Post on 02-Apr-2018
descon.com
Corporate Overview
descon.com
Descon operates four major business lines
POWER
ENGINEERING
CHEMICALS Owning & Operating Two
Power Plants, with supplies to
the State.
Providing Operations &
Maintenance to the Power
Industry Internationally
Operating in the GCC & Pakistan,
with a customer base across the
globe
Descon Automation & Control –
providing integration capability to
both internal and external clients,
globally
Operating a Hydrogen
Peroxide Plant with exports
to the Middle East, Far East,
South Asia and the African
countries
Inspection & Testing
Skilled Manpower for our
customers across globe
Travel & Logistics Support
OTHER LINES
descon.com
Infrastructure Manufacturing
Construction Descon Industrial Services
EPC
Power
Oil & Gas
Engineering & Technology
Descon Automation & Control
Descon Engineering – Business Divisions
descon.com
Descon Engineering – Organogram
CEO
Company Secretary
Head Shared
Services
Chief Human
Resources Officer
Chief Financial Officer
Chief Risk &
Compliance Officer
Chief Strategy Officer
PresidentConstruction
Domestic
UAE
PresidentDescon
Industrial Services
Domestic
UAE
Qatar
Oman
President EPC
Domestic
UAE
PresidentInfrastructure
Domestic
PresidentManufacturing
Domestic
UAE
descon.com
Core Values
descon.com
Descon Engineering Limited
Descon Engineering & Technology
Descon Engineering Qatar LLC, Doha
Descon Engineering FZE, Kuwait
Descon Engineering, Abu Dhabi
Descon Engineering FZE, Sharjah
Descon Engineering Oman LLC
Descon Engineering FZE, Iraq
Descon Automation & Control
Presson Descon International (Pvt) Limited
Olayan Descon JV Saudi Arabia
Engineering Businesses
descon.com
• 31.2 MW at ISO conditions
• IC Engines – Simple Cycle
• Natural Gas
• 8 MWM gas-fired engines TCG 2032 V16 model
• Combined Cycle - IPP Project
• 450 MW at ISO conditions
• 2 Gas Turbines + 1 Steam Turbine - Combined Cycle
• Fuel Natural Gas
• Back up Diesel
• 2 x V92 Siemens GTs & 1 x Siemens ST Hp – D30-16
Power Businesses
Descon Power Solutions (Pvt.) Ltd.
Altern Energy Limited
descon.com
We don’t sell Peroxide, we sell Eco-Friendly Solutions
Pakistan’s largest and only European Technology plant with a 30,000 tons per annum output
Competing with Global companies regionally
Chemicals Business
Descon Oxychem Limited
descon.com
Inspection & Testing
Expertise
• Non-Destructive Examination
• Advanced NDT Techniques
• Industrial Inspection
• Instrument Calibration
• Lifting Equipment
• Tank Calibration
• Cathodic Protection
• Tubular Inspection
• Rig Audit Services
• Industrial Safety & Training
Expertise
• Inspection
• Testing
• Certification
• Calibration
* Inspectest Industrial Solutions (Abu Dhabi) is
an affiliated company of Inspectest (Pvt.) Ltd.
Footprint*
descon.com
1977
• Company established
1980
• OlayanDescon Saudi Arabia
1982
• Lahore Manufacturing Works
1982
• Abu Dhabi
2000
• Joint Venture with JGC Corporation
2000
• Joint Venture with Presson, of Canada
2001
• Ruwais shop established in Abu Dhabi
2002
• Yanbu Saudi Arabia
2004
• Descon Engineering Qatar
2005
• HamriyahManufacturing Works in UAE
2006
• Altern Energy and RouschPower acquired
2007
• Karachi Manufacturing Works commissioned
2008• Descon
Oxychem
2008• Entry in
Kuwait
2013• Entry in Iraq
2015• Entry in
Oman
2017
• Descon Automation & Control BU formed
Major Milestones
descon.com
Our Presence
Internationally
United Arab Emirates
Abu Dhabi
Sharjah
Dubai
Saudi Arabia
Pakistan
Qatar
Oman
Iraq
Baghdad
Kurdistan
Future plans include expansion to
Central Asian States
African Continent
Existing Markets Target markets
Geographic Footprint
descon.com
Jinnah Barrage,
Mianwali
• Power
• Refinery
• Oil & Gas
• Infrastructure/Hydel
• Chemical/Petro-
chemical/Industrial
Pakistan
Afghanistan
India
China
Iran
Corporate Head
Office
New Khanki
Barrage, Wazirabad
K-Electric 2x10 MW Heat
Recovery Power Plant &
Grid Rehab, Karachi
Lahore
Karachi
Islamabad
PPL Adhi Gas Plant – 3
(EPC)
PPL - Gambat GPF
(EPC)
OGDCL KPD-TAY –Wellhead & GPF E&I Work (Procurement & Construction
Contract)
ICI Soda Ash Plant
Engineering
Khurram Tangi,
KPK Wazirastan
Ghotki Canal, Sindh2 x 37.2 MW Co-Gen Project, Etihad Power
Limited, RYK, PAKISTAN
FPCL 117 MW Coal Power
Project (CMEI Works)
Pakistan Aluminum Beverage Cans, Limited
(CMEI)
National Refinery Limited -
CDU/VDU Re-vamp (EPC)
UEP Engineering
40MW Maple Leaf Coal Fired Power Project
Iskandarabad, Mianwali (Civil & Mechanical Works)
Rehabilitation of
Guddu Barrage,
Sindh
Ongoing Major Projects in the Pakistan
descon.com
• UAE
• Qatar
• OmanQatarGas Long Term
Shutdown 7Years +
Slug Catcher Job
Pakistan
Afghanistan
India
China
Iran
Saudi ArabiaUAE
Qatar
Kuwait
Oman
Iraq
Yemen
Dolphin Energy Ltd.
