Post on 08-May-2019
DPEQ Seri 02
EARTHQUAKE DETAILS
Date : 28/09/2018 Date : 28/09/2018 Date : 28/09/2018
Magnitude 5.1 SR Magnitude 7.5 Mww Magnitude 7.5 Mw
Depth 10 km Depth 10 km Depth 10 km
Epicenter Epicenter Epicenter
Latitude 1.18°S Latitude 0.178°S Latitude 0.22°S
Longitude 120.10°E Longitude 119.840°E Longitude 119.86°E
AFFECTED CITIES as reported by USGS (accesed @ http://earthquake.usgs.gov on 1 Oct 2018 - 8pm Jakarta local time - 63 hour after the quake)
ACCUMULATION SUMMARY - INDONESIA EQ INSURANCE on-risk as at 28 September 2018 in billions IDR
III IV V VI VII VIII IX X+
Weak Light Moderate Strong Very Strong Severe Violent Extreme
Resistant Structure None None Very Light Light Moderate Moderate/Heavy Heavy Very Heavy
Vulnerable Structure None None Light Moderate Moderate/Heavy Heavy Very Heavy Very Heavy
- 10,089 97 724 - 31 - -
- 205,790.47 356.33 2,231.38 - 73.87 - -
III IV V VI VII VIII IX X+
- 62,519.72 112.37 1,085.11 - 15.09 - -
- 65,611.64 191.50 387.81 - 33.06 - -
- 8,543.35 3.83 291.24 - 5.97 - -
- 52,673.11 48.57 382.08 - 19.76 - -
- 16,442.64 0.05 85.13 - - - -
III IV V VI VII VIII IX X+
- 1,354.32 - 0.20 - - - -
- 24,303.99 16.79 976.50 - 10.45 - -
- 173,800.18 287.63 865.74 - 54.09 - -
- 6,331.98 51.90 388.93 - 9.34 - -
1
Updated : 04 October 2018
IMPACT-Statistical Report on Catastrophic Event
Statistical Report on Catastrophic Event
PALU EARTHQUAKE 2018
Per Interest
Intensity (MMI)
Perceived Shaking
Potential
Damage
Number of Risk
Total Exposure
Contact Person:
(Andri) andry@maipark.com – (021) 29380088 – ext. 1401; (Danar) danar@maipark.com – (021) 29380088 – ext. 1404; (Lita) – narifianti@maipark.com – (021) 29380088 – ext. 1405
Agriculture
Commercial
Industrial
Residential
Building
Machinery
Stock
Others
Business Interruption
Per Occupation
Your Reliable Partner in Catastrophe Risk Transfer
IMPACT
73.87
2,231.38 8.72
2,365.31
1,395.74
12,667.90
1,487.98
821.87
KAB. DONGGALA
KOTA PALU
KAB. SIGI
KAB. POSO
KAB. MAMUJU
Kota BALIKPAPAN
KAB. GORONTALO
KOTA TERNATE
Exposure on Selected Cities (in billions IDR)
Intensity based on ground shaking only
ALL CITIES IN AFFECTED PROVINCES on-risk as at 28 September 2018
Central Sulawesi : premium (in millions IDR); on-risk exposure per occupation per interest (in billions IDR)
Agriculture Commercial Industrial Residential Total Building Content BI Total
KAB. DONGGALA VIII 31 106.40 - 10.45 54.09 9.34 73.87 15.09 58.79 - 73.87
KOTA PALU VI 724 4,302.45 0.20 976.50 865.74 388.93 2,231.38 1,085.11 1,061.14 85.13 2,231.38
KAB. PARIGI MOUTONG 64 242.52 - 10.64 118.73 35.03 164.40 80.13 84.21 0.05 164.40
KAB. SIGI 16 13.36 - 6.04 0.75 1.93 8.72 5.86 2.85 - 8.72
KAB. BANGGAI 145 14,357.61 - 191.14 10,122.91 34.86 10,348.91 160.20 7,114.38 3,074.33 10,348.91
KAB. BANGGAI KEPULAUAN 8 5.65 - 1.87 - 1.01 2.89 1.65 1.24 - 2.89
KAB. BANGGAI LAUT 7 1.15 - - - 0.85 0.85 0.84 0.02 - 0.85
KAB. BUOL 15 7.58 - 1.98 0.60 1.36 3.94 1.22 2.72 - 3.94
KAB. MOROWALI 60 217.77 6.43 12.57 103.44 6.49 128.93 41.36 87.58 - 128.93
KAB. MOROWALI UTARA 4 0.97 - 0.68 - - 0.68 0.68 - - 0.68
