Design Public Hearing Presentation for Wiehle Avenue at W&OD Trail

Post on 15-Apr-2017

833 views 0 download

Transcript of Design Public Hearing Presentation for Wiehle Avenue at W&OD Trail

County of Fairfax, Virginia

1

Design Public Hearing Presentation for:

Wiehle Avenue at W&OD Trail

March 17, 2016

County of Fairfax, Virginia

2

Location Map

Department of Transportation

WIE

HLE

AVE

NU

E

TO D

ULL

ES

TOLL

RO

AD

PROJECT SITE N

SUNSET HILLS ROAD

WIEHLE-RESTON METRO STATION

ISSA

C

NEW

TON

SQ

MIC

HAE

L FA

RAD

AY C

TW&ODTRAIL

County of Fairfax, Virginia

3

Existing Conditions

Department of Transportation

• W&OD Trail – 10 ft. wide paved asphalt trail– 10 ft. wide gravel/dirt trail

• Wiehle Ave (Urban Arterial)– 24,000 AADT– 2 NB lanes, grass median, 4

SB lanes• At-Grade Crossing

– Crosswalk (75’ L x 40’ W)– Pedestrian/Bicycle Signs

County of Fairfax, Virginia

4

Safety Concerns

Department of Transportation

• Crash Data– 7 reported crashes from

June 2011 to June 2015 • Crash Types

– Vehicle vs. Vehicle– Vehicle vs. Trail User

• Different Behaviors– Cautious– Confused– Oblivious– Careless

Is she really going?

Are they going to stop?

County of Fairfax, Virginia

5

• Safety Improvements– Eliminate conflicts between vehicles and trail users– Minimize vehicle rear-end crashes

• Free-Flow Traffic– Alleviate sudden stops for vehicles traveling through

intersection– Provide an uninterrupted route for trail users

• Public Enhancement– Present viable options to the local community for their

input– Adhere to the aesthetics and history of W&OD Trail

Purpose & Need

Department of Transportation

County of Fairfax, Virginia

6

Dominion Virginia Power (DVP)

Department of Transportation

Single-Circuit 230 kV Monopoles Double-Circuit 230 kV Towers

County of Fairfax, Virginia

7

DVP Electrical Lines• Initial Relocation Plan

– 5 to 6 concrete monopoles– 15 ft. south (CL of poles)

• Guidelines for Design– 25 ft. from conductor lines– 25 ft. workspace around

poles– 20 ft. through access for

maintenance vehicles– 18 ft. maximum width for

structures

• Ongoing Coordination

Department of Transportation

County of Fairfax, Virginia

8

Underground Utilities

Department of Transportation

Water Gas Electric AT&T, Cox, Comcast, Verizon, L3, Zayo

County of Fairfax, Virginia

9

Proposed Trail Alignment

Department of Transportation

• Grade separate W&OD Trail over Wiehle Avenue

• Merging paved trail with gravel trail for bridge crossing

• W&OD Trail Profile– 3% vertical grade vs. 5% vertical grade

County of Fairfax, Virginia

10

Design Details

Department of Transportation

• Access to Wiehle Avenue will be provided• At-grade trail crossing at Wiehle Avenue

will be CLOSED• Widen sidewalk along Wiehle Avenue• Designed to follow DVP offset guidelines

County of Fairfax, Virginia

11

Typical Section

Department of Transportation

Trails merge to meet DVP structure width requirements

County of Fairfax, Virginia

12

Bridge Typical Section

Department of Transportation

County of Fairfax, Virginia

13

Ongoing StudiesVertical Grade

• 3% Vertical Grade– Preferred grade per NVRPA– Easier ride for bicyclists– Bigger project footprint– More impacts and higher costs

• 5% Vertical Grade– Allowable grade per AASHTO– Harder ride for bicyclists– Smaller project footprint– Less impacts and lower costs

• 4% Vertical Grade?

Other Items• Wiehle Avenue Connection

– Prohibit mid-block crossing– Evaluate crosswalk just north of

Sunset Hills Road• Trail Merging

– Unite paved and gravel trails before bridge

– Provide signing to trail users• Drainage/SWM

– Provide closed drainage system to collect storm runoff

– Consider water quality and quantity

Department of Transportation

County of Fairfax, Virginia

14

Maintenance of Traffic

Wiehle Avenue• Road and Bridge

– Temporary traffic controls – Off-peak hours

• Midday• Nighttime

• Adjacent Sidewalk– Bypass Options– Detour Options

W&OD Trail• Gravel Trail

– Permanent controls– Prohibit use

• Paved Trail Open– Leave open– Safe from work areas

Department of Transportation

County of Fairfax, Virginia

15

Requested Feedback• Bridge Type/Finish• Retaining Wall Formliner Finish• Medallion• Other

Department of Transportation

County of Fairfax, Virginia

16

Prestressed Concrete

Department of Transportation

County of Fairfax, Virginia

17

Steel Girder

Department of Transportation

County of Fairfax, Virginia

18

Truss

Department of Transportation

County of Fairfax, Virginia

19

Truss

Department of Transportation

County of Fairfax, Virginia

20

• Retaining Wall Formliner Finish

• Medallions

Aesthetic Options

Department of Transportation

County of Fairfax, Virginia

21

Anticipated Schedule• Public Hearing – Winter 2016• Environmental – Winter 2016• Land Acquisition – Spring 2018• Final Design – Winter 2018• Utility Relocation – Summer 2019• Construction – Winter 2021

Department of Transportation

County of Fairfax, Virginia

22

Questions

Department of Transportation