity of Motors 3 3
Motor Nameplate HP 0.75 0.75
Full Load Amps 2.8
Voltage 208
Phase 3
Power Factor 55% 55%
Operating Hrs 2400 2400
Load Reduction - 40.0%
Elec Cost ($/kWh) 0.167 0.167
ECM RESULTS EXISTING PROPOSED SAVINGS
Electric Energy (kWh) 3,995 2,397 1,598
Electric Energy Cost ($) $667 $400 $267
ELECTRONICALLY COMMUTATED MOTOR CALULATION
ENERGY SAVINGS CALCULATIONS
COMMENTS: Condensate Pump Motor
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 26 of 39
Maintenance Savings and Project Costs: No maintenance cost savings were estimated for this measure. Project Costs are based off RS Means Unit Cost data.
ECM INPUTS EXISTING PROPOSED SAVINGSECM INPUTS PSC ECM
Quantity of Motors 2 2
Motor Nameplate HP 1/3 1/3
Full Load Amps 7.2
Voltage 115 115
Phase 1 1
Power Factor 55% 55%
Operating Hrs 2400 2400
Load Reduction - 40.0%
Elec Cost ($/kWh) 0.167 0.167
ECM RESULTS EXISTING PROPOSED SAVINGS
Electric Energy (kWh) 2,186 1,312 874
Electric Energy Cost ($) $365 $219 $146
ELECTRONICALLY COMMUTATED MOTOR CALULATION
ENERGY SAVINGS CALCULATIONS
COMMENTS: Condensate Pump Motors
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 27 of 39
Energy Savings Summary:
Installation Cost ($): $6,400
NJ Smart Start Equipment Incentive ($): $0
Net Installation Cost ($): $6,400
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $413
Total Yearly Savings ($/Yr): $413
Estimated ECM Lifetime (Yr): 15
Simple Payback 15.5
Simple Lifetime ROI -3.2%
Simple Lifetime Maintenance Savings $0
Simple Lifetime Savings $6,195
Internal Rate of Return (IRR) 0%
Net Present Value (NPV) ($1,469.63)
ECM #5 - ENERGY SAVINGS SUMMARY
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 28 of 39
ECM #6: Install NEMA Premium® Efficiency Motors Description: The improved efficiency of the NEMA Premium® efficient motors is primarily due to better designs with use of better materials to reduce losses. Surprisingly, the electricity used to power a motor represents 95 % of its total lifetime operating cost. Because many motors operate continuously 24 hours a day, even small increases in efficiency can yield substantial energy and dollar savings. The electric motors driving the fuel pumps are candidates for replacing with premium efficiency motors. These standard efficiency motors run considerable amount of time over a year. This energy conservation measure replaces existing inefficient electric motors with NEMA Premium® efficiency motors. NEMA Premium® is the most efficient motor designation in the marketplace today.
Energy Savings Calculations:
Electricusage, kWhHP LF 0.746 HoursofOperation
MotorEfficiency
where, HP MotorNameplateHorsepowerRating LF LoadFactor MotorEfficiency MotorNameplateEfficiency ElectricUsageSavings, kWh ElectricUsage ElectricUsage
Electriccostsavings ElectricUsageSavings ElectricRate$
kWh
The calculations were carried out and the results are tabulated in the table below:
IMPLEMENTATION SUMMARY
EQMTID
FUNCTIONMOTOR
HPHOURS OF
OPERATIONEXISTING
EFFICIENCY
NEMA PREMIUM
EFFICIENCYFP-1 Fuel Pump 1 3,391 82.5% 87.5%FP-2 Fuel Pump 1 3,391 82.5% 87.5%
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 29 of 39
Project Cost, Incentives, and Maintenance Savings: Project costs are based on RS Means Unit Costs and vendor quote data. There are no SmartStart Building® incentives for premium efficiency motors.
Energy Savings Summary:
PREMIUM EFFICIENCY MOTOR CALCULATIONS
EQMTID
MOTOR HP
LOAD FACTOR
EXISTING EFFICIENCY
NEMA PREMIUM
EFFICIENCY
POWER SAVINGS
kW
ENERGY SAVINGS
kWH
COST SAVINGS
FP-1 1 75% 82.5% 87.5% 0.04 132 $22FP-2 1 75% 82.5% 87.5% 0.04 132 $22
TOTAL 0.1 264.2 44.1
Installation Cost ($): $1,030
NJ Smart Start Equipment Incentive ($): $0
Net Installation Cost ($): $1,030
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $44
Total Yearly Savings ($/Yr): $44
Estimated ECM Lifetime (Yr): 15
Simple Payback 23.3
Simple Lifetime ROI -35.7%
Simple Lifetime Maintenance Savings 0
Simple Lifetime Savings $662
Internal Rate of Return (IRR) -5%
Net Present Value (NPV) ($503.18)
ECM #6 - ENERGY SAVINGS SUMMARY
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 30 of 39
ECM #7: Window A/C Unit Replacement Description: The Ecole T. Louverture School has many window air conditioning units located in the classrooms. Many of these units are old and less efficient than newer models. This ECM includes replacement of select Window Air Conditioners that were designated for replacement based on the age and if the efficiency could be upgraded.
This ECM includes replacement of fourteen window air conditioning units of like size and type.
Energy Savings Calculations: Seasonal energy consumption of the air conditioners at the cooling mode is calculated with the equation below:
EnergySavings, kWh CoolingCapacity,BTUHr
1SEER
1SEER
OperationHours
1000 WkWh
DemandSavings, kW
CoolingCapacity,BTUHr
1SEER
1SEER
CoincidenceFactor
CoolingCostSavings EnergySavings, kWh CostofElectricity$
kWh
Unit TagUnit
Location Unit Type
Number of Units
Cooling Capacity, Btu/hr
Manufacturer
Classrooms Classrooms Window AC 14 12,000 Airtemp
Total 14 12,000
Existing Equipment Information
ECM INPUTSCOOLING CAPACITY,
BTU/HrANNUAL COOLING
HOURSEXISTING UNITS
(S)EER
NEW UNITS (S)EER
# OF UNITS
ENERGY SAVINGS kWh
DEMAND SAVINGS kW
Classrooms 12,000 1,000 9.5 EER 11.3 EER 14 2,817 1.9
Total 14 2,817 1.9
ENERGY SAVINGS CALCULATIONS - UNIT REPLACEMENT
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 31 of 39
Project Cost, Incentives, and Maintenance Savings: Project costs are based on vendor quote data for new units. It is assumed district staff will install the new air conditioning units. There are not SmartStart incentives available for window air conditioning units. There is no significant maintenance savings due to implementation of this ECM. Energy Savings Summary:
Installation Cost ($): $7,875
NJ Smart Start Equipment Incentive ($): $0
Net Installation Cost ($): $7,875
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $470
Total Yearly Savings ($/Yr): $470
Estimated ECM Lifetime (Yr): 15
Simple Payback 16.8
Simple Lifetime ROI -10.5%
Simple Lifetime Maintenance Savings $0
Simple Lifetime Savings $7,050
Internal Rate of Return (IRR) -1%
Net Present Value (NPV) ($2,264.17)
ECM #7 - ENERGY SAVINGS SUMMARY
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 32 of 39
ECM #8: Toilet Water Conservation Description: The Ecole T. Louverture School utilizes standard plumbing fixtures. The typical water closet consumption only meets the minimum federally required standard for water efficiency. The urinals in the facility, however, are waterless by design. New flush valves are available that use less water than today’s requirements and can add up to significant water reduction over a long period. This ECM includes the replacement of the existing water closet flush valves within the bathrooms at the facility. Since the urinals utilize no water, no replacements can be recommended for the urinals. The estimated usage of the plumbing fixtures is based on the total population of the facility. The number of valves to be replaced is based on observation of the facility in combination with federal minimum standards per occupancy load. The proposed retrofit includes installation of low flow flush valves that utilize 1.28 gallons per flush. Energy Savings Calculations: For the basis of this calculation the LEED rating system was used to estimate the occupancy usage for students within the school. When water consumption information was not available, the GPF values were estimated for the existing fixtures. Urinals and Toilets:
Flush
GalFixture
DayperPerson
FlushUse
Yr
DaysOccupancynConsumptioWater
Gal1000
Gal1000
$CostAveGallonsn ConsumptioWater
CostWater
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 33 of 39
Project Cost, Incentives, and Maintenance Savings Estimates: The cost estimate is based on installation and materials for 20 water closet flush valves from RS Means Unit Cost Data. There are no Smart Start rebates for installation of low flow plumbing fixtures. No maintenance savings have been estimated for this measure.
ECM INPUTS EXISTING PROPOSED SAVINGS
ECM INPUTS Existing FixturesLow Flow Fixtures
-
Total Number of Students 317 317 -
% Male to Female 50% 50% -
Estimated % Floor Area Served by Older Bathrooms
100% 100% -
Occupied Days Per Year 180 180 -
Lavatory Uses per Day per Person 3 3 -
WC Uses per Day per Person 2.0 2.0 -
Urinal Uses per Day per Person 1.0 1.0 -
Total Urinal Flushes Per Day 159 159 -
Total WC Flushes Per Day 317 317 -
Urinal Gallons Per Flush (GPF) 0.0 0.000 0.000
WC Gallons Per Flush (GPF) 1.6 1.28 0.32
Water Cost ($/1000 Gal) $5.00 $5.00 -
ECM RESULTS EXISTING PROPOSED SAVINGSWater Consumption (Gal) 91,296 73,037 18,259
Water Cost ($) $456 $365 $91
COMMENTS:
WATER CONSERVATION CALCULATIONS
ENERGY SAVINGS CALCULATIONS
*Savings are based on LEED Reference Guide for Green Building Design and Construction - 2009 Edition for WC and Urinal water usage.