KAB. POSO 65 4,377.86 - 17.24 2,340.00 8.06 2,365.31 913.74 1,061.57 390.00 2,365.31
KAB. TOJO UNA-UNA 14 15.16 - 2.40 6.05 2.23 10.68 8.22 2.46 - 10.68
Kab. TOLI-TOLI 56 114.23 - 18.85 0.73 47.04 66.62 51.90 14.72 - 66.62
1,209 23,762.71 6.62 1,250.37 13,613.04 537.13 15,407.17 2,365.99 9,491.67 3,549.51 15,407.17
West Sulawesi : premium (in millions IDR); on-risk exposure per occupation per interest (in billions IDR)
Agriculture Commercial Industrial Residential Total Building Content BI Total
KAB. MAMUJU UTARA V 17 264.01 - 0.12 168.15 14.94 183.21 26.38 156.84 - 183.21
KAB. MAJENE 24 18.13 - 2.48 - 7.10 9.58 5.74 3.84 - 9.58
KAB. MAMASA 6 5.47 - 0.07 - 5.38 5.45 4.99 0.46 - 5.45
KAB. MAMUJU 159 1,991.62 755.75 355.10 246.18 38.71 1,395.74 476.93 915.29 3.52 1,395.74
KAB. MAMUJU TENGAH 6 2.54 - 1.58 - 0.17 1.75 0.85 0.90 - 1.75
KAB. POLEWALI MANDAR 42 56.37 - 9.69 - 18.57 28.26 15.52 12.73 0.01 28.26
254 2,338.15 755.75 369.05 414.33 84.87 1,624.00 530.40 1,090.06 3.53 1,624.00
North Sulawesi : premium (in millions IDR); on-risk exposure per occupation per interest (in billions IDR)
Agriculture Commercial Industrial Residential Total Building Content BI Total
KAB. BOLAANG MONGONDOW 31 6,900.53 - 7.46 4,838.46 2.79 4,848.71 948.96 3,873.36 26.39 4,848.71
KAB. BOLAANG MONGONDOW TIMUR 1 4.57 - 3.20 - - 3.20 3.20 - - 3.20
KAB. BOLAANG MONGONDOW UTARA 3 4.65 - 2.92 - 0.34 3.25 1.00 2.25 - 3.25
KAB. MINAHASA SELATAN 35 36.90 - 6.54 15.51 2.99 25.03 10.84 13.52 0.67 25.03
KAB. MINAHASA TENGGARA 3 44.37 - 5.35 - 1.00 6.35 5.05 1.30 - 6.35
KOTA KOTAMOBAGU 72 376.95 - 81.90 154.18 27.82 263.91 171.50 88.59 3.82 263.91
KOTA TOMOHON 59 212.47 - 76.22 2.18 20.51 98.91 81.23 17.66 0.01 98.91
KAB. KEPULAUAN SANGIHE 81 89.50 - 28.67 0.75 17.06 46.48 31.66 14.81 0.01 46.48
KAB. KEPULAUAN TALAUD 25 36.36 - 22.25 - 0.97 23.22 10.81 12.41 - 23.22
KAB. MINAHASA 104 1,068.90 - 108.58 412.75 20.48 541.81 486.15 55.66 - 541.81
KAB. MINAHASA UTARA 90 6,186.25 - 211.82 2,872.36 62.29 3,146.46 1,552.98 122.12 1,471.36 3,146.46
KAB. SIAU TAGULANDANG BIARO 7 7.66 - 3.63 - 0.24 3.87 0.82 3.05 - 3.87
KOTA BITUNG 269 4,001.37 - 384.31 1,583.12 85.96 2,053.39 887.34 1,166.03 0.02 2,053.39
KOTA MANADO 1,614 9,559.65 - 4,530.58 617.44 1,011.43 6,159.45 3,378.64 2,489.55 291.26 6,159.45
2,394 28,530.12 - 5,473.43 10,496.74 1,253.87 17,224.04 7,570.17 7,860.32 1,793.55 17,224.04
2
City/KabupatenIntensity
(MMI)
Number of
RiskPremium
Occupation Interest
TOTAL
City/KabupatenIntensity
(MMI)
IV
V
Number of
RiskPremium
Occupation Interest
TOTAL
IMPACT-Statistical Report on Catastrophic EventContact Person:
(Andri) andry@maipark.com – (021) 29380088 – ext. 1401; (Danar) danar@maipark.com – (021) 29380088 – ext. 1404; (Lita) – narifianti@maipark.com – (021) 29380088 – ext. 1405
City/KabupatenIntensity
(MMI)
Occupation Interest
TOTAL
Number of
RiskPremium
<IV
IV
IV
Agriculture, 6.62
Commercial, 1,250.37
Industrial, 13,613.04
Residential, 537.13 Building,
2,365.99
Content,
9,491.67
BI,
3,549.51
Agriculture,
755.75
Commercial,
369.05
Industrial,
414.33
Residential, 84.87
Building,
530.40
Content,
