Contents
What is Promat DURASTEEL®? 3
Technical Data & Construction Details 4
Technical Services & System Installation 5
Regulatory Reform (Fire Safety) Order 2005 5
System Performance, Tests and Approvals 6
System Key Features and Benefi ts 8
Promat DURASTEEL® Range 8
Low Radiation Fire Wall 9
Radiation Characteristics 9
Protected Zones, Spandrel Panels, Smoke Screens 10
Valve Protection Enclosures 10
Insulated Fire Wall Systems 12
FIREBLAST® Wall Systems 12
System Applications 13
Specifi cation Details 16
Case Studies 29
Licensee Testimonials 31
Promat DURASTEEL® High Performance Systems
2
Durasteel Brochure.indd 2Durasteel Brochure.indd 2 28/10/08 15:32:5428/10/08 15:32:54
Promat DURASTEEL® High Performance Systems
WHAT IS Promat DURASTEEL®?Promat DURASTEEL® is a composite panel of fi bre reinforced cement mechanically bonded to punched steel sheets on both outer surfaces. It is classed as ‘non-combustible’ to BS 476: Part 4: 1970 and A1 to Clause 10 of BS EN 13501-1:2002. Promat DURASTEEL® is both highly impact and moisture resistant.
Promat DURASTEEL® has been developed and supported through rigorous testing for use in barriers, door and ceiling applications, with a wide range of specifi cations available.
Promat DURASTEEL® systems combine lightness, strength, impact, blast resistance and durability with exceptional fi re resistance. In addition, Promat DURASTEEL® can also withstand the effects of fi refi ghters’ hoses.
Promat DURASTEEL® systems have been used successfully across the industry for many years, including large rail, metro and airport projects, as well as military developments and commercial, pharmaceutical and petrochemical facilities.
Promat has developed DURASTEEL® to provide an effective blast resistant solution to constructions in a wide range of industrial applications, including power generation and anti-terrorist installations.
HIGH PERFORMANCE SYSTEMSPromat DURASTEEL® walls and partitions can be designed and installed in various layout and framing options to meet a multitude of needs. In today’s construction markets the need for systems which can perform multi-functional roles, whilst capable of allowing for fast track and cost effective installation, are of prime importance.
The Promat DURASTEEL® partition and wall systems can easily fulfi l all of these roles. Promat DURASTEEL® walls have resistance to extreme impact, before, during and after exposure to fi re. This ensures that under use, they suffer no damage from the burden of every day exposure within, for instance, warehouse situations. Under fi re conditions they protect and maintain compartmentation and after a fi re they ensure a building remains secure until remedial work can be undertaken.
Promat DURASTEEL® systems can be installed quickly; on most occasions they have no requirement for additional foundations or other special construction works. Installation is a “dry” trade, thus there is no disruption of other trades working in the same areas, allowing faster project completion.
Promat DURASTEEL® systems can offer both integrity only or integrity and insulation. Walls can be designed for high blast resistance and meet most of the generally recognised fi re curves, including cellulosic and hydrocarbon.
Promat DURASTEEL® systems combine extremely high levels of fi re, impact and water resistance. They are proven to withstand the most demanding environments, temperature extremes, hostile elements and can resist high thermal shock, such as high pressure water hoses.
Promat DURASTEEL® partition and wall systems can be used in applications such as separation of hazardous areas, shielding for valve actuators, protection of escape routes and tunnels, construction of refuge areas, compartmentation within buildings and storage areas for hazardous goods or equipment protection.
ABOUT Promat UK
Promat UK Limited is a market leader in passive fi re protection and high temperature insulation, with a fi re protection range that offers a unique combination of product benefi ts: exceptional strength, impact and moisture resistance, ease of working, installation and safety in use.
Promat UK Limited is a subsidiary of Promat International, which has sales offi ces, factories and workshops worldwide.
Promat DURASTEEL® fi re and impact resistant systems provide a cost effective fast track solution for the compartmentation of large warehouses and fi re resistant enclosures, rooms, ceilings, cable trunking and similar applications.
Promat DURASTEEL® systems can be fi tted with a range of compatible personnel doors, sliding and guillotine doors, roller shutters and access hatches to provide up to 240 minutes fi re resistance.
3
Durasteel Brochure.indd 3Durasteel Brochure.indd 3 28/10/08 15:32:5528/10/08 15:32:55
Promat DURASTEEL® High Performance Systems
General Technical data
Material class Non-combustible
Surface spread of fl ame Class 1
Building Regulations classifi cation Class 0
Alkalinity (approximately) pH (core) 10-13
Thermal conductance (approximately) at 20°C W/m2K 60 (9.5mm)
Coeffi cient of expansion (20-100°C) m/mK 15 x 10-6 (9.5mm)
Nominal moisture content (air-dried) % 6
Moisture movement (ambient-saturated) % –
Thickness tolerance of standard boards +1.0 to -1.0 (9.5mm)
Length x Width tolerance of standard boards mm ±2.0
NOTE: Fire performance fi gures denote integrity (E) and insulation (I) performance respectively.
For details of specifi cations and installation details, please consult Promat Technical Services.
Performance Details
Specifi c Applications Primary Performance Fire Performance
Required (minutes)
Public and service corridors
Warehousing
Industrial buildings
Mass transit systems
Manufacturing facilities
Other areas subject to
abnormally rough use
Offshore facilities
Petrochemical industry
Gas processing plant
Other areas subject to
projectile or explosion risk
Impactresistance
Blastresistance
Board Format Data
Thickness Length x Width Approximate Weight
(mm) (mm) (Kg/m2)
Dry With approx.
6% moisture
6 2500 x 1200 15.9 16.8
9.5 2000 x 1200 19.8 21.0
9.5 2500 x 1200 19.8 21.0
Typical Mechanical Properties
Flexural strength Frupture 6mm Average, dry N/mm2 109
Flexural strength Frupture 9.5mm Average, dry N/mm2 84
Modulus of elasticity E 6mm Average, dry N/mm2 55000
Modulus of elasticity E 9.5mm Average, dry N/mm2 40000
E240E240, El60
E240, El120El240
H0H60
H120
44
Durasteel Brochure.indd 4Durasteel Brochure.indd 4 28/10/08 15:32:5628/10/08 15:32:56
Promat DURASTEEL® High Performance Systems
5
DESIGN AND TECHNICAL SERVICESWith over 100 years of combined experience, our dedicated technical and sales
support teams are available to provide information and assistance to help in the
design and installation of Promat DURASTEEL® systems.
SYSTEM INSTALLATIONAfter a site survey, installers will provide fully designed working drawings. Promat will
supply the fi re resisting sheets, doors and penetration seals, which provides a single source
and responsibility.
All elements are tested as a combined system to ensure compatibility, with one source of
warranty. Access panels for maintenance or fi re stopping of penetrations through the barrier
can be included in the system estimate.
Promat DURASTEEL® systems are installed by experienced, licensed installers. Once the work
is complete, the system undergoes a thorough check before the installation is issued with a
Certifi cate of Conformity.
Our licensed installers are all assessed under the FIRAS third party accreditation scheme.
REGULATORY REFORM (FIRE SAFETY) ORDER 2005 (RRFSO)Fire safety law changed in October 2006. The emphasis of the new law is prevention of fi res
and reduction of risk, and makes it the property owner’s responsibility to ensure the safety of
everyone who uses their premises and the immediate vicinity.
The Department for Communities and Local Government (DCLG) have produced a set of
guides to advise the responsible person how to comply to the fi re safety law, help them to
conduct a fi re risk assessment and identify general fi re precautions that will need to be put in
place.
Failure to meet the requirements of these new regulations could lead to prosecution, which
could then result in hefty fi nes or even imprisonment. The Order replaces any previous fi re
legislation. Any fi re certifi cates issued under the Fire Precautions Act 1997 ceased to have effect
from 1st October 2006.
Promat provides a free advice service to help parties within the building industry to make the
right choices in fi re safety. Promat’s technical department monitors any changes and tests
systems in order to offer solutions to help comply with fi re safety legislation.
Durasteel Brochure.indd 5Durasteel Brochure.indd 5 28/10/08 15:33:0028/10/08 15:33:00
Promat DURASTEEL® High Performance Systems
The picture right shows a Promat DURASTEEL® wall undergoing impact following a fi re test. The picture above shows a concrete block wall undergoing similar testing.
Single-skin E60, E120, E240 or E360 Marine Classifi cation A0 Constructions (A and B class), H0
Double-skin EI 60, EI 90, EI 120, EI 180 Marine Classifi cation A60 Constructions or EI 240 for standard fi re tests H60 and H120 ratings for hydrocarbon fi re tests.
Special Constructions
Type Building & Construction Offshore Constructions
SYSTEM PERFORMANCE
Promat DURASTEEL® has been designed and installed in many purpose built fi re walls, which provide special performance characteristics beyond fi re resistance. All structures can be independently assessed to ensure the required performance is achieved.
SYSTEM TESTS AND APPROVALSPromat DURASTEEL® systems have been tested extensively in the UK to comply to all relevant
parts of BS 476, as well as many internationally recognised approvals such as: Factory Mutual
(FM), Underwriters Laboratories (UL), Underwriters Laboratories Canada (ULC), Det Norske
Veritas (DNV), Lloyds Register of Shipping (LRS), Zulassung, EDF and LUL. The systems have
also achieved the stringent Certifi re approvals.
Over £2.5M has been spent on tests, assessments and approvals to comply with many
insurance specifi c requirements, both in the UK and overseas.
Promat has completed investigative programmes at our facilities in Belgium and the UK.
DURASTEEL® is manufactured in accordance with independently accredited BS EN ISO 9001
quality and ISO 14001 environmental management systems.
6
Durasteel Brochure.indd 6Durasteel Brochure.indd 6 28/10/08 15:33:0128/10/08 15:33:01
Promat DURASTEEL® High Performance Systems
The picture above shows a Promat DURASTEEL® wall being fi re tested to E240. Below are examples of Promat DURASTEEL® UK and International certifi cation.
7
Durasteel Brochure.indd 7Durasteel Brochure.indd 7 28/10/08 15:33:0328/10/08 15:33:03
SYSTEMS AVAILABLESome common partition systems constructed from Promat DURASTEEL® are shown on the
following pages. When considering the design of walls, it is essential to consider the section
size of the steel framing in conjunction with the wind loading factors, expansion allowance,
together with the height and span of the wall, to ensure that under both ambient and fi re
conditions, the wall will provide the necessary design performance. The basic framing system
comprises of lightweight steel sections, with a nominal 3mm thickness, dependant on the other
design factors etc. All framing is either bolted, screwed or welded into position, dependant on
location, performance parameters and design requirements.
Where a cold smoke seal is required, the boards must be bedded on PROMASEAL® fi re rated
silicone or PROMASEAL® Intumescent mastic. For demountable wall systems, to ensure
sealants do not act as adhesives, a cold smoke seal composed of a 2mm thick strip of Promat
PL Intumescent strip can be applied. For integrity only systems, Promat DURASTEEL® walls
have been tested with the framework on both the exposed and unexposed face to fi re, in
order to show that the frame can be exposed without detriment to the fi re performance of the
system.
The framing for the Promat DURASTEEL® wall systems must be securely fi xed back to a
substrate (concrete, masonry or steel) that has an equal or better fi re performance than
the designed wall. All fi xings must be non-combustible, and must be listed in the approval
documents. Expansion bolts used to fi x framework should be steel, not aluminium or plastic.
