Table of Contents
TOPIC PAGE
SMECO Engineering Summary 4
Electric Service Request Information Requirements and Form 5
Customer/Developer/Contractor/Electrician Responsibilities 8
Separation and Depth - Electric Power Facilities 9
General Conduit Installation Guidelines 10
Typical Conduit Detail - 600 Amp Enclosure and Switch 11
Typical Conduit Detail - 200 Amp Enclosure 12
Typical Conduit Detail- I Phase and 3 Phase Transformers 13
Primary Riser Conduit Installation 14
Poured Concrete Pad For 3 Phase Transformers 1500 kva or Greater1 15
Fiberglass Box Pad For 3 Phase Transformer Installation 16
Mini-Fiberglass Box Pad For 75 and 150 kva 3 Phase Mini-Transformer 17 Installation
Three Phase Flat Pad Conduit Requirements 18
Underground Residential Services From Secondary Pedestals For 19 Conduit Installation Only
Underground Residential Services From Secondary Subsurface 20 Pedestals For Traditional Neighborhood Development
Meter Installation Requirements For Multiple Services ofThree 22 or More (240V or less Phase to Ground)
Current Transformer Cabinet - 1 00A to 800A Service Rating 23
1 This page has been revised as ofMarch 2015
Table of Contents
TOPIC PAGE
Current Transformer Cabinet - 801A to 2000A Service Rating 24
CT/Bus Bar Cabinet For Metering and Service Cable Termination1 25 (2500A or Less)
Bus Bar Cabinet For Service Cable Tennination 26
Typical Switchgear/Switchboard Utility Compartment Requirements 27 (This standard is being revised, consult with SMECO Engineering
Before purchasing and installing)
General Requirements For Meter Rooms 29
Separation ofOutdoor Oil Filled Distribution Transformers From1 30 Buildings and Other Equipment Less Than 2500 KVA
Barrier Post Specifications and Installation Requirements 31
Marker Ball Installations at Road Crossings 32
Underground Temporary Construction Service 34
Overhead Temporary Construction Service Pole 35
1 This page has been revised as ofMarch 2015
SMECO Engineering Summary
Initial Contact Phase **You will be required to provide infonnation described on the Electric
Service Request Form (See pages 5-8 of this handbook).
**You will be assigned an engineer who will contact you back to set up a site meeting.
SMECO Engineering Verify availability and configuration ofelectric service.
Meet customer at project site.
Provide a copy ofthe "handbook".
Customer/Developer/Contractor/Electrician Review entire "handbook" and abide by all items pertinent to the project.
Submit a complete package ofall items that have been identified for engineering design to commence.
SMECO Engineering Review all infonnation received and provides comments back on approvals.
Designs the job.
Notifies Right-of -way/easement Dept.
Calculates construction costs and customer charges.
Pre-construction Phase Customer/Developer/Contractor/Electrician
Provides any outstanding revisions.
Provide signed agreements, contracts, inspections and payment.
SMECO Engineering Review and approve corrected revisions.
Sends customer invoice (ClAC)
Releases design to Construction Department and Meter Department
Construction Phase Customer/Developer/Contractor/Electrician
Refer to standards, guidelines, and specifications found in handbook for installations and construction ofcustomer owned equipment and SMECO facilities and equipment .
SM 1-888-440-3311 P.O. Box 1937, Hughesville, MD 20637 www.smeco.coop
ELECTRIC SERVICE REQUEST INFORMATION REQUIREMENTS
Southern MarylandElectric Cooperative
NEW SERVICE
Please provide the following Information so that SMECO can design a new service:
Electrlc Service Request Form: Fully oompleted Page 2 and 3 of this document for each meter requested.
Drawings: One set of County approved plans, which include the following: electrical, architectural, site plan, grading plan, storm water management, landscaping, topography, water, sewer, gas or other utilities (including utility profile drawings). Ifpossible, please submit on disk (AutoCAD) to expedite the design process. A requested meter and transformer location can be shown. All equipment locations are subject to SMECO approval.
Riser Diagram: Profile drawings(s) showing the layout and dimension of proposed service equipment. This diagram is to include all panel, CT cabinet. junction box, trough, transfer switch and otherservice equipment details and must be approved by SMECO orior to installation. A standard phone jack with dial tone is required at the metering location for services with expected demands above 500 kW (as calculated by SMECO).
Manufacturer Info: Manufacturer catalog cut sheets and/or drawings (including part numbers, ratings, dimensions etc.) are required to be submitted for SMECO approval for any of the following if being used: meter stacks, switchgear, generator automatic transfer switches. Note: All automatic transfer switches shall be of the open-transition (break before make) design. This must be indicated on the information provided. Jf electronic starting or other significant harmonic producing equipment is to be installed, a harmonic profile of the load at each harmonic up to the 50th multiple, is required. Equipment must meet IEEE 519 standard for harmonic generation.
SERVICE MODIFICATION OR UPGRADE
Please provide the following information for an existing service:
Electric Service Request Form: If modification pages 2 and 3; upgrade pages 2 and 3 - list added load only.
Drawings: One (1) set of drawings which reflect any remodeling to be performed (if applicable). Ifpossible, please submit on disk (AutoCAD) to expedite the design process.
Riser Diagram: See above description. Both the existing and new service arrangements shall be shown.
Manufacturer Info: See above description.
WHERE TO SEND INFORMATION SMECO - ATTN: ENGINEERING & OPERATIONS - DISTRIBUTION ENGINJSYSTEM INFO. 14950 COOPERATIVE PLACE, PO BOX 1937 HUGHESVILLE, MD 20637-1937 Note: Designs must be approved by SMECO before equipment Is purchased or installed.
Ifyou have not had prior service with SMECO in this name and this request is for Commercial Service, provide the Articles of Incorporation and the TAX ID number for the business. Your request will not be started until this information is received.
Page 1 of 3
1-888-440-3311 P.O. Box 1937, Hughasvllla, MD 20637 www.smeco.coopSMECO
Sou/hem Maryland Eleclric COoperative
ELECTRIC SERVICE REQUEST FORM
*Work Request No.: -------- Date Submitted: (for SMECO's use)
Name Service Will Be In:
911 Service Address: ---------------------------Sub division:
Billing Address:
Contact Person: ----------------Tel No.:
Designing Company:
Address:
Tel No.:
New Construction r Change to existing service r Meter Number:
Description: OH to UG Conversion: r yes House Panel/Bldg #: Heavy Up: to
Unit or Suite #{s): Service Relocation: r yes Misc./Description:
Temporary Service r
Requested Voltage: r 120/240V, 1 PH r 120/240V, 3 PH (high-leg)** r 120/208V, 3PH r 120/208V, 1PH ** r 277/480V, 3PH ** These services granted by special
permission only (call SM ECO)
Service/Main Disconnect(s) Size (Amps):
Connected Load (Amps):
* Note: If you have not had prior service with SMECO in this name and this request is for Commercial Service, provide the Articles of Incorporation and the TAX ID number for the business. Your request will not be started until this information is received.
Page 2 of 3
1-888-440-3311 P.O. Box 1937, Hughesville, MD 20637 www.smeco.coop
ELECTRIC SERVICE REQUEST FORM
Electrical Load Data Note: See Page 1 for additional required information
Type of Load kW Phase Type of Load kW Phase Liahtina Receptacles Cooking Miscellaneous Air Conditionina Other(list separately): Heat Pump Compressor Resistance Heat Water Heating Refrigeration Motors
Largest Motor Rating (HP): Locked Rotor Amps:
Proposed Type Motor Starting: r Full Line Voltage r Delta-Y r Other r Reduced Voltage r Electronic
Power Factor Correction Measures Taken?: ryes r no Note: SMECO Increases bUllng demand to compensate for average powerfactor less than 90% (See GS Rate Schedule)
Submitted by: Print Name Signature*
* Signature above indicates that submitter has read Page 1 - Information Requirements
FOR SMECO USE ONLY
Date Received: Account No.
FOR CONDUIT INSPECTION* AND SCHEDULING OF CONSTRUCTION CREWS PLEASE CALL THE FOLLOWING:
CALVERT COUNTY 410-535-9408 ST. MARYS COUNTY 301-475-1593 P.G. & CHARLES COUNTY 301-396-4907
*PLEASE ALLOW 24 HOURS NOTICE FOR CONDUIT INSPECTION
Page 3 of 3
CUSTOMER/ DEVELOPER/ CONTRACTOR/ ELECTRICIAN RESPONSIBILITIES
1. INSTALLATION OF THE UNDERGROUND ELECTRIC CONDUIT SYSTEM SHALL NOT BEGIN UNTIL THE CONTRACTOR RECEIVES SMECO APPROVED PROJECT DRAWINGS. THESE DRAWINGS ARE TO BE FOLLOWED IN CONJUNCTION WITH DRAWING A-4542 "GENERAL CONDUIT INSTALLATION GUIDELINES".
2. INSURE DEPTH OF CONDUIT IS BASED ON FINISHED GRADE ELEVATIONS.
3. THE DEVELOPER SHALL BE RESPONSIBLE FOR SUPPLYING PROPERTY MARKERS, RIGHT-OF-WAY MARKERS, RADIUS OF CURVATURE MARKERS, SIDEWALK MARKERS, AND CURB MARKERS AS NEEDED FOR THE ELECTRICAL CONDUIT INSTALLATION BEFORE, DURING AND AFTER CONSTRUCTION.
4. SMECO MUST INSPECT THE UNDERGROUND ELECTRIC CONDUIT SYSTEM INCLUDING ALL OPEN TRENCHES. MAKE REQUEST VIA PROJECT POINT OF CONTACT . ..FUTURE INSPECTION POLICY IS UNDER DEVELOPMENT*
5. THE CONDUIT SYSTEM WILL BE OFFICIALLY ACCEPTED WHEN SMECO SUCCESSFULLY INSTALLS CABLE IN THE CONDUIT SYSTEM. ALL AS-BUilT DRAWINGS MUST BE SUBMITTED TO SMECO PRIOR TO FINAL ACCEPTANCE.
6. FIELD CHANGES TO THE CONDUIT DESIGN MUST BE APPROVED BY SMECO ENGINEERING IN WRITING.
7. THE DEVELOPER SHALL ENSURE THAT THE CONSTRUCTION SITE IS FREE FROM ANY OBSTRUCTIONS SUCH AS DIRT, LUMBER, CONCRETE BLOCK, ETC. THAT MAY PREVENT THE INSTALLATION OF THE ELECTRIC DISTRIBUTION CABLE SYSTEM.