1,090.06
BI, 3.53
Your Reliable Partner in Catastrophe Risk Transfer
Agriculture, 6.62
Commercial, 1,250.37
Industrial, 13,613.04
Residential, 537.13
Building,
2,365.99
Content,
9,491.67
BI,
3,549.51
South East Sulawesi: premium (in millions IDR); on-risk exposure per occupation per interest (in billions IDR)
Agriculture Commercial Industrial Residential Total Building Content BI Total
KAB. BOMBANA 15 11.54 - 1.55 - 4.53 6.08 4.20 1.88 - 6.08
KAB. BUTON UTARA 5 1.42 - 0.67 - 0.35 1.02 0.37 0.65 - 1.02
KAB. KOLAKA 75 58.67 - 35.66 25.85 15.27 76.78 18.61 58.16 - 76.78
KAB. KOLAKA TIMUR 2 0.30 - 0.40 - - 0.40 0.30 0.10 - 0.40
KAB. KOLAKA UTARA 13 13.01 - 9.98 - 1.60 11.58 9.45 2.13 - 11.58
KAB. KONAWE 26 56.27 - 16.53 32.18 3.95 52.65 7.85 44.81 - 52.65
KAB. KONAWE SELATAN 12 403.89 - 1.44 401.97 0.75 404.16 84.82 319.34 - 404.16
KAB. KONAWE UTARA 8 176.46 - 5.15 88.04 - 93.19 20.18 73.01 - 93.19
KAB. MUNA 23 10,631.87 - 6.29 13,997.24 1.76 14,005.29 653.22 13,255.87 96.20 14,005.29
KOTA KENDARI 430 1,843.77 - 749.04 79.14 140.27 968.45 519.89 399.29 49.26 968.45
KAB. BUTON 12 25.43 - 22.71 - 2.08 24.79 9.13 15.67 - 24.79
KAB. WAKATOBI 5 0.90 - - - 0.90 0.90 0.60 0.30 - 0.90
KOTA BAU-BAU 65 328.50 - 330.13 86.07 21.01 437.21 282.84 136.53 17.84 437.21
691 13,552.05 - 1,179.54 14,710.49 192.46 16,082.49 1,611.46 14,307.72 163.31 16,082.49
South Sulawesi: premium (in millions IDR); on-risk exposure per occupation per interest (in billions IDR)
Agriculture Commercial Industrial Residential Total Building Content BI Total
KAB. BARRU 44 14.51 - 1.66 13.72 3.88 19.26 7.06 11.76 0.44 19.26
KAB. BONE 108 39.42 - 32.52 1.10 26.30 59.92 24.42 35.50 - 59.92
KAB. ENREKANG 14 5.13 - 0.05 - 5.11 5.15 3.03 2.12 - 5.15
KAB. LUWU 25 38.56 - 3.15 31.82 12.17 47.15 24.07 23.07 - 47.15
KAB. LUWU TIMUR 246 116,510.11 0.07 15.36 81,493.86 22.53 81,531.82 24,049.06 52,745.57 4,737.19 81,531.82
KAB. LUWU UTARA 37 120.42 - 8.44 110.00 2.02 120.47 21.93 98.53 - 120.47
KAB. MAROS 95 147.05 - 23.79 135.53 36.07 195.39 77.49 117.90 - 195.39
KAB. PANGKAJENE DAN KEPULAUAN 42 175.77 - 3.89 150.31 21.89 176.09 43.93 132.16 - 176.09
KAB. PINRANG 41 41.24 - 9.26 12.35 24.97 46.58 21.05 25.54 - 46.58
KAB. SIDENRENG RAPPANG 61 57.74 - 9.64 4.00 17.67 31.31 15.36 15.95 - 31.31
KAB. SOPPENG 27 7.81 - 4.51 - 3.36 7.87 4.68 3.19 - 7.87
KAB. TANA TORAJA 29 180.54 - 11.08 168.04 1.53 180.66 74.05 106.61 - 180.66
KAB. TORAJA UTARA 26 56.73 - 36.36 - 20.35 56.71 39.59 15.12 2.00 56.71
KAB. WAJO 50 45.19 - 4.56 7.73 30.90 43.19 19.43 23.74 0.02 43.19
KOTA MAKASSAR 2,716 9,134.81 - 6,666.29 2,716.29 1,735.00 11,117.58 6,004.25 4,748.80 364.53 11,117.58
KOTA PALOPO 158 170.44 - 82.27 12.66 70.78 165.72 71.59 81.80 12.32 165.72
KOTA PARE-PARE 163 202.17 - 80.23 7.79 112.67 200.69 133.86 66.76 0.07 200.69
KAB. BANTAENG 31 48.84 - 8.93 49.88 5.47 64.29 42.98 21.31 - 64.29
KAB. BULUKUMBA 85 36.18 - 14.42 7.58 26.38 48.38 20.40 27.98 0.00 48.38
KAB. GOWA 150 674.92 - 88.11 697.75 105.37 891.23 413.65 456.15 21.43 891.23
KAB. JENEPONTO 22 2,417.25 - 5.00 3,120.15 57.31 3,182.46 56.58 3,125.88 - 3,182.46
