diagrama de masas

Post on 10-Apr-2016

29 views 2 download

description

diagrama de masas y calculo de volumen

Transcript of diagrama de masas

FACTOR DE CONTRACCION

DATOS A INGRESAR RESULTADOS

ProgresivaDISTANCIA AREA CORTEAREA RELLENO VCB

m m2 m2 m3

00+270 0.00 0.452 0.000 0.00000+280 10.00 0.331 0.000 3.91500+300 20.00 0.000 2.213 3.31000+320 20.00 0.260 0.285 2.60000+340 20.00 0.000 0.141 2.60000+350 10.00 0.427 0.000 2.13500+360 10.00 2.930 0.930 16.78500+370 10.00 1.081 0.000 20.05500+380 10.00 1.560 1.049 13.20500+400 20.00 1.115 0.060 26.750

91.36

VOLUMEN TOTAL DE CORTE EN TODO EL PROYECTO

VOLUMEN LATERAL DE CORTE UTILIZADO COMO RELLENO EN LA MISMA ESTACION

FACTOR DE CONTRACCION 1.00

RESULTADOSVRC VRB VLA SA OMm3 m3 m3 m3 m3

0.000 0.000 0.000 0.000 0.0000.000 0.000 0.000 3.915 3.915

22.130 22.130 3.310 -18.820 -14.90524.980 24.980 2.600 -22.380 -37.2854.260 4.260 2.600 -1.660 -38.9450.705 0.705 0.705 1.430 -37.5154.650 4.650 4.650 12.135 -25.3804.650 4.650 4.650 15.405 -9.9755.245 5.245 5.245 7.960 -2.015

11.090 11.090 11.090 15.660 13.645

34.85

VOLUMEN LATERAL DE CORTE UTILIZADO COMO RELLENO EN LA MISMA ESTACION

VOLUMEN LONGITUDINAL MATERIA CORTE LLEVADO A OTRA ESTACION

ASUMIMOS EL VALOR DE 1 POR NO TENER COMO DATO

56.51

VOLUMEN LONGITUDINAL MATERIA CORTE LLEVADO A OTRA ESTACION

DATOS A INGRESAR

ProgresivaDISTANCIA AREA CORTE

m m2

0+000 0.00 0.000+020 20.00 1.000+040 20.00 9.000+060 20.00 14.000+080 20.00 12.000+100 20.00 10.000+120 20.00 11.000+130 10.00 10.000+140 10.00 9.000+150 10.00 8.000+160 10.00 7.000+180 20.00 6.000+200 20.00 5.000+220 20.00 4.000+240 20.00 3.000+260 20.00 1.060+280 20.00 2.000+290 10.00 0.000+300 10.00 10.000+310 10.00 9.090+330 20.00 3.000+350 20.00 4.000+370 20.00 5.000+390 20.00 6.000+400 10.00 8.030+410 10.00 8.000+420 10.00 9.000+430 10.00 10.000+450 20.00 11.000+460 10.00 12.000+480 20.00 13.380+500 20.00 1.000+520 20.00 5.000+540 20.00 2.00