8. THE DEVELOPER SHALL BE RESPONSIBLE FOR ANY AND ALL COMPACTION (IF NEEDED) WITHIN THE ROAD RIGHT-OF-WAY AND ON PRIVATE PROPERTY WHERE SMECO FACILITIES ARE LOCATED. SUCH FACILITIES INCLUDE BUT ARE NOT LIMITED TO, TRANSFORMERS, ENCLOSURES, SWITCHES, ETC. AND INCLUDES ALL LANDSCAPING AND SWALE RECONSTRUCTION.
9. THE DEVELOPER MUST PROVIDE A TEN-FOOT UTILITY EASEMENT ALONG THE ROAD RIGHT-OF-WAY ON PRIVATE PROPERTY FOR ALL ROADS WITHIN THE DEVELOPMENT. ALL TREES, AND OTHER OBSTRUCTIONS, MUST BE REMOVED WITHIN THIS EASEMENT.
10. THE DEVELOPER SHALL BE RESPONSIBLE TO ENSURE SHRUBS, PLANTS, AND STRUCTURES ARE KEPT TEN (10) FEET FROM THE FRONT SIDE OF TRANSFORMERS AND ENCLOSURES AND THREE (3) FEET FROM THE OTHER SIDES. SMECO RESERVES THE RIGHT TO REMOVE ANY OBSTRUCTIONS WITHOUT NOTICE TO THE OWNER IF ANY DEVIATIONS FROM THIS STANDARD ARE ENCOUNTERED IN THE FIELD.
11. CITY, COUNTY, OR STATE PERMITS AND RAILROAD PERMITS AND RIGHT-OF-WAYS WILL BE OBTAINED BY SMECO AS NECESSARY. NO CONSTRUCTION CAN BE STARTED UNTIL ALL APPLICABLE APPROVED PERMITS ARE RECEIVED.
12. STREETLIGHTS AND SECURITY YARD LIGHTS ARE AVAILABLE FROM SMECO WITH DEVELOPER COST PARTICIPATION FOR LIGHTING MATERIALS. THE DEVELOPER IS RESPONSIBLE FOR ALL CONDUITS FOR LIGHTING. CONTACT SMECO LIGHTING REPRESENTATIVE FOR FURTHER INFORMATION.
THESE SPECIFICATIONS REFLECT MINIMUM REQUIREMENTS AND SMECO RESERVES THE RIGHT TO ALTER OR IMPOSE MORE STRINGENT REQUIREMENTS AS NECESSARY.
I 1 I UPDATED TITLE I 11119/14 IJRMI RJS I O I UPDATED SHEET BORDER I INO I REVISION
DRAWN I I
CHECKED
CLC KLW
I6111/14 IKJGI RJS
DATE IBYIAPP
APPROVED
CUSTOMER/ DEVELOPER/ HOR
CONTRACTOR/ ELECTRICIAN DATE ICONST. UNIT#I RDUP# 6/23/08 NIA I T-116
RESPONSIBILITIES DWG. # SHT. # ITOTAL SHT. #
A-4543 1 1
24" MINIMUM SECONDARY POWER 4/0, 500 MCM CABLES
2 1/2", 3", 4" CONDUITS
BACKFILL FREE OF MATERIALS LARGER THAN 1" DIAMETER THAT
MAY DAMAGE CONDUIT OR DIRECT BURIED CABLE. BOTTOM OF TRENCH
MUST HAVE A SMOOTH GRADE.
4"
COMPACTED BACKFILL
2"
36" MINIMUM PRIMARY POWER
1/0, 750, 1000 MCM CABLES 4", 6", 8" CONDUITS
HYSICAL CO RATION MAY ' VARY FOR CABLES OF THE SAME ""-SIZE OR SAME CIRCUIT -THERE IS PER RUS BULLETIN
NO MINIMUM SEPARATION 172BF-806 REQUIRED BETWEEN CABLES (TYP.)
*DEPTHS SPECIFIED ABOVE ARE TO FINISHED GRADE.* MINIMUM SEPARATION (FEETI-HORIZONTAL
OTHER UTILITIES MULTIPLE CIRCUITS
SMECO WATER/
TELE- FIBER CABLE SECONDARY/ STREET PRIMARY PRIMARY
FACILTY SEWER/ PHONE OPTIC TV
GAS SERVICE LIGHT 1/0CABLE 750 or1000 STORM CABLE CABLE CABLE
SECONDARY/ ;/. 1 y, 1 /,SERVICE 1 Note(8) Note(2) 0 0 5
CABLE
STREET V, 1 ;/. V.LIGHT 1 Note(8) 1 0 0 5 CABLE
PRIMARY V, 1 y, 1
~ 1/. 31/0CABLE 1
Note(8) Note(3) 5
PRIMARY 750 or 1000
5 5 5 5 5
5 5CABLE Note(3) 5 5
(NOTE 6)
NOTES: 1. ALL VERTICAL SEPARATIONS SHALL BE A MINIMUM OF 1 FT.
: 2. ELECTRIC METERS SHALL HAVE 3 FT. SEPARATION FROM GAS METERS.
5. VALUE IN UPPER HALF REFERS TO INSTALLATIONS OF BOTH CABLES AT THE SAME TIME VALUE IN BOTTOM HALF REFERS TO WHEN ONE CABLE ALREADY EXISTS IN THE GROUND AND THE OTHER IS BEING INSTALLED I
~ 3. ,:..... .c ::,
~
a
f... C, z w
4.
- 5 FT. SEPARATION FROM COMPRESSED OR LIQUEFIED NATURAL GAS DISPENSER ENCLOSURES.
• 20 FT. SEPARATION FROM LIQUEFIED PETROLEUM GAS DISPENSER ENCLOSURES.
- 5 FT. VERTICAL AND HORIZONTAL SEPARATION FROM GAS MAIN PIPELINES.
REFERENCES: 2007 NESC SECTION 32-320 (B), 32-352, SECTION 35-353, SECTION 35-354, NEC TABLE 514.3(8)(2).
6. PRIMARY 750 OR 1000 MCM CABLE IS TO BE LOCATED BY ITSELF ON THE OPPOSITE SIDE OF A STREET AWAY FROM ALL OTHER UTILITIES INCLUDING OTHER 1/0 U.G. PRIMARY CABLE WHENEVER POSSIBLE.
7. VALUES ABOVE ARE MINIMUMS, GREATER SEPARATIONS ARE ENCOURAGED TO PERMIT ACCESS TO AND MAINTENANCE OF EITHER FACILITY TO LIMIT THE CHANCES OF DAMAGE .
,ii ~ ....,,O..,..,.,AOD=eo=-=F1:=::eE=R-:ccOPT1=c=ro=--=1:""AB""'Le=-----""T""-::-6-1:--::-&--:-:10--=cL.,,,.,.,HJ"="'R
8. WHEN INSTALLED IN CONJUNCTION WITH A GROUNDED ELECTRIC SUPPLY SYSTEM NO MINIMUM HORIZONTAL SEPARATION IS REQUIRED. NO DA'lc BY APf'
SEPARATION & DEPTH ELECTRIC POWER
FACILITIES
DRAWN CHECKED APPROVED CLC KLW HOR
RUS#
UR2
DWG. # SHT. # TOTAL SHT. # A-4557 1 1
fi
i j i.. .c gi
1
I !i .0.
I.!.., C, z w
~ ii: 0 UPDATED SHEET BORDER 6/11/14 KJG
NO REVISION DATE BY APP
DRAWN CHECKED APPROVED CLC KLW HOR
GENERAL CONDUIT DATE CONST. UNIT# ROUP#
INSTALLATION GUIDELINES 6123108 NIA T-115 DWG. # SHT. # TOTAL SHT. # A-4542 1 1
GENERAL CONDUIT INSTALLATION GUIDELINES
PER SMECO TARIFF- PART V- EXTENSIONS OF THE SYSTEM. SECTION E. CONNECTION TO SUPPLY SYSTEM FOR RESIDENTIAL. COMMERCIAL AND INDUSTRIAL UNDERGROUND EXTENSIONS: DEVELOPERAND BUILDERS (CONTRACTOR/CUSTOMER) IS RESPONSIBLE FOR THE INSTALLATION OF ALL CONDUIT.
1. ALL PVC TO BE SCHEDULE 40.
2. ALL CONDUIT TO MAINTAIN 12-INCH MINIMUM VERTICAL SEPARATION FROM ALL WATER, SEWER, GAS AND STORM DRAINS.
3. FOR 750 MCM AL URD IN CONDUIT INSTALLATIONS: INSTALL 8-INCH SCHEDULE 40 PVC UL RATED FOR ELECTRICAL USE AT 36-INCH MINIMUM DEPTH WITH 90-DEGREE ELBOWS UP AT EACH END. ELBOWS TO HAVE MINIMUM 48-INCH RADIUS SWEEP. SEE DRAWING A-4541 OR A-4550 FOR TYPICAL CONDUIT DETAIL.
4. FOR 1/0 AL URD CONDUIT INSTALLATIONS: INSTALL 4-INCH SCHEDULE 40 PVC UL RATED FOR ELECTRICAL USE AT 36-INCH MINIMUM DEPTH WITH 90-DEGREE ELBOWS UP AT EACH END. ELBOWS TO HAVE MINIMUM 36-INCH RADIUS SWEEP. SEE DRAWING A-4541, A-4550, A-4551 OR A-4552 FOR TYPICAL CONDUIT DETAIL.
5. FOR RESIDENTIAL OR COMMERCIAL SECONDARY SERVICE INSTALLATIONS: INSTALL 2 ½-INCH, 3-INCH, OR 4-INCH SCHEDULE 40 PVC AS DIRECTED BY SMECO UL RATED FOR ELECTRICAL USE AT 24-INCH DEPTH WITH 90-DEGREE ELBOWS UP AT EACH END. ELBOWS TO HAVE 36-INCH MINIMUM RADIUS SWEEP. SEE DRAWING A-4552 FOR TYPICAL CONDUIT DETAIL.