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 34 of 39
Energy Savings Summary:
Installation Cost ($): $6,300
NJ Smart Start Equipment Incentive ($): $0
Net Installation Cost ($): $6,300
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $91
Total Yearly Savings ($/Yr): $91
Estimated ECM Lifetime (Yr): 15
Simple Payback 69.2
Simple Lifetime ROI -78.3%
Simple Lifetime Maintenance Savings $0
Simple Lifetime Savings $1,365
Internal Rate of Return (IRR) -15%
Net Present Value (NPV) ($5,213.65)
ECM #8 - ENERGY SAVINGS SUMMARY
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 35 of 39
ECM #9: Automatic Flow Sink Faucets Description: The Ecole T. Louverture School utilizes standard manual plumbing fixtures. The typical water faucet consumption only meets the minimum federal required standard for water efficiency. New fixtures are available that use less water than today’s requirements and can add up to significant water reduction over a long period. This ECM includes the replacement of sink faucets within the facility with new low flow automatic faucets. The estimated usage of the plumbing fixtures is based on the estimated usage per day for each device and the facility operating days per year. The number of plumbing fixtures to be replaced is based on observations of the facility. The proposed retrofit includes installation of low flow automatic faucets. When water consumption information was not available, the GPF values were estimated for the existing fixtures. Energy Savings Calculations: Faucets:
WaterUsage Quantity OperationDaysyr
UsageMinDay
FixtureGalMin
ElectricUsage
FaucetWaterUsage Gal 8.33lbsGal
SpecificHeat 1 ∆T 70
3,413Btu
1HWHEfficiency
50%
NaturalGasUsage
FaucetWaterUsage Gal 8.33lbsGal
SpecificHeat 1 ∆T 70
100,000Btu
1HWHEfficiency
50%
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 36 of 39
The cost for installation and materials is based on 12 faucets. There are no Smart Start rebates for installation of low flow plumbing fixtures.
ECM INPUTS EXISTING PROPOSED SAVINGS
Quantity of Sinks 12 12
Flow Rate (GPM) 2.2 0.5 1.7
Device Usage (min per day) 10 8
Facility Operation (days / year) 180 180
Heat Content of Water (Btu/gal/°F) 8.33 8.33
Temperature Rise (°F) 70.0 70.0
Efficiency of Heating System (%) 80% 80%
Natural Gas Rate ($/therm) $1.030 $1.030
Water Rate ($/1000gal) $5.000 $5.000
Natural Gas Usage (Therm) 173 31 142
Water Usage (gallons) 47,520 8,640 38,880
Energy Cost ($) $416 $76 $340COMMENTS:
LOW FLOW WATER SAVING DEVICES
ENERGY SAVINGS CALCULATIONS
Heating Savings based on 50% Hot Cold Mix. Assume a 20% reduction in operation time for automatic flow.
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 37 of 39
Energy Savings Summary:
Installation Cost ($): $7,680
NJ Smart Start Equipment Incentive ($): $0
Net Installation Cost ($): $7,680
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $340
Total Yearly Savings ($/Yr): $340
Estimated ECM Lifetime (Yr): 15
Simple Payback 22.6
Simple Lifetime ROI -33.6%
Simple Lifetime Maintenance Savings $0
Simple Lifetime Savings $5,100
Internal Rate of Return (IRR) -5%
Net Present Value (NPV) ($3,621.10)
ECM #9 - ENERGY SAVINGS SUMMARY
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 38 of 39
REM #1: Solar System Description: The Ecole T. Louverture School has highly sloped roof sections and a parking lot that is situated mainly within the shadow of the school building. Therefore, both roof and parking lot solar array installations have been deemed infeasible.
East Orange School District - Ecole T. Louverture School Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 39 of 39
VI. ADDITIONAL RECOMMENDATIONS The following recommendations include no cost/low cost measures, Operation & Maintenance (O&M) items, and water conservation measures with attractive paybacks. These measures are not eligible for the Smart Start Buildings incentives from the office of Clean Energy but save energy none the less.
A. Chemically clean the condenser and evaporator coils periodically to optimize efficiency. Poorly maintained heat transfer surfaces can reduce efficiency 5-10%.
B. Maintain all weather stripping on windows and doors.
C. Clean all light fixtures to maximize light output.
D. Provide more frequent air filter changes to decrease overall system power usage and maintain better IAQ.
E. Turn off computers when not in use. Ensure computers are not running in screen saver mode.
F. Replace any old CRT Monitors with LED/LCD Type Monitors, which can draw as much as a quarter the power of an equivalent CRT monitor.
G. Ensure outside air dampers are functioning properly and only open during occupied mode.
APPENDIX A1 of 1
LIFETIME ENERGY SAVINGS
LIFETIME MAINTENANCE
SAVINGSLIFETIME ROI SIMPLE PAYBACK
INTERNAL RATE OF RETURN (IRR)
NET PRESENT VALUE (NPV)
MATERIAL LABORREBATES,
INCENTIVES
NET INSTALLATION
COSTENERGY MAINT. / SREC TOTAL (Yearly Saving * ECM Lifetime)
(Yearly Maint Svaing * ECM Lifetime)
(Lifetime Savings - Net Cost) / (Net Cost)
(Net cost / Yearly Savings)
($) ($) ($) ($) ($/Yr) ($/Yr) ($/Yr) (Yr) ($) ($) (%) (Yr) ($) ($)
ECM #1 Interior Lighting Upgrade $37,210 $19,325 $7,210 $49,325 $7,246 $0 $7,246 15 $108,690 $0 120.4% 6.8 12.01% $37,177.28
ECM #2 Lighting Controls $600 $300 $40 $860 $48 $0 $48 15 $720 $0 -16.3% 17.9 -2.14% ($286.98)
ECM #3 Fuel Oil to Natural Gas Conversion $5,000 $5,000 $0 $10,000 $30,633 $0 $30,633 15 $459,495 $0 4495.0% 0.3 306.33% $355,694.77
ECM #4 Domestic Hot Water Heater Upgrade $12,200 $7,800 $400 $19,600 $670 $0 $670 15 $10,050 $0 -48.7% 29.3 -7.38% ($11,601.58)
ECM #5 EC Motor Upgrade $3,750 $2,650 $0 $6,400 $413 $0 $413 15 $6,195 $0 -3.2% 15.5 -0.40% ($1,469.63)
ECM #6 Premium Efficiency Motors $600 $430 $0 $1,030 $44 $0 $44 15 $662 $0 -35.7% 23.3 -5.08% ($503.18)
ECM #7 Window AC Replacement $6,300 $1,575 $0 $7,875 $470 $0 $470 15 $7,050 $0 -10.5% 16.8 -1.35% ($2,264.17)
ECM #8 Toilet Water Conservation $3,500 $2,800 $0 $6,300 $91 $0 $91 15 $1,365 $0 -78.3% 69.2 -14.95% ($5,213.65)
ECM #9 Automatic Flow Sink Faucets $5,400 $2,280 $0 $7,680 $340 $0 $340 15 $5,100 $0 -33.6% 22.6 -4.73% ($3,621.10)
Notes: 1) The variable Cn in the formulas for Internal Rate of Return and Net Present Value stands for the cash flow during each period.2) The variable DR in the NPV equation stands for Discount Rate3) For NPV and IRR calculations: From n=0 to N periods where N is the lifetime of ECM and Cn is the cash flow during each period .
ECM COST & SAVINGS BREAKDOWN
CONCORD ENGINEERING GROUP
East Orange School District - Ecole T. Louverture School
INSTALLATION COST YEARLY SAVINGS
ECM LIFETIMEDESCRIPTIONECM NO.