CURVA DE MASA

VOLUMEN TOTAL DE CORTE EN TODO EL PROYECTO

-800.00

-600.00

-400.00

-200.00

0.00

200.00

400.00

600.00

800.00

1,000.00

1,200.00

0.0010.0054.44

228.89

477.78

664.44

818.89885.00

930.00951.11954.44924.44

845.56

724.44

561.11

323.93

54.53

-63.24-124.36-145.57

-269.12

-432.45

-553.56

-632.45-645.63-637.71-613.82-568.82

-436.59

-354.93

-145.57-157.33

-252.88-282.88

Curva Masa

CALCULO DEL MATERIAL DE PRESTAMO O ELIMINACION

DETERMINACION DE LAS ZONAS DE BALANCE

-800.00

-600.00

-400.00

-200.00

0.00

200.00

400.00

600.00

800.00

1,000.00

1,200.00

0.0010.0054.44

228.89

477.78

664.44

818.89885.00

930.00951.11954.44924.44

845.56

724.44

561.11

323.93

54.53

-63.24-124.36-145.57

-269.12

-432.45

-553.56

-632.45-645.63-637.71-613.82-568.82

-436.59

-354.93

-145.57-157.33

-252.88-282.88

Curva Masa

VOLUMEN LONGITUDINAL MATERIA CORTE LLEVADO A OTRA ESTACION

-800.00

-600.00

-400.00

-200.00

0.00

200.00

400.00

600.00

800.00

1,000.00

1,200.00 zonas de balance

1

2

LINEAS DE BALANCE

-800.00

-600.00

-400.00

-200.00

0.00

200.00

400.00

600.00

800.00

1,000.00

1,200.00 zonas de balance

1

2

-800.00

-600.00

-400.00

-200.00

0.00

200.00

400.00

600.00

800.00

1,000.00

1,200.00 LINEAS DE BALANCE

SENTIDO DEL ACAREO

-800.00

-600.00

-400.00

-200.00

0.00

200.00

400.00

600.00

800.00

1,000.00

1,200.00 LINEAS DE BALANCE

-800.00

-600.00

-400.00

-200.00

0.00

200.00

400.00

600.00

800.00

1,000.00

1,200.00

SENTIDO DE LOS ACARREOS

Corte

Corte

Relleno

Relleno

SELECCIÓN DEL EQUIPO MAS EFICIENTE PARA CADA ZONADISTANCIAS DE ACARREO

vol 954.44area 151,233.19

DA-1 158.45

vol 500.06area 52,130.55

DA-2 104.25

FACTOR DE CONTRACCION 0.90

DATOS A INGRESAR RESULTADOSAREA RELLENO VCB VRC VRB VLA

m2 m3 m3 m3 m3

0.00 0.00 0.00 0.00 0.000.00 10.00 0.00 0.00 0.005.00 100.00 50.00 55.56 55.560.00 230.00 50.00 55.56 55.561.00 260.00 10.00 11.11 11.112.00 220.00 30.00 33.33 33.333.00 210.00 50.00 55.56 55.564.00 105.00 35.00 38.89 38.895.00 95.00 45.00 50.00 50.006.50 85.00 57.50 63.89 63.896.40 75.00 64.50 71.67 71.678.00 130.00 144.00 160.00 130.009.00 110.00 170.00 188.89 110.0010.00 90.00 190.00 211.11 90.0011.00 70.00 210.00 233.33 70.0014.00 40.60 250.00 277.78 40.6013.00 30.60 270.00 300.00 30.6010.00 10.00 115.00 127.78 10.0010.00 50.00 100.00 111.11 50.0011.00 95.45 105.00 116.67 95.4511.00 120.90 220.00 244.44 120.9010.00 70.00 210.00 233.33 70.009.00 90.00 190.00 211.11 90.008.00 110.00 170.00 188.89 110.007.00 70.15 75.00 83.33 70.156.00 80.15 65.00 72.22 72.225.00 85.00 55.00 61.11 61.114.00 95.00 45.00 50.00 50.003.00 210.00 70.00 77.78 77.783.00 115.00 30.00 33.33 33.331.00 253.80 40.00 44.44 44.4413.00 143.80 140.00 155.56 143.801.00 60.00 140.00 155.56 60.008.00 70.00 90.00 100.00 70.00

3,590.45 2,135.94

CURVA DE MASA

VOLUMEN TOTAL DE CORTE EN TODO EL PROYECTO

VOLUMEN LATERAL DE CORTE UTILIZADO COMO RELLENO EN LA MISMA ESTACION

-800.00

-600.00

-400.00

-200.00

0.00

200.00

400.00

600.00

800.00

1,000.00

1,200.00

0.0010.0054.44

228.89

477.78

664.44

818.89885.00

930.00951.11954.44924.44

845.56

724.44

561.11

323.93

54.53

-63.24-124.36-145.57

-269.12

-432.45

-553.56

-632.45-645.63-637.71-613.82-568.82

-436.59

-354.93

-145.57-157.33

-252.88-282.88

Curva Masa

CALCULO DEL MATERIAL DE PRESTAMO O ELIMINACION

material de prestamo

1,454.51

DETERMINACION DE LAS ZONAS DE BALANCE

-800.00

-600.00

-400.00

-200.00

0.00

200.00

400.00

600.00

800.00

1,000.00

1,200.00

0.0010.0054.44

228.89

477.78

664.44

818.89885.00

930.00951.11954.44924.44

845.56

724.44

561.11

323.93

54.53

-63.24-124.36-145.57

-269.12

-432.45

-553.56

-632.45-645.63-637.71-613.82-568.82

-436.59

-354.93

-145.57-157.33

-252.88-282.88

Curva Masa

-800.00

-600.00

-400.00

-200.00

0.00

200.00

400.00

600.00

800.00

1,000.00

1,200.00 zonas de balance

1

2

LINEAS DE BALANCE

-800.00

-600.00

-400.00

-200.00

0.00

200.00

400.00

600.00

800.00

1,000.00

1,200.00 zonas de balance

1

2

-800.00

-600.00

-400.00

-200.00

0.00

200.00

400.00

600.00

800.00

1,000.00

1,200.00 LINEAS DE BALANCE

SENTIDO DEL ACAREO

-800.00

-600.00

-400.00

-200.00

0.00

200.00

400.00

600.00

800.00

1,000.00

1,200.00 LINEAS DE BALANCE

-800.00

-600.00

-400.00

-200.00

0.00

200.00

400.00

600.00

800.00

1,000.00

1,200.00

SENTIDO DE LOS ACARREOS

Corte

Corte

Relleno

Relleno

SELECCIÓN DEL EQUIPO MAS EFICIENTE PARA CADA ZONA

TRAILLA

TRACTOR

RESULTADOSSA OMm3 m3

0.00 0.0010.00 10.0044.44 54.44

174.44 228.89248.89 477.78186.67 664.44154.44 818.8966.11 885.0045.00 930.0021.11 951.113.33 954.44

-30.00 924.44-78.89 845.56

-121.11 724.44-163.33 561.11-237.18 323.93-269.40 54.53-117.78 -63.24-61.11 -124.36-21.22 -145.57

-123.54 -269.12-163.33 -432.45-121.11 -553.56-78.89 -632.45-13.18 -645.637.93 -637.71

23.89 -613.8245.00 -568.82

132.22 -436.5981.67 -354.93

209.36 -145.57-11.76 -157.33-95.56 -252.88-30.00 -282.88 material de prestamo

1,454.51

CURVA DE MASA

VOLUMEN LONGITUDINAL MATERIA CORTE LLEVADO A OTRA ESTACION

CALCULO DEL MATERIAL DE PRESTAMO O ELIMINACION

DETERMINACION DE LAS ZONAS DE BALANCE

LINEAS DE BALANCE

SENTIDO DEL ACAREO

SELECCIÓN DEL EQUIPO MAS EFICIENTE PARA CADA ZONA

DISTANCIAS DE ACARREO

vol 954.44area 151,233.1927 dato del autocad

DA-1 158.45

vol 500.06area 52130.5500 dato del autocad

DA-2 104.25