Long term Shutdown
3Years
QP Refinery
Shutdown 3 Years
RAS GAS Long Term
Man Power Supply
Chiyoda Almana Engineering
LLC. (Misc. Jobs)
Miscellaneous
Retrofit Jobs (ABB
LLC., Siemens)
GASCO: Long Term Shutdown
Agreement 3 YearsADCO Sahil Field
Development (EPC)
BOROUGE: 2 Major Shutdowns –
Static Equipment Package
ADCO South East Tie-Ins Package B (EPC)
LINDE: Borouge Ruwais-III
Repair Works
Petrofac ZADCO UZ-750 (Construction)
FERTIL New Bagging and Truck
Loading Facility (EPC)
JGC Corp. - Barzan
Orpic - Shutdown
SIUCI –Annual Turnaround
Ongoing Major Projects in the Middle East
descon.com
Number of Nationalities: 26* Number of Employees over 15K
*Cultural Diversity supports our International businesses
Annual Revenue
is US$1 Billion
Order Book is of
US$3 Billion
Revenue Mix Business wise (%) - 2016
Nationalities & Number of Employees
71
27
2 1
Engineering Power Chemicals Other Lines
descon.com
ChemicalsOil & Gas
FMCG
FertilizerPower
Renewable EnergyCement Hydro Power Infrastructure
Industry Sectors
descon.com
Lahore Manufacturing Works (LMW)Lahore – Pakistan
(Boilers & Process Equipment)
Al Jubail – KSA(Process Equipment)
Yanbu – KSA(Process Equipment & General
Fabrication)
Karachi Manufacturing Works (KMW)
Karachi – Pakistan(Wind Tower, General Fabrication)
Alkhor – Qatar(General Fabrication)
Hamriyah Manufacturing Works (HMW)
Hamriyah – Sharjah(Steel Structure, Pressure Vessels
and Skids)
Manufacturing Facilities
descon.com
Plant Engineering - Lahore
Plant Engineering
Karachi
Product Engineering
Sharjah
Process Equipment Engineering Lahore
Product Engineering
Al Jubail - KSA
Plant Engineering
Abu Dhabi
Boiler Engineering
Lahore
Total 973 Design Engineers
Design Centres
Adhere to all applicable HSE standards and comply with applicable legal, regulatory and industry and other
requirements.
Ensure Health and Safety of all stakeholders.
Demonstrate personal ownership for HSE matters through visible leadership at every level.
Empower all employees to activity report unsafe conditions and actions to continually improve HSE culture and
make them accountable against set goals and targets.
Manage risks related to business processes proactively to ensure that ill health, injuries and environmental
impacts are prevented.
Ensure appropriate and reliable emergency response system to be in place in all company operations.
Establish HSE audit system to assess level of compliance and ensure corrective actions.
Communicate this policy to all Stakeholders and provide training, resources and other support to encourage
behavior that upholds this policy.
“
”
• CE - Marking
• ISO Certification (ISO 14001:2004, ISO 9001-2008 (UKAS) & OHSAS 18001-2007)
• ASME Certification (A, PP, S, U, U2 and R)
We, at Descon, commit to
sustainable performance in Health,
Safety & Environment and shall
endeavor due recognition from all
stakeholders. In order to achieve
this we shall:
HSE Policy
descon.com
• Engineering Execution 8.5 million man-hours
• Construction Execution 684 million man-hours
• Equipment Manufacturing 500,000 tons
• Plant Maintenance 66 million man-hours
• As at 2013, Descon Engineering’s ENR Ranking stood at 126 / 250
in the International category, while 208 / 250 in the Global category
Since1977. . .
Accumulated Experience
descon.com
Descon Technical Institute
• Established in 1998.
• Trained more than 31,000 skilled and semi-skilled workers.
• International standards followed.
• Welders’ Certification conducted by 3rd Party for Welders Qualification
Test (WQT) for Advanced Welding (6G) and Electric Welding (3G).
Major Courses Offered:
- Advance Welder 6G
- Electric Welder 3 G
- Electrical Supervisor
- Pipe Fabricator
- Pipe & General Fitter
- Millwright
- Electrical Technician
- Safety Inspector
- Rigger / Scaffolder
- Safety Assistant
Corporate Social Responsibility - CSR
descon.com
Clientele
descon.com
Thank You