6. THE NUMBER AND SIZE OF CONDUITS REQUIRED IS DETERMINED BY SMECO ENGINEERING
7. NO MORE THAN THREE (3) 90° ELBOW BENDS SHOULD BE USED OVER THE ENTIRE RUN. IF SITE CONDITIONS WARRANT MORE THAN THREE, THEN CONSULT SMECO ENGINEERING PRIOR TO INSTALLATION FOR APPROVAL.
8. ALL CONDUIT CONNECTIONS ARE TO BE GLUED.
9. CONDUITS DO NOT HAVE TO BE CONCRETE-ENCASED. UNLESS OTHER SPECIFICATIONS WARRANT SUCH.
10. CONDUITS SHALL ENTER ENCLOSURES, PULL BOXES, BOX PADS AND PEDESTALS AS SHOWN IN THE GENERAL EXAMPLES PROVIDED; HOWEVER, IT'S IMPORTANT TO REFER TO PROJECT ENGINEERING DRAWINGS PROVIDED FOR SPECIFIC INSTRUCTIONS. IN ADDITION TO DRAWINGS REFERENCED ABOVE, SEE A-2763, A-3281, A-4548, A-4554.
11. CONDUITS SHALL BE TERMINATED WITH A STANDARD STRAIGHT END SECTION.
12. CHECK WITH SMECO ENGINEERING FOR USE OF PULL STRINGS TO BE INSTALLED AS DIRECTED .
13. SUBSURFACE PULL BOXES MAY BE REQUIRED DEPENDING ON THE SPECIFIC INSTALLATION. REFER TO SPEC DRAWING A-4553.
14. INSPECTION INSTRUCTIONS - BEFORE ANY CONDUIT TRENCH BACKFILLING OPERATIONS ARE BEGUN, THE CONTRACTOR AND SMECO MUST JOINTLY INSPECT THE INSTALLATIONS. MAKE REQUEST VIA PROJECT POINT OF CONTACT. SEE DRAWING A-4543 FOR DEVELOPER RESPONSIBILITIES. *FUTURE INSPECTION POLICY IS UNDER DEVELOPMENT.*
S
J I I I
I ~ /4" PVC 4"PVC
"t>I NOTES: C)
ii;i 1. SEE DRAWING A-4542 FOR GENERAL CONDUIT INSTALLATION GUIDELINES.
I I
48" P..____--"'+"Ci) I I
I I
t I
I
-
<£ """I----48"---i
600 AMP - 3 AND 2 SWITCH
i I I
I I
t I 1r I
i ~ ~ t-F-----f~)---
18" I I I
l I!
t
I II
I 1 I
3 WAY - 600 AMP ENCLOSURE
--------~~ <£
4"PVC
_______J[<t I
I I I
I I
I
I I
I 48"
________L_J \_4" PVC(£
600 AMP - 2 AND 2 SWITCH
<f 2 WAY - 600 AMP ENCLOSURE
2. ALL CONDUIT SHOWN IS 8 11 PVC UNLESS OTHERWISE NOTED. 0 UPDATED SHEET BORDER
NO REVISION
TYPICAL DRAWN CHECKED APPROVED
CLC KLW HDR
-CONDUIT DETAIL DATE CONST. UNIT# ROUP#
600 AMP ENCLOSURE 6/24/08 N/A T-117
People. Power. Progress. AND SWITCH DWG. # SHT. # TOTAL SHT. #A-4550 1 1
NOTE: 1. CONTACT HUGHESVILLE ENGINEERING FOR CONDUIT SIZE AND
TOTAL NUMBER OF RUNS. 2. SEE DRAWING A-4542 FOR GENERAL CONDUIT INSTALLATION
GUIDELINES. 3. ALL CONDUIT SHOWN IS 4 INCH PVC UNLESS OTHERWISE NOTED.
16"
IF..____.........,C!) l I
I 16"
~ 16"1611
p__-~(!)--l 1 16"
~ 200 AMP ENCLOSURE 200 AMP ENCLOSURE
(4 WAY) (3 WAY)
I 16"
P....______._....c!)-1---___._i
I 200 AMP ENCLOSURE 200 AMP ENCLOSURE
(2WAY) (DEAD END)
I
0 UPDATEDSHEETBORDER
NO REVISION
DRAWN CHECKED APPROVED CLC KLW HDR
People. Power. Progress. ..
TYPICAL CONDUIT DETAIL DATE CONST. UNIT# ROUP#
200 AMP ENCLOSURE 6124108 N/A T-118 DWG. # SHT. # TOTAL SHT. # A-4551 1 1
-----40"----~
NOTE #1 NOTE#1
1-PHASE TRANSFORMER 3-PHASE TRANSFORMER (LOOP FED) (LOOP FED)
-----40"----~
NOTE #1 NOTE #1
--<t
1-PHASE TRANSFORMER 3-PHASE TRANSFORMER (RADIAL FED) (RADIAL FED)
23"--J
NOTE: 1. CONTACT HUGHESVILLE ENGINEERING FOR
CONDUIT SIZE AND TOTAL NUMBER OF RUNS.
2. SEE DRAWING A-4542 FOR GENERAL CONDUIT INSTALLATION GUIDELINES.
3. ALL CONDUIT SHOWN IS 4 INCH PVC UNLESS 3-PHASE MINI TRANSFORMER OTHERWISE NOTED. (RADIAL FED ONLY)
0 UPOATEO SHEET BORDER NO REVISION
DRAWN CHECKED APPROVEDTYPICAL CONDUIT DETAIL CLC KLW HDR
1-PHASE AND 3-PHASE DATE CONST. UNIT# ROUP# 6/24/08 NIA T-119TRANSFORMER
DWG. # SHT. # TOTAL SHT. # A-4552 1 1
NOTE: 1. SEE DRAWING A-4542 FOR GENERAL
CONDUIT INSTALLATION GUIDELINES.
POLE
CONDUIT TO BE TIGHT TO POLE
WIRE TO POLE TO SECURE
... People. Power. Progress.
SCHEDULE 40 PVC RISER STUB
6" MIN.
i---- PER SMECO REQUIREMENTS
~SCHEDULE 40 PVC
SCHEDULE 40 PVC ELBOW RADIUS SWEEP PER
SMECO REQUIREMENTS
2 UPDATED SHEET BORDER
NO REVISION
DRAWN CHECKED APPROVED CLC KLW HDR
PRIMARY RISER DATE CONST. UNIT# ROUP#
CONDUIT INSTALLATION 6123108 NtA T-120 DWG. # SHT. # TOTAL SHT. # A-4541 1 1
·1,,
I I 0
11 IF I' I' 11 11 II l'I ··l l N' II I I l J II II ' I I I I JI D I I I I II II J I I I• 11 n I I I 1, II II I J I II · 11 I I I II II I I I' . 11 .II 1 I I H II f l
· 1 II II I I I II U I 1 I ' JI II I J•
··1;...;........ll-.•tl,.......;.l"...,·1-
r""'---++--'--~--------:..,_..:.......:....~2·
,. 12"
A l!:::::=::::1=::::::::j:===i::::::::::::::::::============Y_..___
a· ...1-----48"----..l4" 12" 12·
i---------84"--------
SEE
L\NOTE3 I
TOP VIEW
CONCRETE PAD
1" I I
SECTION A-A
TOOL OR CHAMFER EDGES
ISOMETRIC
18" WINDOW
1-11•--.-~W~l~~-W--,.;..
NOTES: 1. SIZE AND NUMBER OF SECONDARY
CONDUIT ELBOWS ARE DEPENDENT UPON SERVICE CONDUCTOR REQUIRED. THIS SHALL BE RECOMMENDED BY HUGHESVILLE ENGINEERING.
2. THE PAD SHALL BE 12" THICK WITH REINFORCING STEEL #4 BARS, ATSM-A615 GRADE 60, PLACE APPROX. 6" O.C. EACH WAY AND SECURELY TIED TOGETHER .
3. MINIMUM CONCRETE COVER OVER REINFORCING STEEL 2 INCHES.
4. SEE DRAWING A-4542 FOR GENERAL CONDUIT INSTALLATION GUIDELINES.
84" 5. FACE OF PAD ALIGNS WITH FRONT OF TRANSFORMER.
l..._ A
i5 2 REVISED NOTES
POURED CONCRETE PAD DRAWN CHECKED APPROVED
CLC KLW HOR FOR THREE PHASE DATE CU# RUS#
TRANSFORMERS 7/9/08 UM1-6C
People. PoWBt: Progress. 1500 KVA OR GREATER DWG.# SHT.# TOTALSHT.# A-4548 1 1
ITEM QTY. MATERIAL STOCK NO. C PAD TRANSFORMER BOX 3-PHASE 183375
gc ASREQ. CONDUrr ELBOW 90° SEE NOTE
C
2"TYP.
4"DIA. (TYP.)
2 1/2"- 4" DIA. 72"(TYP.) 76"
84"
NOTES: 1. SIZE AND NUMBER OF
SECONDARY CONDUIT ELBOWS ARE DEPENDENT UPON SERVICE CONDUCTOR REQUIRED. THIS SHALL BE RECOMMENDED BY HUGHESVILLE ENGINEERING.
2. 6500LB. MAXIMUM TRANSFORMER WEIGHT.
18"
A A 6"
5" 4"TYP. ----40"----
.,_____48"-----i 12" "-----84"---I
TOP VIEW
EIGHT CONDUIT ELBOWS MAXIMUM
CUT ENDS OF CONDUITI AS REQUIRED 32"
GRADE I I
~~=======1 I I 1====::::::1
ISOMETRIC VIEW 1/4" = 1'
I I 24"
3/4" 36" I I I I gc
I I I I
2 UPDATED SHEET BORDER 6/10/14 KJG 1 REV. CONDUIT POSITION IN PAD WINDOW 6119/DB KLW 0 ADDED CONDUITS ~15195SECTION A-A AF JMB
NO REVISION DATE EIY APP
DRAWN CHECKED APPROVED
SM FIBER GLASS BOX PAD A.FLORA JMB KMC
FOR THREE PHASE DATE CONST. UNIT# ROUP# 11/3/93 0614 UM6-10TRANSFORMER
DWG. # SHT. # TOTAL SHT. #INSTALLATION A-2763 1 1
CC
CONDUIT AS REQUIRED
ITEM QTY. MATERIAL STOCK NO. C 1 PAD TRANSFORMER 58x58x203PH 183255
gc />SREQ. CONDurr ELBOW 90• SEENOlE
NOTES: 1. SIZE AND NUMBER OF
SECONDARY CONDUIT ELBOWS ARE DEPENDENT UPON SERVICE CONDUCTOR REQUIRED. THIS SHALL BE RECOMMENDED BY HUGHESVILLE ENGINEERING.