ECM ENERGY AND FINANCIAL COSTS AND SAVINGS SUMMARY
Appendix B Page 1 of 6
Concord Engineering Group, Inc. 520 BURNT MILL ROAD VOORHEES, NEW JERSEY 08043 PHONE: (856) 427-0200 FAX: (856) 427-6508
SmartStart Building Incentives The NJ SmartStart Buildings Program offers financial incentives on a wide variety of building system equipment. The incentives were developed to help offset the initial cost of energy-efficient equipment. The following tables show the current available incentives from July 1, 2015 to June 30, 2016, further details including how to apply, forms, and calculated incentive values can be found the Clean Energy Website. (www.njcleanenergy.com)
Electric Chillers
Water-Cooled Chillers
Constant Speed: Base: $8 - $30 per ton
Performance Add: $2 - $2.25 per ton Variable Speed:
Base: $12 - $44 per ton Performance Add: $2 - $4.00 per ton
Air-Cooled Chillers
Constant Speed: Base: $20 per ton
Performance Add: $3.50 per ton Variable Speed:
Base: $90 - $92 per ton Performance Add: $4.00 per ton
Energy Efficiency must comply with ASHRAE 90.1-2013
Gas Cooling Gas Absorption Chillers (Indirect & Direct-Fired)
$185 - $450 per ton
Desiccant Systems
$1.00 per cfm – gas or electric
Electric Unitary HVAC
Unitary AC and Split Systems $73 - $92 per ton Air-to-Air Heat Pumps $73 - $92 per ton
Water-Source Heat Pumps $81 per ton Packaged Terminal AC & HP $65 per ton
Central DX AC Systems $40- $72 per ton Dual Enthalpy Economizer Controls $250 Occupancy Controlled Thermostat
(Hospitality & Institutional Facility) $75 per thermostat
A/C Economizing Controls < 5 tons $85/unit; >5 tons $170/unit Energy Efficiency must comply with ASHRAE 90.1-2007
Appendix B Page 2 of 6
Gas Heating
Hot Water Gas Fired Boilers < 300 MBH
Non-Condensing: $0.95 per MBH,
Minimum $400 per unit Condensing:
$2.00 per MBH, Minimum $1000 per unit
Hot Water Gas Fired Boilers ≥ 300 - 1500 MBH
Non-Condensing: $1.75 per MBH
Condensing: $2.20 per MBH
Minimum $1000 per unit
Hot Water Gas Fired Boilers >1500 - ≤ 2500 MBH
Non-Condensing: $1.50 per MBH
Condensing: $2.20 per MBH
Hot Water Gas Fired Boilers >2500 - ≤ 4000 MBH
Non-Condensing: $1.30 per MBH
Condensing: $2.00 per MBH
Steam, Except Natural Draft, Gas fired Boilers < 300 MBH
$1.40 per MBH, Minimum $400 per unit
Steam, Except Natural Draft, Gas fired Boilers ≥ 300 – 1500 MBH
$1.20 per MBH
Steam, Except Natural Draft, Gas fired Boilers > 1500 – 2500 MBH
$1.20 per MBH
Steam, Except Natural Draft, Gas fired Boilers > 2500 – 4000 MBH
$1.00 per MBH
Steam, Natural Draft < 300 MBH
$1.40 per MBH, Minimum $300 per unit
Steam, Natural Draft ≥ 300 - 1500 MBH
$1.00 per MBH
Steam, Natural Draft >1500 - ≤ 2500 MBH
$0.90 per MBH
Steam, Natural Draft >2500 - ≤ 4000 MBH
$0.70 per MBH
All Types Gas Fired Boilers > 4000 MBH
(Calculated through Custom Measure Path)
Gas Furnaces $400 per unit, AFUE ≥ 95%
Boiler Economizing Controls $1,200 - $2,700
Low Intensity Infrared Heating $300 - $500 per unit
Natural Gas Water Heating Gas Water Heaters ≤ 50 gallons, 0.67
energy factor or better $50 per unit
Gas-Fired Water Heaters > 50 gallons $1.00 - $2.00 per MBH
Gas-Fired Booster Water Heaters $17 - $35 per MBH
Gas Fired Tankless Water Heaters $300 per unit
Appendix B Page 3 of 6
Ground Source Heat Pumps
Closed Loop $450 per ton, EER ≥ 16 $600 per ton, EER ≥ 18 $750 per ton, EER ≥ 20
Energy Efficiency must comply with ASHRAE 90.1-2007
Variable Frequency Drives Variable Air Volume $65 - $155 per hp
Chilled-Water Pumps ≥ 20 hp $60 per VFD rated hp
Rotary Screw Air Compressors ≥ 25 hp $5,250 to $12,500 per drive Centrifugal Fan Applications on
Constant Volume HVAC Systems $80 per VFD rated hp, maximum
$6,000 per drive Cooling Towers ≥ 10 hp $60 per VFD rated hp
Boiler Fans > 5 HP $65 to $155 per hp
Boiler Feed Water Pumps > 5 HP $60 to $155 per hp
Commercial Kitchen Hood up to 50 HP Retrofit $55 – $300 per hp
New Hood $55 - $250 per hp
Prescriptive Lighting
T-8 reduced Wattage (28w/25w 4’, 1-4 lamps)
Lamp & ballast replacement $10 per fixture
For retrofit of T-8 fixtures by permanent de-lamping & new reflectors
(Electronic ballast replacement required)
$5 per fixture
T-5 and T-8 High Bay Fixtures $25 - $150 per fixture
HID ≥ 100w Replace with new induction fixture.
(must be 30% less watts/fixture than HID system)
$70 per fixture
HID ≥ 100w Retrofit with induction lamp, power coupler and generator
(must be 30% less watts/fixture than HID system)
$50 per fixture
Appendix B Page 4 of 6
Prescriptive Lighting - LED
LED Architectural Floor and Spot Luminaires
$50 per fixture
LED Bollard Fixtures $50 per fixture
LED Display Case Lighting $30 per display case
LED Fuel Pump Canopy $100 per fixture
LED High-Bay and Low-Bay Fixtures for Commercial & Industrial Bldgs.
$150 per fixture
LED High-Bay-Aisle Lighting $150 per fixture
LED Linear Ambient Luminaires (Indirect, Indirect/Direct, Direct/Indirect, Direct)
2’ Fixtures - $20/fixture 3’ Fixtures - $30/fixture 4’ Fixtures - $45/fixture 6’ Fixtures - $60/fixture 8’ Fixtures - $75/fixture
LED Linear Replacement Lamps (2’ & 4’ only)
$5 per lamp
Luminaires for Ambient Lighting of Interior Commercial Spaces
(1x4, 2x2, 2x4 New Fixtures and Retrofit Kits)
1x4 LED - $15 per fixture 2x2 LED - $15 per fixture 2x4 LED - $25 per fixture
LED Outdoor Pole/Arm-Mounted Area and Roadway Luminaries
$100 per fixture
LED Outdoor Pole/Arm-Mounted Decorative Luminaries
$50 per fixture
LED Outdoor Wall-Mounted Area Luminaries
$100 per fixture
LED Parking Garage Luminaries $100 per fixture
LED Retrofit Kits for Large Outdoor Pole / Arm-Mounted Area and
Roadway Luminaires $150 per fixture
LED Refrigerator/Freezer case lighting replacement of fluorescent in medium
and low temperature display case
$30 per 4 foot $42 per 5 foot $65 per 6 foot
LED Shelf-Mtd. Display & Task Lights $15 per linear foot
Appendix B Page 5 of 6
LED Stairwell and Passageway Luminaires
$40 per fixture
LED Track or Mono-Point Directional Lighting Fixtures
$30 per fixture
LED Wall-Wash Lights $30 per fixture
EnergyStar Commercial Lighting Fixtures
$5 to $10 per fixture
EnergyStar Screw and Pine-Based Bulbs
$5 to $10 per lamp
Lighting Controls – Occupancy Sensors
Wall Mounted (Existing Facilities Only)
$20 per control
Remote Mounted (Existing Facilities Only)
$35 per control
Daylight Dimming Controls $45 per fixture controlled
Occupancy Based hi-low Dimming Control
$35 per fixture controlled
Occupancy Sensor Remote Mounted High-Bay (Existing Facilities Only)
$35 per control
Refrigeration Doors/Covers
Energy-Efficient Doors/Covers for Installation on Open Refrigerated Cases
$100 per door
Aluminum Night Curtains for Installation on Open Refrigerated Cases
$3.50 per linear foot
Refrigeration Controls
Door Heater Controls $50 per control Electric Defrost Controls $50 per control Evaporator Fan Controls $75 per control Novelty Cooler Shutoff $50 per control
Refrigerator / Freezer Case Premium Efficiency Motors
Fraction ECM Motor < 1 HP $40 per ECM for replacement of
existing shaded-pole motor
Appendix B Page 6 of 6
Food Service Equipment
Combination Oven/Steamer (Electric) $1,000/oven
Combination Oven/Steamer (Natural Gas)
$750/oven
Convection Oven (Electric) $350/oven
Convection Oven (Natural Gas) $500/oven
Rack Oven (Natural Gas) $1,000/single oven, $2,000/double oven
Conveyor Oven (Natural Gas) $500/small deck $750/large deck
Fryer (Electric) $200/vat
Fryer (Natural Gas) $749/vat
Large Vat Fryer (Electric) $200/vat
Large Vat Fryer (Natural Gas) $500/vat
Griddle (Electric) $300/griddle
Griddle (Natural Gas) $125/griddle
Steam Cooker (Electric) $1,250/steamer
Steam Cooker (Natural Gas) $2,000/steamer
Insulated Holding Cabinets $200 to $300/unit
Glass Door Refrigerators $75 to $150/unit
Solid Door Refrigerators $50 to $200/unit
Glass Door Freezers $200 to $1,000/unit
Solid Door Freezers $100 to $600/unit
Ice Machines $50 to $500/unit
Dishwashers $400 to $1,500/unit
Other Equipment Incentives
Performance Lighting
$1.00 per watt per SF below program incentive threshold, currently 5% more energy efficient than ASHRAE 90.1-
2007 for New Construction and Complete Renovation
Custom Electric and Gas Equipment Incentives
not prescriptive
Custom Measures
$0.16 KWh and $1.60/Therm of 1st year savings, or a buy down to a 1 year
payback on estimated savings. Minimum required savings of 75,000
KWh or 1,500 Therms and an IRR of at least 10%.
Page 1 of 8
ENERGY STAR® Data Verification Checklist
60ENERGY STAR ®
Score1
Ecole T. Louverture School
Registry Name: Ecole T. Louverture SchoolPrimary Function: K-12 SchoolGross Floor Area (ft²): 60,000Built: 1898
For Year Ending: 04/30/2015Date Generated: 08/13/2015
1. The ENERGY STAR score is a 1-to-100 assessment of a building’s energy efficiency as compared with similar building nationwide, adjusting for climate and businessactivity.
Property & Contact Information
Property AddressEcole T. Louverture School290 Central AvenueEast Orange, New Jersey 07018
Property ID: 4440569
Property OwnerEast Orange School District199 4th Avenue, 5th FloorEast Orange, NJ 07017(____)____-______
Primary ContactRacquel Ferguson199 4th Avenue, 5th FloorEast Orange, NJ 07017(973) 266-5742racquel.ferguson@eastorange.k12.nj.us
1. Review of Whole Property Characteristics
Basic Property Information
1) Property Name: Ecole T. Louverture School
Is this the official name of the property?
If “No”, please specify: _____________________________________
Yes No
2) Primary Function: K-12 School
Is this an accurate description of the primary use of this property? Yes No
3) Location:
290 Central AvenueEast Orange, New Jersey 07018
Is this correct and complete?
Yes No
4) Gross Floor Area: 60,000 ft² Yes No
Page 2 of 8
Does this represent the entire property? (i.e., no part of the building/property wasexcluded/subtracted from the total) If “no” please specify what space has been excluded.
5) Average Occupancy: 90
Is this occupancy accurate for the entire 12 month period being assessed? Yes No
6) Number of Buildings: 1
Does this number accurately represent all structures? Yes No
Notes:
Indoor Environmental Standards
1) Ventilation for Acceptable Indoor Air Quality
Does this property meet the ASHRAE Standard 62 for ventilation for acceptable indoorair quality?