Promat DURASTEEL® High Performance Systems
KEY BENEFITS● Comprehensive technical expertise
● Certifi re accredited systems
● FIRAS accredited and fully qualifi ed
licensed installers
● Guaranteed system with full certifi cate
of conformity
● Tested to comply to UK and
international standards
● Insurance industry recognition
● System fully fi re tested to conform
to new RR(FS)O standards
● Tested with a range of service
penetrations and fi re doors
● No maintenance ‘fi t and forget’ system
● Over 40 years service life
● High speed of installation
8
KEY FEATURES:
• Up to EI 240 and E 360 fi re rating
• Impact resistant
• Unaffected by water
• Non-combustible
• Minimal smoke or toxic gas in a fi re
• Slim, space-saving profi le
• Lightweight, no foundations
• Easily relocatable
• Hose-stream resistant
• Mechanical or seismic vibration resistant
• Suitable for retro-installation
• Low sound transmission
• Good acoustic insulation performance
Durasteel Brochure.indd 8Durasteel Brochure.indd 8 28/10/08 15:33:0728/10/08 15:33:07
Distance from After 30 After 60 After 120 After 240 barrier (metres) minutes minutes minutes minutes
0.5 7.5 12.0 16.0 20.0
1.5 4.6 7.1 9.8 12.5
2.5 2.5 3.9 5.4 6.9
Promat DURASTEEL® High Performance Systems
LOW RADIATION FIRE WALLLow radiation fi re wall for constructions that require a high degree of stability, integrity
and insulation as measured upon the unexposed surface of the wall is not critical, but
where heat radiation from exposed to unexposed face could be of importance. Promat
DURASTEEL® low heat radiation walls offer a lightweight construction, which is very narrow
across its thickness.
Used in conjunction with the Promat DURASTEEL® pallet racking fi re barrier system,
this wall offers increased warehousing space and allows for racking to be placed practically
against the Promat DURASTEEL® wall itself.
Single layer Promat DURASTEEL® fi re walls can be constructed using framing of either steel
channels, Tee sections or back to back angle sections. The type of framing system and
the dimensions of the steel sections will depend on the performance requirements of the
wall in terms of wind load, fi re performance and impact resistance. In these circumstances,
Promat DURASTEEL® walls provide a bespoke solution.
RADIATION CHARACTERISTICSRadiation levels measured during a test on a single skin 9.5mm Promat
DURASTEEL® barrier
Effects of Thermal Radiation
Radiation Heat Flux (kW/m2) Observed effect
0.67 Summer sunshine in the UK
12.5 Piloted ignition of timber
29 Spontaneous ignition of timber
Radiation Levels (kW/m2)
9
Durasteel Brochure.indd 9Durasteel Brochure.indd 9 28/10/08 15:33:1028/10/08 15:33:10
Promat DURASTEEL® High Performance Systems
PROTECTED ZONES, SPANDREL PANELS, SMOKE SCREENSSmoke kills more people in fi res than heat, fl ames or structural collapse. It is therefore
recognised that occupant safety in a fi re can be greatly improved by providing an
effi cient smoke extraction system. Part of an engineered smoke control system may
involve the provision of smoke reservoirs, the use of smoke channelling screens and
smoke curtains.
Testing standards for smoke control equipment smoke curtains and screens shall meet
the requirements of BS 7346: Part 3: 1990, which requires the screen to withstand a
fi re temperature of 600°C +/-20°C for a minimum of 30 minutes.
The Promat DURASTEEL® system has been tested to the criteria of BS 476:
Part 20, which has much higher exposure temperature requirements and it provided a
performance in excess of 240 minutes. Promat DURASTEEL® barriers can also be
used in position as horizontal “wings” (protected zones) at the head and to the sides of fi re
walls, forming an added “band” of protection at the junction with other substrates (as detailed
in the FPA Design Guide Supplement 2004). This makes it exceptionally diffi cult for fi re to
breach a roof and thus leap over the top of, or around, the fi re resistant wall system.
Promat DURASTEEL® can also be used within spandrel panel systems, positioned at the end
of fl oor slabs in order to prevent fi re bridging gaps between fl oor slabs and curtain
wall systems.
VALVE PROTECTION ENCLOSURESThe ability to isolate storage areas or to direct highly combustible fuels away from
a heat source through a series of protected valves is paramount in the event of fi re.
When subjected to high temperatures, the plastic parts of a valve can easily be rendered
inoperative, resulting in the valve’s inability to divert or arrest fl ow.
Promat DURASTEEL® can offer different methods of protection for valves, dependent on
the requirement.
In certain circumstances, it may be suffi cient to protect the valve with a fi re resistant
shielding. In other cases, a more substantial form of protection may be required. In these
circumstances, the valve can be fully enclosed within a Promat DURASTEEL® valve actuator
box. These boxes have been designed to ensure the valve temperature cannot rise by
more than 30°C in 15 minutes, or 30°C in 30 minutes, depending on the type of Promat
DURASTEEL® system installed.
10
Durasteel Brochure.indd 10Durasteel Brochure.indd 10 28/10/08 15:33:1328/10/08 15:33:13
Promat DURASTEEL® barrier
Typical Penetration details Insulated barrier
Promat DURASTEEL® High Performance Systems
11
Durasteel Brochure.indd 11Durasteel Brochure.indd 11 28/10/08 15:33:1628/10/08 15:33:16
Promat DURASTEEL® High Performance Systems
INSULATED FIRE WALLFire walls are used in constructions where high insulation as well as stability is required during a
fi re. Promat DURASTEEL® insulated fi re walls are designed to prevent the passage of heat from
a fully developed fi re on the exposed face. The maximum permitted temperature rise allowable
on the surface of the unexposed face is 140°C as a mean temperature over all the surface, or a
maximum temperature rise of 180°C at any one point over all the surface.
Insulated wall constructions should be used in areas where the following may occur:
● Escaping personnel or fi re fi ghters may have bodily contact with the wall surface.
● If used as a wall lining to any escape route, for instance as an access tunnel within a factory.
● If there are any volatile chemicals or materials stored within the vicinity of the fi re wall and
which may ignite at low temperatures.
● There is a need to improve compartmentation beyond simple integrity.
There are a number of methods of constructing insulated wall systems. Each option has its
own benefi ts. The type of system, thickness and density of the rock wool and cover strips, if
required, are all dependent on the fi re and physical performance required from the system.
FIREBLAST® WALLDesigned specifi cally to protect personnel and equipment from the effects of explosion,
fi re, impact, and the effects of smoke and fumes in hazardous environments, such as offshore
platforms, petrochemical installations, chemical plants, military establishments, civil defence
works and hazardous process plants.
Additional features of FIREBLAST® fi re and blast resistant walls:
● Blast resistant, tested from 0.3 to 2 bar over pressure.
● Resistant to hydrocarbon fi res, tested to H120.
● Impact resistant to 4000J after 180 minute fi re test. In accordance with DIN 4102 Parts 2
and 3 requirements
● High energy absorption.
● Hose stream resistant to a 5 bar high pressure hose (ASTM E119).
Unlike many fi re and blast resistant materials, Promat DURASTEEL® is non-combustible and will
withstand an explosion followed by a prolonged fi re and still be unaffected by hose stream fi re
fi ghting. Its integrity remains unimpaired, ensuring continued protection against fi re, impact and
moisture as well as preventing the escape of smoke and toxic gases. Promat DURASTEEL®
systems are tested up to H120 fi re rating, and the systems can be designed to suit specifi c
project performance requirements.
All FIREBLAST® walls are individually tailored to suit specifi c project performance requirements,
please consult the Promat Technical Services Department for specifi cation and construction details.
12
Durasteel Brochure.indd 12Durasteel Brochure.indd 12 28/10/08 15:33:1828/10/08 15:33:18
Promat DURASTEEL® High Performance Systems
Knights of Old DURASTEEL® barrier
SYSTEM APPLICATIONS
Promat DURASTEEL® FOR INDUSTRY
Manufacturing & Warehouse Complex
The need for effective protection of personnel,
plant, stores and property in industry is vital.
Promat DURASTEEL® is proven to contain
fi re within compartments of a production area
or storage facility, thus allowing evacuation of
personnel, minimising disruption of processes
and preventing the destruction of valuable stocks.
Promat DURASTEEL®
FOR TRANSPORTATION
INFRASTRUCTURE
Underground Rail System
Promat DURASTEEL® is lightweight,
robust and ideally suited to the
external environment of all trackside,
station and rolling stock fi re protection
requirements. It is also widely used in
road and rail tunnels.
As an indication of the effectiveness of Promat DURASTEEL® these photographs show a production facility before and after a fi re. The Promat DURASTEEL® wall separating two sections of the factory performed exactly as designed. Indeed, the bottling plant on the unaffected side of the barrier was operational again within 2 days of the fi re, therefore minimising the effects of the incident as much as possible.
13
Durasteel Brochure.indd 13Durasteel Brochure.indd 13 28/10/08 15:33:1828/10/08 15:33:18
Promat DURASTEEL® High Performance Systems
Promat DURASTEEL® FOR COMMERCE
High-Rise Offi ce Block
Promat DURASTEEL® is the fi rst choice fi re protection
product for an impressively wide range of structures,
including high-rise offi ces and hotels, airports, retail
parks, leisure complexes, public buildings and
government institutions.
Promat DURASTEEL® has also undergone rigorous
testing for use in electrical plant rooms and is the
approved system for the numerous EDF installations
throughout London.
Other Promat DURASTEEL® applications may be suitable in high-rise offi ce blocks; e.g. fi re
doors, fuel storage and boiler room enclosures, ceilings above liftshafts, ceilings to fan rooms,
lift door transom panels, curtain wall fi re breaks and penetration seals.
Airport
For every airport operator, one item within their mission statement is to provide for the highest
standard of safety in civil aviation and airport operation. The range of Promat DURASTEEL®
systems for airports are proven to meet or exceed the most rigorous British and International
legislative requirements.
Other Promat DURASTEEL® applications may be suitable in airports; e.g. duct splitters,
riser shafts, transformer enclosures.
14
Durasteel Brochure.indd 14Durasteel Brochure.indd 14 28/10/08 15:33:2428/10/08 15:33:24
Promat DURASTEEL® High Performance Systems
PROMAT DURASTEEL® FOR NUCLEAR AND FOSSIL FUEL POWER STATIONS
Nuclear/Fossil Fuel Power Stations
In an industry where the concern for environmental protection, coupled with increasing
demand for electrical power, brings constant technology development in both conventional
and new approaches to energy supply, only a system such as Promat DURASTEEL® has
the fl exibility to match the need for innovative solutions.
Promat DURASTEEL® is non-combustible, will withstand prolonged hydrocarbon fi re,
resists hose-stream fi re-fi ghting, is impact and moisture resistant, and does not emit
smoke or toxic gases.
Promat DURASTEEL® FOR HYDROCARBON
Offshore Oil/Gas Production Platform
The light weight and strength of Promat DURASTEEL® combine with its resistance to
hydrocarbon fi re, blast, impact, water and corrosion to make Promat DURASTEEL® systems
the ideal choice for fi re protection on offshore production platforms and in potentially hazardous
land-based environments.
