Transcript of DPR-12-3-2015

SE-I-Sp 2CMANGALORE HASSAN MYSORE SOLUR LPG PIPELINE PROJECTOWNERM/s Hindstan Petroleum Corporation LimiIted.(HPCL)Reporting Date12.3.2015CONSULTANTM/s Mott MacDonald Pvt.Ltd.(MMPL)Progress Date12.3.2015CONTRACTORM/s ACE Pipeline Contracts Pvt.Ltd.DPR Report No.63SUB CONTRACTAdvance Infrastructures Pvt.Ltd.DAILY PROGRESS REPORT MAIN LINESr. No.Description of Activity UOMSection-I,Spread-2 C, Coffee Estate(Ch.102 toCh.143) RemarksTotal Scope (Appx.)Actual Start DateProgressFinish date Previous TodayCumulative1Receipt of FIM - Line Pipes1.116" API 5L Gr. X65, 7.14 MM WT 3LPE CoatedMtr3973630.12.201412224.160- 012,224.1601.216" API 5L Gr. X65, 7.92 MM WT 3LPE CoatedMtr10896.000- 096.0001.316" API 5L Gr. X65, 7.92 MM WT 3LPP CoatedMtr15696.000- 096.000Total Receipt of pipes (1.1 to 1.3)Mtr4000012,416.160- 012,416.1601.424" Casing PipeMtr720.000- 00.0002ROU released by HPCLMtr4000031.12.201425000.000- 025000.0003Route SurveyMtr4000031.12.201420201.000- 020201.0004ROU Clearing & GradingMtr4000031.12.201417448.00050.0017498.0005StringingMtr400001.1.201410162.800- 010162.8006Pipe Bending (Cold)Nos.38914.1.2015119.0006.000125.0007Welding 7.1Main Line WeldingNo33252.01.2015760.00014.00774.000Mtr400002.01.20159217.920159.909,377.8207.2Free Tie - In WeldingNo40.00040.000Mtr484.800484.8007.3Tie - In WeldingNo05.2.20157.0004.0011.0007.4Total Welding(7.1 to 7.4)No807.0018.00825.000Mtr9,702.72159.909,862.628Non Destructive Testing (NDT)8.1Radiogrpahy TakenNo33602.0120157328.00740.008.2Radiogrpahy ReviewedNo732732.00Report Updated8.31st AcceptNo641- 0641.00Report Updated8.4Repairs No70- 070.008.5Repairs AcceptedNo62- 062.008.6Retake(RT)/Reshoot (RS)/GRSNo21- 021.008.7RT / RS / GRS AcceptedNo21- 021.008.9Radiography repair percentage%10%- 010%8.10UT on Repair jointNo724- 0724.00Report Updated8.11Total Radiography Accepted No565- 0565.009Field Joint CoatingNo332524.01.20150- 0- 0Report Updated10.1Concrete Weight Coating pipe - 3LPPMtr4610.000- 0- 011TrenchingMtr400006.1.20156879.000100.006,979.00012LoweringMtr400002.2.20155325.080- 05,325.08013HDPE LayingMtr400003.2.20154315.715- 04,315.71514BackfillingMtr400003.2.20153891.515120.004,011.515ch.12400015OFC BlowingMtr4000016Splicing / Jointing of OFCNos.1017TCP/PCP WorksN/AN/AN/AN/A17.1Soil Resistivity survey(CP)RM17.2TCP/PCP - Mg Anode InstallationNos.17.3TCP/PCP - Zn Anode InstallationNos.17.4TCP (Pin Brazing)17.5Installation of TLP BoxNos.18Crossings18.1Railway CrossingsNos.Nil0.00018.2National Highway CrossingsNos.Nil0.00018.3State Highway CrossingsNos.30.00018.4Other Road CrossingNos.240.00018.5River CrossingsNos.10.00018.6Canal CrossingsNos.00.00018.7Nala CrossingsNos.30.00018.8Bentonite filling ( for Cased crossing )Nos.30.00019Pre Hydrostatic TestingNos.30.00020Post HydrotestingMtr30.00021Main lineHydrostatic TestingMtr400000.00022SwabingMtr400000.00023DryingMtr400000.00024Electronic Gauge PiggingMtr400000.00025Installation of Markers25.1Boundary MarkersNos.3200.00025.2Kilometer MarkersNos.320.00025.3Aerial MarkersNos.80.00025.4Direction MarkersNos.3560.00025.5Warning MarkersNos.880.00025.6Navigable Crossing Warning SignNos.70.00025.7OFC MarkersNos.Nil0.00025.8Total Markers InstallationNos.26Final Cleanup & Restoration Mtr400000.000