Yes No
2) Acceptable Thermal Environmental Conditions
Does this property meet the ASHRAE Standard 55 for thermal comfort? Yes No
3) Adequate Illumination
Does this property adhere to the IESNA Lighting Handbook for lighting quality? Yes No
Notes:
2. Review of Property Use Details
K-12 School: Building Use
1) Gross Floor Area: 60,000 ft²
Is this the total size, as measured between the principal exterior surfaces of theenclosing fixed walls of the building(s)? This includes all areas inside the building(s)such as: occupied tenant areas, common areas, meeting areas, break rooms,restrooms, elevator shafts, mechanical equipment areas, and storage rooms. Gross
Yes No
Page 3 of 8
Floor Area should not include interstitial plenum space between floors, which may housepipes and ventilation. Gross Floor Area is not the same as rentable, but rather includesall area inside the building(s). Leasable space would be a sub-set of Gross Floor Area.In the case where there is an atrium, you should count the Gross Floor Area at thebase level only. Do not increase the size to accommodate open atrium space at higherlevels. The Gross Floor Area should not include any exterior spaces such as balconiesor exterior loading docks and driveways.
2) Gymnasium Floor Area: 0 ft²
Does the gymnasium floor area include all areas devoted to a gymnasium, includinggymnasium/athletic areas, spectator areas, locker rooms, and other associated spaces?
Yes No
3) High School: No
Is the property a high school (teaching grades 10, 11, and/or 12)? If the propertyteaches to high school students at all, the user should check ‘yes’ to ‘high school’. Forexample, if the school teaches to grades K-12 (elementary/middle and high school), theuser should check ‘yes’ to ‘high school’.
Yes No
4) Number of Workers on Main Shift: 50
Is this the number of workers present during the main shift? Note that this is not a totalcount of workers, but rather a count of workers who are present at the same time. Forexample, if there are two daily eight hour shifts of 100 workers each, the Number ofWorkers on Main Shift value is 100. Number of Workers on Main Shift may includeemployees of the property, sub-contractors who are onsite regularly, and volunteerswho perform regular onsite tasks. Number of Workers should not include visitors to thebuildings such as clients, customers, or patients.
Yes No
5) Student Seating Capacity: 317
Is this the maximum number of students for which the school was designed? Thisshould include the seating capacity of the entire school. If portable classrooms havebeen added to the school, include the capacity of these classrooms, as they expand theoverall capacity of the school.
Yes No
6) Months in Use: 10
Is this the total number of months that the property is open for standard activities? Yes No
7) Weekend Operation: No
Does the property include regular activities on the weekend beyond the scope ofmaintenance, cleaning, and security personnel? Weekend activity could include anytime when the property is used for classes, performances, or other school or communityactivities. The Yes selection is appropriate for any property that is open on one or bothdays of the weekend during one or more seasons of the year.
Yes No
8) Number of Computers: 264
Is this the total number of desktop computers, laptops, and data servers at the property?This number should not include tablet computers, such as iPads, or any other types ofoffice equipment. The count should only reflect computers that are owned by the school.It should not include any computers that are brought onsite by students or staff.
Yes No
9) Cooking Facilities: 100% Yes
Does the property have a commercial cooking area designed to provide and serve foodto occupants and/or visitors? This may include restaurants and cafeterias. If the propertycontains only employee break room kitchens, this field should be marked No.
Yes No
Page 4 of 8
10) Number of Walk-in Refrigeration/Freezer Units: 0
Is this the total count of walk-in units at the property? Walk-in Refrigeration/Freezersare typically very large units located in storage areas or commercial kitchens that wouldnot be accessible to all building occupants. This count should only include large storageunits that a person actually walks into in order to store or retrieve perishable goods.
Yes No
11) Percent That Can Be Heated: 100
Is this the total percentage of the property that can be heated by mechanical equipment? Yes No
12) Percent That Can Be Cooled: 10
Is this the total percentage of the property that can be cooled by mechanical equipment?This includes all types of cooling from central air to individual window units.
Yes No
13) School District: East Orange
Is this the administrative school district in which the property is located? Yes No
Notes:
3. Review of Energy Consumption
Data Overview
Site Energy Use SummaryElectric - Grid (kBtu) 780,459 (15%)Fuel Oil (No. 2) (kBtu) 4,420,545.1 (84%)Natural Gas (kBtu) 76,602.9 (2%)Total Energy (kBtu) 5,277,607
Energy IntensitySite (kBtu/ft²) 88Source (kBtu/ft²) 116.6
National Median ComparisonNational Median Site EUI (kBtu/ft²) 96.5National Median Source EUI (kBtu/ft²) 127.9% Diff from National Median SourceEUI
-8.8%
Emissions (based on site energy use)Greenhouse Gas Emissions (MetricTons CO2e)
436.6
Power Generation Plant or Distribution Utility:Public Service Electric & Gas Co
Note: All values are annualized to a 12-month period. Source Energy includes energy used in generation and transmission to enable an equitable assessment.
Summary of All Associated Meters
The following meters are associated with the property, meaning that they are added together to get the total energy use for theproperty. Please see additional tables in this checklist for the exact meter consumption values.
Meter Name Fuel Type Start Date End Date Associated With
Natural Gas Natural Gas 12/12/2013 In UseEcole T. LouvertureSchool
Page 5 of 8
Meter Name Fuel Type Start Date End Date Associated With
Fuel Oil (No. 2) Fuel Oil No 2 10/28/2014 In UseEcole T. LouvertureSchool
Electric Grid Meter Electric 12/12/2013 In UseEcole T. LouvertureSchool
Total Energy Use
Do the meters shown above account for the total energy use of this property during thereporting period of this application?
Yes No
Additional Fuels
Do the meters above include all fuel types at the property? That is, no additional fuels such asdistrict steam, generator fuel oil have been excluded.
Yes No
On-Site Solar and Wind Energy
Are all on-site solar and wind installations reported in this list (if present)? All on-site systemsmust be reported.
Yes No
Notes:
Natural Gas Meter: Natural Gas (therms)
Associated With: Ecole T. Louverture SchoolStart Date End Date Usage
04/11/2014 05/15/2014 55.94
05/15/2014 06/12/2014 61.04
06/12/2014 07/14/2014 35.65
07/14/2014 08/12/2014 22
08/12/2014 09/11/2014 50.42
09/11/2014 10/10/2014 76.91
10/10/2014 11/10/2014 62.16
11/10/2014 12/11/2014 87.44
12/11/2014 01/13/2015 72.83
01/13/2015 02/11/2015 79.24
Page 6 of 8
Start Date End Date Usage
02/11/2015 03/13/2015 94.12
03/13/2015 04/14/2015 64.57
04/14/2015 05/13/2015 62.46
Total Consumption (therms): 824.78
Total Consumption (kBtu (thousandBtu)):
82,478
Total Energy Consumption for this Meter
Do the fuel consumption totals shown above include consumption of all energy trackedthrough this meter that affect energy calculations for the reporting period of this application(i.e., do the entries match the utility bills received by the property)?
Yes No
Notes:
Fuel Oil No 2 Meter: Fuel Oil (No. 2) (Gallons (US))
Associated With: Ecole T. Louverture SchoolDelivery Date Quantity
10/28/2014 852
11/12/2014 853
11/17/2014 885
11/21/2014 600
11/28/2014 1,200
12/04/2014 860
12/10/2014 1,098
12/12/2014 584
12/15/2014 865
12/19/2014 354
12/29/2014 1,065
01/07/2015 1,046
01/10/2015 1,091
01/14/2015 1,440
01/19/2015 1,447
01/23/2015 1,025
01/26/2015 1,087
01/29/2015 1,099
Page 7 of 8
Delivery Date Quantity
02/02/2015 1,361
02/06/2015 1,339
02/09/2015 1,000
02/12/2015 1,007
02/16/2015 1,852
02/20/2015 1,436
02/25/2015 1,832
02/28/2015 943
03/03/2015 1,267
03/06/2015 1,019
03/12/2015 1,127
03/19/2015 1,141
Total Consumption (Gallons (US)): 32,775
Total Consumption (kBtu (thousandBtu)):
4,522,950
Total Energy Consumption for this Meter
Do the fuel consumption totals shown above include consumption of all energy trackedthrough this meter that affect energy calculations for the reporting period of this application(i.e., do the entries match the utility bills received by the property)?
Yes No
Notes:
Electric Meter: Electric Grid Meter (kWh (thousand Watt-hours))
Associated With: Ecole T. Louverture SchoolStart Date End Date Usage Green Power?
04/11/2014 05/15/2014 10,800 No
05/15/2014 06/12/2014 27,480 No
06/12/2014 07/14/2014 19,200 No
07/14/2014 08/12/2014 10,920 No
08/12/2014 09/11/2014 15,480 No
09/11/2014 10/10/2014 18,960 No
10/10/2014 11/10/2014 18,840 No
11/10/2014 12/11/2014 21,720 No
12/11/2014 01/13/2015 19,440 No
Page 8 of 8
Start Date End Date Usage Green Power?
01/13/2015 02/11/2015 20,280 No
02/11/2015 03/13/2015 22,440 No
03/13/2015 04/14/2015 18,840 No
04/14/2015 05/13/2015 18,240 No
Total Consumption (kWh (thousandWatt-hours)):
242,640
Total Consumption (kBtu (thousandBtu)):
827,887.7
Total Energy Consumption for this Meter
Do the fuel consumption totals shown above include consumption of all energy trackedthrough this meter that affect energy calculations for the reporting period of this application(i.e., do the entries match the utility bills received by the property)?
Yes No
Notes:
4. Signature & Stamp of Verifying Licensed Professional
___________________ (Name) visited this site on ___________ (Date). Based on the conditions observed at the timeof the visit to this property, I verify that the information contained within this application is accurate and in accordancewith the Licensed Professional Guide.