15
Durasteel Brochure.indd 15Durasteel Brochure.indd 15 28/10/08 15:33:2528/10/08 15:33:25
Promat DURASTEEL® High Performance Systems
Promat DURASTEEL® STANDARD BARRIER SYSTEMS SPECIFICATION DETAILS
Height of Size of channel for single Size of channel for double partition (metres) skin uninsulated partition skin insulated partitions (mm x mm x mm) (mm x mm x mm)
0 – 6 80 x 60 x 3 80 x 60 x 3 6 – 9 150 x 60 x 3 150 x 60 x 3 9 – 12 Two 150 x 60 x 3 back to back Two 150 x 60 x 3 back to back 12 – 15 Two 175 x 60 x 3 back to back Two 200 x 60 x 3 back to back
Stud Channel Sizes
Insulated Partitions
Fire resistance Minimum stud DURASTEEL® Rock wool infi ll – minutes depth – mm fi llets per face E240 / I120 80 1* 2 x 40mm x 140kg/m3
E240 / I120 150 None 3 x 50mm x 80kg/m3
E240 / I240 80 2* 3 x 40mm x 140kg/m3
E240 / I240 150 2* 3 x 50mm x 100kg/m3
Stud Channel Sizes
Height of Size of steel channel (mm x mm x mm) for fi re resistance partition – m period (minutes)
60 mins 90 mins 120mins 180mins 240mins 0 – 6 80 x 60 x 3 80 x 60 x 3 80 x 60 x 3 80 x 60 x 3 80 x 60 x 3 6 – 9 80 x 60 x 3 80 x 60 x 3 150 x 60 x 3 150 x 60 x 3 150 x 60 x 3 9 – 12 150 x 60 x 3 150 x 60 x 3 150 x 60 x 3 150 x 60 x 3 150 x 60 x 3 12 – 15 150 x 60 x 3 175 x 60 x 3 175 x 60 x 3 175 x 60 x 3 2 no. 150 x 60 x 3 back to back
Insulated Partitions
Board confi guration either side of steel channel Fire resistance Thickness of Thickness of – minutes PROMATECT® -250 (mm) DURASTEEL® (mm) E240, El60 12 6 E240, El90 12 9.5 E240, El120 15 9.5 E240, El180 20 9.5 E240, El 240 25 9.5
PAINTING AND DECORATINGPromat DURASTEEL® is self-fi nished
in either galvanised or stainless
steel and requires no decoration.
If decoration is required, Promat
DURASTEEL® should be de-greased
with a solvent based cleaning agent
before any form of decoration is
applied. Seek paint manufacturers
recommendations.
MAINTENANCE AND CLEANINGPanels do not normally require any
maintenance in use. If panels are
damaged they should be replaced
rather than repaired in order to
ensure fi re performance
is maintained.
SPECIFICATION DETAILSThe following pages details the specifi cations for the range of standard barriers, composite
barriers and suspended ceilings offered. If you require advice on bespoke systems please
contact Technical Services on 01344 381400.
Promat DURASTEEL® COMPOSITE BARRIER SYSTEMS SPECIFICATION DETAILS
For Standard barriers specifi cation details see pages 18-19.
*Fillets must overlap the channels by at least 20mm on both sides. For Composite barriers specifi cation details see
pages 25-27.
See pages 20-24 for suspended
ceiling specifi cations. For self
supporting ceilings please refer to
the Promat Technical department
on 01344 381400.
PROMAT DURASTEEL® SUSPENDED CEILING SPECIFICATION DETAILS
CF418 – Doorsets
CF424 – Partitions and Ceilings
CF480 – Ductwork
CF607 – Composite Barriers
16
CF418 D
Durasteel Brochure.indd 16Durasteel Brochure.indd 16 28/10/08 15:33:2828/10/08 15:33:28
Promat DURASTEEL® High Performance Systems
240 MINUTE DURASTEEL® PROTECTED ZONE (E 240 - EI 15)
If a fi re breaks out near the area where a compartment wall meets a roof, there is a risk
that it will spread over the roof to the adjoining compartment. To reduce the risk, Approved
Document B requires protection to be installed to a protected zone of the roof 1500mm either
side of the compartment wall. However, for more onerous circumstances, the FPA Design
Guide suggests a minimum of 2500mm, or up to 5000mm dependent upon the orientation of
the ridge and the presence of a sprinkler system.
A DURASTEEL® protected zone detail is required for instances where a DURASTEEL®
fi re barrier (acting as a compartment wall) abuts a roof system. Please contact Promat UK
Technical Services department for further information.
17
Durasteel Brochure.indd 17Durasteel Brochure.indd 17 28/10/08 15:33:2928/10/08 15:33:29
Promat DURASTEEL® High Performance Systems
DURASTEEL® Fire Barrier E 240 Integrity only (formerly STI 240)Fire resistance: 240 minutes integrity only. (Fire attack from either face)
(formerly referred to as the STI 240 system)
Channel (minimum): 80mm x 60mm x 3mm (for heights up to 6m)
Overall width: 89.5mm
Weight (nominal): 27kg/m2
Estimated sound reduction: 33dB
Perimeter channels fastened to surrounding construction with M10 or M12
all-steel expanding anchors (or equivalent for alternative types of supporting
construction) at 500mm maximum centres.
The vertical channels are set at a maximum 1200mm centres. Horizontal and
vertical channel members either welded together or joined with steel angle cleats,
minimum 60mm x 60mm x 3mm thick x 60mm long, fastened to each channel
member with two M10 steel bolts and nuts.
A single layer of 9.5mm DURASTEEL® fi xed on one side of channel with M5.5 steel
self drill and tap Tek screws at 250mm nominal centres. Fixings a minimum of
12mm from edge of sheet and a maximum of 50mm from corners. Length of fi xing
to be suffi cient to ensure appropriate penetration of screw thread in accordance
with screw manufacturer’s recommendations.
Vertical board joints coincide with studs, horizontal board joints are backed by
steel channel the same size as the vertical studs.
Expansion allowance will be required for barriers above 4 metres high. Please
contact Promat UK Technical department for further information.
DURASTEEL® Fire Barrier E 240 – EI 60 (formerly STI 240/60)Fire resistance: 240 minutes integrity - 60 minutes insulation.
(Fire attack from either face)
(formally referred to as the STI 240/60 System)
Channel (minimum): 80mm x 60mm x 3mm (for heights up to 6m)
Overall width: 118mm
Weight (nominal): 51kg/m2
Estimated sound reduction: 42dB
Perimeter channels fastened to surrounding construction with M10 or M12
all-steel expanding anchors (or equivalent for alternative types of supporting
construction) at 500mm maximum centres.
The vertical channels are set at a maximum 1200mm centres. Horizontal and
vertical channel members either welded together or joined with steel angle cleats,
minimum 60mm x 60mm x 3mm thick x 60mm long, fastened to each channel
member with two M10 steel bolts and nuts.
9.5mm DURASTEEL® fi llet fi xed on both sides of channel. Fillet strips to overlap channel by
minimum of 20mm on both sides.
9.5mm DURASTEEL® sheets fi xed through fi llet on both sides of the channel with M5.5
steel self drill and tap Tek screws at 250mm nominal centres. Fixings a minimum of
12mm from edge of sheet and a maximum of 50mm from corners. Length of fi xing to be
suffi cient to ensure appropriate penetration of screw thread in accordance with screw
manufacturer’s recommendations.
Vertical board joints coincide with studs, horizontal board joints are backed by steel channel
the same size as the vertical studs. Expansion allowance will be required for barriers above
4 metres high. Please contact Promat UK Technical department for further information.
Back to back channels fastened together with M10 steel bolts and nuts at 500mm maximum centres. The vertical joints in the DURASTEEL® should be offset by 30mm from
the centreline of the back-to-back studs, to avoid a straight through path for hot gases. Horizontal channels are single channels.
Back to back channels fastened together with M10 steel bolts and nuts at 500mm
maximum centres. The vertical joints in the DURASTEEL® should be offset by 30mm
from the centreline of the back-to-back studs, to avoid a straight through path for hot
gases. Horizontal channels are single channels.
Steel channel sizes for barrier heights up to 15 metres
Height of Channel size Estimated Sound
Barrier (m) (mm x mm x mm) Insulation Rw (dB)
0 – 6 80 x 60 x 3 33
6 – 9 150 x 60 x3 33
9 – 12
Two 150 x 60 x 3 33
back to back
12 – 15
Two 175 x 60 x 3 33
back to back
DURASTEEL® FIRE BARRIER SPECIFICATIONS
Steel channel sizes for barrier heights up to 15 metres
Height of Channel size Durateel fi llets Rock wool Estimated Sound
Barrier (m) (mm x mm x mm) per face infi ll Insulation Rw (dB)
0 – 6 80 x 60 x 3 1 None 42
6 – 9 150 x 60 x3 1 None 42
9 – 12 Two 150 x 60 x 3 back to back 1 None 42
12 – 15 Two 200 x 60 x 3 back to back 1 None 42
18
Durasteel Brochure.indd 18Durasteel Brochure.indd 18 28/10/08 15:33:3028/10/08 15:33:30
Promat DURASTEEL® High Performance Systems
DURASTEEL® FIRE BARRIER SPECIFICATIONS
DURASTEEL® Fire Barrier E 240 – EI 120 (formerly STI 240/120)Fire resistance: 240 minutes integrity - 120 minutes insulation.
(Fire attack from either face) (formally referred to as the STI 240/120 System)
Channel (minimum): 80mm x 60mm x 3mm (for heights up to 6m)
Overall width: 118mm
Weight (nominal): 62kg/m2
Estimated sound reduction: 47dB
Perimeter channels fastened to surrounding construction with M10 or M12
all-steel expanding anchors (or equivalent for alternative types of supporting
construction) at 500mm maximum centres.
The vertical channels are set at a maximum 1200mm centres. Horizontal and
vertical channel members either welded together or joined with steel angle cleats,
minimum 60mm x 60mm x 3mm thick x 60mm long, fastened to each channel
member with two M10 steel bolts and nuts.
9.5mm DURASTEEL® fi llet strips fi xed on both sides of channel, number of fi llet
strips according to requirements in Table below. Fillet strips to overlap channel
DURASTEEL® Fire Barrier EI 240 (formerly STI 240/240)Fire resistance: 240 minutes integrity - 240 minutes insulation. (Fire attack from either face) (formally referred to as the STI 240/240 System)Channel (minimum): 80 x 60 x 3 (for heights up to 6m)Overall width: 137mmWeight (nominal): 72kg/m2
Estimated sound reduction: 50dB
Perimeter channels fastened to surrounding construction with M10 or M12 all-steel expanding anchors (or equivalent for alternative types of supporting construction) at 500mm maximum centres.
The vertical channels are set at a maximum 1200mm centres. Horizontal and vertical channel members either welded together or joined with steel angle cleats, minimum 60mm x 60mm x 3mm thick x 60mm long, fastened to each channel member with two M10 steel bolts and nuts.
9.5mm DURASTEEL® fi llets fi xed on both sides of channel, number of fi llet strips according to requirements in Table below. Fillet strips to overlap channel by
minimum of 20mm on both sides.
by minimum of 20mm on both sides. 9.5mm DURASTEEL® sheets fi xed through the fi llet
on both sides of channel, with M5.5 steel self drill and tap Tek screws at 250mm nominal
centres. Fixings a minimum of 12mm from edge of sheet and a maximum of 50mm from
corners. The length of fi xing to be suffi cient to ensure appropriate penetration of screw
thread, in accordance with manufacturer’s recommendations. Vertical board joints coincide
with studs, horizontal board joints are backed by steel channel the same size as the vertical
studs. Rock wool infi ll, according to the table below, is fi tted into the channels. The layers
are staggered by a minimum of 150mm.
If the rock wool does not fi ll the cavity, it must be fastened into position with 2.5mm-
diameter steel stud-welded pins and 38mm-diameter spring steel washers. The pins are
positioned in a grid 400mm x 400mm maximum. Expansion allowance will be required for
barriers above 4 metres high. Please contact Promat UK Technical department for
further information.