KAB. SELAYAR 20 43.86 - 18.65 - 12.10 30.74 20.92 9.82 - 30.74
Kab. SINJAI 27 78.15 - 20.02 51.75 33.40 105.18 54.22 43.96 7.00 105.18
KAB. TAKALAR 41 85.18 - 9.21 95.60 7.15 111.96 43.25 68.71 - 111.96
4,258 130,332.03 0.07 7,157.42 88,887.92 2,394.37 98,439.78 31,286.86 62,007.93 5,145.00 98,439.78
3
InterestCity/Kabupaten
Intensity
(MMI)
Number of
RiskPremium
Occupation
<IV
TOTAL
City/KabupatenIntensity
(MMI)Premium
IV
<IV
Contact Person:
(Andri) andry@maipark.com – (021) 29380088 – ext. 1401; (Danar) danar@maipark.com – (021) 29380088 – ext. 1404; (Lita) – narifianti@maipark.com – (021) 29380088 – ext. 1405
Occupation InterestNumber of
Risk
TOTAL
IMPACT-Statistical Report on Catastrophic Event
IV
Agriculture, -
Commercial, 1,179.54
Industrial, 14,710.49
Residential, 192.46 Building, 1,611.46
Content,
14,307.72
BI, 163.31
Agriculture, 0.07
Commercial, 7,157.42
Industrial,
88,887.92
Residential, 2,394.37
Building, 31,286.86
Content,
62,007.93
BI, 5,145.00
Your Reliable Partner in Catastrophe Risk Transfer
East Kalimantan: premium (in millions IDR); on-risk exposure per occupation per interest (in billions IDR)
Agriculture Commercial Industrial Residential Total Building Content BI Total
KAB. BERAU 143 658.66 - 142.47 684.20 80.23 906.89 380.55 444.94 81.41 906.89
KAB. KUTAI BARAT 126 1,145.59 31.02 154.17 1,187.83 155.63 1,528.64 1,011.24 439.01 78.39 1,528.64
KAB. KUTAI KARTANEGARA 263 4,191.27 - 139.52 5,181.50 272.97 5,593.99 1,305.56 3,748.89 539.54 5,593.99
KAB. KUTAI TIMUR 182 6,971.19 - 1,683.03 7,668.37 31.88 9,383.28 4,012.19 3,105.96 2,265.12 9,383.28
KAB. MAHAKAM ULU 1 0.01 - - - 0.02 0.02 - 0.02 - 0.02
KAB. PASER 89 327.16 - 114.74 137.72 193.64 446.09 220.31 224.44 1.34 446.09
KAB. PENAJAM PASER UTARA 33 307.65 299.95 35.98 39.28 45.06 420.27 174.22 246.05 - 420.27
Kota BALIKPAPAN 933 9,710.49 - 9,288.97 1,806.89 1,572.04 12,667.90 4,304.66 6,638.22 1,725.02 12,667.90
KOTA BONTANG 514 14,915.72 1.81 148.75 18,487.66 91.45 18,729.68 9,707.77 7,952.51 1,069.39 18,729.68
Kota SAMARINDA 825 2,142.63 - 1,831.74 591.09 415.68 2,838.51 1,060.58 1,554.26 223.67 2,838.51
3,109 40,370.38 332.78 13,539.38 35,784.53 2,858.58 52,515.27 22,177.09 24,354.30 5,983.88 52,515.27
South Kalimantan: premium (in millions IDR); on-risk exposure per occupation per interest (in billions IDR)
Agriculture Commercial Industrial Residential Total Building Content BI Total
KAB. BALANGAN 11 7.84 - 9.83 0.56 0.07 10.46 1.68 8.77 - 10.46
KAB. BANJAR 119 417.74 - 355.79 70.14 87.25 513.18 251.58 250.11 11.49 513.18
KAB. HULU SUNGAI SELATAN 11 13.51 - 17.18 - 0.85 18.02 15.31 2.71 - 18.02
KAB. HULU SUNGAI TENGAH 51 17.41 - 15.33 0.38 7.52 23.24 5.96 17.27 - 23.24
KAB. HULU SUNGAI UTARA 13 731.84 - 28.97 945.99 1.50 976.45 385.40 5.75 585.30 976.45
KAB. KOTA BARU 85 4,268.95 50.09 191.28 5,366.71 8.19 5,616.27 357.06 5,070.54 188.67 5,616.27
KAB. TABALONG 53 2,584.43 - 231.20 3,219.32 24.26 3,474.78 1,084.34 2,210.23 180.22 3,474.78
KAB. TANAH BUMBU 157 1,588.80 9.07 192.75 2,053.06 76.91 2,331.79 332.87 1,556.82 442.10 2,331.79