Signature: _______________________ Date: _________
Licensed Professional
____ ________,(____)____-________________________
NOTE: When applying for the ENERGY STAR, the signature of theVerifying Professional must match the stamp. Professional Engineer Stamp
(if applicable)
ENERGY STAR® Statement of EnergyPerformance
60ENERGY STAR®
Score1
Ecole T. Louverture School
Primary Property Function: K-12 SchoolGross Floor Area (ft²): 60,000Built: 1898
For Year Ending: April 30, 2015Date Generated: August 13, 2015
1. The ENERGY STAR score is a 1-100 assessment of a building’s energy efficiency as compared with similar buildings nationwide, adjusting forclimate and business activity.
Property & Contact Information
Property AddressEcole T. Louverture School290 Central AvenueEast Orange, New Jersey 07018
Property OwnerEast Orange School District199 4th Avenue, 5th FloorEast Orange, NJ 07017(____)____-______
Primary ContactRacquel Ferguson199 4th Avenue, 5th FloorEast Orange, NJ 07017(973) 266-5742racquel.ferguson@eastorange.k12.nj.us
Property ID: 4440569
Energy Consumption and Energy Use Intensity (EUI)
Site EUI88 kBtu/ft²
Annual Energy by FuelElectric - Grid (kBtu) 780,459 (15%)Fuel Oil (No. 2) (kBtu) 4,420,545 (84%)Natural Gas (kBtu) 76,603 (2%)
National Median ComparisonNational Median Site EUI (kBtu/ft²) 96.5National Median Source EUI (kBtu/ft²) 127.9% Diff from National Median Source EUI -9%
Source EUI116.6 kBtu/ft²
Annual EmissionsGreenhouse Gas Emissions (Metric TonsCO2e/year)
437
Signature & Stamp of Verifying Professional
I ___________________ (Name) verify that the above information is true and correct to the best of my knowledge.
Signature: _______________________Date: ___________
Licensed Professional
____ ________,(____)____-________________________
Professional Engineer Stamp(if applicable)
MAJOR EQUIPMENT LISTConcord Engineering
Terminal Units
Terminal UnitsTag Window AC UV
Unit Type Window Unit Unit Ventilator
Qty 14 27
Location Varies Classroom
Area Served Classrooms Classroom
Manufacturer Airtemp Nesbitt
Model No. - -
Serial No. - -
Cooling Type Packaged DX No Cooling
Cooling Capacity (Tons) 1 -
Cooling Efficiency 9.4 to 9.6 EER -
Heating Type No Heating Steam
Heating Input (MBH) N/A -
Heating Efficiency N/A -
Approx Age 10 38
ASHRAE Service Life 20 20
Remaining Life 10 0
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
Appendix D - Major Equipment List - Louverture School Page 1 of 6
MAJOR EQUIPMENT LISTConcord Engineering
Boilers
BoilersTag B-1 B-2
Unit Type Fire-Tube (Steam) Cast-Iron Sectional (Steam)
Qty 1 1
Location Boiler Room Boiler Room
Manufacturer Continental Automatic Boiler Smith Cast Iron Boilers
Model No. - 28HE-13
Serial No. F104A125LS-7S05-4236A 28HE-13-132240
Input Capacity (Btu/h) 37.5 GPH No. 2 3,978 MBH/27.5 GPH
Output Capacity (Btu/h) 5,000 Lbs/Hr 3,304 MBH (2,565 MBH Steam)
Approx. Efficiency % 68.0% 83.1%
Fuel Type Fuel Oil #2 Dual Fuel Gas/Oil
Approx Age 38 0
ASHRAE Service Life 25 35
Remaining Life 0 35
CommentsBoiler new, not hooked up/installed as of survey date
Note:
"N/A" = Not Applicable. "-" = Info Not Available
Appendix D - Major Equipment List - Louverture School Page 2 of 6
MAJOR EQUIPMENT LISTConcord Engineering
Dom HWH
Domestic Water HeatersTag DHW-1
Unit Type Nat. Gas, Storage
Qty 1
Location Basement, Boiler Rm
Area Served Building DHW
Manufacturer Rheem
Model # G76-200
Serial # RN 0896G01259
Storage Size (Gal) 76
Input Capacity (MBH/KW) 199.9 MBH
Recovery (Gal/Hr) 181.8 GPH
Efficiency % 80%
Fuel Natural Gas
Approx Age 19
ASHRAE Service Life 15
Remaining Life 0
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
Appendix D - Major Equipment List - Louverture School Page 3 of 6
MAJOR EQUIPMENT LISTConcord Engineering
Pumps
PumpsTag CP-1,2,3 CP-4,5
Unit Type Base-mounted Base-mounted
Qty 3 2
Location Boiler Room Boiler Room
System Served Building Condensate Lower Level Condensate
Manufacturer - -
Model # - -
Serial # - -
Horse Power 3/4 1/3
Flow Rate (GPM) - -
Head Pressure (FTHD) - -
Motor Manufacturer WEG Marathon
Motor Frame E56J 56J-65
Electrical Power (V/P/HZ)
208-230V/3Ph/60Hz 115V/1Ph/60Hz
Motor RPM 3450 3450
Motor Efficiency % 72.0% 72.0%
Pump VFD
Approx Age 38 38
ASHRAE Service Life 18 18
Remaining Life 0 0
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
Yes No N/A Yes No N/A
Appendix D - Major Equipment List - Louverture School Page 4 of 6
MAJOR EQUIPMENT LISTConcord Engineering
Pumps
PumpsTag
Unit Type
Qty
Location
System Served
Manufacturer
Model #
Serial #
Horse Power
Flow Rate (GPM)
Head Pressure (FTHD)
Motor Manufacturer
Motor Frame
Electrical Power (V/P/HZ)
Motor RPM
Motor Efficiency %
Pump VFD
Approx Age
ASHRAE Service Life
Remaining Life
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
FP-1,2
Base-mounted
2
Boiler Room
Fuel Pump
-
-
-
1.0
-
-
Emerson
143T
208V/3Ph/60Hz
1740
82.5%
38
18
0
Yes No N/A
Appendix D - Major Equipment List - Louverture School Page 5 of 6
MAJOR EQUIPMENT LISTConcord Engineering
Kitchen-Misc
Kitchen / Misc. Tag Refr-1 Fr-1
Unit Type Reach-in Refrigerator Reach-in Refrigerator Warming Cabinet
Qty 1 1 2
Location Kitchen Kitchen Kitchen
ManufacturerContinental Refrigerator
Continental Refrigerator
-
Model No. 2R 2F -
Serial No. 15313476 15313336 -
Fuel Electric Electric Electric
Comments
R134A R404A
Note:
"N/A" = Not Applicable. "-" = Info Not Available
Appendix D - Major Equipment List - Louverture School Page 6 of 6
CEG Project #:
Facility Name:
Address:
City, State, Zip
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings, kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
1 1 - Hallway 2200 2-Lamp T8 Electronic1x8 Surface Mount Direct 2 110 2 0.22 484 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones4 60 2 0.12 264 0.10 220 $35 0 No New Controls 0 0.0% 0 $0 $240.00 $90.00 $330.00 $40.00 8.40 $0.00 $0.00 $0.00 YES -
2 1- H4 2200Ceiling Mounted CFL
(13W)Direct
1 13 1 0.01 29 Replace Philips LED A19 6W 1 6 1 0.01 13 0.01 15 $2 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 13.44 $0.00 $0.00 $0.00 FALSE -
3 1 - Vestibule 22004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 1 0.11 251 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 1 0.05 99 0.07 152 $24 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 5.04 $0.00 $0.00 $0.00 FALSE -
3 1 - Entry 22004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 2 0.23 502 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 2 0.09 198 0.14 304 $48 0 No New Controls 0 0.0% 0 $0 $180.00 $90.00 $270.00 $30.00 5.04 $0.00 $0.00 $0.00 FALSE -
4 1 - Gym 2000High Pressure Sodium
(200W)Direct
1 240 10 2.40 4,800 Replace Cree High Bay LED 160W 1 160 10 1.60 3,200 0.80 1,600 $251 0 No New Controls 0 0.0% 0 $0 $4,500.00 $900.00 $5,400.00 $1,500.00 15.53 $0.00 $0.00 $0.00 FALSE -
8 2/3 Stairwell 2200 2-Lamp T8 Electronic1x8 Pendant Direct 2 110 3 0.33 726 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones4 60 3 0.18 396 0.15 330 $52 0 No New Controls 0 0.0% 0 $0 $360.00 $135.00 $495.00 $60.00 8.40 $0.00 $0.00 $0.00 FALSE -
5 2 - Gym Office 20002-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
2 62 4 0.25 496 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
2 30 4 0.12 240 0.13 256 $40 0 No New Controls 0 0.0% 0 $0 $240.00 $180.00 $420.00 $40.00 9.45 $0.00 $0.00 $0.00 FALSE -
6 2- K7 Entry 22002-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
2 62 1 0.06 136 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 66 0.03 70 $11 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 8.60 $0.00 $0.00 $0.00 FALSE -
3 2 - K7 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 12 1.37 2,189 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 12 0.54 864 0.83 1,325 $208 0 No New Controls 0 0.0% 0 $0 $1,080.00 $540.00 $1,620.00 $180.00 6.92 $0.00 $0.00 $0.00 FALSE -
6 2 - K7 Back 4002-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
2 62 1 0.06 25 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 12 0.03 13 $2 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 47.27 $0.00 $0.00 $0.00 FALSE -
9 2- K7 Back 400 CFL (40W)Ceiling Mounted Direct 1 40 1 0.04 16 Replace 28W LED A-Lamp 1 28 1 0.03 11 0.01 5 $1 0 No New Controls 0 0.0% 0 $0 $70.00 $27.50 $97.50 $10.00 116.11 $0.00 $0.00 $0.00 FALSE -
6 2- K5 Back 4002-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
2 62 2 0.12 50 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 2 0.06 24 0.06 26 $4 0 No New Controls 0 0.0% 0 $0 $120.00 $90.00 $210.00 $20.00 47.27 $0.00 $0.00 $0.00 FALSE -
7 2 - K5 Loft 400 2-Lamp T12 Magnetic1x8 Surface Mount Direct 2 131 1 0.13 52 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones4 60 1 0.06 24 0.07 28 $4 0 No New Controls 0 0.0% 0 $0 $120.00 $45.00 $165.00 $20.00 32.52 $0.00 $0.00 $0.00 FALSE -
3 2 - K5 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 8 0.91 1,459 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 8 0.36 576 0.55 883 $139 0 No New Controls 0 0.0% 0 $0 $720.00 $360.00 $1,080.00 $120.00 6.92 $0.00 $0.00 $0.00 FALSE -