10"
TOP VIEW
TWO CONDUIT ELBOWS MAXIMUM CUT ENDS OF
!
A
4"DIA. 2 1/2"- 4" DIA.---(TYP.) (TYP.) --+--.+-7
6"
SECONDAR
7"
i---33"--..i -----48"-----iS"
i------581/2"-----
48" 58 1/2"
A
ISOMETRIC VIEW
36"
SECTION A-A
0 UPDATEDSHEETBOROER 8/1111<1 KJG NO
SM INI-FIBERGLASS BOX PAD FOR 75KVA & 150KVA
THREE PHASE People. Power. Progress. MINI-TRANS INSTALLATION
REVISION DATE BY APP
DRAWN CHECKED APPROVED CLC KLW HDR
DATE CONST. UNIT# ROUP# 8/5/08 1152 UM6-10A
DWG. # SHT. # TOTAL SHT. # A-4554 1 1
ITEM QTY. MATERIAL STOCK NO. C 1 PAD PRECAST 72"x72" TRANSFORMER 183350
gc AS REQ. CONDUIT ELBOW 90° SEE NOTE
C NOTES: 1. INSTALL CONDUIT 1w ABOVE THE PAD TO
PREVENT WATER MIGRATION.
2 1/2"- 4" DIA. (TYP.)
2. SIZE AND NUMBER OF SECONDARY CONDUIT ELBOWS ARE DEPENDENT UPON SERVICE CONDUCTOR REQUIRED. THIS SHALL BE RECOMMENDED BY HUGHESVILLE ENGINEERING.
72"
18"
12" A A 5"
40" ' i-----48"-----i 12" ......------72"-------iI
TOP VIEW
EIGHT CONDUIT ELBOWS MAXIMUM
ISOMETRIC VIEW 1/4" =1't
10"
SECTION A-A 1 UPDATED SHEET BORDER
0 REV. CONDUIT POSITION IN PAD WINDOW
APPROVEDTHREE PHASE KLW
TRANSFORMER FLAT PAD DATE CONST. UNIT# ROUP# 5/15/95 0634 UM6•16SM CONDUIT REQUIREMENTS
DWG. # SHT. # TOTAL SHT. # A•3281 1 1
•
SECONDARY PEDESTAL
"\:
FIBER GLASS\
•
• • • •
•
p" • •• •• •• •• •• ••
•
•••••II II 11 II••••••
~'-----r----.--------:-'.'=~------"""T---:-==-::-:--:-::-:--=---,ITEM QTY. MATERIAL STOCK NO.ia--;_;__-1----+----------------+------jp" 2 CONNECTOR TRANSFORMER DISCONNECT - LEFT 125173
p' 1 CONNECTOR TRANSFORMER DISCONNECT - RIGHT 125174,;_;-----'--1----+----------------+------i ifa--....:...-1----+----------------+------i
1 ENCLOSURE SECONDARY w/ PANEL KIT & GND SLEEVE 0 UPDATED SHEET BORDER 6/10/14 KJG gn
People. Power. Progress.
144560 NO
UNDERGROUND RESIDENTIAL ERVICES FROM SECONDAR PEDESTALS FOR CONDUIT
INSTALLATION ONLY
REVISION DATE BY APP
DRAWN CHECKED APPROVED CLC KLW
DATE CONST. UNIT# RDUP# 1/25/08 1151 T■17A
DWG. # SHT. # TOTAL SHT. # A-4531 1 1
2-RUNS 500MCM 3C TO TRANSFORMER
(SOURCE)
~ BOXPAD
;_.,
i Oil GRADE
~ z:. ~ ::,
~
j s:::
i I l w
TRANS. PED.
AA LJBB
cc DD EE FF2-RUNS
500MCM 3C
NOTE: 1. NUMBER OF SERVICES WILL BE DIVIDED AS EVENLY AS POSSIBLE BETWEEN TRANSFORMER AND ENCLOSURE. 2. A MAXIMUM OF EIGHT (8) CABLE RUNS FROM A 100 OR 167 KVA TRANSFORMER .
2-RUNS 500MCM 3C TO TRANSFORMER
CONDUIT (SOURCE)
6" 2-RUNS FRONT VIEW GRAVEL SIDE VIEW
500MCM 3C I
A-.,,J
'rf-L_~
- -
~ ~ "
-
COVER
PLAN VIEW D UPDATED SHEET BORDER
NO REVISION
CHECKED APPROVED UNDERGROUND RESIDENTIAL SERVICES KLW HDR
FROM SECONDARY SUBSURFACE DATE CONST. UNIT# ROUP# 1/25/08 N/A T-17BPEDESTALS FOR TRADITIONAL
MATERIAL STOCK NO. VAULT (PULL BOX) SECONDARY 36x80x36
AA BB CC _Q EE
290520
3 CONNECTOR GELPORT 8 POS. SEC. 125250
SUBSURFACE TRANS. PULLBOX
CABLE HOLDER
CLIP
2-RUNS S00MCM 3C
FF
CUNO. 1220
1225
People. Power. Pmg8ss. DWG. # SHT. # TOTAL SHT. #NEIGHBORHOOD DEVELOPMENT A-4553 1 2
NOTES:
1. DETERMINE WHICH KNOCKOUTS OR ACCESS AREAS ARE TO BE REMOVED. NUMBER AND SIZES OF CONDUITS ARE TO BE SPECIFIED BY SMECO ENGINEERING. REMOVE KNOCKOUTS AS REQUIRED. CUT OUT ANY ACCESS AREAS REQUIRED WITH A SAWSALL OR CHOP SAW. REMOVE ANY SHARP EDGES WITH A RASP OR FILE AFTER MAKING CUTS AND REMOVING KNOCKOUTS. DO NOT CUT THROUGH STRUCTURAL SECTIONS CONTAINING POLYMER CONCRETE.
2. SET PULL BOX IN BOTTOM OF EXCAVATION ON A 6-INCH LAYER OF PEA GRAVEL FOR DRAINING PURPOSES. .
3. CONDUIT SHOULD BE INSTALLED ON COMPACTED SOIL OR OTHERWISE SUPPORTED WHEN ENTERING TO LIMIT THE LIKELIHOOD OF SHEAR STRESS ON THE CONDUIT AT THE POINT OF ENTRANCE.
4. PLACE AND COMPACT FILL AROUND ENCLOSURE FREE OF MATERIALS THAT MAY DAMAGE THE CONDUIT NOTE: INSTALL COVER BEFORE TO HELP SUPPORT THE UPPER BOX SECTION.
5. IF PAVEMENT IS TO BE PLACED AROUND THE ENCLOSURE, LEAVE 2 TO 4 INCHES OF THE CORRUGATED SIDEWALL EXPOSED AND SLOPE THE FILL GRADE AWAY FROM THE ENCLOSURE TO MATCH THE SURROUNDING PAVEMENT SUB-GRADE. OTHERWISE, COMPLETE BACKFILLING TO FINAL LINE AND
GRADE.
6. ALL INSTALLED CONDUITS MUST BE UL RATED SCHEDULE 40 GRAY PVC.
7. REFER TO DRAWING A-4542 FOR GENERAL CONDUIT INSTALLATION GUIDELINES.
8. LOAD RATING: A16 (ASTM C857)- HEAVY DUTY - RATED FOR USES IN ALLEYS, DRIVEWAYS, PARKING LOTS OR AREAS SUBJECT TO HEAVY VEHICLES.
9. APPROXIMATE WEIGHT OF PULL BOX IS 613 LBS.
0 UPDATED SHEET BORDER 6/11/14 KJG NO REVISION DATE BY APP
SM DRAWN CHECKED APPROVED
NDERGROUND RESIDENTIAL SERVICES CLC KLW HOR
FROM SECONDARY SUBSURFACE DATE CONST. UNIT# RDUP#
PEDESTALS FOR TRADITIONAL 1/25/08 NIA T-17B DWG. # SHT. # TOTAL SHT. #
NEIGHBORHOOD DEVELOPMENT A-4553 2 2
SEENOTEl8(AS REQUIRED)
JUNCTION BOX\ SEENOTE#2 METER STACK SEEN01E#3 \
o o o
o
SEENOTE#8
INCOMINGSERVICECABLEDo D AND CONDUIT TO JUNCllON BOX. NUMBER AND SIZE AS
SPECFIED BY SMECODo D SEENOTE#3
GRADEDo D SELF-CONTAINED METER
D o D ~~
INCOMING SERVICE CABLE AND CONDUITTOJUNCTION
I
(TYP.) SEENOTE #4
INCOMING SERVICE CABLE
BOX. NUMBER AND SIZE AS SPECIFIED 8VSMECO
SEENOTE#3
MAIN DISCONNECT CONSUMER{AS REQUIRED) DISCONNECTJUNCTION BOX SEENOTE#2. AND CONDUIT TO JUNCTION(AS REQUIRED)SEENOTE#3 BOX. NUMBl:R ANO SIZEAS
SPECIFIED BYSMECO:e ...........~~ ;.. SEENOTE#3I 1 GRAPE
SOUTHERNMAAVLAND ELECTRIC COOPERATIVE, INC. ~.IMRl'UNDIOl37
I I~~ J,~ i i,I GRADE
METER INSTALLATION REQUIREMENTS FORMULTIPLE SERVICES
OF THREE OR MORE {240V OR LESS PHASE TO GROUND)
CONSTRUC'T10N UNIT(CU}.