9.5mm DURASTEEL® sheets fi xed through the fi llet on both sides of channel, using M5.5 steel
self drill and tap Tek screws at 250mm nominal centres. Fixings a minimum of 12mm from edge
of sheet and a maximum of 50mm from corners. The length of fi xing to be suffi cient to ensure
appropriate penetration of screw thread, in accordance with manufacturer’s recommendations.
Vertical board joints coincide with studs, horizontal board joints are backed by steel
channel the same size as the vertical studs.
Rock wool infi ll, according to the table below, is fi tted into the channels. The layers are
staggered by a minimum of 150mm. If the rock wool does not fi ll the cavity, it must be
fastened into position with 2.5mm-diameter steel stud-welded pins and 38mm-diameter
spring steel washers. The pins are positioned in a grid 400mm x 400mm maximum.
Expansion allowance will be required or barriers above 4 metres high. Please contact
Promat UK Technical department for further information.
Back to back channels fastened together with M10 steel bolts and nuts at 500mm maximum centres. The vertical joints in the DURASTEEL® should be offset by 30mm from
the centreline of the back-to-back studs, to avoid a straight through path for hot gases. Horizontal channels are single channels.
Back to back channels fastened together with M10 steel bolts and nuts at 500mm maximum centres. The vertical joints in the DURASTEEL® should be offset by 30mm from
the centreline of the back-to-back studs, to avoid a straight through path for hot gases. Horizontal channels are single channels.
Steel channel sizes for barrier heights up to 15 metres
Height of Channel size Durateel fi llets Rock wool Estimated Sound
Barrier (m) (mm x mm x mm) per face infi ll Insulation Rw (dB)
0 – 6 80 x 60 x 3 1 2 x 40mm x 140kg/m3 47
6 – 9 150 x 60 x3 None 3 x 50mm x 80kg/m3 51
9 – 12 Two 150 x 60 x 3 back to back None 3 x 50mm x 80kg/m3 51
12 – 15 Two 200 x 60 x 3 back to back None 4 x 50mm x 60kg/m3 53
Steel channel sizes for barrier heights up to 15 metres
Height of Channel size Durateel fi llets Rock wool Estimated Sound
Barrier (m) (mm x mm x mm) per face infi ll Insulation Rw (dB)
0 – 6 80 x 60 x 3 2 3 x 40mm x 140kg/m3 50
6 – 9 150 x 60 x3 2 3 x 50mm x 100kg/m3 55
9 – 12 Two 150 x 60 x 3 back to back 2 3 x 50mm x 100kg/m3 55
12 – 15 Two 200 x 60 x 3 back to back 1 4 x 50mm x 80kg/m3 56
19
Durasteel Brochure.indd 19Durasteel Brochure.indd 19 28/10/08 15:33:3128/10/08 15:33:31
Promat DURASTEEL® High Performance Systems
DURASTEEL® SUSPENDED CEILING MEMBRANE
(E 240 - Integrity Only) Fire from above or belowFire resistance: 240 minutes integrity only. (Fire attack from above or below)
Channel (minimum): 80mm x 60mm x 3mm
Overall depth: 89.5mm
Weight (nominal): 27kg/m2
Perimeter channels of ceiling membrane fastened to surrounding construction
with M10 or M12 allsteel expanding anchors (or equivalent for alternative types of
supporting construction) at 500mm maximum centres.
Primary channels at 1200mm maximum centres, supported from building structure
above the ceiling membrane with steel drop rods at 1.5m centres. Threaded rods pass
through clearance holes in the upper fl ange of the channels and are fastened with steel
hexagon full nuts.
Diameter of drop rods such that the tensile stress within the rods does not exceed
6N/mm2 for fi re ratings up to 240 minutes. (This may be increased to 10N/mm2 if only
a 120 minutes fi re rating is required).
9.5mm DURASTEEL® boards fastened to lower fl ange of steel channels with M5.5
steel self-drill and tap Tek screws at 200mm nominal centres. Fixings a minimum of
12mm from edge of sheet and a maximum of 50mm from corners. Length of fi xing
to be suffi cient to ensure appropriate penetration of screw thread in accordance with
screw manufacturer’s recommendations.
Longitudinal board joints coincide with primary channels, transverse board joints
backed by steel channel the same size as the primary channels. Longitudinal and
transverse channel members are either welded together or joined with steel angle
cleats, minimum 60mm x 60mm x 3mm thick x 60mm long, fastened to each channel
member with two M10 steel bolts and nuts.
Where an expansion allowance is provided within the primary channels, steel jointing
channels, minimum 50mm fl anges x 3mm thick, are fastened to the primary channels
with M10 steel bolts and nuts. The width of the jointing channel (web dimensions)
should be such that it is a close fi t within the primary channels.
On one side of the expansion gap the primary and jointing channels are connected
with minimum two M10 bolts. On the opposite side the channels are connected,
through slotted holes, with minimum two M10 bolts fi tted with fusible washers.
For fi re attack from below, an expansion allowance of at least 6mm per metre is
required for primary channels longer than 4m.
For fi re attack from above, an expansion allowance of at least 6mm per metre is
required for all sizes of ceiling.
As drop rods support the ceiling, the length and width of ceiling membrane
is unrestricted.
DURASTEEL® SUSPENDED CEILING MEMBRANE
(E 240 – EI 120) Fire from belowFire resistance: 240 minutes integrity – 120 minutes insulation.
(Fire attack from below)
Channel (minimum): 80mm x 60mm x 3mm
Overall depth: 108.5mm
Weight (nominal): 42kg/m2
Perimeter channels of ceiling membrane fastened to surrounding construction
with M10 or M12 all steel expanding anchors (or equivalent for alternative types of
supporting construction) at 500mm maximum centres.
Primary channels at 1200mm maximum centres, supported from building structure
above the ceiling membrane with steel drop rods at 1.5m centres. Threaded rods pass
through clearance holes in the upper fl ange of the channels and are fastened with steel
hexagon full nuts.
Diameter of drop rods such that the tensile stress within the rods does not exceed
6N/mm2 for fi re ratings up to 240 minutes. (This may be increased to 10N/mm2 if only
a 120 minutes fi re rating is required).
9.5mm DURASTEEL® fi llet strips fi tted over the upper and lower faces of the channel
members. Fillets must overlap the channels by at least 20mm on both sides.
9.5mm DURASTEEL® boards fastened (through fi llet strips) to lower fl ange of steel
channels with M5.5 steel self-drill and tap Tek screws at 200mm nominal centres.
Fixings a minimum of 12mm from edge of sheet and a maximum of 50mm from
corners. Length of fi xing to be suffi cient to ensure appropriate penetration of screw
thread in accordance with screw manufacturer’s recommendations.
Longitudinal board joints coincide with primary channels, transverse board joints
backed by steel channel the same size as the primary channels.
Longitudinal and transverse channel members are either welded together or joined
with steel angle cleats, minimum 60mm x 60mm x 3mm thick x 60mm long, fastened
to each channel member with two M10 steel bolts and nuts.
Rock wool insulation 80mm x 140 kg/m3 nominal density, fi tted over the soffi t layer of
DURASTEEL® by fi lling the channels. Joints in layers of rock wool overlap by at least 150mm.
Where an expansion allowance is provided within the primary channels, steel jointing
channels, minimum 50mm fl anges x 3mm thick, are fastened to the primary channels
with M10 steel bolts and nuts. The width of the jointing channel (web dimensions)
should be such that it is a close fi t within the primary channels.
On one side of the expansion gap the primary and jointing channels are connected
with minimum two M10 bolts. On the opposite side the channels are connected,
through slotted holes, with minimum two M10 bolts fi tted with fusible washers.
For fi re attack from below, an expansion allowance of at least 6mm per metre is
required for primary channels longer than 4m.
As drop rods support the ceiling, the length and width of ceiling membrane is unrestricted.
DURASTEEL® CEILING SPECIFICATIONS
20
Durasteel Brochure.indd 20Durasteel Brochure.indd 20 28/10/08 15:33:3128/10/08 15:33:31
Promat DURASTEEL® High Performance Systems
DURASTEEL® SUSPENDED CEILING MEMBRANE
(EI 120) Fire from above or belowFire resistance: 120 minutes integrity and insulation (Fire from above or below)
Channel (minimum): 80mm x 60mm x 3mm
Overall depth: 166mm
Weight (nominal): 34kg/m2
Perimeter channels of ceiling membrane fastened to surrounding construction
with M10 or M12 all steel expanding anchors (or equivalent for alternative types of
supporting construction) at 500mm maximum centres.
Primary channels at 1200mm maximum centres, supported from building structure
above the ceiling membrane with steel drop rods at 1.5m centres. Threaded rods pass
through clearance holes in the upper fl ange of the channels and are fastened with steel
hexagon full nuts.
Diameter of drop rods such that the tensile stress within the rods does not
exceed 10N/mm2.
6 mm DURASTEEL® boards fastened to lower fl ange of steel channels with M5.5 steel
self-drill and tap Tek screws at 200mm nominal centres. Fixings a minimum of 12mm
from edge of sheet and a maximum of 50mm from corners. Length of fi xing to be
suffi cient to ensure appropriate penetration of screw thread in accordance with screw
manufacturer’s recommendations. Longitudinal board joints coincide with primary
channels, transverse board joints backed by steel channel the same size as the
primary channels.
Longitudinal and transverse channel members are either welded together or joined
with steel angle cleats, minimum 60mm x 60mm x 3mm thick x 60mm long, fastened
to each channel member with two M10 steel bolts and nuts.
Rock wool insulation 80mm x 140 kg/m3 nominal density, laid over the steel channels.
Joints in layers of rock wool overlap by at least 150mm.
Where an expansion allowance is provided within the primary channels, steel jointing
channels, minimum 50mm fl anges x 3mm thick, are fastened to the primary channels
with M10 steel bolts and nuts. The width of the jointing channel (web dimensions)
should be such that it is a close fi t within the primary channels.
On one side of the expansion gap the primary and jointing channels are connected
with minimum two M10 bolts. On the opposite side the channels are connected,
through slotted holes, with minimum two M10 bolts fi tted with fusible washers.
For fi re attack from below, an expansion allowance of at least 6mm per metre is
required for primary channels longer than 4m.
For fi re attack from above, an expansion allowance of at least 6mm per metre is
required for all sizes of ceiling.
As drop rods support the ceiling, the length and width of ceiling membrane
is unrestricted.
DURASTEEL® SUSPENDED CEILING MEMBRANE
(E 240 – EI 120) Fire from above or below (Method 1)Fire resistance: 240 minutes integrity – 120 minutes insulation (Fire from above or below)
Channel (minimum): 80mm x 60mm x 3mm
Overall depth: 169.5mm
Weight (nominal): 38kg/m2
Perimeter channels of ceiling membrane fastened to surrounding construction
with M10 or M12 all steel expanding anchors (or equivalent for alternative types of
supporting construction) at 500mm maximum centres.
Primary channels at 1200mm maximum centres, supported from building structure
above the ceiling membrane with steel drop rods at 1.5m centres. Threaded rods pass
through clearance holes in the upper fl ange of the channels and are fastened with steel
hexagon full nuts.
Diameter of drop rods such that the tensile stress within the rods does not exceed
6N/mm2 for fi re ratings up to 240 minutes. (This may be increased to 10N/mm2 if only
a 120 minutes fi re rating is required).
9.5 mm DURASTEEL® boards fastened to lower fl ange of steel channels with M5.5
steel self drill and tap Tek screws at 200mm nominal centres. Fixings a minimum of
12mm from edge of sheet and a maximum of 50mm from corners. Length of fi xing
to be suffi cient to ensure appropriate penetration of screw thread in accordance with
screw manufacturer’s recommendations.
Longitudinal board joints coincide with primary channels, transverse board joints
backed by steel channel the same size as the primary channels.