Smart Start Incentive
East Orange, NJ 07018
290 Central Ave.
1C15143
Ecole T. Louverture School
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
Appendix E - Lighting Audit -Louverture School Page 1 of 8
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings, kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
1 2 - K5 Loft Bottom 400 2-Lamp T8 Electronic1x8 Surface Mount Direct 2 110 1 0.11 44 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones4 60 1 0.06 24 0.05 20 $3 0 No New Controls 0 0.0% 0 $0 $120.00 $45.00 $165.00 $20.00 46.18 $0.00 $0.00 $0.00 FALSE -
3 2 - Classroom 6 4004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 13 1.48 593 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 13 0.59 234 0.90 359 $56 0 No New Controls 0 0.0% 0 $0 $1,170.00 $585.00 $1,755.00 $195.00 27.69 $0.00 $0.00 $0.00 FALSE -
10 2 - Main Entrance 2600 4-Lamp T8 Electronic2x4 Recessed Direct 4 114 2 0.23 593 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 2 0.09 234 0.14 359 $56 0 No New Controls 0 0.0% 0 $0 $180.00 $90.00 $270.00 $30.00 4.26 $0.00 $0.00 $0.00 FALSE -
5 2 - Main Office Entry 22002-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
2 62 4 0.25 546 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
2 30 4 0.12 264 0.13 282 $44 0 No New Controls 0 0.0% 0 $0 $240.00 $180.00 $420.00 $40.00 8.60 $0.00 $0.00 $0.00 FALSE -
5 2 - Main Office 20002-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
2 62 3 0.19 372 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
2 30 3 0.09 180 0.10 192 $30 0 No New Controls 0 0.0% 0 $0 $180.00 $135.00 $315.00 $30.00 9.45 $0.00 $0.00 $0.00 FALSE -
6 2 - Main Office Closet 4002-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
2 62 2 0.12 50 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 2 0.06 24 0.06 26 $4 0 No New Controls 0 0.0% 0 $0 $120.00 $90.00 $210.00 $20.00 47.27 $0.00 $0.00 $0.00 FALSE -
11 1 - Back Stairwell Bathroom 500 Incandescent (100W)
Ceiling Mounted Direct 1 100 1 0.10 50 Replace Philips 18W LED A-Lamp 1 18 1 0.02 9 0.08 41 $6 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 5.05 $0.00 $0.00 $0.00 FALSE -
12 1 thru 4 - Back Stairwell 2200 2-Lamp T8 Electronic
1x4 Pendant Prismatic Lens 2 62 3 0.19 409 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 3 0.09 198 0.10 211 $33 0 No New Controls 0 0.0% 0 $0 $180.00 $135.00 $315.00 $30.00 8.60 $0.00 $0.00 $0.00 FALSE -
3 1 thru 4- Back Stairwell 2200
4-Lamp T8 Electronic2x4 Recessed Prismatic
Lens4 26 1 0.03 57 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 1 0.05 99 (0.02) (42) ($7) 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 (18.29) $0.00 $0.00 $0.00 FALSE -
13 2 - Classroom 3 16004-Lamp T12 Magnetic
2x4 Recessed Prismatic Lens
4 164 8 1.31 2,099 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 8 0.36 576 0.95 1,523 $239 0 No New Controls 0 0.0% 0 $0 $720.00 $360.00 $1,080.00 $120.00 4.01 $0.00 $0.00 $0.00 FALSE -
3 2 - Classroom 3 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 4 0.46 730 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 4 0.18 288 0.28 442 $69 0 No New Controls 0 0.0% 0 $0 $360.00 $180.00 $540.00 $60.00 6.92 $0.00 $0.00 $0.00 FALSE -
14 2 - Classroom 3 Closet 400 CFL (40W)Pendant Mounted Direct 1 40 1 0.04 16 Replace 28W LED A-Lamp 1 28 1 0.03 11 0.01 5 $1 0 No New Controls 0 0.0% 0 $0 $70.00 $27.50 $97.50 $10.00 116.11 $0.00 $0.00 $0.00 FALSE -
19 2 - Classroom 4 1600 4-Lamp T8 Electronic2x4 Pendant Prismatic Lens 4 114 9 1.03 1,642 Re-Lamp / De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 9 0.41 648 0.62 994 $156 0 No New Controls 0 0.0% 0 $0 $810.00 $405.00 $1,215.00 $135.00 6.92 $0.00 $0.00 $0.00 FALSE -
14 2 - Classroom 4 Closet 400 CFL (40W)Pendant Mounted Direct 1 40 1 0.04 16 Replace 28W LED A-Lamp 1 28 1 0.03 11 0.01 5 $1 0 No New Controls 0 0.0% 0 $0 $70.00 $27.50 $97.50 $10.00 116.11 $0.00 $0.00 $0.00 FALSE -
Appendix E - Lighting Audit -Louverture School Page 2 of 8
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings, kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
15 2 - Boys Bathroom 2200 CFL (40W)Recessed Direct 1 40 1 0.04 88 Replace 28W LED A-Lamp 1 28 1 0.03 62 0.01 26 $4 0 No New Controls 0 0.0% 0 $0 $70.00 $27.50 $97.50 $10.00 21.11 $0.00 $0.00 $0.00 FALSE -
16 2 - Boys Bathroom 2200 CFL (13W)Recessed Direct 1 13 1 0.01 29 Replace Philips LED A19 6W 1 6 1 0.01 13 0.01 15 $2 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 13.44 $0.00 $0.00 $0.00 FALSE -
17 2 - Boys Bathroom 2200 IncandescentRecessed Direct 1 100 1 0.10 220 Replace Philips 18W LED A-Lamp 1 18 1 0.02 40 0.08 180 $28 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 1.15 $0.00 $0.00 $0.00 FALSE -
15 2 - Girls Bathroom 2200 CFL (40W)Recessed Direct 1 40 1 0.04 88 Replace 28W LED A-Lamp 1 28 1 0.03 62 0.01 26 $4 0 No New Controls 0 0.0% 0 $0 $70.00 $27.50 $97.50 $10.00 21.11 $0.00 $0.00 $0.00 FALSE -
16 2 - Girls Bathroom 2200 CFL (13W)Recessed Direct 1 13 1 0.01 29 Replace Philips LED A19 6W 1 6 1 0.01 13 0.01 15 $2 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 13.44 $0.00 $0.00 $0.00 FALSE -
17 2 - Girls Bathroom 2200 IncandescentRecessed Direct 1 100 1 0.10 220 Replace Philips 18W LED A-Lamp 1 18 1 0.02 40 0.08 180 $28 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 1.15 $0.00 $0.00 $0.00 FALSE -
13 2 - Classroom 2 16004-Lamp T12 Magnetic
2x4 Recessed Prismatic Lens
4 164 9 1.48 2,362 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 9 0.41 648 1.07 1,714 $269 0 No New Controls 0 0.0% 0 $0 $810.00 $405.00 $1,215.00 $135.00 4.01 $0.00 $0.00 $0.00 FALSE -
18 2 - Classroom 2 Closet 400 2-Lamp T12 Magnetic1x4 Pendant Direct 2 82 2 0.16 66 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 2 0.06 24 0.10 42 $7 0 No New Controls 0 0.0% 0 $0 $120.00 $90.00 $210.00 $20.00 29.09 $0.00 $0.00 $0.00 FALSE -
3 2 - Hallway 2 22004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 8 0.91 2,006 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 8 0.36 792 0.55 1,214 $191 0 No New Controls 0 0.0% 0 $0 $720.00 $360.00 $1,080.00 $120.00 5.04 $0.00 $0.00 $0.00 FALSE -
19 2 - Classroom 1 1600 4-Lamp T8 Electronic2x4 Pendant Prismatic Lens 4 114 9 1.03 1,642 Re-Lamp / De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 9 0.41 648 0.62 994 $156 0 No New Controls 0 0.0% 0 $0 $810.00 $405.00 $1,215.00 $135.00 6.92 $0.00 $0.00 $0.00 FALSE -
14 2 - Classroom 1 Closet 400 CFL (40W)Pendant Mounted Direct 1 40 1 0.04 16 Replace 28W LED A-Lamp 1 28 1 0.03 11 0.01 5 $1 0 No New Controls 0 0.0% 0 $0 $70.00 $27.50 $97.50 $10.00 116.11 $0.00 $0.00 $0.00 FALSE -
13 3 - Classroom 14 16004-Lamp T12 Magnetic
2x4 Recessed Prismatic Lens
4 164 9 1.48 2,362 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 9 0.41 648 1.07 1,714 $269 0 No New Controls 0 0.0% 0 $0 $810.00 $405.00 $1,215.00 $135.00 4.01 $0.00 $0.00 $0.00 FALSE -
18 1- Boiler Room 400 2-Lamp T12 Magnetic1x4 Pendant Direct 2 82 6 0.49 197 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 6 0.18 72 0.31 125 $20 0 No New Controls 0 0.0% 0 $0 $360.00 $270.00 $630.00 $60.00 29.09 $0.00 $0.00 $0.00 FALSE -
20 1- Boiler Room 400 2-Lamp T12 Magnetic1x8 Pendant Direct 2 131 1 0.13 52 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones4 60 1 0.06 24 0.07 28 $4 0 No New Controls 0 0.0% 0 $0 $120.00 $45.00 $165.00 $20.00 32.52 $0.00 $0.00 $0.00 FALSE -
Appendix E - Lighting Audit -Louverture School Page 3 of 8
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings, kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
3 1- Hallway 22004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 12 1.37 3,010 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 12 0.54 1,188 0.83 1,822 $286 0 No New Controls 0 0.0% 0 $0 $1,080.00 $540.00 $1,620.00 $180.00 5.04 $0.00 $0.00 $0.00 FALSE -
3 1 - Boy's Bathroom 22004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 3 0.34 752 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 3 0.14 297 0.21 455 $71 5Dual Technology
Occupancy Sensor - Remote Mnt.