C>RA\'M CLC DATE 8-11.fl CHECKED KLW UNIT NO. T-'1111 APMOVEI> HDR DWG. NO. A-4535 SCALE SHT. NO. _1_ OF _1_
1. CUSTOMER SHALL PROVIDE A SEPARATE FEl:D FROM THE JUNCTIONBOXTO EACH METERING POINT UNLESS MAIN DISCONNECT, METER STACK OR GANGED BASE IS USED. USEOF TROUGH IS OPTIONALIFUSED,TROUGH SHALL BE PER NEC REQUIREMENTS AND A MINIMUM OF 12" x12". MINIMUM DIAMETER OF CONDUIT FROM TROUGH TO METER SHALL BE 2 ½•. TROUGH SHALL HAVE PROVISIONS FOR SEALING,
2, AMAIN DISCONNECT SHALLBE PERMITTED ONLYIFTHE NUMBER OF SERVICES IS GREATER TI-iAN SIX AMO SHALL BE SUPPLIED BY CUSTOMER. DISCONNECTSHALL BE FED FROM JUNCTION BOX. DISCONNECTSHAU.HAVE PROVISIONS FORSEALING. DISCONNECT SHALL BE Pl:R NEC REQUIREMENTS,
3. A JUNCTION BOX SHALL BE REQUIRED FOR THREE OR MORES!lRVICES AND ALL lROUOH AND METERSTACK INSTALLATIONS. IF NUMBER OFCUSTOMER PHASE CONDUCTORS IS GREATER THAN FOUR PER PHASE, JUNCTION BOX SHALL eeOF BUS BAR CONSTRUCTION (PER SMECO OWG. T-106). IN ALLCASES, JUNCTION BOX SHALL BE PROVIDEDAND INSTALLEDBY CUSTOMeR. SMECO SHALL PROVIDEANO INST.ALLINCOMING SERVICE CABLE FROM TRANSFORMER, THE SERVICE CABl.liWillENTER AMO TERMINATEIN THI: JUNCTION BOX. INSTALLATIONOF CONDUIT SHAU. BEASSPECIFIED BY SMECO. JUNCTION 80X SHALL HAVE PROVISIONS FOR SEALING.
4, SELF CONTAINED METERS SHALL BE FED SEPARATELY FROM JUNCTION BOX UNLESS MAIN DISCONNECT, METERSTACK OR GANGED BASESARE USED. NO Ml:TERSHALL BE LOWER THAN 2'OR HIGHER THAN B'ABOVE GRADE. MINIMUM SEPARATION BETWEEN SELF..coNTA11-ED METERSSHALL BE 10"ON CENTER, SELF-CONTAINED METERSCAN BE MOUNTED ABOVE OR BELOW TROUGH, IF USEO.
5. WHEN REQUIRED BYSMECO, CT CABINET SHALL BE PROVIDED AND INSTALLED BY CUSTOMER (PER SMECO DWG. T•10t OR T-102). SMECO SHAU. PROVIDE ANO INSTALLALL CTs AND CONNECTORS AND SHALL MAKEALL CONNECTIONSWITHIN CTCABINET. CUSTOMER SHALLINSTALL SMECO PROVIDED MeTER BOXES. (PER SMECO DWG. T-101 OR T-102). CT CABINET SHALL BE FED FROM JUNCllON BOX (OR DISCONNECT IF REQUIRED),
6. METER STACK MUST BEFED FROM SEPARATEJUNCTION BOX (OR DISCONNECTIF Rl:QUJREO).ALL METERS MUSTHAVE INDMDUAL DISCONNECTING MEANS. ABYPASS SWITCH IS REQUIRED FORALL lHREE PHASE SERVICES. ALL METERSTACKS SHALL BE PER NEC REQUIREMENTS. STACKS SHALL NOT BE MORE THAN 5 ELECTRIC METERS HIGH. NO METER SHALL BE LOWER THANT OR HIGHER THAN 6'ABOVE GRADE.
7. A MINIMUM 3' SEPARATION SHALL BE MAINTAINEDBETWEEN SERVICE ENTRANCE EQUIPMENTAND ALL OTHER GROUNDED EQUIPMENT SUCH AS GAS METERS, PROPANE TANKS, WATER METERS, ETC.
e. GANGED METER BASES SHALL BE PROVIDED BY SMECO AND INSTALLED BYCUSTOMER. BASESAREAVAILABLE: WITH 3 TO 6SINGLE PHASe METERS. NO METERSHALL BE LOWERTHAN4' OR HIGHER THAN 6'ABOVE GRADE.
9, ONE METER ALLOWED PER TENANT SPACE. BASED ON SMeCO TARIFF BILLING REQUIREMENTS AND Nl:C225.30AND/OR230AO ASAPPLICABLE.
ALL ARRANGEMENTS ARE ACCEPTABLE SELF-CONTAINED GANGED METER BASE
MAIN DISCONNECT
METER ENCLOSURE 12"X20" TRANSFORMER OPERATED SOCKET.
1-1/4" MIN.
4 3/4"'( CONDUIT
(SEE NOTE #4)
~
20" 0
g~ MIN. M KWH
METER ENCLOSURE
0
0
0
0
r,
D
0 0 0 0
• 0
36" 0
~ r, ::>w ~o-~ r, i(!)
: 0
/ \ ~I-
0 ID
0 0 D 0
30" I\, ,2:· ~ ::>W
CT CABINET ~(!) : 0
(TO BE PROVIDED AND '91-• CUSTOMER TO PURCHASE TRANSFORMER
OPERATED METER ENCLOSURE INSTALLED BY CUSTOMER) r~ii?
• CUSTOMER TO MOUNT AT SMECO APPROVED OUTSIDE LOCATION
• SMECO WILL PROVIDE INTERNAL SOCKET ASSEMBLY AT TIME OF CTINSTALLATION
• PART NUMBER - METER DEVICES 606U8065C-1208 • SMECO STOCK NUMBER 670000
NOTES:
1. CABINET SHALL BE MADE OF MIN. 12 GAUGE GALVANIZED METAL. CABINET SHALL BE MOUNTED WITH LONG DIMENSION IN DIRECTION OF CABLE PULL. COVER SHALL BE REMOVABLE, SEALABLE AND LOCKABLE {TAB W/1/4" HOLE TO ALLOW BREAK-AWAY LOCK} 1Vl,O TABS REQUIRED AT OPPOSITE ENDS FOR FLUSH MOUNTED COVERS.
2. LINE AND LOAD ENTRANCE CABLES SHALL BE GROUPED ON OPPOSITE ENDS OF CABINET. IF THE NUMBER OF CUSTOMER PHASE CONDUCTORS IS GREATER THAN FOUR PER PHASE A CT BUS BAR CABINET IS REQUIRED. REFER TO T-103. (DWG. A-3661}
3. LOAD SIDE CONDUCTORS TO BE GIVEN {1) COMPLETE ~p INSIDE CT CABINET FOR SMECO MAKE-UP PURPOSES.
4. METER ENCLOSURE SHALL BE LOCATED MIN. OF 4" AND MAX. OF 50 WIRE FEET FROM CT CABINET. BOTTOM OF CT AND METER ENCLOSURE SHALL BE MIN. OF 3'~" ABOVE GRADE. TOP OF METER ENCLOSURE SHALL BE MAX. OF 6'-0" ABOVE GRADE. AND, TOP OF CT BOX SHALL BE MAX. OF 6'-6" ABOVE GRADE.
5. A 3'-0" MIN. SEPARATION SHALL BE MAINTAINED BETVVEEN SERVICE ENTRANCE EQUIPMENT AND ALL OTHER GROUNDED EQUIPMENT, SUCH AS GAS AND WATER METERS, PROPANE TANKS, ETC.
6. V\ft-lERE LINE, LOAD OR METER CONDUITS ARE TO ENTER BACK OF CT CABINETS, THEY \NILL ENTER AT TOP OF BACK
NOTE: METER DEPT. UPON VERIFICATION OF LOCKS I TABS, WARNING SIGN IS TO BE APPLIED TO CABINET COVER. STOCK#: 166929
0 0 0 0 0
0
0 0
w 0 0
0 0
0 0 0 0 0 0
CABINET COVER
C UPDATED DIMENSIONSAND NOTES PERJ. FAUNCE B ADDED LOCKS AND TABS/ WARNING SIGN/ CABLE RUN NOTES A REMOVED REACTIVE METER/ADOED NOTES
NO REVISION
DRAWN CHECKED
11130/13131m
3/1-4/06
DATE
APP
1 MG KL cc Kl cc JMB BY APP
ROVED JMB
CU# RUS# NIA T-101
SHT.# TOTALSHT.# 1 1
CURRENT TRANSFORMER D.CHASE
CABINET DATE 6/17/98100A TO S00A DWG.#SERVICE RATING A-3659
----
METER ENCLOSURE 12"X20" TRANSFORMER OPERATED SOCKET. METER DEPT. UPON VERIFICATION
OF LOCKS/ TABS, WARNING SIGN IS
1-1/4" MIN. -CONDUIT
~SEE NOTE #4)
4 3/4" \-'\/.-~
020"
h:-L,,. I 4"~gI" ' MIN. '.h- KWH .., METER ENCLOSURE
CUSTOMER TO PURCHASE
TRANSFORMER OPERATED ME1ER ENCLOSURE
• CUSTOMER TO MOUNT AT SMECO APPROVED OUTSIDE LOCATION
• SMECO VIJILL PROVIDE INTERNAL SOCKET ASSEMBLY AT TIME OF CT INSTALLATION
• PART NUMBER - METER DEVICES 606U8065C-1208 SMECO STOCK NUMBER 670000
~/----=-----:--~/0 0 0 O 0
0
0
ti
0
0
o
•
0
0
0
" 0
0
0
/~-------1• LoJ/t:::::::I:::::::::£:::::::J[::::::::f:....o...v- 15" o a 11 11 o I ____ 36" ------i•V._ '
CT CABINET (TO BE PROVIDED AND
INSTALLED BY CUSTOMER)
TO BE APPLIED TO CABINET COVER STOCK#: 166929
60"
'/' ~
7 0 0
di:0
0
0
w 0 0
.___ 0 0
0 0
0
0
0 0
0 0
0 0 0 0
CABINET COVER
NOTES:
1. CABINET SHALL BE MADE OF MIN. 12 GAUGE GALVANIZED METAL. CABINET SHALL BE MOUNTED 1/IJITH LONG DIMENSION IN DIRECTION OF CABLE PULL. COVER SHALL BE REMOVABLE, SEALABLE AND LOCKABLE (TAB W/1/4" HOLE TO ALLOW BREAK-AWAY LOCK) TVVO TABS REQUIRED AT OPPOSITE ENDS FOR FLUSH MOUNTED COVERS.