Longitudinal and transverse channel members are either welded together or joined
with steel angle cleats, minimum 60mm x 60mm x 3mm thick x 60mm long, fastened
to each channel member with two M10 steel bolts and nuts.
Rock wool insulation 80mm x 140 kg/m3 nominal density, laid over the steel channels.
Joints in layers of rock wool overlap by at least 150mm.
Where an expansion allowance is provided within the primary channels, steel jointing
channels, minimum 50mm fl anges x 3mm thick, are fastened to the primary channels
with M10 steel bolts and nuts. The width of the jointing channel (web dimensions)
should be such that it is a close fi t within the primary channels.
On one side of the expansion gap the primary and jointing channels are connected
with minimum two M10 bolts. On the opposite side the channels are connected,
through slotted holes, with minimum two M10 bolts fi tted with fusible washers.
For fi re attack from below, an expansion allowance of at least 6mm per metre is
required for primary channels longer than 4m.
For fi re attack from above, an expansion allowance of at least 6mm per metre is
required for all sizes of ceiling.
As drop rods support the ceiling, the length and width of ceiling membrane
is unrestricted.
DURASTEEL® CEILING SPECIFICATIONS
21
Durasteel Brochure.indd 21Durasteel Brochure.indd 21 28/10/08 15:33:3128/10/08 15:33:31
Promat DURASTEEL® High Performance Systems
22
DURASTEEL® SUSPENDED CEILING MEMBRANE
(E 240 – EI 120) Fire from above or below (Method 2)Fire resistance: 240 minutes integrity – 120 minutes insulation
(Fire from above or below)
Channel (minimum): 60mm x 150mm x 60mm x 3mm
Overall depth: 169mm
Weight (nominal): 61kg/m2
Perimeter channels of ceiling membrane fastened to surrounding construction
with M10 or M12 allsteel expanding anchors (or equivalent for alternative types of
supporting construction) at 500mm maximum centres.
Primary channels at 1200mm maximum centres, supported from building structure
above the ceiling membrane with steel drop rods at 1.5m centres. Threaded rods pass
through clearance holes in the upper fl ange of the channels and are fastened with steel
hexagon full nuts.
Diameter of drop rods such that the tensile stress within the rods does not exceed
6N/mm2 for fi re ratings up to 240 minutes. (This may be increased to 10N/mm2 if only
a 120 minutes fi re rating is required).
9.5 mm DURASTEEL® boards fastened to upper and lower fl ange of steel channels
with M5.5 steel self drill and tap Tek screws at 200mm nominal centres. Fixings
a minimum of 12mm from edge of sheet and a maximum of 50mm from corners.
Length of fi xing to be suffi cient to ensure appropriate penetration of screw thread in
accordance with screw manufacturer’s recommendations.
Longitudinal board joints coincide with primary channels, transverse board joints
backed by steel channel the same size as the primary channels.
Longitudinal and transverse channel members are either welded together or joined
with steel angle cleats, minimum 60mm x 60mm x 3mm thick x 60mm long, fastened
to each channel member with two M10 steel bolts and nuts.
Rock wool insulation 80mm x 140 kg/m3 nominal density, fi tted over the soffi t layer of
DURASTEEL® by fi lling the steel channels. Joints in layers of rock wool overlap by at least
150mm.
Where an expansion allowance is provided within the primary channels, steel jointing
channels, minimum 50mm fl anges x 3mm thick, are fastened to the primary channels
with M10 steel bolts and nuts. The width of the jointing channel (web dimensions)
should be such that it is a close fi t within the primary channels.
On one side of the expansion gap the primary and jointing channels are connected
with minimum two M10 bolts. On the opposite side the channels are connected,
through slotted holes, with minimum two M10 bolts fi tted with fusible washers.
For fi re attack from below, an expansion allowance of at least 6mm per metre is
required for primary channels longer than 4m. For fi re attack from above, an expansion
allowance of at least 6mm per metre is required for all sizes of ceiling.
As drop rods support the ceiling, the length and width of ceiling membrane
is unrestricted.
DURASTEEL® SUSPENDED CEILING MEMBRANE
(EI 240) Fire from belowFire resistance: 240 minutes integrity & insulation. (Fire attack from below)
Channel (minimum): 60mm x 150mm x 60mm x 3mm
Overall depth: 178.5mm
Weight (nominal): 54kg/m2
Perimeter channels of ceiling membrane fastened to surrounding construction
with M10 or M12 all steel expanding anchors (or equivalent for alternative types of
supporting construction) at 500mm maximum centres.
Primary channels at 1200mm maximum centres, supported from building structure
above the ceiling membrane with steel drop rods at 1.5m centres. Threaded rods pass
through clearance holes in the upper fl ange of the channels and are fastened with steel
hexagon full nuts.
Diameter of drop rods such that the tensile stress within the rods does not exceed
6N/mm2 for fi re ratings up to 240 minutes.
9.5mm DURASTEEL® fi llet strips fi tted over the upper and lower faces of the channel
members. Fillet must overlap the channels by at least 20mm on both sides.
9.5mm DURASTEEL® boards fastened (through fi llet strips) to lower fl ange of steel
channels with M5.5 steel self-drill and tap Tek screws at 200mm nominal centres.
Fixings a minimum of 12mm from edge of sheet and a maximum of 50mm from
corners. Length of fi xing to be suffi cient to ensure appropriate penetration of screw
thread in accordance with screw manufacturer’s recommendations.
Longitudinal board joints coincide with primary channels, transverse board joints
backed by steel channel the same size as the primary channels.
Longitudinal and transverse channel members are either welded together or joined
with steel angle cleats, minimum 60mm x 60mm x 3mm thick x 60mm long, fastened
to each channel member with two M10 steel bolts and nuts.
Rock wool insulation 150mm x 140 kg/m3 nominal density, fi tted over the soffi t layer of
DURASTEEL® by fi lling the channels. Joints in layers of rock wool overlap by at least 150mm.
Where an expansion allowance is provided within the primary channels, steel jointing
channels, minimum 50mm fl anges x 3mm thick, are fastened to the primary channels
with M10 steel bolts and nuts. The width of the jointing channel (web dimensions)
should be such that it is a close fi t within the primary channels.
On one side of the expansion gap the primary and jointing channels are connected
with minimum two M10 bolts. On the opposite side the channels are connected,
through slotted holes, with minimum two M10 bolts fi tted with fusible washers.
For fi re attack from below, an expansion allowance of at least 6mm per metre is
required for primary channels longer than 4m.
As drop rods support the ceiling, the length and width of ceiling membrane
is unrestricted.
DURASTEEL® CEILING SPECIFICATIONS
Durasteel Brochure.indd 22Durasteel Brochure.indd 22 28/10/08 15:33:3228/10/08 15:33:32
Promat DURASTEEL® High Performance Systems
23
DURASTEEL® SUSPENDED CEILING MEMBRANE
(EI 240) Fire from above or below (Method 1)Fire resistance: 240 minutes integrity & insulation. (Fire attack from above or below)
Channel (minimum): 80mm x 60mm x 3mm
Overall depth: 151mm
Weight (nominal): 55kg/m2
Perimeter channels of ceiling membrane fastened to surrounding construction
with M10 or M12 allsteel expanding anchors (or equivalent for alternative types of
supporting construction) at 500mm maximum centres.
Primary channels at 1200mm maximum centres, supported from building structure
above the ceiling membrane with steel drop rods at 1.5m centres. Threaded rods pass
through clearance holes in the upper fl ange of the channels and are fastened with steel
hexagon full nuts.
Diameter of drop rods such that the tensile stress within the rods does not exceed
6N/mm2 for fi re ratings up to 240 minutes.
9.5mm DURASTEEL® boards fastened to lower fl ange of steel channels with M5.5
steel self-drill and tap Tek screws at 200mm nominal centres. Fixings a minimum of
12mm from edge of sheet and a maximum of 50mm from corners. Length of fi xing
to be suffi cient to ensure appropriate penetration of screw thread in accordance with
screw manufacturer’s recommendations.
Longitudinal board joints coincide with primary channels, transverse board joints
backed by steel channel the same size as the primary channels.
Longitudinal and transverse channel members are either welded together or joined
with steel angle cleats, minimum 60mm x 60mm x 3mm thick x 60mm long, fastened
to each channel member with two M10 steel bolts and nuts.
Rock wool insulation, total of 120mm x 140 kg/m3 nominal density fi tted with 2 x
60mm thick layers, one layer fi tted over the DURASTEEL® soffi t layer by fi lling the
channels and the second layer fi tted over channels. Joints in layers of rock wool
overlap by at least 150mm.
A layer of 1.5mm thick steel sheet is laid on top of the upper layer of rock wool.
Where an expansion allowance is provided within the primary channels, steel jointing
channels, minimum 50mm fl anges x 3mm thick, are fastened to the primary channels
with M10 steel bolts and nuts. The width of the jointing channel (web dimensions)
should be such that it is a close fi t within the primary channels.
On one side of the expansion gap the primary and jointing channels are connected
with minimum two M10 bolts. On the opposite side the channels are connected,
through slotted holes, with minimum two M10 bolts fi tted with fusible washers.
For fi re attack from below, an expansion allowance of at least 6mm per metre is
required for primary channels longer than 4m.
For fi re attack from above, an expansion allowance of at least 6mm per metre is
required for all sizes of ceiling.
As drop rods support the ceiling, the length and width of ceiling membrane
is unrestricted.
DURASTEEL® SUSPENDED CEILING MEMBRANE
(EI 240) Fire from above or below (Method 2)Fire resistance: 240 minutes integrity & insulation. (Fire attack from above or below)
Channel (minimum): 60mm x 150mm x 60mm x 3mm
Overall depth: 188mm
Weight (nominal): 75kg/m2
Perimeter channels of ceiling membrane fastened to surrounding construction
with M10 or M12 all steel expanding anchors (or equivalent for alternative types of
supporting construction) at 500mm maximum centres.
Primary channels at 1200mm maximum centres, supported from building structure
above the ceiling membrane with steel drop rods at 1.5m centres. Threaded rods pass
through clearance holes in the upper fl ange of the channels and are fastened with steel
hexagon full nuts.
Diameter of drop rods such that the tensile stress within the rods does not exceed
6N/mm2 for fi re ratings up to 240 minutes.
9.5mm DURASTEEL® fi llet strips fi tted over the upper and lower faces of the channel
members. Fillets must overlap the channels by at least 20mm on both sides.
9.5mm DURASTEEL® boards fastened (through fi llet strips) to upper and lower fl ange
of steel channels with M5.5 steel self-drill and tap Tek screws at 200mm nominal
centres. Fixings a minimum of 12mm from edge of sheet and a maximum of 50mm
from corners. Length of fi xing to be suffi cient to ensure appropriate penetration of
screw thread in accordance with screw manufacturer’s recommendations.
Longitudinal board joints coincide with primary channels, transverse board joints
backed by steel channel the same size as the primary channels.
Longitudinal and transverse channel members are either welded together or joined
with steel angle cleats, minimum 60mm x 60mm x 3mm thick x 60mm long, fastened
to each channel member with two M10 steel bolts and nuts.
Rock wool insulation 150mm x 140 kg/m3 nominal density, fi tted over the soffi t layer of
DURASTEEL® by fi lling the channels. Joints in layers of rock wool overlap by at least 150mm.
Where an expansion allowance is provided within the primary channels, steel jointing
channels, minimum 50mm fl anges x 3mm thick, are fastened to the primary channels
with M10 steel bolts and nuts. The width of the jointing channel (web dimensions)
should be such that it is a close fi t within the primary channels.