For AIPLFor ACEFor MMPLFor HPCL

EquipmentMANGALORE HASSAN MYSORE SOLUR LPG PIPELINE PROJECTOWNERM/s Hindstan Petroleum Corporation Limited.(HPCL)Reporting Date12.3.2015CONSULTANTM/s Mott MacDonald Pvt.Ltd.(MMPL)Progress Date12.3.2015CONTRACTORM/s ACE Pipeline Contracts Pvt.Ltd.DPR Report No.63SUB CONTRACTORAdvance Infrastructures Pvt.Ltd.EQUIPMENT DEPLOYMENT STATUS SECTION-I SP 2CS. NoEquipmentSection-I,Spread-2 C, Coffee Estate(Ch.102 toCh.143) RemarksRequiredMobilised1Excavator (Crawler Mounted) / Backhoe272Pipe Layer / Side Boom 572G or Higher Capacity113Dozer CAT D7/D8 or equivalent114Hydra 12ton13Pipe receiving,Sringing6Welding machine - 400 Amp10107Pay Welder118Bending Machine119Boring machine(Suitable for cased crossing 110Internal X-Ray Crawler Machine1111External X-Ray Machine112Internal Line-up Clamp (Pneumatic)2213External Line-up Clamp2214Compressor (600 CFM)115Joint Coating Crew with Compressor (300 CFM) and Hopper assembly.1116Filling Pump (250 -300 CUM/Hr)17High Pressure Pump (200 Bar)18Chemical Dosing Pump19Completed Hydrotest kit with all instruments (Dead weight Tester, Presure & temparature recorder, thermocouple etc) & Test Cabin21Farm Tractor1223Flat Bed Trailer 2324Automatic Cutting / Bevelling Machine25Holiday detector(of suitable range)1126Voltmeter1127Jeepmeter128Crain 20 tonN/AN/ATotal Equipment DeployedFOR AIPLFor ACEFor MMPLFor HPCL