2. LINE AND LOAD ENTRANCE CABLES SHALL BE GROUPED ON OPPOSITE ENDS OF CABINET. IF THE NUMBER OF CUSTOMER PHASE CONDUCTORS IS GREATER THAN FOUR PER PHASE A CT BUS BAR CABINET IS REQUIRED. REFER TO T-103. (DWG. A-3661)
3. LOAD SIDE CONDUCTORS TO BE GIVEN (1) COMPLETE I/I/RAP INSIDE CT CABINET FOR SMECO MAKE-UP PURPOSES.
4. METER ENCLOSURE SHALL BE LOCATED MIN. OF 4" AND MAX. OF 50 VIJIRE FEET FROM CT CABINET. BOTTOM OF METER ENCLOSURE SHALL BE MIN. OF 3'-6" ABOVE GRADE. BOTTOM OF CT BOXES SHALL BE A MIN. OF 1'-6" ABOVE GRADE. TOP OF METER ENCLOSURE SHALL BE MAX. OF 6'-0" ABOVE GRADE. AND, TOP OF CT BOX SHALL BE MAX. OF 6'-6" ABOVE GRADE.
5. A 3'-0" MIN. SEPARATION SHALL BE MAINTAINED BETWEEN SERVICE ENTRANCE EQUIPMENT AND ALL OTHER GROUNDED EQUIPMENT, SUCH AS GAS AND WATER METERS, PROPANE TANKS, ETC.
6. WHERE LINE, LOAD OR METER CONDUITS ARE TO ENTER BACK OF CT CABINETS, THEY WILL ENTER AT TOP OF BACK
C UPOATEOOIMENSIONSAND NOTESPERJ. FAUNCE 11/30/11 MG KLIII
B AODEOLOCKSANDTABS/WARNINGSIGN/CABLERUN NOTES 3131108 CC f<LIA
A REMOVED REACTIVE METER/ADDED NOTES 3/14/06 CC JMB
NO REVISION DATE BY APP
SMICOPeople. PoW8r. Progass.
CURRENT TRANSFORMER CABINET
801 A TO 2000A SERVICE RATING
DRAWN CHECKED APPROVED D.CHASE JMB
DATE CU# RUS# 6/18198 NIA T-102
DWG. # ISHT. # ITOTAL SHT. # A-3660 1 1
e REVISEDNEUTRAL BUS LAIB.ING 7l2f//12 8 UPOATEDOIMENSIONSAND NOTES PERJ.FAUNCE 11/3W11 A ADDl!O ldETER IIOX/WARNIHGSIGNICABI.ERUN NOTES 3131/08 t«) REVISION DATI:
DJV MG cc BY
Kl: Kl: Kl: APP
CT/BUS BAR CABINET DRAWN CHECKED APPROVED
D.CHASE JAL JMB FOR METERING AND DATE CU# RUS#
SERVICE CABLE TERMINATION 8/23/98 N/A T-103
Peopll,. Power. Pmgrsss. (2500A OR LESS) DWG.# SHT. #- TOTALSHT.# A-3861 1 1
I
I Ig
NOTE: METER DEPT. UPONVERIFICATION OFLOCKS /TABS, WARNING SIGN IS TO BE APPLIED TO CABINET COVER.
112• HOLE, PRE-DRILLED FOR NEMA SPACING. !fQis.ALLOWADEQUATE SPACE TO CONNECT FUTURE CONDUCTORS: MINUMUM 4
BUSBAR DETAIL 3• 5• 5• 5"
w ., I
J
., I__________ .J
42'MINIMUM
STOCK#: 186928
::i;
i METER ENCLO$UREz
{SEE NOTE #7)!i ~
4' MIN.
1114°MIN. 0 CONDUIT
(SEE #7)
:::i
i 2 2
~
Ii ~Ill
~~
FRONT VIEW
NOTES: 1. THIS BUS BAA CABINET IS CUTOMER EQUIPMENT AND AS
SUCH IS SUBJECT TO ELECTRICAL INSPECTION. 2. THIS TYPE OF CABIN.ETWILLBE REQUIRED, IFNUMBER OF
CUSTOMER PHASE CONDUCTORS IS GREATER THAN FOUR PER PHASE.
3. LOAD SIDE CONDUCTORS TO BE GJVEN (1) COMPLETE WRAP INSIDE CT CA81N6T FOR SM.ECO MAKE-UP PURPOSl:S.
4. BUS BAR SHALL BE COPPER AND SIZED ACCORDINGTO LOAD REQUIREMENTS AND NEC REQUIREMENTS.
5. A3' MINIMUM SEPARATION SHALL BE MAINTAINED BETWEEN SERVICE ENTRANCE EQUIPMENT ANDALL GROUNDED NONELECTRICAL UTILITYEQUIPMENT SUCH AS GAS METERS, WATER SYSTEM EQUIPMENT, PROPANETANKS, ETC.
B. SERVICES RATED ABOVE 2SOOA WILL REQUIRE SWITCHGEAR WITH COMPARTMENT FOR CT METERING EQUIPMENT.
4•
METER ENCLOSURE 1.2"X20•TRANSFORMER OPERATED SOCKET,
• CUSTOMERTO PURCHASE TRANSFORMER OPERATED METER ENCLOSURE
• CUSTOMER TO MOUNT AT SMECOAPPROVEO OUTSIDE LOCATION
• SMECO WILL PROVIDE INTERNALSOCKET ASSEMBLY AT TIME OF CT INSTALLATION
• PART NUMBER. METER DEVICES 606U8085C-1206
•SMECOSTOCKNUMBER 670000
:Ii~w
I"~g1o
LOCATION FOR CURRENT
l'RANSFORMERS
SIDE VIEW 4" CONDUITS FOR SERVICE CABLE, NUMBERAS REQUIRED BY SMECO(T'iP.)
7. 1 1/4" MINIMUM CONDUIT MUST BE RUN BETWEEN THE METERING ENCLOSURE AND l'HI! CT/BUS BAR CABINET. TOTAL DISTANCE SHALL BE NOMORE THAN FIFTY WIRE FEET.
8. METER ENCLOSURE SHALL BE A MINIMUM OF3'-8" ABOVE GRADE. TOP OF METER ENCLOSURE SHAU. BE A MAXIMUM OF 6..Q" FROM GRADE.
8. COVER SHALL BE REMOVA81.E, SEAlABLE AND LOCKABLE (TAB W/1/4" HOLE TO ALLOW BREAK-AWAY LOCK.) lWOTABS REQUIRED AT OPPOSITE ENDS FOR FLUSH MOUHTED COVERS.
1/2" HOLE, FIELD DRILL FOR NEMA SPACING. NOTE: ALLOW ADEQUATE SPACE TO CONNECT FUTURE 3" 5" 5" 5" 4"
:!!:
:i!: NEUTRAL BUS
•0 t')
...; i
9/29/98 N/A T-106
DWG. # SHT. # TOTAL SHT. # A-3669 1 1
li-,____36_"_M_IN_IM_ U_M ____-i.. l "'- SIDE VIEW
i ""---- 4" CONDUITS FOR SERVICE CABLE, FRONT VIEW NUMBER AS REQUIRED BY SMECO(TYP.)>
.! NOTES: f 1. THIS BUS BAR CABINET JS CUSTOMER EQUIPMENT AND 4. COVER SHALL BE REMOVABLE, SEALABLE AND c AS SUCH IS SUBJECT TO ELECTRICAL INSPECTION. LOCKABLE (TAB W/1/4" HOLE TO ALLOW BREAK-AWAY ,! LOCK.)il
2. BUS BAR SHALL BE COPPER AND SIZED ACCORDING TO i 0 LOAD REQUIREMENTS AND NEC REQUIREMENTS. j
!I 3. A 3' MINIMUM SEPARATION SHALL BE MAINTAINED BETWEEN SERVICE ENTRANCE EQUIPMENT AND ALL GROUNDED NON-ELECTRICAL UTILITY EQUIPMENT
ffi SUCH AS GAS METERS, WATER SYSTEM EQUIPMENT, 1 UPDATED SHEET BORDER
1-3/4"
CONDUCTORS: MINUMUM 4
BUSBAR DETAIL
::>-r---- "'"121--'llllr"---------
z_,____.-""'--------------, ~
PROPANE TANKS, ETC. 0 REVISED
NO
BUS BAR CABINET FOR SERVICE CABLE
TERMINATION People. Power. Progress.
REVISION
DRAWN CHECKED APPROVED TKB
DATE CONST. UNIT# ROUP#
,, CUSTOMER TO PURCHASE TRANSFORMER OPERATEDMETER ENCLOSURE METER ENCLOSURE12''X20" TRANSFORMER
• CUSTOMER TO MOUNT AT SMECO APPROVED OUTSIDEOPERATED SOCKET. LOCATION
• SMECO VI/ILL PROVIDE INTERNAL SOCKET ASSEMBLY AT TIME OF CT INSTALLATION
• PART NUMBER - METER DEVICES 606U8065C-1208 • SMECO STOCK NUMBER 670000
1-1/'4" MIN. CONDUIT /
(SEE NOTE 1#7)BARRIER 4 3/4"
I'
CT COMPARTMENT 22"
CABLE LANDING 30"
COMPARTMENT 24"
---- 36" ----l FRONT VIEWFRONT VIEW
(INSIDE DETAIL)
~ 1. CT COMPARTMENT TO BE COMPLETELY ISOLATED BY BARRIERS AND TO HAVE
SEALING AND PADLOCKING PROVISIONS. 2.CT COMPARTMENT TO HAVE A DOUBLE HINGEO DOOR. 3. CABLE LANDING COMPARTMENT TO HAVE REMOVABLE BOLT-ON COVER. 4. PROVIDE SCREW-TYPE (NON-CRIMP) TERMINATIONS FOR NUMBER & SIZE ALUMINUM
UTILITY CABLES AS SPECIFIED. 5. REMOVABLE LINKS TO BE SIZED FOR USE WITH SMECO SUPPLIED & INSTALLED
18" WINDOW TYPE crs AND SWGR/S'l'i/BD CURRENT RATING. ---+----- EXTRUDED ALUM. 6. NOTE THE REQUIREMENT FOR CT MOUNTING PROVISION. ALSO ACCEPTABLE IS
~ CT BAR w/ ADJUSTABLE EAR/WING TYPE SUPPORT THAT FRICTION BINDS TO Tl-IE REMOVABLE LINK OR 1/2" STUDS INSULATING BARS FORWARD & BEHIND THE MIDPOINT OF Tl-IE REMOVABLE LINK.