On one side of the expansion gap the primary and jointing channels are connected
with minimum two M10 bolts. On the opposite side the channels are connected,
through slotted holes, with minimum two M10 bolts fi tted with fusible washers.
For fi re attack from below, an expansion allowance of at least 6mm per metre is
required for primary channels longer than 4m.
For fi re attack from above, an expansion allowance of at least 6mm per metre is
required for all sizes of ceiling.
As drop rods support the ceiling, the length and width of ceiling membrane
is unrestricted.
DURASTEEL® CEILING SPECIFICATIONS
Durasteel Brochure.indd 23Durasteel Brochure.indd 23 28/10/08 15:33:3228/10/08 15:33:32
Promat DURASTEEL® High Performance Systems
DURASTEEL® SUSPENDED CEILING MEMBRANE
(EI 240) Fire from above and below (Method 3)Fire resistance: 240 minutes integrity & insulation. (Fire attack from above or below)
Channel (minimum): 80mm x 60mm x 3mm
Overall depth: 137mm
Weight (nominal): 73kg/m2
Perimeter channels of ceiling membrane fastened to surrounding construction
with M10 or M12 all steel expanding anchors (or equivalent for alternative types of
supporting construction) at 500mm maximum centres.
Primary channels at 1200mm maximum centres, supported from building structure
above the ceiling membrane with steel drop rods at 1.5m centres. Threaded rods pass
through clearance holes in the upper fl ange of the channels and are fastened with steel
hexagon full nuts.
Diameter of drop rods such that the tensile stress within the rods does not exceed
6N/mm2 for fi re ratings up to 240 minutes.
2 x 9.5mm DURASTEEL® fi llet strips fi tted over the upper and lower faces of the
channel members. Fillets must overlap the channels by at least 20mm on both sides.
9.5mm DURASTEEL® boards fastened (through the fi llet strips) to upper and lower
fl anges of steel channels with M5.5 steel self drill and tap Tek screws at 200mm
nominal centres. Fixings a minimum of 12mm from edge of sheet and a maximum of
50mm from corners. Length of fi xing to be suffi cient to ensure appropriate penetration
of screw thread in accordance with screw manufacturer’s recommendations.
Longitudinal board joints coincide with primary channels, transverse board joints
backed by steel channel the same size as the primary channels.
Longitudinal and transverse channel members are either welded together or joined
with steel angle cleats, minimum 60mm x 60mm x 3mm thick x 60mm long, fastened
to each channel member with two M10 steel bolts and nuts.
Rock wool insulation 120mm x 140 kg/m3 nominal density, fi tted over the soffi t layer of
DURASTEEL® by fi lling the channels. Joints in layers of rock wool overlap by at least 150mm.
Where an expansion allowance is provided within the primary channels, steel jointing
channels, minimum 50mm fl anges x 3mm thick, are fastened to the primary channels
with M10 steel bolts and nuts. The width of the jointing channel (web dimensions)
should be such that it is a close fi t within the primary channels.
On one side of the expansion gap the primary and jointing channels are connected
with minimum two M10 bolts. On the opposite side the channels are connected,
through slotted holes, with minimum two M10 bolts fi tted with fusible washers.
For fi re attack from below, an expansion allowance of at least 6mm per metre is
required for primary channels longer than 4m.
For fi re attack from above, an expansion allowance of at least 6mm per metre is
required for all sizes of ceiling.
As drop rods support the ceiling, the length and width of ceiling membrane
is unrestricted.
DURASTEEL® CEILING SPECIFICATIONS
24
Durasteel Brochure.indd 24Durasteel Brochure.indd 24 28/10/08 15:33:3328/10/08 15:33:33
Promat DURASTEEL® High Performance Systems
DURASTEEL® COMPOSITE BARRIER SYSTEM SPECIFICATIONS
60 minute DURASTEEL® Composite Barrier System (E240 – EI60)Construction
1. Head and base track 80mm x 60mm x 3mm thick steel channel fi xed to fl oor slab and soffi t with M10 or M12 all steel expanding anchors (or equivalent for alternative types of construction) at 500mm maximum centres. Floor slab and soffi t to have minimum of the same level of fi re protection as that required by barrier.
2. Steel channel framework 80mm x 60mm x 3mm channel (1). Vertical channels at maximum 1200 mm centres, Horizontal channels at maximum 2000 mm centres. For partition heights up to 4 metres, horizontal and vertical channel members may be welded together or joined with steel angle cleats, minimum 60mm x 60mm x 3mm thick x 60mm long, fastened to each channel member with two M10 steel bolts and nuts. Above 4 metre height the horizontal and vertical channel members are joined with the angle cleats. Wherever possible, the main vertical channel studs should be formed in one continuous length to avoid the need for splicing.
3. One layer of 12mm thick PROMATECT® -250 (2) fi xed on both sides of the wall using countersunk ribbed timber-fi x Tek screws at 600mm centres. Vertical board joints coincide with studs. Horizontal board joints are fi tted with an internal 100mm wide x 12mm PROMATECT® -250 (4) cover strip, fi xed both sides of the joint with steel drywall screws at 250mm nominal centres.
4. 6mm thick DURASTEEL® sheet (3), fastened to the framework, through the PROMATECT® -250 boards, on both sides of the wall using M5.5 steel self drill and tapping Tek screws at 250mm nominal centres. The length of fi xing to be suffi cient to ensure appropriate penetration of screw thread, in accordance with recommendations from the fi xing manufacturer. Vertical joints coincide with the studs. Horizontal board joints coincide with the horizontal channels or are fi tted with an internal steel cover strip, 100mm wide x 3mm thick, fastened on both sides of the joint with M5.5 steel self drill and tap Tek screws at 250mm nominal centres.
90 minute DURASTEEL® Composite Barrier System (E240 – EI90)Construction
1. Head and base track 80mm x 60mm x 3mm thick steel channel fi xed to fl oor slab
and soffi t with M10 or M12 all steel expanding anchors (or equivalent for alternative
types of construction) at 500mm maximum centres. Floor slab and soffi t to have
minimum of the same level of fi re protection as that required by barrier.
2. Steel channel framework 80mm x 60mm x 3mm channel (1). Vertical channels
at maximum 1200 mm centres, Horizontal channels at maximum 2000 mm
centres. For partition heights up to 4 metres, horizontal and vertical channel
members may be welded together or joined with steel angle cleats, minimum
60mm x 60mm x 3mm thick x 60mm long, fastened to each channel member
with two M10 steel bolts and nuts. Above 4 metre height the horizontal and
vertical channel members are joined with the angle cleats. Wherever possible,
the main vertical channel studs should be formed in one continuous length to
avoid the need for splicing.
3. One layer of 12mm thick PROMATECT® -250 (2) fi xed on both sides of the
wall using countersunk ribbed timber-fi x Tek screws at 600mm centres. Vertical
board joints coincide with studs. Horizontal board joints are fi tted with an
internal 100mm wide x 12mm PROMATECT® -250 (4) cover strip, fi xed both
sides of the joint with steel drywall screws at 250mm nominal centres.
4. 9.5mm thick DURASTEEL® sheet (3), fastened to the framework, through the
PROMATECT® -250 boards, on both sides of the wall using M5.5 steel self drill
and tapping Tek screws at 250mm nominal centres. The length of fi xing to be
suffi cient to ensure appropriate penetration of screw thread, in accordance with
recommendations from the fi xing manufacturer. Vertical joints coincide with the
studs. Horizontal board joints coincide with the horizontal channels or are fi tted
with an internal steel cover strip, 100mm wide x 3mm thick, fastened on both
sides of the joint with M5.5 steel self drill and tap Tek screws at 250mm
nominal centres.
Up to a height of 4m no expansion allowance is required. Above that height an
expansion allowance of at least 6mm per metre height is required. Where an expansion
allowance is provided at the top of a partition, steel channels, minimum 50mm fl anges
x 3mm thick, are fastened to the vertical channels with M10 steel bolts and nuts. The
width of the channel (web dimensions) should be such that it is a close fi t within the
channel studs. At the junction above the expansion gap the channels are connected
with minimum two M10 bolts. At the junction below the expansion gap the channels
are connected, through slotted holes, with minimum two M10 bolts fi tted with fusible
washers. The gap in the DURASTEEL® and PROMATECT® -250 board facing is covered
with a DURASTEEL® and PROMATECT® -250 board cover panel that is fastened to
the steel framework above the gap (through the facing boards) and overlaps the facing
boards below the gap by at least 75mm.
Up to a height of 4m no expansion allowance is required. Above that height an
expansion allowance of at least 6mm per metre height is required. Where an expansion
allowance is provided at the top of a partition, steel channels, minimum 50mm fl anges
x 3mm thick, are fastened to the vertical channels with M10 steel bolts and nuts. The
width of the channel (web dimensions) should be such that it is a close fi t within the
channel studs. At the junction above the expansion gap the channels are connected
with minimum two M10 bolts. At the junction below the expansion gap the channels
are connected, through slotted holes, with minimum two M10 bolts fi tted with fusible
washers. The gap in the DURASTEEL® and PROMATECT® -250 board facing is covered
with a DURASTEEL® and PROMATECT® -250 board cover panel that is fastened to
the steel framework above the gap (through the facing boards) and overlaps the facing
boards below the gap by at least 75mm.
Height of Size of Channel Acoustic Sound
Partition Stud Required Insulation Rw (assessed)
Up to 9m 80mm x 60mm x 3mm thick 42 dB
9m – 15m 150mm x 60mm x 3mm thick 45 dB
Height of Size of Channel Acoustic Sound
Partition Stud Required Insulation Rw (assessed)
Up to 9m 80mm x 60mm x 3mm thick 43 dB
9m – 12m 150mm x 60mm x 3mm thick 45 dB
12m – 15m 175mm x 60mm x 3mm thick 46 dB
1
4 2
3
25
Durasteel Brochure.indd 25Durasteel Brochure.indd 25 28/10/08 15:33:3328/10/08 15:33:33
Promat DURASTEEL® High Performance Systems
DURASTEEL® COMPOSITE BARRIER SYSTEM SPECIFICATIONS
120 minute DURASTEEL® Composite Barrier System (E240 – EI120)Construction
1. Head and base track 80mm x 60mm x 3mm thick steel channel fi xed to fl oor slab and soffi t with M10 or M12 all steel expanding anchors (or equivalent for alternative types of construction) at 500mm maximum centres. Floor slab and soffi t to have minimum of the same level of fi re protection as that required by barrier.
2. Steel channel framework 80mm x 60mm x 3mm channel (1). Vertical channels at maximum 1200 mm centres, Horizontal channels at maximum 2000 mm centres. For partition heights up to 4 metres, horizontal and vertical channel members may be welded together or joined with steel angle cleats, minimum 60mm x 60mm x 3mm thick x 60mm long, fastened to each channel member with two M10 steel bolts and nuts. Above 4 metre height the horizontal and vertical channel members are joined with the angle cleats. Wherever possible, the main vertical channel studs should be formed in one continuous length to avoid the need for splicing.
3. One layer of 15mm thick PROMATECT® -250 (2) fi xed on both sides of the wall using countersunk ribbed timber-fi x Tek screws at 600mm centres. Vertical board joints coincide with studs. Horizontal board joints are fi tted with an internal 100mm wide x 15mm PROMATECT® -250 (4) cover strip, fi xed both sides of the joint with steel drywall screws at 250mm nominal centres.