KAB. TANAH LAUT 116 3,406.09 - 8.50 4,508.66 24.00 4,541.16 599.39 3,694.48 247.29 4,541.16
KAB. TAPIN 29 269.80 187.61 65.09 42.33 64.82 359.85 96.35 263.43 0.07 359.85
KAB. BARITO KUALA 12 22.02 - 22.54 6.53 0.31 29.38 19.99 5.34 4.05 29.38
KOTA BANJAR BARU 179 309.70 - 273.46 75.71 69.10 418.28 154.28 237.49 26.51 418.28
KOTA BANJARMASIN 787 1,445.67 0.07 1,007.87 599.69 310.64 1,918.27 743.59 1,069.55 105.14 1,918.27
1,623 15,083.80 246.85 2,419.79 16,889.08 675.42 20,231.13 4,047.80 14,392.50 1,790.84 20,231.13
Central Kalimantan: premium (in millions IDR); on-risk exposure per occupation per interest (in billions IDR)
Agriculture Commercial Industrial Residential Total Building Content BI Total
KAB. BARITO SELATAN 10 27.10 - 5.04 30.74 0.39 36.16 35.04 1.13 - 36.16
KAB. BARITO TIMUR 23 110.32 - 24.01 123.99 0.12 148.13 46.92 94.89 6.31 148.13
KAB. BARITO UTARA 31 250.63 - 68.35 158.60 106.54 333.49 309.56 23.93 - 333.49
KAB. GUNUNG MAS 8 104.17 - 0.15 138.58 0.23 138.95 28.98 109.97 - 138.95
KAB. KAPUAS 59 70.98 - 68.31 4.52 20.33 93.15 66.24 26.91 - 93.15
KAB. KATINGAN 6 12.10 - 14.08 1.90 0.14 16.11 13.22 2.90 - 16.11
KAB. KOTAWARINGIN BARAT 128 571.57 - 41.72 706.85 12.31 760.88 451.28 309.60 - 760.88
KAB. KOTAWARINGIN TIMUR 154 312.45 11.23 131.34 187.59 74.25 404.41 191.10 200.07 13.24 404.41
KAB. LAMANDAU 65 569.25 - 0.59 752.53 6.34 759.45 524.04 235.41 - 759.45
KAB. MURUNG RAYA 12 86.57 - 18.09 94.64 2.79 115.52 94.36 16.88 4.28 115.52
KAB. PULANG PISAU 8 5.84 - 7.53 - - 7.53 4.22 1.10 2.21 7.53
KAB. SERUYAN 27 119.40 15.75 12.28 118.80 4.54 151.37 125.79 25.58 - 151.37
KAB. SUKAMARA - 180.13- - - 240.34- - 240.34- 172.84- 67.50- - 240.34-
KOTA PALANGKA RAYA 305 659.10 0.97 102.05 704.52 63.08 870.61 519.36 332.31 18.94 870.61
836 2,719.36 27.95 493.52 2,782.91 291.05 3,595.43 2,237.28 1,313.18 44.97 3,595.43
4
TOTAL
InterestCity/Kabupaten
Intensity
(MMI)
Number of
RiskPremium
City/KabupatenIntensity
(MMI)
Number of
RiskPremium
Occupation Interest
TOTAL
IMPACT-Statistical Report on Catastrophic EventContact Person:
(Andri) andry@maipark.com – (021) 29380088 – ext. 1401; (Danar) danar@maipark.com – (021) 29380088 – ext. 1404; (Lita) – narifianti@maipark.com – (021) 29380088 – ext. 1405
IV
IV
<IV
IV
<IV
TOTAL
City/KabupatenIntensity
(MMI)
Number of
RiskPremium
Occupation Interest
Occupation
Agriculture, 332.78
Commercial, 13,539.38
Industrial, 35,784.53
Residential, 2,858.58
Building,
22,177.09
Content,
24,354.30
BI, 5,983.88
Agriculture, 246.85
Commercial,
2,419.79
Industrial,
16,889.08
Residential,
675.42 Building,
4,047.80
Content,
14,392.50
BI, 1,790.84
Your Reliable Partner in Catastrophe Risk Transfer
Agriculture, 27.95
Commercial,
493.52
Industrial,
2,782.91
Residential,
291.05
Building,
2,237.28
Content,
1,313.18
BI, 44.97
North Kalimantan: premium (in millions IDR); on-risk exposure per occupation per interest (in billions IDR)
Agriculture Commercial Industrial Residential Total Building Content BI Total
KAB. BULUNGAN 61 60.98 - 30.40 48.63 2.31 81.34 10.24 71.10 - 81.34
KAB. MALINAU 8 109.26 - 4.31 134.57 4.98 143.86 2.19 141.67 - 143.86