(SEE NOTE 6) 7. 1 1/4" RIGID CONDUIT SHOULD BE RUN BETWEEN THE METERING ENCLOSURE AND THE SWITCHGEAR CT COMPARTMENT. TOTAL DISTANCE SHALL BE NO MORE THAN
----1-----1-GLASTIC SUPPORT FIFTY WIRE FEET.
12"
8. SWITCHGEAR MUST BE BOTTOM FED. AN EXCEPTION MUST BE APPROVED BY HUGHESVILLE DISTRIBUTION ENGINEERING.
9. VERTICAL CT BARRIERS ARE OPTIONAL. IF BARRIERS ARE USED Tl-IE MINIMUM CT COMPARTMENT WIDTH IS 32".BARRIER
ALL DIMENSIONS SHOWN ARE MINIMUM VALUES
,____ 30" -----1
RIGHT VIEW A UPDATED DIMENSIONS AND NOTES PER J . FAUNCE 11/30/11 MG KL NO REVISION DATE BY APP
DRAWN CHECKED APPROVEDTYPICAL SWITCHGEAR/ CLC JAL KLW SWITCHBOARD UTILITY DATE CU# RUS#
7/25102 NIA T-107COMPARTMENT REQUIREMENTS DWG.# SHT.# TOTALSHT.#FOR 120/208 OR 277/480 VOLTS A-3838 1
0 20"
6"
REMOVABLE LINKS
-----+----lf- (SEE NOTE 5)
(SEE NOTE ◄)
-
.. 0 •
1
1-888-440-3311
P.O. Box 1937, Hughesvllle, MD 20637 People. Power. Progress.
www.smeco.coop
By signature below, I state that the switchgear proposed for the following project:
Complies with all the requirements detailed on SMECO's TYPICAL SWITCHGEAR/SWITCHBOARD UTILITY COMPARTMENT REQUIREMENTS drawing, No. A-3838, date 7/25/02. Additional cut-sheets furnished to SMECO which deviate from the requirements ofDrawing A-3838 does not constitute approval. Such approval must be requested in writing and will be approved in writing by SMECO's Engineering Department.
SIGNED:__________________________
8
... People. Power. Progress.
1. METER ROOM SHALL HAVE 2 EXITS LOCATED AT OPPOSITE ENDS. ONE SHALL HAVE MINIMUM WIDTH OF 42w AND PREFERABLY OPEN TO THE EXTERIOR OF THE BUILDING. THE OTHER SHALL HAVE MINIMUM WIDTH OF 36". BOTH DOORS SHALL BE MINIMUM OF 6.5' IN HEIGHT.
2. DOORS SHALL NOT LOCK FROM THE INSIDE. DOORS SHALL HAVE INSIDE PUSH BAR (PANIC BAR) AND SWING OUTWARD. DOORS SHALL BE IDENTIFIED AS "ELECTRICAL ROOM" OR "METER ROOM". BOTH DOORS SHALL BE LOUVERED, UNLESS ROOM IS CLIMATE CONTROLLED WITH HVAC SYSTEM. SMECO SHALL BE PROVIDED ENTRY ACCESS TO ROOM AT ALL TIMES. ONCE METERS ARE ENERGIZED, CONTRACTOR /OWNER TO PROVIDE SMECO WITH TWO KEYS, FOR EACH ROOM ON SITE, AND ALLOW FOR SMECO TO INSTALL A LOCK BOX AT TOP OF THE DOOR OR ON THE DOOR HANDLE. IF DOOR IS EQUIPPED WITH A DIGITAL LOCK, SMECO IS TO BE GIVEN THE PASS CODE/CARD. ANY CHANGES IN THE LOCKING SYSTEM, (KEY, CODE OR CARD), IT IS THE RESPONSIBILITY OF THE CONTRACTOR/OWNER TO PROVIDE SMECO WITH CURRENT KEYS, CODES OR CARDS.
3. AT ALL TIMES, A MINIMUM OF 4', MEASURED FROM THE FRONT OF ALL PANELS, TROUGHS, JUNCTION BOXES, CT CABINETS, METER BASES, SELF CONTAINED AND GANG STACKS, AND SWITCHGEAR, SHALL REMAIN FREE AND CLEAR OF ALL OBSTRUCTIONS. ROOM rs NOT TO BE USED AS A STORAGE AREA. NEC SECTION 110.26
NESC SECTION 125
4. METER ROOM PLANS MUST BE SUBMITTED TO SMECO FOR APPROVAL. THIS APPROVAL IS IN ADDITION TO NEC AND/OR LOCAL GOVERNING AGENCY REQUIREMENTS. PLANS ARE TO SHOW THE LAYOUT AND DIMENSIONS OF ALL PROPOSED SERVICE EQUIPMENT AND MUST BE APPROVED BY SMECO PRIOR TO INSTALLATION.
5. ALL METERING AND SERVICE EQUIPMENT MUST BE PERMANENTLY MOUNTED AND LABELED TO PROPERLY IDENTIFY THE RESPECTIVE ADDRESS, SUITE OR UNIT. ADHESIVE TAPE IS NOT TO BE USED FOR IDENTIFICATION PURPOSES. IT IS THE RESPONSIBILITY OF THE CONTRACTOR/OWNER TO NOTIFY SMECO OF ANY ADDRESS CHANGES,
6. ALL METERING AND SERVICE EQUIPMENT MUST COMPLY WITH ALL SMECO STANDARDS AND SPECIFICATIONS.
7. A ROOM HOUSING A SINGLE SERVICE SWITCHGEAR IS NOT CONSIDERED A METER ROOM. THEREFORE, THE METER BASE ASSOCIATED WITH THE CT COMPARTMENT SHALL BE MOUNTED ON EXTERIOR OF THE BUILDING, A MAXIMUM DISTANCE OF 50 WIRE FEET FROM THE CT COMPARTMENT, AND NOT WITHIN THE SWITCHGEAR ROOM. FOR EXPECTED DEMANDS ABOVE 500KW, AS CALCULATED BY SMECO, CONTRACTOR/OWNER IS REQUIRED TO HAVE A DEDICATED TELEPHONE LINE AVAILABLE FOR SMECO'S USE AS A COMMUNICATIONS MEDIUM FOR METER READING. IT IS THE CONTRACTOR/OWNER'S RESPONSIBILITY TO PROVIDE A DEDICATED wDIAL TONE" PHONE LINE AT THE METERING LOCATION. SMECO PHONE LINE TO BE IN SERVICE WITHIN 20 DAYS FROM ACTIVATION OF PHONE SERVICE ON SITE. ONCE ENERGIZED, REFER TO ITEM #2 ABOVE FOR SMECO ACCESS PROVISIONS FOR THIS ROOM.
. GANG METER STACKS MUST BE MOUNTED TO ASSURE THAT THE CENTERLINE OF THE LOWER SLOT OPENING IS A MINIMUM OF 2' AND THE CENTERLINE OF THE UPPER SLOT OPENING IS A MAXIMUM OF 6' ABOVE FINISHED FLOOR. SELF CONTAINED METER BASES MUST BE MOUNTED TO ASSURE THAT THE CENTERLINE OF THE METER SLOT OPENING IS A MINIMUM OF 4' AND A MAXIMUM OF 6' ABOVE FINISH FLOOR. ALL METERING EQUIPMENT MUST BE POSITIONED AT LEAST 3' FROM ANY SIDE WALL OF THE METER ROOM.
2 UPDATED SHEET BORDER 6110/14 KJG 1 CHANGED RDUP# TO T-109 10/27/08 CC KLW 0 REV. TITLED BLOCK AND N~ 10127/08 CC KLW
NO REVISION DATE BY APP
DRAWN CHECKED APPROVEDGENERAL REQUIREMENTS TKB
FOR METER ROOMS 1--DA_T_E--r'-C-ON_S_T_.U-N-IT-'-#~R-D-UP#---
HUGHESVILLE GUIDELINES 9129198 NIA r-109 DWG. # SHT. # TOTAL SHT. # A-3670 1 1
FIRE-BARRIER WALL DESIGN REQUIREMENTS
WHEN LESS
CSEENOTE
0:: w ii,
i
2'MIN.
2' MIN.
THAN REQUIRED DISTANCE
NOTE: DISTANCE CANNOT BE LESS THAN MINIMUM DISTANCE SPECIFIED IN ABOVE TABLE FOR "COMBUSTIBLE BUILDING MATERIALS" SEPARATION.
NOTE: THIS SMECO STANDARD IS INTENDED TO COMPLY WTH THE FOLLO\NING DOCUMENTS: 1) 2008 NEC ARTICLE 450.27, 2) 2007 NESC ARTICLE 15-152, 3) ANSI IEEE STANDARD 979-1994 (R2004) SECTION 4.4, 4) C1997 FACTORY MUTUAL ENGINEERING CORPORATION PROPERTY LOSS PREVENTION DATA SHEETS SECTION 2.4, 5) RURAL UTILITIES SUMMARY OF ITEMS OF ENGINEERING INTEREST AUGUST 2004 PAGES 8 THROUGH 8, AND 6) 02001 HI-LINE ENGINEERING, LLC GUIDE PAGES TR-21 AND TR-22.
1 NEWTITLE BLOCK& UPDATE NOTEtl2 NO REVISION
12/4/12 DJV KL BY APP
SEPARATION OF OUTDOOR OIL FILLED
DISTRIBUTION TRANSFORMERS FROM
BUILDINGS AND OTHER EQUIPMENT
People. Power. F'rot:,8ss. LESS THAN 2500 KVA RATING
DRAVI/N APPROVED
JML KLW
DATE CU# RUS#
10-1-08 NIA T-10
DWG.# SHT.# TOTALSHT.#
A-4563 1 1
TRANSFORMER SEPARATION REQUIREMENTS
TRANSFORMER RATING (:S 1000 GALLONS OF
MINERAL OIL)
MINIMUM DISTANCE FROM BUILDING WALL UTILIZING:
MINIMUM DISTANCE FROM OTHER ELECTRICAL EQUIPMENTCOMBUSTIBLE BUILDING,r~--~
m6~-~DQ~l
NON~OMBUSTlt:1LE BUILDING MATERIAL OR APPROVED FIRE
BARRIER WALL ( SEE NOTE#2)
S 75 KVA
s 333 KVA
>333 KVA
10 FT. (14 FT. FROM DOORS & WINDOWS)
20 FT.
30 FT.
10 FT.
10 FT.
10 FT.
5 FT.
5FT,
5 FT.
NOTE 1: DISTANCES ARE MEASURED FROM CLOSEST EDGE OF TRANSFORMER CASE, COOLING FIN, OR OTHER PROTRUSION TO THE CLOSEST FACE OF THE BUILDING WALL OR OTHER BUILDING OVERHANG FOR BUILDINGS THREE FLOORS OR LESS. IF AN OIL RETENTION DIKE JS REQUIRED, THE MEASUREMENT IS TAKEN FROM THE CLOSEST EDGE OF THE DIKE.