4. 9.5mm thick DURASTEEL® sheet (3), fastened to the framework, through the PROMATECT® -250 boards, on both sides of the wall using M5.5 steel self drill and tapping Tek screws at 250mm nominal centres. The length of fi xing to be suffi cient to ensure appropriate penetration of screw thread, in accordance with recommendations from the fi xing manufacturer. Vertical joints coincide with the studs. Horizontal board joints coincide with the horizontal channels or are fi tted with an internal steel cover strip, 100mm wide x 3mm thick, fastened on both sides of the joint with M5.5 steel self drill and tap Tek screws at 250mm nominal centres.
180 minute DURASTEEL® Composite Barrier System (E240 – EI180)Construction
1. Head and base track 80mm x 60mm x 3mm thick steel channel fi xed to fl oor slab
and soffi t with M10 or M12 all steel expanding anchors (or equivalent for alternative types of construction) at 500mm maximum centres. Floor slab and soffi t to have minimum of the same level of fi re protection as that required by barrier.
2. Steel channel framework 80mm x 60mm x 3mm channel (1). Vertical channels at maximum 1200 mm centres, Horizontal channels at maximum 2000 mm centres. For partition heights up to 4 metres, horizontal and vertical channel members may be welded together or joined with steel angle cleats, minimum 60mm x 60mm x 3mm thick x 60mm long, fastened to each channel member with two M10 steel bolts and nuts. Above 4 metre height the horizontal and vertical channel members are joined with the angle cleats. Wherever possible, the main vertical channel studs should be formed in one continuous length to avoid the need for splicing.
3. One layer of 20mm thick PROMATECT® -250 (2) fi xed on both sides of the wall using countersunk ribbed timber-fi x Tek screws at 600mm centres. Vertical board joints coincide with studs. Horizontal board joints are fi tted with an internal 100mm wide x 20mm PROMATECT® -250 (4) cover strip, fi xed both sides of the joint with steel drywall screws at 250mm nominal centres.
4. 9.5mm thick DURASTEEL® sheet (3), fastened to the framework, through the PROMATECT® -250 boards, on both sides of the wall using M5.5 steel self drill and tapping Tek screws at 250mm nominal centres. The length of fi xing to be suffi cient to ensure appropriate penetration of screw thread, in accordance with recommendations from the fi xing manufacturer. Vertical joints coincide with the studs. Horizontal board joints coincide with the horizontal channels or are fi tted with an internal steel cover strip, 100mm wide x 3mm thick, fastened on both sides of the joint with M5.5 steel self drill and tap Tek screws at 250mm nominal centres.
Up to a height of 4m no expansion allowance is required. Above that height an
expansion allowance of at least 6mm per metre height is required. Where an expansion
allowance is provided at the top of a partition, steel channels, minimum 50mm fl anges
x 3mm thick, are fastened to the vertical channels with M10 steel bolts and nuts. The
width of the channel (web dimensions) should be such that it is a close fi t within the
channel studs. At the junction above the expansion gap the channels are connected
with minimum two M10 bolts. At the junction below the expansion gap the channels
are connected, through slotted holes, with minimum two M10 bolts fi tted with fusible
washers. The gap in the DURASTEEL® and PROMATECT® -250 board facing is covered
with a DURASTEEL® and PROMATECT® -250 board cover panel that is fastened to
the steel framework above the gap (through the facing boards) and overlaps the facing
boards below the gap by at least 75mm.
Up to a height of 4m no expansion allowance is required. Above that height an
expansion allowance of at least 6mm per metre height is required. Where an expansion
allowance is provided at the top of a partition, steel channels, minimum 50mm fl anges
x 3mm thick, are fastened to the vertical channels with M10 steel bolts and nuts. The
width of the channel (web dimensions) should be such that it is a close fi t within the
channel studs. At the junction above the expansion gap the channels are connected
with minimum two M10 bolts. At the junction below the expansion gap the channels
are connected, through slotted holes, with minimum two M10 bolts fi tted with fusible
washers. The gap in the DURASTEEL® and PROMATECT® -250 board facing is covered
with a DURASTEEL® and PROMATECT® -250 board cover panel that is fastened to
the steel framework above the gap (through the facing boards) and overlaps the facing
boards below the gap by at least 75mm.
Height of Size of Channel Acoustic Sound
Partition Stud Required Insulation Rw (assessed)
Up to 9m 80mm x 60mm x 3mm thick 44 dB
9m – 12m 150mm x 60mm x 3mm thick 45 dB
12m – 15m 175mm x 60mm x 3mm thick 47 dB
Height of Size of Channel Acoustic Sound
Partition Stud Required Insulation Rw (assessed)
Up to 6m 80mm x 60mm x 3mm thick 43 dB
6m – 12m 150mm x 60mm x 3mm thick 45 dB
12m – 15m 175mm x 60mm x 3mm thick 47 dB
26
Durasteel Brochure.indd 26Durasteel Brochure.indd 26 28/10/08 15:33:3328/10/08 15:33:33
Promat DURASTEEL® High Performance Systems
DURASTEEL® COMPOSITE BARRIER SYSTEM SPECIFICATIONS
240 minute DURASTEEL® Composite Barrier System (EI240)Construction
1. Head and base track 80mm x 60mm x 3mm thick steel channel fi xed to fl oor slab
and soffi t with M10 or M12 all steel expanding anchors (or equivalent for alternative
types of construction) at 500mm maximum centres. Floor slab and soffi t to have
minimum of the same level of fi re protection as that required by barrier.
2. Steel channel framework 80mm x 60mm x 3mm channel (1). Vertical channels
at maximum 1200 mm centres, Horizontal channels at maximum 2000 mm
centres. For partition heights up to 4 metres, horizontal and vertical channel
members may be welded together or joined with steel angle cleats, minimum
60mm x 60mm x 3mm thick x 60mm long, fastened to each channel member
with two M10 steel bolts and nuts. Above 4 metre height the horizontal and
vertical channel members are joined with the angle cleats. Wherever possible,
the main vertical channel studs should be formed in one continuous length to
avoid the need for splicing.
3. One layer of 25mm thick PROMATECT® -250 (2) fi xed on both sides of the wall
using countersunk ribbed timber-fi x Tek screws at 600mm centres. Vertical
board joints coincide with studs. Horizontal board joints are fi tted with an
internal 100mm wide x 25mm PROMATECT® -250 (4) cover strip, fi xed both
sides of the joint with steel drywall screws at 250mm nominal centres.
4) 9.5mm thick DURASTEEL® sheet (3), fastened to the framework, through the
PROMATECT® -250 boards, on both sides of the wall using M5.5 steel self drill
and tapping Tek screws at 250mm nominal centres. The length of fi xing to be
suffi cient to ensure appropriate penetration of screw thread, in accordance with
recommendations from the fi xing manufacturer. Vertical joints coincide with the
studs. Horizontal board joints coincide with the horizontal channels or are fi tted
with an internal steel cover strip, 100mm wide x 3mm thick, fastened on both
sides of the joint with M5.5 steel self drill and tap Tek screws at 250mm
nominal centres.
Height of Size of Channel Acoustic Sound
Partition Stud Required Insulation Rw (assessed)
Up to 6m 80mm x 60mm x 3mm thick 44 dB
6m – 12m 150mm x 60mm x 3mm thick 48 dB
2 x 12m – 15m 150mm x 60mm x 3mm thick 48 dB
The notation ‘2x’ refers to back-to back channels that are fastened together with M10
steel bolts and nuts at 500mm maximum centres. The vertical joints in the DURASTEEL®
panels must be offset by 30mm from the centreline of the back-to-back studs to avoid a
straight through path for hot gasses. The horizontal channels are single channels.
Up to a height of 4m no expansion allowance is required. Above that height an
expansion allowance of at least 6mm per metre height is required. Where an expansion
allowance is provided at the top of a partition, steel channels, minimum 50mm fl anges x
3mm thick, are fastened to the vertical channels with M10 steel bolts and nuts. The
width of the channel (web dimensions) should be such that it is a close fi t within the
channel studs. At the junction above the expansion gap the channels are connected
with minimum two M10 bolts. At the junction below the expansion gap the channels are
connected, through slotted holes, with minimum two M10 bolts fi tted with fusible
washers. The gap in the DURASTEEL® and PROMATECT® -250 board facing is covered
with a DURASTEEL® and PROMATECT® -250 board cover panel that is fastened to the
steel framework above the gap (through the facing boards) and overlaps the facing boards
below the gap by at least 75mm.
27
Durasteel Brochure.indd 27Durasteel Brochure.indd 27 28/10/08 15:33:3428/10/08 15:33:34
DURASTEEL® COMPOSITE MEMBRANE SPECIFICATIONS
240 Minute DURASTEEL® Composite Membrane Plenum Ceiling -
Fire from Below (E240 EI60)
Introduction
This DURASTEEL® composite membrane plenum ceiling may be constructed as a self-
supporting membrane for areas up 3m x 2m (maximum span 3m); or as a suspended
ceiling system with hangers coincident with the longitudinal framing channels at
1500mm centres.
Promat PROMATECT® -250 panels, fi tted to underside of the DURASTEEL® ceiling,
contribute to the fi re insulation performance of the system, and also provide a fair face
to the ceiling.
Construction
Self Supporting Ceiling Option: Weight (nominal) 37kg/m2
The maximum area as a self supporting ceiling (supported on all four edges) is 3m x 2m.
Perimeter framing (1) of 80mm x 60mm x 3mm CRC is fastened to surrounding
construction with M10 or M12 all-steel expanding anchors (or equivalent for alternative
types of supporting construction), at 500mm maximum centres.
Supporting channels (2) in 80mm x 60mm x 3mm CRC at 1200mm maximum
centres are either welded to the perimeter framing or joined using 120 x 60 x 3mm
angled cleats fastened to each channel member with two M10 steel bolts and
nuts. Transverse 80mm x 60mm x 3mm CRC (3) are installed coincident with the
DURASTEEL® end of board joints.
9.5mm DURASTEEL® (4) is fastened to the underside of the framing using 38mm TEK
screws fi xed at 200mm centres.
MF5 ceiling sections (5) are installed perpendicular to the DURASTEEL® framing at
625mm centres, with MF6 (6) channel at the ceiling perimeter fastened to the walls.
The MF5 grid system is fastened to the CRC framework through the DURASTEEL®
panels, and to the underside of DURASTEEL® ceiling using 38mm TEK screws at
400mm centres.
A 15mm PROMATECT® -250 ceiling lining (7) is fastened to the MF grid system using
32mm Drywall screws at 200mm centres. (Screws are to be inserted 15mm from the
board edge, and 40mm from the corner of the board).
Note: PROMATECT® -250 boards are installed parallel to the DURASTEEL® panels
(and at right angles to the MF5 ceiling sections), but with staggered joints in both
directions between layers.
100mm wide PROMATECT® -250 cover strips (8) are fastened behind the transverse
joints between the MF5 sections of the PROMATECT® -250 boards, using 32mm
drywall screws at nominal 250mm centres, with the screws at 25mm from edge of the
board, and 50mm from ends of the cover strips.
Suspended Ceiling Option: Weight (nominal): 37kg/m2
Perimeter framing of 80mm x 60mm x 3mm CRC (1) is fastened to surrounding
construction with M10 or M12 all-steel expanding anchors (or equivalent for alternative
types of supporting construction) at 500mm maximum centres.
Primary channels of 80mm x 60mm x 3mm CRC (2) at 1200mm maximum centres
fastened to the perimeter and suspended from the building structure above the ceiling
membrane using steel drop rods at maximum 1.5m centres. The threaded rods pass
through clearance holes in the upper fl ange of the channels, and are fastened with steel
hexagon full nuts.
The diameter of the hanger rods are such sized so that the tensile stress within the rods
does not exceed 6N/mm2.
An expansion allowance of at least 6mm per metre is required for primary channels
longer than 4m.
