1

DYNAMICS AX 2012 FÅ OVERBLIK OG SE NYE MULIGHEDER

HVORDAN STYRER JEG PRODUKTIONEN MED AX 2012?

Michael Johnny Pedersen

Maj 2013

PRODUCT LIFECYCLE

AGENDA

PROJECT

PLANNING

BID

PROCESS

CHANGE

MANAGEMENT

MANUFACTURING DELIVERY

ANALYSIS

PROJECT

EXECUTION

SERVICE

DESIGN

CHANGE

REQUEST

CHANGE

MANAGEMENT

2

ENGINEER-TO-ORDER

MASTER CATALOG

3

MARKET BID DESIGN INSTALL SERVICE BUILD

ENGINEER-TO-ORDER

SUPPORTING PROCESSES CONTROL

INVOICES CASH DAILY/MTH PERIODIC

MANUFACTURING

CHARACTERISTICS

MANUFACTURING

CHARACTERISTICS ENGINEER-TO-ORDER HIGH VOLUME

LOW VOLUME

HIGH COMPLEXITY

ETO

MTO

MTS

ATO

TPM

Product Engineering

Project Manufacturing

& Visual Planning

Product Configuration

Service Management Supply Chain Services

Asset Management

4

Advanced

Configurator

Enterprise

Asset

Management

Advanced

Warehouse

Management

5

RAPIDVALUE CONCEPT

Product

Engineering

Visual

Project

Planning

Asset

Service

Management

ADVANCED DISCRETE

MANUFACTURING

SOLUTIONS

Project

Engineering &

Manufacturing

BID PHASE

6

PROCESS BID APPROVAL

7

PROCESS

• Develop proposal

• Define customer

• Create Bid

• Complete cost estimate

• Finalize contract

SCENARIO BID PROCESS

CASES BASED ON CREATE BID

• New project quotation

• Show re-use of existing bid structure

• Start workflow for approval process

• Transfer to project

8

PROJECT QUOTATION

CAPABILITIES & BENEFITS

• Multi-project work break down

structures

• Workflow, approval process

• Margin control

• Powerful statistics

IMPROVED ESTIMATE STRUCTURE

TO BE IN LINE WITH PROJECT

STRUCTURE. ACCESS TO ACCURATE

HISTORICAL DATA HELP BUILD

QUOTES

9

DESIGN PHASE

10

PROCESS PLAN OVERALL PROJECT

11

PROCESS

• Plan overall project

CREATE A PLAN TO RESOURCE THE PROJECT AND CREATE A NEW

BUDGET BASED ON REALISTIC RESULTS.

SCENARIO PLAN OVERALL PROJECT

CASE PLAN OVERALL PROJECT USING VISUAL PLANNING

• Build dependence between activities

• Allocate to available resources

12

VISUAL PLANNING

CAPABILITIES & BENEFITS

• Graphical projects planning and

capacity charts

• Graphically plan connected

materials and activities

• Track progress on tasks

13

PROCESS DESIGN

14

PROCESS

• Develop detailed plan for design phase

• Record project cost

• Monitor timeline progress

SCENARIO DESIGN

CASE DESIGN WORK

• Start design work

• Identify items for structure

• Book hours

15

PROJECT COSTING

CAPABILITIES & BENEFITS

• Personalized KPI’s

• Earned Value

• Semi-committed costs

• S-curve

HAVE UP TO DATE PROJECT

INFORMATION AVAILABLE IN THE

SYSTEM ON THE PROJECT.

16

PROCESS BUILD

17

PROCESS :

• Create Change request

• Submit for approval

• Approve for change

• Identify change project

• Create Engineering Change Order

• Identify where use & dependencies

• Make changes

• Approve & process

SCENARIO BUILD

CASE BUILD

• Link material need and activities

• Schedule item

• Start production

18

MULTI-LEVEL LOGISTICS VIEW

19

CAPABILITIES & BENEFITS

• Connect procurement and

production to projects

• Drive the construction supply

chain with full awareness

PROCESS CHANGE MANAGEMENT

20

PROCESS

• Build plan, release detailed design to build

• Source material

• Control inventory

• Make components

• Assembly of final product

• Monitor build phase

SCENARIO CHANGE MANAGEMENT

21

CASE BUILD

• Production change request

• Search and substitute

• Design change using Engineering

Change Order

ENGINEERING CHANGE REQUEST

22

CAPABILITIES & BENEFITS

• Workflow-Driven

• Multi-Product

• A structured way to capture issues, ideas and turn them into changes

ENGINEERING CHANGE ORDER

CAPABILITIES & BENEFITS

• Multi-product

• Where-used

• Insight in logistical impact of

change

• Integrated with PLM ECM

process

23

VERSION MANAGEMENT

24

CAPABILITIES & BENEFITS

• Version control via engineering

version with optional tracking in

logistics.

• Determines BOM, Engineering

Attributes

PRODUCT SEARCH & ALTERNATIVES

25

CAPABILITIES & BENEFITS

• Re-use existing products

• Minimize inventory costs

• Faster time-to-market

ANALYSIS

26

PROCESS CHANGE MANAGEMENT

27

PROCESS:

• Make references

• Using project cube for analysis

• Monitor progress

• Enable in Role Center

ORGANIZE DATA FOR ANALYSIS

28

KNOWLEDGE MANAGEMENT

IS ALWAYS ABOUT GETTING

THE RIGHT KNOWLEDGE TO

THE RIGHT PEOPLE

KNOWLEDGE

ORGANIZING

INTELLIGENCE

PATTERNS

FUNCTION

PRODUCT

MARKET

UNSTRUCTURED & STRUCTURED

INFORMATION ORGANIZED

STRUCTURED DATA THROUGH

PROJECT

29

GBP123 .02.01.01 Frame Building

FUNCTION

PRODUCT

LOCATION

TEMPLATE

Project GBP123

GBP123 .02 GBM2

Installation

GBP123 .02.02 Carousel

GBP123 .02..01.02 conveyor

GBP123 .02.03 Recycle system

02 Purifier

03 Heat exchanger 04 Pump assembly

01 Frame

PROJECT

GBP123 .02.01 Infra structure

SERVICE

30

PROCESS SERVICE

31

PROCESS:

• Create service objects

SERVICE OBJECTS

32

SPARE PARTS

SERVICE STRUCTURE FROM

PROJECT, AS MAINTAINED

WORK ORDER SCHEDULING

33

SCENARIO SERVICE

CASE

• Create object structure from project

SPARE PARTS

34

SUMMARY

35

PRODUCT LIFECYCLE

AGENDA

36

PROJECT

PLANNING

BID

PROCESS CHANGE

MANAGEMENT

MANUFACTURING

DELIVERY

ANALYSIS

PROJECT

EXECUTION

SERVICE

DESIGN

CHANGE

REQUEST

CHANGE

MANAGEMENT