NOTE2: NON-COMBUSTIBLE BUILDING MATERIALS ARE CONSIDERED TO BE CONCRETE BLOCK, BRICK, SHEET STEEL, REINFORCED CONCRETE, ETC. ( IM-iERE NO DOORS OR WNDOWS WU EXIST )
NOTE3 : TRANSFORMER DOORS TO FACE AWAY FROM BUILDING. (DON'T OBSTRUCT ACCESS TO DOORS, MIN. 10FT.)
NOTES:
LOCATIONS AND SPACING TO BE DETERMINED BY ENGINEERING DEPARTMENT, HUGHESVILLE.
OBTAIN AND/OR VERIFY CABLE LOCATION BEFORE INSTALLING.
POST TO BE FILLED WITH ___CONCRETE AND THE CONCRETE
SHALL BE ROUNDED OFF ON TOP OF THE POST.
4" DIAMETER GALVANIZED RIDGID STEEL PIPE i-------SHALL COMPLY WITH U.L. 6, ANSI C80.1, AND
FEDERAL SPEC. WWC-581. 4'
MIN.
___CONCRETE TO BE TAPERED AROUND BASE OF POST.
4' MIN.
~ •···... .. ; : a •• :, •·• ...•.
. . ··:.... ;. :• : •. h,_.. ,.
0 UPDATED SHEET BORDER
LK RAH RJM
DATE CONST. UNIT# RDUP# 4/14/87 NIA T-70
NO
-BARRIER POST
SPECIFICATIONS AND INSTALLATION
People. Power. Progress. REQUIREMENTS
REVISION
DRAWN CHECKED APPROVED
DWG.# SHT.# TOTAL SHT.# A-4763 1 1
•
NOTES:
1. ELECTRONIC MARKER BALLS SHALL BE INSTALLED AT THE LOCATIONS SHOWN ON THE APPROVED SMECO ENGINEERING DRAWINGS THAT INDICATE SIZE, LOCATION, AND NUMBER OF CONDUITS TO BE INSTALLED AT PROPOSED ROAD CROSSINGS. SEE SHEET 2 FOR SAMPLE PROJECT DRAWING.
SAMPLE ROAD CROSSING PROFILE
60" 60" -..---------- ROAD RIGHT OF WAY -----------
MIN. MIN.
~ELECTRONIC MARKER BALL ABOVE CONDUIT STUB
MIN. 36" DEPTH TO ELECTRONIC MARKER BALL.......,..e MAX. TOP OF CONDUIT ABOVE CONDUIT STUB DEPTH
NUMBER AND SIZE OF CONDUITS WILL VARY BY PROJECT
2. ONE ELECTRONIC MARKER BALL ( MARKER BALL} IS NEEDED AT EACH END OF THE CONDUIT RUN AND SHALL BE PLACED ABOVE THE TALLEST CONDUIT IN THE TRENCH USING A SMALL MOUND OF FIRM SOIL AS BEDDING AND SECURED WITH PLASTIC CABLE TIE IF NECESSARYTO ANCHOR THE UNIT BEFORE BACKFILLING TRENCH.
MARKER BALL LOCATION IN THE TRENCH
MAXIMUM DEPH = 36" TO BOTTOM OF MARKER BALL ...
i ~ .,
BACKFILL FREE OF MATERIALSi LARGER THAN 1" DIAMETER ~ THAT MAY DAMAGE CONDUIT. &.• :, IN THIS SAMPLE TRENCH, THE • ;; 8 r:: TALLEST CONDUIT IS 8" PVC 0 ;o:, BOTTOM OF TRENCH MUST .a
I HAVE A SMOOTH GRADE.
9-r::
3. MAXIMUM DEPTH FOR ANY MARKER BALL SHOULD NOTEXCEED 36 "FROM FINAL GRADE. SEE SHEET 2 FOR ,,I ADDITIONAL INSTALLATION DETAILS. tll z Ill 4. MARKER BALLS SHALL BE INSTALLED AT THE TIME OF CONSTRUCTION WHEN THE CONDUIT AND CABLE ARE VISIBLEw ...J AND BEFORE THE OPEN TRENCH HAS BEEN BACKFILLED.ii:
DRAWN CHECKED APPROVEDMARKER BALL KJG RJS KLW
INSTALLATIONS AT DATE CONST. UNIT# ROUP# 2/12/14 N/A T-121ROAD CROSSINGS
DWG. # SHT. # TOTAL SHT. # A-4758 1 2
5. SMECO ENGINEERING DRAWINGS FOR NEW SUBDIVISIONS SHALL PROVIDE AT LEAST 2 CLARIFYING NOTES SIMILAR TO THE FOLLOWING FOR PROPOSED ROAD CROSSINGS:
a. DEVELOPER SHALL INSTALL SMECO PROVIDED MARKER BALLS AT ALL ROAD CROSSINGS. b. DEVELOPER SHALL CONTACT SMECO'S CONSTRUCTION DEPARTMENT IN ADVANCE TO OBTAIN MARKER BALLS FOR
A SPECIFIC SMECO PROJECT IN THAT AREA.
SAMPLE PROJECT WITH ROAD CROSSINGS AND MARKER BALL LOCATIONS
,f), MARKER BALL LOCATION
6. SMECO STOCK NO. 178265, A4" DIAMETER, ELECTRONIC MARKER BALL THAT IS RED IN COLOR, IS THE CURRENTLY APPROVED MARKER BALL TO BE USED ON UNDERGROUND PROJECTS WITH ROAD CROSSINGS. THE PREVIOUS 15" FLAT DISK MARKER IS BEING PHASED OUT.
7. THE ABOVE GUIDELINES ARE INTENDED TO SUPPLEMENT OTHER APPROVED SMECO STANDARDS THAT INCLUDE, BUT ARE NOT NECESSARILY LIMITED TO THE FOLLOWING:
a. GENERAL CONDUIT INSTALLATION GUIDELINES: T-115. DWG. A-4542 b. DEVELOPER RESPONSIBILITIES: T-116, DWG. A-4543 c. SEPARATION & DEPTH - ELECTRIC POWER FACILITIES: MISC. UR2 DWG. A-4557 d. UNDERGROUND RIGHT-OF-WAY CROSSING PROFILE: SECTION 18, T-29 DWG. A-3632
SM MARKER BALL
INSTALLATIONS AT ROAD CROSSINGS
DRAWN CHECKED APPROVED KJG RJS KLW
DATE CONST. UNIT# ROUP# 2/12/14 NIA T-121
DWG. # SHT. # TOTAL SHT. # A-4758 2 2
NOTES:
1. Grounding as approved by inspection authority.
6'MAX.
4'MIN. MAIN SERVICE FUSED
1-14---------- DISCONNECT OR CIRCUIT BREAKER (OUTDOOR lYPE)
#6 CU. MINIMUM GROUNDING
WIRE TO BE PROTECTED OR
I ADEQUATELY SECURED I
IjI .s en C l_~:8 :::,... 'C 'Iii
.._______ 10' ------2i 11c ! MAX. FROMAN
! :::, ,___________. 11
0 ---+-------- METER & METER SOCKET
EXISTING SECONDARY .!!! TAPING POINT g 11 IL
1 C
g LJ ... GROUNDING ELECTRODE
'IS
C!)
ifi 1 UPDATED SHEET BORDER ~
ii: 0 CONVERTED HAND DWG TO CAD DWG NO REVISION
UNDERGROUND DRAWN CHECKED APPROVED
SM JEF
TEMPORARY DATE CU# RUS#
CONSTRUCTION 9/22/82 UM8-2A
SERVICE DWG.# SHT.# TOTALSHT. # A-4584 1 1
----------.60' MAX. FROM TRANSFORMER-----------~
----~
--+------ USE WEATHERHEAD SMECO SELF SUPPORTING SERVICE CABLE
SERVICE ENTRANCE CABLE ~r-------- OR SERVICE ENTRANCE
CONDUCTORS IN CONDUIT
2'SUGGESTED POLE SIZE 4' x 4' x 16 FEET LONG. SET 4' IN GROUND SUGGESTED BRACE SIZE. 2" X4" X 14'
CABLE STRAPS SPACED NOT MORE THAN 24 INCHES
10'MIN
0 -r----- METER & METER SOCKET
6'MAX.
4'MIN. MAIN SERVICE FUSED DISCONNECT OR CIRCUIT
BREAKER (OUTDOOR TYPE)
#6 CU. MINIMUM GROUNDING WIRE TO BE PROTECTED OR
ADEQUATELY SECURED
I .-______1__I2__H__E_IG_H=-T______-i 4' MIN.1
OF POLE I I II_J I I II L...---' II
NOTES: II II
1. Pole must be sufficiently rigid and guyed or braced to withstand 200 lbs pull at the ~~•----- GROUNDING ELECTRODE top, if brace is used it should be attached approximately 2 feet below the service attachment and should extend a distance from the base of the pole at least equal to one half the height of the pole. Also pole must be tall enough for service cable to maintain appropriate clearances over all areas crossed.
2. Grounding as approved by inspection authority. 2 UPDATED SHEET BORDER 3/6/15 KT KLW 1 ADDED NOTE #3 & MAX. DIST. FROM XFRMR 7/6/09 M
3. Up to 3 spans of primary conductor at 270'-300' each span 0 CONVERTED HAND DWG TO CAD DWG 2/28/09 M KLW
I I I Il._L1
NO
OVERHEAD TEMPORARY
CONSTRUCTION SERVICE POLE
REVISION DATE BY APP
DRAWN CHECKED APPROVED JEF
DATE CU# RUS# 9/22/82 M8-10
DWG.# SHT. # TOTAL SHT. # A-4585 1 1