Where an expansion allowance is provided within the primary channels, steel jointing
channels (minimum 50mm fl anges x 3mm thick) are fastened to the primary channels
with M10 steel bolts and nuts. The width of the jointing channel (web dimensions) should
be such that it is a close fi t within the primary channels.
On one side of the expansion gap the primary and jointing channels are connected with
minimum two M10 bolts. On the opposite side the channels are connected, through
slotted holes, with minimum two M10 bolts fi tted with fusible washers.
Transverse 80mm x 60mm x 3mm CRC (3) are cleated between the primary channels,
coincident with the DURASTEEL® board ends.
9.5mm DURASTEEL® (4) is fastened to the underside of the framing using 38mm TEK
screws fi xed at 200mm centres.
MF5 ceiling sections (5) are installed perpendicular to the DURASTEEL® framing at
625mm centres, with MF6 (6) channel at the ceiling perimeter fastened to the walls.
The MF5 grid system is fastened to the CRC framework through the DURASTEEL®
panels, and to the underside of DURASTEEL® ceiling using 38mm TEK screws at
400mm centres.
A 15mm PROMATECT® -250 ceiling lining (7) is fastened to the MF grid system using
32mm Drywall screws at 200mm centres. (Screws are to be inserted 15mm from the
board edge, and 40mm from the corner of the board).
Note: PROMATECT® -250 boards are installed parallel to the DURASTEEL® panels
(and at right angles to the MF5 ceiling sections), but with staggered joints in both directions
between layers.
100mm wide PROMATECT® -250 cover strips (8) are fastened behind the transverse joints
between the MF5 sections of the PROMATECT® -250 boards, using 32mm drywall screws at
nominal 250mm centres, with the screws at 25mm from edge of the board, and 50mm from
ends of the cover strips.
Since drop-rods support the ceiling, the length and width of ceiling membrane
is unrestricted.
Promat DURASTEEL® High Performance Systems
28
Durasteel Brochure.indd 28Durasteel Brochure.indd 28 28/10/08 15:33:3528/10/08 15:33:35
Promat DURASTEEL® High Performance Systems
Heathrow Terminal 5The quality of Promat DURASTEEL® and our specialist installers were tested to the full during the construction of Heathrow Terminal 5. Promat supplied 100,000m2 of DURASTEEL® to the £4.2m billion project, its largest specifi cation to date.
Designed by the Richard Rogers Partnership, T5 is being hailed as a new landmark for London. It can accommodate 30 million passengers a year. But there’s far more to it than just a building. As well as the vast new terminal – which could fi t 50 football pitches – and its two satellites, the project includes 47 aircraft stands, a control tower, a 4,000 space multi-storey car park, a hotel, rail links, a spur road from the M25, even a diversion of two rivers.
Promat’s input includes the largest ever specifi cation of a DURASTEEL® fi re barrier. It is being used in the main terminal building, the satellites and in the railway station – in some areas forming barriers 14m high.
Promat supplied the 100,000m2 of DURASTEEL® in 9.5mm sheet for insulated fi re barriers. It features prominently below apron level, lining the tunnel-like service corridors, the cavernous baggage handling areas, lift pits, workshops and plant rooms. The continuous barriers of silver Promat DURASTEEL®, punctuated by apertures for doors and services, provides a purposeful presence throughout all these areas.
Promat DURASTEEL® easily met the specifi cation for EI 120 fi re resistance. But that’s not the only reason it was chosen. The system was installed well before the dry envelope stage, so it had to be exceptionally tough and durable.
MACE Solutions – the fi xed price service provider within Mace Infrastructure Sector – are the package contractor responsible for the design and construction of the compartment walls below the main terminal.
And the architects working in partnership with MACE Solutions, Bryden Wood Associates, cite Promat’s technical expertise in helping to develop the specifi cation, including wind loadings for the tall barriers and developing systems such as barriers with a plasterboard facing for offi ce areas.
The Promat DURASTEEL® barriers’ high impact resistance was another key factor. “The barriers must withstand the impact of trolleys and baggage systems,” says project architect Dan Cunliffe. “Promat DURASTEEL® was the best product for the project, based on its versatility across a wide range of performance and other functional criteria.”
The Promat DURASTEEL® walls were constructed from pre-cut kits fabricated in R&S Fire & Security Limited’s factory in Essex, and delivered in meticulously labeled, pre-assembled kit form. They are installed section by section using scissor lifts.
John Allsop, the senior site agent for R&S, says “Promat DURASTEEL® is as easy to install as plasterboard, but of course it’s far more durable and robust.”
“We have a close association with both Promat and MACE Solutions,” says R&S Group’s managing director Keith Barclay. “This proactive relationship has ensured that delivery of the contract has run smoothly and effi ciently for the client BAA. It’s on time, within budget and in accordance with the T5 project principles.”
CASE STUDIES
“ Before the roof went on,
rain water was running
down the DURASTEEL®
walls for months on end
without any detrimental
effect on the integrity
of the product.”
says John Allsop,
site agent for Essex-based R&S
Fire & Security Ltd, the specialist
sub-contractor responsible for
its installation.
“ The system selection
process identifi ed Promat
DURASTEEL® as the most
appropriate partitioning
material based on the fi re
rating, its durability and
ability to withstand the
environmental conditions
that exist during the early
phases of construction”
MACE solutions
29
Durasteel Brochure.indd 29Durasteel Brochure.indd 29 28/10/08 15:33:3528/10/08 15:33:35
White City Development, West LondonThe tallest ever DURASTEEL® fi rewall in the UK is providing protection for power plants within the refurbished Grade ll-listed west DIMCO building, a central component of the regeneration.
Westfi eld London is a retail, leisure and lifestyle development by the world’s largest retail property group, Australian-owned Westfi eld. The development is a 46-acre site between Shepherd’s Bush and White City tube stations, until recently an industrial wasteland. The £1.6 billion development contains the largest shopping centre in Europe along with leisure facilities, 14-screen cinema, a spa and gymnasium, bars, restaurants, new transport links and affordable housing. Westfi eld London aims to become the capital’s premier retail, leisure and lifestyle destination.
On Westfi eld London, Promat DURASTEEL® came through with fl ying colours. The Grade II-listed DIMCO building was built more than 100 years ago, originally to house Europe’s fi rst electricity generating facility. Its refurbishment has been an ambitious and complex task involving extensive temporary works for the complete roof and roof structure replacement. A Promat DURASTEEL® barrier provides 120 minutes fi re compartmentation protection for the electricity sub-station within the west DIMCO structure, which supplies power to the new development.
At 25m high, the barrier installed is the tallest to date, and one of the most complex in terms of detailing and installation. Promat’s expertise was key.
London based Towns-Wadey is Westfi eld’s building contractor for the DIMCO project. Design Manager James Wraight said: “The DURASTEEL® wall has a bespoke design which is completely independent from the listed DIMCO building fabric, new roof and roof structure, offering 2 hour fi re compartmentation and fi re protection to the supporting steel structure. To keep the wall independent, we worked closely with Promat, specialist contractor Sharpfi bre and the Architect to achieve working movement details whilst maintaining a practical and safe installation process. We were able to use the system to hide the complex supporting steel structure, eliminating further fi re protection providing value engineering options for our client”.
“DURASTEEL® was the right product for the job and Promat offered good design advice,” says Sharpfi bre.
Promat DURASTEEL® High Performance Systems
30
So why Promat
DURASTEEL®?
“ It’s a very versatile
material, offering a high
level of fi re protection...
...The fi re barrier
comes as a complete
system, so you don’t
need to specify an
additional fi re stopping
material for services
penetrations. The
contemporary aesthetic
of the DURASTEEL®
complements the
industrial character of
the DIMCO building.”
Lisa Pemberton, project architect
for Ian Ritchie Architects.
Durasteel Brochure.indd 30Durasteel Brochure.indd 30 28/10/08 15:33:3628/10/08 15:33:36
Promat DURASTEEL® High Performance Systems
TESTIMONIALS
31
THE INVICTA GROUP
“Over a period of 10 years, Invicta
Storage Systems Ltd has been
pleased to install DURASTEEL®
barriers and vaults to our clients,
resulting in an excellent working
partnership with Promat UK Ltd.
Invicta values its position as a licensed
installer and actively takes every
opportunity to advance its technical
sales, product knowledge and
market share.
DURASTEEL® has become one of our
core products and we have successfully
installed a number of 4-hour fi re rated
barriers and vaults to many of our blue
chip clients throughout the UK, Europe
and the USA.
Our success has been contributed
to referrals from satisfi ed customers,
impressed by the product’s unique
capabilities and our professional service.
We look forward to building on an already
excellent working relationship with
Promat in the future.”
MITIE McCARTNEY FIRE
PROTECTION LIMITED
“MITIE McCartney Fire Protection Ltd, part
of the £1.4 billion pound, 50,000 strong
MITIE Group Plc, have been a market
leader in passive fi re protection for over
25 years. For most of this time, we have
been working closely with Promat, utilising
their full range of products, services and
technical support.
Appointed as a licensed DURASTEEL®
applicator for fi re barriers at the inception
of the scheme, MITIE McCartney Fire
Protection and Promat are capable of
bringing together their vast experience to
provide and enhance life safety systems
and property protection on sites as varied
as airports, steel works, commercial
premises and power stations.
DURASTEEL® has proved popular with
clients, not only because of its robust
nature but also due to the confi dence it
provides through the extensive test data
and certainty of application through the
approved licensed installer scheme.”
R&S FIRE AND SECURITY LIMITED
“In 1998 we created a separate division within
the R&S group devoted solely to DURASTEEL®
Systems. We take pride in the quality of our
installations and strive to improve our technical
capabilities in order to provide our Clients’
with both the service they seek, and a product
system that fulfi ls their needs.
Over this period we have formed an excellent
working relationship with Promat UK Ltd in both
promoting, and successfully manufacturing
and installing 4 hour fi re rated barrier, ceiling,
enclosure, and ductwork systems for our blue
chip clients throughout the UK, Europe
and Asia.
Our professional attention to design, detail and
installation of these fl exible and unique systems by
a dedicated labour force and management team,
has enabled this division to succeed. This coupled
with our “can do” approach has resulted in repeat
business and referrals from satisfi ed Clients.
In continuing partnership with Promat UK Ltd,
we anticipate successfully expanding on this
relationship to provide more clients with the
proven and tested Promat DURASTEEL® system
to solve their fi re protection problems.”
SHARPFIBRE LIMITED
“At Sharpfi bre our mission is to safely deliver high quality fi re protection
and insulation solutions that are cost effective for our clients and
profi table for both the company and its stakeholders. Established since
1987 Sharpfi bre has become a leader in passive fi re protection and are
pleased to be a licensed DURASTEEL® installer.
Operating out of our offi ces in Basildon, Essex and Paris in France,
Sharpfi bre have built an excellent reputation for being the contractor of
choice when it comes to technical knowledge, directly employed labour
and health and safety. Working closely with Promat and our other key
supply chain partners, Sharpfi bre provide a cost-effective, effi cient
and technically compatible fi re protection solutions available on the
market today.
Having completed several major DURASTEEL® schemes, including the
tallest ever DURASTEEL® fi rewall in the UK, it is now that we can bring
to our clients the knowledge and experience of both a market leading
installer and a market leading manufacturing team.”
Durasteel Brochure.indd 31Durasteel Brochure.indd 31 28/10/08 15:33:3928/10/08 15:33:39
Promat UK LimitedThe Sterling Centre, Eastern Road, Bracknell, Berkshire RG12 2TD
Telephone: 01344 381300 Fax: 01344 381301www.promat-durasteel.co.uk
DSB Sept.08