ManpowerMANGALORE HASSAN MYSORE SOLUR LPG PIPELINE PROJECTOWNERM/s Hindstan Petroleum Corporation Limited.(HPCL)CONSULTANTM/s Mott MacDonald Pvt.Ltd.(MMPL)CONTRACTORM/s ACE Pipeline Contracts Pvt.Ltd.SUB CONTRACTORAdvance Infrastructures Pvt.Ltd.MANPOWER DEPLOYMENT STATUS SECTION - I 2CSr. No.Personnel CategorySpread-2 C, Coffee Estate(Ch.102 toCh.143)RemarksNeriyaNameNameContact No.1Project ManagerMr.Arun Sharma82383300352RCMMr. Ashok Mishra99501780043Construction Manager Mr.Manoj Kumar90999826014QA/QC EngineerMr.Harsh Yadav97111119445Asst. Planning EngineerMr.Deepu Thankachan85928291426Store KeeperMr.Tapan Kumar Jena95837092227SurveyorMr.Ramesh mishra70526498338Forest Liasioning SupervisorMr.Jamaluddin99160701869Trenching FormanMr.Kamlesh Goswamy769838522410Stringing SupervisorMr.Arun Kumar875734492111Welding Engineer Mr.Jibin Philp996179377312Safety OfficerMr.Pankaj singh774297333713Trenching SupervisorMr.M.D Kunju14Joint Coating SupervisorMr.Pramod Yadov756487649415LoweringMr.M.D Kunju16Sr.ForemanMr.Ramesh Sharma17Pipe Bending operatorMr.Pramod 18Welder 1.Mr.Walihulla 2.Mr.Kankan Das 3.Mr.Luhit Senchua 4.Mr.Robin Gohain 5.Mr.Rohit Chellang 6.Mr.Pyar Ali 7.Mr.Azad Hussain 8.Mr.Mansur alam 9.Mr.Guddu Gupta 10Mr.Satish Kumar19Fitter1.Mr.Mustafa Alam 2.Mr.Jeetender Prasad20Grinder1.Mr.Monikanath Bruah 2.Mr.Raju Baruah 3.Mr.Thaneshwar Baruah 4.Mr.Dipankar Gohain 5.Mr.Bipul Baruah 6.Mr.Anand Mech 7.Mr.Devidayal Mishra 8.Mr.Monikanatha Baruah 9.Mr.Beyjnatkh Gupta 10.Mr,sirajuddin Ansari21Insulatorpramod yadov22Sand BlasterLal Babu23X-Ray / UT CrewBirendra kumar(SIEVERT)970213721324MechanicRavinder Kumar25ElectricianMr.Murari Prasad26Rigger1.Mr.Bajnath 2.Mr.Jeetendar Kr. Singh, 3.Mr.kishor Dubey 4.Mr.Vinod 5.Mr.Raju Yadav 6.Mr.Rabindar Yadav 7.Mr.Rajesh Paawan 8.Mr.Bholu Mishra 9.Mr.Rizwanullah27Backhoe OperatorMr.Budhan Kr.28Hydra OperatorMr.venkitesh29Dozer OperatorMr.Bhima Rao30Sideboom OperatorMr.Saab Jan31JCB OperatorMr.Raghu32Machine Helper1.Mr.Prasant Devgon 2.Mr.Ram Raj Singh 3.Mr.Rajan Singh 4.Mr.Bitupan Baruah 5.Mr.Sabir ansari 6.Rahul Sharma 7.Mr.Kamlesh Sharma 10.Mr.Sandeep Gupta 11.Mr.Zafer Ali33Semi Skilled Labour / Technicians 1.Mr.Chandra P.Panday 2.Mr.Biswajit Baruah, 3.Mr.Umesh Konwar, 4.Mr.Bakul Gogai, 5.Mr.Giriraj Rajak, 6.Mr.Amor Gupta, 7.Mr.Bonowari Sharma, 8.Mr.Neyaj Ahammed34Un Skilled Labour1.Mr.Ayab Khan 2.Mr.Hamid 3.Mr.Shakhar 4.Mr.Ayub Khan 5.Mr.Emran 6.Mr.Baby35Account OfficerMr.Ramesh Kumar Mishra900717219136Security1.Mr.Ramesh 2.Mr.Bhagirath 3.Mr. K.N Pandey37Driver1.Mr.Munna Jha 2.Mr.Hemanth 3.Mr.Prasad 4.Mr.Sasi38Cook1.Mr.Vijay Baida 2.Mr.Sarat Singh 3.Mr.Phool Singh 4.Yusuf sahahTotal Personnel Deployed100For AIPLFor ACEFor MMPL

Next day planMANGALORE HASSAN MYSORE SOLUR LPG PIPELINE PROJECT NEXT DAY'S PLANSp 2C (Ch. 102 to143)OWNERM/s Hindstan Petroleum Corporation Limited. (HPCL)NDP Report No.61CONSULTANTM/s Mott MacDonald Pvt.Ltd. (MMPL)CONTRACTORAce Pipeline Contracts (P) Ltd.Date13-Mar-15SUB-CONTRACTORAdvance Infrastructures Pvt. Ltd.

Sr. No.Description of Activity Location/ ChainageTimeResponsible Person for the activityContact No.Additional Information if anyStartFinish1Clearing and Grading1949.00 AM6:00PMPrashant 97318621911Stringing2469.00 AM6:00PMRajnesh97425534171film reviewRT room9:00 AMBirendra kumar(SIEVERT)97021372132SURVEYCH.1148:00 AM6:00 PMRAMESH MISHRA70526498333Tie inCH.125.9008:00 AMjitendra82924312634Peel testCH.133,1229:00 AMMr.Pramod Yadov75648764945ROU C&GCH.1148:00 AM6:00 PMRamesh Sharma87629829606STRINGINGCH.1139;00AM6;00PMKamlesh Goswamy76983852247WELDINGCh. 1139:00AM6:00PMJibin Philip99617937738NDTCH.1240009:00AMBirendra kumar(SIEVERT)97021372139MUT CH..1339;00AMMANJUR ANSARI944850695210TrenchingCH.1229:00amMD Kunju973145653811repairCh 131000jitendra829243126312PIPEBOOK CHECKAT OFFICE9:00amDeepu Thankachan859282914213LOWERINGCH.13311AMMD Kunju973145653814BEND INSPECTIONAT YARD12:00PMSourav Kumar867686113815BACKFILLINGAT CH.13310:00AMMD Kunju9731456538