1 20.0% 59 $9 $270.00 $135.00 $405.00 $45.00 5.04 $200.00 $50.00 $250.00 FALSE 26.81
21 1 - Storage 4004-Lamp T8 Electronic
2x4 Surface Mount Prismatic Lens
4 114 9 1.03 410 Re-Lamp / De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 9 0.41 162 0.62 248 $39 0 No New Controls 0 0.0% 0 $0 $810.00 $405.00 $1,215.00 $135.00 27.69 $0.00 $0.00 $0.00 FALSE -
22 1 - Storage 400 4-Lamp T8 Electronic2x4 Pendant Prismatic Lens 4 114 1 0.11 46 Re-Lamp / De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 1 0.05 18 0.07 28 $4 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 27.69 $0.00 $0.00 $0.00 FALSE -
6 1 - Girl'a Bath 22002-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
2 62 1 0.06 136 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 66 0.03 70 $11 5
Dual Technology Occupancy Sensor - Remote
Mnt.1 20.0% 13 $2 $60.00 $45.00 $105.00 $10.00 8.60 $200.00 $50.00 $250.00 FALSE 120.63
23 1 - Girl'a Bath 2200 2-Lamp T8 Electronic2x4 Pendant Prismatic Lens 2 62 2 0.12 273 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 2 0.06 132 0.06 141 $22 5
Dual Technology Occupancy Sensor - Remote
Mnt.0 20.0% 26 $4 $120.00 $90.00 $210.00 $20.00 8.60 $0.00 $0.00 $0.00 FALSE 0.00
3 1- Special ED B-1 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 11 1.25 2,006 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 11 0.50 792 0.76 1,214 $191 0 No New Controls 0 0.0% 0 $0 $990.00 $495.00 $1,485.00 $165.00 6.92 $0.00 $0.00 $0.00 FALSE -
6 1 - Classroom B-2 16002-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
2 62 10 0.62 992 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 10 0.30 480 0.32 512 $80 0 No New Controls 0 0.0% 0 $0 $600.00 $450.00 $1,050.00 $100.00 11.82 $0.00 $0.00 $0.00 FALSE -
21 1- Computer Lab 16004-Lamp T8 Electronic
2x4 Surface Mount Prismatic Lens
4 114 9 1.03 1,642 Re-Lamp / De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 9 0.41 648 0.62 994 $156 0 No New Controls 0 0.0% 0 $0 $810.00 $405.00 $1,215.00 $135.00 6.92 $0.00 $0.00 $0.00 FALSE -
22 1- H2 2200 4-Lamp T8 Electronic2x4 Pendant Prismatic Lens 4 114 2 0.23 502 Re-Lamp / De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 2 0.09 198 0.14 304 $48 0 No New Controls 0 0.0% 0 $0 $180.00 $90.00 $270.00 $30.00 5.04 $0.00 $0.00 $0.00 FALSE -
24 1- H2 22001-Lamp T8 Electronic0.5x4 Surface Mount
Prismatic Lens1 32 1 0.03 70 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones1 15 1 0.02 33 0.02 37 $6 0 No New Controls 0 0.0% 0 $0 $30.00 $45.00 $75.00 $5.00 11.92 $0.00 $0.00 $0.00 FALSE -
6 1 - H1 22002-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
2 62 1 0.06 136 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 66 0.03 70 $11 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 8.60 $0.00 $0.00 $0.00 FALSE -
25 1 - H1 2200 IncandescentSurface Mounted Direct 1 60 2 0.12 264 Replace Philips LED A19 10.5W 1 10.5 2 0.02 46 0.10 218 $34 0 No New Controls 0 0.0% 0 $0 $26.00 $55.00 $81.00 $20.00 1.78 $0.00 $0.00 $0.00 FALSE -
26 1- Office 20002-Lamp T8
2x4 Surface Mounted Prismatic Lens
2 62 2 0.12 248 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 2 0.06 120 0.06 128 $20 6
Dual Technology Occupancy Sensor - Switch
Mnt.1 20.0% 24 $4 $120.00 $90.00 $210.00 $20.00 9.45 $50.00 $50.00 $100.00 FALSE 26.54
Appendix E - Lighting Audit -Louverture School Page 4 of 8
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings, kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
21 1 - H3 22004-Lamp T8 Electronic
2x4 Surface Mount Prismatic Lens
4 114 1 0.11 251 Re-Lamp / De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 1 0.05 99 0.07 152 $24 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 5.04 $0.00 $0.00 $0.00 FALSE -
24 1- H3 22001-Lamp T8 Electronic0.5x4 Surface Mount
Prismatic Lens1 32 1 0.03 70 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones1 15 1 0.02 33 0.02 37 $6 0 No New Controls 0 0.0% 0 $0 $30.00 $45.00 $75.00 $5.00 11.92 $0.00 $0.00 $0.00 FALSE -
3 1 - Kitchen 20004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 9 1.03 2,052 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 9 0.41 810 0.62 1,242 $195 0 No New Controls 0 0.0% 0 $0 $810.00 $405.00 $1,215.00 $135.00 5.54 $0.00 $0.00 $0.00 FALSE -
22 3 - Classroom 15 1600 4-Lamp T8 Electronic2x4 Pendant Prismatic Lens 4 114 9 1.03 1,642 Re-Lamp / De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 9 0.41 648 0.62 994 $156 0 No New Controls 0 0.0% 0 $0 $810.00 $405.00 $1,215.00 $135.00 6.92 $0.00 $0.00 $0.00 FALSE -
13 3 - Classroom 9 16004-Lamp T12 Magnetic
2x4 Recessed Prismatic Lens
4 164 12 1.97 3,149 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 12 0.54 864 1.43 2,285 $359 0 No New Controls 0 0.0% 0 $0 $1,080.00 $540.00 $1,620.00 $180.00 4.01 $0.00 $0.00 $0.00 FALSE -
13 3-Classroom 9 Closet 4004-Lamp T12 Magnetic
2x4 Recessed Prismatic Lens
4 164 1 0.16 66 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 1 0.05 18 0.12 48 $7 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 16.06 $0.00 $0.00 $0.00 FALSE -
13 3 - Nurse's Office 20004-Lamp T12 Magnetic
2x4 Recessed Prismatic Lens
4 164 3 0.49 984 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 3 0.14 270 0.36 714 $112 0 No New Controls 0 0.0% 0 $0 $270.00 $135.00 $405.00 $45.00 3.21 $0.00 $0.00 $0.00 FALSE -
13 3- Classroom 16 16004-Lamp T12 Magnetic
2x4 Recessed Prismatic Lens
4 164 12 1.97 3,149 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 12 0.54 864 1.43 2,285 $359 0 No New Controls 0 0.0% 0 $0 $1,080.00 $540.00 $1,620.00 $180.00 4.01 $0.00 $0.00 $0.00 FALSE -
27 3 - Classroom 16 Closet 400 Incandescent
Pendant Mounted Direct 1 100 1 0.10 40 Replace Philips 18W LED A-Lamp 1 18 1 0.02 7 0.08 33 $5 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 6.31 $0.00 $0.00 $0.00 FALSE -
13 3 - Hallway 3 22004-Lamp T12 Magnetic
2x4 Recessed Prismatic Lens
4 164 10 1.64 3,608 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 10 0.45 990 1.19 2,618 $411 0 No New Controls 0 0.0% 0 $0 $900.00 $450.00 $1,350.00 $150.00 2.92 $0.00 $0.00 $0.00 FALSE -
3 3 - Hallway 3 22004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 1 0.11 251 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 1 0.05 99 0.07 152 $24 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 5.04 $0.00 $0.00 $0.00 FALSE -
22 4 -Computer Lab 1600 4-Lamp T8 Electronic2x4 Pendant Prismatic Lens 4 114 4 0.46 730 Re-Lamp / De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 4 0.18 288 0.28 442 $69 0 No New Controls 0 0.0% 0 $0 $360.00 $180.00 $540.00 $60.00 6.92 $0.00 $0.00 $0.00 FALSE -
12 4 - Auditorium 1600 2-Lamp T8 Electronic1x4 Pendant Prismatic Lens 2 62 44 2.73 4,365 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 44 1.32 2,112 1.41 2,253 $354 0 No New Controls 0 0.0% 0 $0 $2,640.00 $1,980.00 $4,620.00 $440.00 11.82 $0.00 $0.00 $0.00 FALSE -
28 4 - Auditorium Closet 1 400 2-Lamp T12
1x4 Surface Mount Direct 2 82 1 0.08 33 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 12 0.05 21 $3 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 29.09 $0.00 $0.00 $0.00 FALSE -
Appendix E - Lighting Audit -Louverture School Page 5 of 8
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings, kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
29 4 - Auditorium Closet 2 400 1-Lamp T12
1x4 Surface Mount Direct 1 48 2 0.10 38 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones1 15 2 0.03 12 0.07 26 $4 0 No New Controls 0 0.0% 0 $0 $60.00 $90.00 $150.00 $10.00 33.78 $0.00 $0.00 $0.00 FALSE -
15 Stairwell 2 2200 CFL (40W)Recessed Direct 1 40 1 0.04 88 Replace 28W LED A-Lamp 1 28 1 0.03 62 0.01 26 $4 0 No New Controls 0 0.0% 0 $0 $70.00 $27.50 $97.50 $10.00 21.11 $0.00 $0.00 $0.00 FALSE -