KAB. NUNUKAN 48 576.07 12.52 130.73 623.12 1.79 768.16 483.45 284.70 - 768.16
KAB. TANA TIDUNG 93 426.74 - 73.63 462.07 33.39 569.09 310.31 258.77 - 569.09
KOTA TARAKAN 241 719.45 - 258.99 557.00 111.93 927.92 340.92 583.27 3.73 927.92
451 1,892.49 12.52 498.06 1,825.39 154.40 2,490.36 1,147.11 1,339.52 3.73 2,490.36
Gorontalo: premium (in millions IDR); on-risk exposure per occupation per interest (in billions IDR)
Agriculture Commercial Industrial Residential Total Building Content BI Total
KAB. BOALEMO 11 1,674.09 - 1.51 858.39 7.97 867.87 50.19 817.67 - 867.87
KAB. BONE BOLANGO 17 362.35 - 1.87 187.03 2.11 191.01 21.77 155.89 13.35 191.01
KAB. GORONTALO 242 2,856.17 - 171.52 1,250.45 66.01 1,487.98 331.71 1,137.33 18.93 1,487.98
KAB. GORONTALO UTARA 11 58.43 - 1.00 16.43 15.92 33.35 7.77 25.58 - 33.35
KAB. POHUWATO 26 36.55 - 8.57 7.70 2.99 19.26 7.28 11.98 - 19.26
KOTA GORONTALO 207 1,074.52 - 249.73 29.93 278.66 558.32 395.98 161.83 0.51 558.32
514 6,062.10 - 434.20 2,349.92 373.66 3,157.78 814.70 2,310.29 32.79 3,157.78
North Maluku: premium (in millions IDR); on-risk exposure per occupation per interest (in billions IDR)
Agriculture Commercial Industrial Residential Total Building Content BI Total
KAB. PULAU TALIABU IV - - - - - - - - - - -
KAB. HALMAHERA BARAT 10 76.29 - 4.99 34.65 0.53 40.17 2.90 37.27 - 40.17
KAB. HALMAHERA SELATAN 13 6,098.87 21.08 11.53 4,246.49 0.17 4,279.27 15.48 4,133.79 130.00 4,279.27
KAB. HALMAHERA TENGAH 8 132.79 - 1.04 91.85 0.04 92.92 78.00 14.92 - 92.92
KAB. HALMAHERA TIMUR 8 13.76 - - 3.85 5.81 9.66 9.40 0.25 - 9.66
KAB. HALMAHERA UTARA 50 275.68 - 133.65 1.60 10.38 145.63 77.56 62.89 5.17 145.63
KAB. KEPULAUAN SULA 5 0.57 - 0.40 - - 0.40 - 0.40 - 0.40
KAB. PULAU MOROTAI 3 0.37 - 0.19 - - 0.19 - 0.19 - 0.19
KOTA TERNATE 328 1,981.26 - 652.11 15.74 154.01 821.87 583.49 237.82 0.55 821.87
KOTA TIDORE KEPULAUAN 21 106.84 - 1.80 48.44 4.91 55.15 49.17 5.97 - 55.15
446 8,686 21 806 4,443 176 5,445 816 4,494 136 5,445
DISCLAIMER
ALL INSURANCE DATA PRESENTED BASED ON CEDED PORTFOLIO FROM INSURANCE COMPANIES IN INDONESIA TO MAIPARK AS AT DATE STATED.
MAP AND INTENSITY ARE PRESENTED BASED ON USGS CALCULATION. ALL FORMULAS AND METHODOLOGIES ARE ACCESSIBLE ON ITS WEBSITES.
5
TOTAL
Occupation Interest
TOTAL
City/KabupatenIntensity
(MMI)
Number of
RiskPremium
Occupation Interest
IV
<IV
Number of
RiskPremium
Occupation Interest
TOTAL
City/KabupatenIntensity
(MMI)
Number of
RiskPremium
(Andri) andry@maipark.com – (021) 29380088 – ext. 1401; (Danar) danar@maipark.com – (021) 29380088 – ext. 1404; (Lita) – narifianti@maipark.com – (021) 29380088 – ext. 1405
ALL EARTHQUAKE PARAMETER(S) IS BASED ON PUBLISHED DATA FROM Badan Meteorologi Klimatologi dan Geofisika (BMKG), United States Geological Survey (USGS) and Geo Forschungs Zentrum (GFZ) ON THEIR
RESPECTIVE WEBSITES. ALL INFORMATION PRESENTED IS DIFFERENT BETWEEN INSTITUTE, DEPENDING ON SEISMIC DATA AND METHODOLOGY APPLIED. MAIPARK DOES NOT SUGGEST THESE EQ INFORMATION TO
BE USED AS AN UNDERWRITING GUIDELINE AS THESE ONLY REPRESENT CIRCUMSTANCE FOR RELATED SPECIFIC EVENT.
