Post on 09-Nov-2021
PROJECT No.
DRAWING No.
CHECKED
SCALE
DRAWN
DATE
DATE
TITLE
INFRASTRUCTURE &
PROJECT
REVISION DETAILS
DO NOT SCALE FROM DRAWING.ALL DIMENSIONS ARE IN mm UNLESS
OTHERWISE STATED.
COPYRIGHT, DESIGNS and PATENTS ACT 1986:
THIS DRAWING MAY NOT BE REPRODUCED, COPIED OR USEDIN ANY WAY WITHOUT THE WRITTEN PERMISSION OF THEDIRECTOR OF DEVELOPMENT AND INFRASTRUCTURE. C THE HIGHLAND COUNCIL
NOTES
ENVIRONMENT
The HighlandCouncil
Comhairle naGaidhealtachd
REVISION
T:\0
01_D
esig
n Te
am 2
\003
_Sm
all_
Sche
mes
_Pro
ject
s\H
AS30
01 S
afer
Rou
tes
To S
choo
l\202
0 - 2
021
Sche
mes
\Loc
hcar
ron
Prim
ary
- YC
HM
S304
9\2
DR
AWIN
GS\
CAD
\LIV
E\LO
CH
CAR
RO
N_L
IVE_
01.d
wg
06/
04/2
021
AN
SI A
(8.5
0 x
11.0
0 In
ches
)
DRAWNBY
CHECKBY DATE
1.
REV
CONSULTATIONISSUE
C CROWN COPYRIGHT AND DATABASE RIGHTS 2019 OS100023369. YOU ARE GRANTED A NON-EXCLUSIVE, ROYALTYFREE, REVOCABLE LICENCE SOLELY TO VIEW THE LICENSEDDATA FOR NON-COMMERCIAL PURPOSES FOR THE PERIODWHICH THE HIGHLAND COUNCIL MAKES IT AVAILABLE. YOUARE NOT PERMITTED TO COPY, SUB-LICENSE, DISTRIBUTE,SELL OR OTHERWISE MAKE AVAILABLE THE LICENSED DATATO THIRD PARTIES IN ANT FORM. THIRD PARTY RIGHTS TOENFORCE THE TERMS OF THIS LICENCE SHALL BE RESERVEDTO THE OS.
ORIGINAL SIZE
A1 (594 x 841)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
B
C
D
E
F
G
H
J
K
L
M
A
B
C
D
E
F
G
H
J
K
L
M
PROJECT DESIGN UNITCOUNCIL BUILDINGS
HIGH STREETDINGWALL IV15 9QN
PHONE: 01349 868800E-MAIL: PDU.DT2@highland.gov.uk
CYCLING, WALKING ANDSAFER STREETS AT
LOCHCARRONPRIMARY SCHOOL
A896 - CENTRALCROSSING IMPROVEMENTS
AS SHOWNCF 03/02/21
BS 06/04/21
YCHMS3049
102 01
01 CONSULTATION ISSUE CF BS 06/04/21
SITE
LOCATION PLANSCALE 1:50,000
GENERAL LAYOUTSCALE 1:500
DETAIL 01SCALE 1:100
REFER TO DETAIL 03
0.9mDK
1.8mBN
0.9mDK
EXISTING FOOTPATH
LEGEND
PROPOSED FOOTPATH SURFACE(APPROX 16.2m²)
AREA TO BE GRADED
400x400 TACTILE PAVING (BUFF)
EF KERB
BN - BULL NOSE PEDESTRIAN CROSSING KERBHB2 - HALF BATTERED ROAD KERBDK - DROP KERBEF - EDGING KERB
3.0m
0.5m4.9m
DETAIL 02SCALE 1:200
DETAIL 03SCALE 1:200
REFER TO DETAIL 02
REFER TO DETAIL 01
5.0m 5.0m
.5m
5.5m 12.5mROAD MARKINGTO DIAG 1012.1
6.5m
ROAD MARKING
TO DIAG 1009.A
23.9m
ROAD MARKING
TO DIAG 1012.1
3.0m
.5m
.5m
5.0m
5.6m
.5m
5.0m
51.8mROAD MARKINGTO DIAG 1009.A
27.2mROAD MARKING
TO DIAG 1012.1
5.5m
5.6m
ROAD MARKINGTO DIAG 1012.1
101.2m
8.5mROAD MARKING
TO DIAG 1012.1
8.5mROAD MARKINGTO DIAG 1012.1
REFER TO DETAIL 01
EXISTING TACTILESAND DROPPED KERB
TIE INTO EXISTING FOOTPATH
HIGH FRICTION SURFACING (RED)
0.9m
5003000
4000
EXISTINGKERB LINE ROAD MARKING TO DIAG 1012.1
ROAD MARKING DETAILSCALE 1:20
REFER TO ROAD MARKING DETAIL REFER TO ROAD MARKING DETAIL
REFER TO ROAD MARKING DETAIL
REFER TO ROAD MARKING DETAILREFER TO ROAD MARKING DETAIL ROAD MARKING OMITTED AT GULLY
ROAD MARKING OMITTED AT GULLYROAD MARKING OMITTED AT GULLY
ROAD MARKING OMITTED AT GULLY
ROAD MARKING OMITTED AT GULLY