17 Stairwell 2 2200 IncandescentRecessed Direct 1 100 1 0.10 220 Replace Philips 18W LED A-Lamp 1 18 1 0.02 40 0.08 180 $28 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 1.15 $0.00 $0.00 $0.00 FALSE -
17 4 - Art Closet 400 IncandescentRecessed Direct 1 100 1 0.10 40 Replace Philips 18W LED A-Lamp 1 18 1 0.02 7 0.08 33 $5 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 6.31 $0.00 $0.00 $0.00 FALSE -
17 4 - Attic Storage 400 IncandescentRecessed Direct 1 100 3 0.30 120 Replace Philips 18W LED A-Lamp 1 18 3 0.05 22 0.25 98 $15 0 No New Controls 0 0.0% 0 $0 $45.00 $82.50 $127.50 $30.00 6.31 $0.00 $0.00 $0.00 FALSE -
114 4 - Art Classroom 16002-Lamp T12 Magnetic2x4 Surface Mounted
Prismatic2 62 4 0.25 397 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 4 0.12 192 0.13 205 $32 0 No New Controls 0 0.0% 0 $0 $240.00 $180.00 $420.00 $40.00 11.82 $0.00 $0.00 $0.00 FALSE -
114 4 - Teacher's Workroom 2000
2-Lamp T12 Magnetic2x4 Surface Mounted
Prismatic2 62 3 0.19 372 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 3 0.09 180 0.10 192 $30 6
Dual Technology Occupancy Sensor - Switch
Mnt.1 20.0% 36 $6 $180.00 $135.00 $315.00 $30.00 9.45 $50.00 $50.00 $100.00 $20.00 14.15
115 4 - Teacher's Workroom Closet 1 400 1-Lamp T12 Magnetic
1x2 Surface Mounted Direct 1 64 1 0.06 26 Re-Lamp Seesmart LED 2' Tube 9W 4Kbypass ballast and provide new
tombstones1 9 1 0.01 4 0.06 22 $3 0 No New Controls 0 0.0% 0 $0 $20.00 $45.00 $65.00 $5.00 17.37 $0.00 $0.00 $0.00 FALSE -
11 4 - Teacher's Workroom Closet 1 400 Incandescent (100W)
Ceiling Mounted Direct 1 100 1 0.10 40 Replace Philips 18W LED A-Lamp 1 18 1 0.02 7 0.08 33 $5 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 6.31 $0.00 $0.00 $0.00 FALSE -
6 4 - Teacher's Workroom Closet 2 400
2-Lamp T8 Electronic1x4 Surface Mount
Prismatic Lens2 62 1 0.06 25 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 12 0.03 13 $2 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 47.27 $0.00 $0.00 $0.00 FALSE -
6 4 - Teacher Work Room Hallway 2200
2-Lamp T8 Electronic1x4 Surface Mount
Prismatic Lens2 62 2 0.12 273 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 2 0.06 132 0.06 141 $22 0 No New Controls 0 0.0% 0 $0 $120.00 $90.00 $210.00 $20.00 8.60 $0.00 $0.00 $0.00 FALSE -
11 4 - Teacher Workroom Storage 400 Incandescent (100W)
Ceiling Mounted Direct 1 100 1 0.10 40 Replace Philips 18W LED A-Lamp 1 18 1 0.02 7 0.08 33 $5 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 6.31 $0.00 $0.00 $0.00 FALSE -
11 4 - Stairwell Foyer 2200 Incandescent (100W)Ceiling Mounted Direct 1 100 1 0.10 220 Replace Philips 18W LED A-Lamp 1 18 1 0.02 40 0.08 180 $28 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 1.15 $0.00 $0.00 $0.00 FALSE -
9 4 - Stairwell Foyer 2200 CFL (40W)Ceiling Mounted Direct 1 40 1 0.04 88 Replace 28W LED A-Lamp 1 28 1 0.03 62 0.01 26 $4 0 No New Controls 0 0.0% 0 $0 $70.00 $27.50 $97.50 $10.00 21.11 $0.00 $0.00 $0.00 FALSE -
Appendix E - Lighting Audit -Louverture School Page 6 of 8
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings, kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
13 3 - Classroom 10 16004-Lamp T12 Magnetic
2x4 Recessed Prismatic Lens
4 164 9 1.48 2,362 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 9 0.41 648 1.07 1,714 $269 0 No New Controls 0 0.0% 0 $0 $810.00 $405.00 $1,215.00 $135.00 4.01 $0.00 $0.00 $0.00 FALSE -
3 3 - Classroom 10 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 3 0.34 547 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 3 0.14 216 0.21 331 $52 0 No New Controls 0 0.0% 0 $0 $270.00 $135.00 $405.00 $45.00 6.92 $0.00 $0.00 $0.00 FALSE -
11 3 - Boy's Bathroom 2200 Incandescent (100W)Ceiling Mounted Direct 1 100 2 0.20 440 Replace Philips 18W LED A-Lamp 1 18 2 0.04 79 0.16 361 $57 0 No New Controls 0 0.0% 0 $0 $30.00 $55.00 $85.00 $20.00 1.15 $0.00 $0.00 $0.00 FALSE -
2 3 - Boy's Bathroom 2200Ceiling Mounted CFL
(13W)Direct
1 13 1 0.01 29 Replace Philips LED A19 6W 1 6 1 0.01 13 0.01 15 $2 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 13.44 $0.00 $0.00 $0.00 FALSE -
13 3 - Classroom 13 16004-Lamp T12 Magnetic
2x4 Recessed Prismatic Lens
4 164 12 1.97 3,149 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 12 0.54 864 1.43 2,285 $359 0 No New Controls 0 0.0% 0 $0 $1,080.00 $540.00 $1,620.00 $180.00 4.01 $0.00 $0.00 $0.00 FALSE -
116 3 - Storage 400 2-Lamp T12 Magnetic2x4 Recessed Prismatic 2 62 3 0.19 74 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
2 30 3 0.09 36 0.10 38 $6 0 No New Controls 0 0.0% 0 $0 $180.00 $135.00 $315.00 $30.00 47.27 $0.00 $0.00 $0.00 FALSE -
13 3 - Classroom 11 Storage 400
4-Lamp T12 Magnetic2x4 Recessed Prismatic
Lens4 164 12 1.97 787 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 12 0.54 216 1.43 571 $90 0 No New Controls 0 0.0% 0 $0 $1,080.00 $540.00 $1,620.00 $180.00 16.06 $0.00 $0.00 $0.00 FALSE -
11 3 - Girl's Bathroom 2200 Incandescent (100W)Ceiling Mounted Direct 1 100 3 0.30 660 Replace Philips 18W LED A-Lamp 1 18 3 0.05 119 0.25 541 $85 0 No New Controls 0 0.0% 0 $0 $45.00 $82.50 $127.50 $30.00 1.15 $0.00 $0.00 $0.00 FALSE -
3 3 - Classroom 12 26004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 9 1.03 2,668 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 9 0.41 1,053 0.62 1,615 $253 0 No New Controls 0 0.0% 0 $0 $810.00 $405.00 $1,215.00 $135.00 4.26 $0.00 $0.00 $0.00 FALSE -
11 3 - Classroom 12 Storage 400 Incandescent (100W)
Ceiling Mounted Direct 1 100 1 0.10 40 Replace Philips 18W LED A-Lamp 1 18 1 0.02 7 0.08 33 $5 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 6.31 $0.00 $0.00 $0.00 FALSE -
3 3 - Storage Classroom 8/12 400
4-Lamp T8 Electronic2x4 Recessed Prismatic
Lens4 114 8 0.91 365 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 8 0.36 144 0.55 221 $35 0 No New Controls 0 0.0% 0 $0 $720.00 $360.00 $1,080.00 $120.00 27.69 $0.00 $0.00 $0.00 FALSE -
117 3 - Classroom 8 Closet 4002-Lamp T12 Magnetic2x4 Pendant Mounted
Direct2 62 1 0.06 25 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 12 0.03 13 $2 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 47.27 $0.00 $0.00 $0.00 FALSE -
118 3 - Stairwell Room 400 1-Lamp CFL (60W)Surface Mounted Direct 1 60 2 0.12 48 Existing to Remain Existing to Remain 1 60 0 0.12 48 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -
3 3 - Office 1 20004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 6 0.68 1,368 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 6 0.27 540 0.41 828 $130 6Dual Technology
Occupancy Sensor - Switch Mnt.
1 20.0% 108 $17 $540.00 $270.00 $810.00 $90.00 5.54 $50.00 $50.00 $100.00 FALSE 5.90
Appendix E - Lighting Audit -Louverture School Page 7 of 8
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings, kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
3 3 - Office 2 20004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 2 0.23 456 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 2 0.09 180 0.14 276 $43 6Dual Technology
Occupancy Sensor - Switch Mnt.
1 20.0% 36 $6 $180.00 $90.00 $270.00 $30.00 5.54 $50.00 $50.00 $100.00 $20.00 14.15
119 Rear Exterior 3000 HID Wall-Mounted Spotlight (150W) 1 150 2 0.30 900 Replace RAB FFLED 39W LED
Floodlight 1 39 2 0.08 234 0.22 666 $105 6Dual Technology
Occupancy Sensor - Switch Mnt.
1 20.0% 47 $7 $664.00 $400.00 $1,064.00 $200.00 8.26 $50.00 $50.00 $100.00 $20.00 10.89
TOTAL 425 47.5 73,684 423 18 28,197 29.6 45,487 $7,141 6 1 303 $48 $36,546 $18,925 $55,471 $7,010 6.79 $600 $300 $900 $40.00 18.08
Appendix E - Lighting Audit -Louverture School Page 8 of 8