IMPACT-Statistical Report on Catastrophic EventContact Person:
IV
City/KabupatenIntensity
(MMI)
Agriculture, 332.78
Commercial, 13,539.38
Industrial, 35,784.53
Residential, 2,858.58
Building,
22,177.09
Content,
24,354.30
BI, 5,983.88
Your Reliable Partner in Catastrophe Risk Transfer
Agriculture, 332.78
Commercial, 13,539.38
Industrial, 35,784.53
Residential, 2,858.58
Building,
22,177.09
Content,
24,354.30
BI, 5,983.88
Agriculture, 332.78
Commercial, 13,539.38
Industrial, 35,784.53
Residential, 2,858.58
Building,
22,177.09
Content,
24,354.30
BI, 5,983.88
REPORTED CLAIMS (NON - TBA) accumulated as at 17:09 WIB
Central Sulawesi : claim amount per occupation (in million IDR) with number of risk
Number of
Risk Claim Amount
Number
of Risk Claim Amount
Number
of Risk Claim Amount
Number
of Risk Claim Amount
Number
of Risk Claim Amount
KAB. DONGGALA VIII - - - - - - - - - -
KOTA PALU VI - - 19 89,037.68 - - - - 19 89,037.68
KAB. PARIGI MOUTONG - - 1 0.004 - - - - 1 0.004
KAB. SIGI - - - - - - - -
KAB. BANGGAI - - - - - - - -
KAB. BANGGAI KEPULAUAN - - - - - - - -
KAB. BANGGAI LAUT - - - - - - - - - -
KAB. BUOL - - - - - - - - - -
KAB. MOROWALI - - - - - - - - - -
KAB. MOROWALI UTARA - - - - - - - - - -
KAB. POSO - - - - - - - - - -
KAB. TOJO UNA-UNA - - - - - - - - - -
Kab. TOLI-TOLI 1 0.004 - - - - 1 0.004
- - 21 89,037.69 - - - - 21 89,037.69
DISCLAIMER
6
V
IV
Occupation
TotalCity/Kabupaten
Intensity
(MMI)
Agriculture Commercial Industrial Residential
TOTAL
(Andri) andry@maipark.com – (021) 29380088 – ext. 1401; (Danar) danar@maipark.com – (021) 29380088 – ext. 1404; (Lita) – narifianti@maipark.com – (021) 29380088 – ext. 1405
ALL NUMBERS OBTAINED FROM INSURANCE COMPANIES ESTIMATION REPORTED TO MAIPARK IN THE FORM OF PRELIMINARY LOSS ADVICE AS AT DATE AND TIME STATED. THE
ESTIMATION CAN CHANGE SIGNIFICANTLY DUE TO INFORMATION UPDATED BY INSURANCE COMPANIES.
TOTAL CLAIM REPORTED ARE 49 RISKS, CONSISTS OF:
1. TOTAL CLAIM REPORTED NON TBA = 21 RISKS, THE AMOUNT OF CLAIM IS IDR 89,037,691,432.04, CONTRIBUTED BY 3 COMPANIES.
2. TOTAL CLAIM REPORTED TBA = 28 RISKS (FOR MORE DETAIL INFORMATION SEE IN THE NEXT PAGE)
IMPACT-Statistical Report on Catastrophic EventContact Person:
TBA IS AN ABBREVIATION FOR "TO BE ANNOUNCED" WHICH MEAN NO ESTIMATION AVAILABLE FOR AMOUNT OF CLAIM.
Your Reliable Partner in Catastrophe Risk Transfer
TO BE ANNOUNCED (TBA) CLAIMS accumulated as at 17:09 WIB
Central Sulawesi
KAB. DONGGALA VIII
KOTA PALU Conventional power station, buildings with boiler houses and steam houses 1
Mass communication 1
Private Building 12
Trading and storage 4
Insufficient information 3
Coffee roasting plants and coffee extract factories, malting 1
Manufacturer of plastic articles, Foam plastic, Synthetics resin 1
Edible fats, edible oil and desiccated coconut producers 2
KAB. PARIGI MOUTONG
KAB. SIGI
KAB. BANGGAI
KAB. BANGGAI KEPULAUAN
KAB. BANGGAI LAUT
KAB. BUOL
KAB. MOROWALI
KAB. MOROWALI UTARA
KAB. POSO
KAB. TOJO UNA-UNA
Kab. TOLI-TOLI
25
North Sulawesi
KAB. BOLAANG MONGONDOW
KAB. BOLAANG MONGONDOW TIMUR
KAB. BOLAANG MONGONDOW UTARA
KAB. MINAHASA SELATAN
KAB. MINAHASA TENGGARA
KOTA KOTAMOBAGU
KOTA TOMOHON
KAB. KEPULAUAN SANGIHE
KAB. KEPULAUAN TALAUD
KAB. MINAHASA
KAB. MINAHASA UTARA
KAB. SIAU TAGULANDANG BIARO
KOTA BITUNG
KOTA MANADO Mass communication 3
3
7
(Andri) andry@maipark.com – (021) 29380088 – ext. 1401; (Danar) danar@maipark.com – (021) 29380088 – ext. 1404; (Lita) – narifianti@maipark.com – (021) 29380088 – ext. 1405
IMPACT-Statistical Report on Catastrophic EventContact Person:
ALL NUMBERS OBTAINED FROM INSURANCE COMPANIES ESTIMATION REPORTED TO MAIPARK IN THE FORM OF PRELIMINARY LOSS ADVICE AS AT
DATE AND TIME STATED. THE ESTIMATION CAN CHANGE SIGNIFICANTLY DUE TO INFORMATION UPDATED BY INSURANCE COMPANIES.
TBA IS AN ABBREVIATION FOR "TO BE ANNOUNCED" WHICH MEAN NO ESTIMATION AVAILABLE FOR AMOUNT OF CLAIM.
City/KabupatenIntensity
(MMI)Description of 3 Digit Occupation Code
TOTAL
Description of 3 Digit Occupation Code
Number
of Risk
V
IV
VI
IV
<IV
TOTAL
Number
of RiskCity/Kabupaten
Intensity
(MMI)
Your Reliable Partner in Catastrophe Risk TransferYour Reliable Partner in Catastrophe Risk Transfer
EXPOSURE PROFIL OF CENTRAL SULAWESI 18 Sep - 04 Oct 2018
8 IMPACT-Statistical Report on Catastrophic EventContact Person:
(Andri) andry@maipark.com – (021) 29380088 – ext. 1401; (Danar) danar@maipark.com – (021) 29380088 – ext. 1404; (Lita) – narifianti@maipark.com – (021) 29380088 – ext. 1405
Your Reliable Partner in Catastrophe Risk Transfer
1218 Risks
15,420 1217 Risks
15,418
1217 Risks
15,418 1215 Risks
15,417
1215 Risks
15,417
1214 Risks
15,417
1214 Risks
15,417
1214 Risks
15,417 1210 Risks
15,408
1210 Risks
15,408 1209 Risks
15,407
1207 Risks
15,396 1205 Risks
15,394
1139 Risks
15,301
1130 Risks
15,171
1130 Risks
15,171
1130 Risks
15,171
15,000
15,050
15,100
15,150
15,200
15,250
15,300
15,350
15,400
15,450
Tuesday, September 18,
2018
Wednesday, September 19,
2018
Thursday, September 20,
2018
Friday, September 21, 2018 Saturday, September 22,
2018
Sunday, September 23,
2018
Monday, September 24,
2018
Tuesday, September 25,
2018
Wednesday, September 26,
2018
Thursday, September 27,
2018
Friday, September 28, 2018 Saturday, September 29,
2018
Sunday, September 30,
2018
Monday, October 1, 2018 Tuesday, October 2, 2018 Wednesday, October 3,
2018
Thursday, October 4, 2018
EX
PO
SU
RE
(IN
BIL
LIO
NS
ID
R)
ON-RIKS AS AT
SUMMARY OF CLAIM REPORTED POSITION
DISCLAIMER
NUMBER OF RISKS PRESENTED IN THE GRAPH ABOVE ONLY REPRESENTED FROM NON TBA CLAIMS.
9 IMPACT-Statistical Report on Catastrophic EventContact Person:
(Andri) andry@maipark.com – (021) 29380088 – ext. 1401; (Danar) danar@maipark.com – (021) 29380088 – ext. 1404; (Lita) – narifianti@maipark.com – (021) 29380088 – ext. 1405
Your Reliable Partner in Catastrophe Risk Transfer
21 Risks
89,037,687,432
-
10,000,000,000
20,000,000,000
30,000,000,000
40,000,000,000
50,000,000,000
60,000,000,000
70,000,000,000
80,000,000,000
90,000,000,000
100,000,000,000
3-Oct-2018 4-Oct-2018 4-Oct-2018 5-Oct-2018 5-Oct-2018 6-Oct-2018 6-Oct-2018 7-Oct-2018 7-Oct-2018
CL
AIM
(IN
ID
R)
DATA AS AT
10 IMPACT-Statistical Report on Catastrophic EventContact Person:
(Andri) andry@maipark.com – (021) 29380088 – ext. 1401; (Danar) danar@maipark.com – (021) 29380088 – ext. 1404; (Lita) – narifianti@maipark.com – (021) 29380088 – ext. 1405
Your Reliable Partner in Catastrophe Risk Transfer
Kota Palu(Zone V)
Kota Makassar
Kota Kendari(Zone V)
Kota Manado(Zone V)