Demand Response: An Integrated Resource

Post on 15-Jan-2016

60 views 0 download

Tags:

description

Demand Response: An Integrated Resource. John Goodin Lead, Demand Response. CEC Scoping Workshop Load Management Standards March 3, 2008. MRTU Core Market Functions. Day-ahead: Clear bid-in supply against bid-in demand Congestion management Procure operating reserves and regulation - PowerPoint PPT Presentation

Transcript of Demand Response: An Integrated Resource

Demand Response:An Integrated Resource

CEC Scoping WorkshopLoad Management StandardsMarch 3, 2008

John GoodinLead, Demand Response

2

MRTU Core Market Functions

Day-ahead:Clear bid-in supply against bid-in demandCongestion managementProcure operating reserves and regulation Perform Unit Commitment -to ensure adequate resources are available to meet forecasted demand & reserve requirements in real-time

Real Time:Procure additional operating reserves and regulation, if necessaryReal-time dispatch of resources to meet instantaneous demand Reliable real-time operation -observe grid constraints, respond to contingencies, comply with WECC/NERC operating criteria

3

Key Challenge… Meeting the Growing Demand

CAISO Load Duration CurveSept '05 to Sept '06

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

55,000

1

26

2

52

3

78

4

1,0

45

1,3

06

1,5

67

1,8

28

2,0

89

2,3

50

2,6

11

2,8

72

3,1

33

3,3

94

3,6

55

3,9

16

4,1

77

4,4

38

4,6

99

4,9

60

5,2

21

5,4

82

5,7

43

6,0

04

6,2

65

6,5

26

6,7

87

7,0

48

7,3

09

7,5

70

7,8

31

8,0

92

8,3

53

8,6

14

Hour

Ho

url

y A

ve. D

eman

d

50,085 MW Peak 7/24/06

Greater than 45,000 MW 57 hours or 0.65%

Greater than 40,000 MW 279 hours or 3.2%

Greater than 35,000 MW 805 hours or 9.2%

Winter Peak 33,275 MW 12/14/05

4

Key Challenge… Increasing Load Factor (Summer)

28,000

29,500

31,000

32,500

34,000

35,500

37,000

38,500

40,000

41,500

43,000

44,500

46,000

47,500

49,000

50,500

52,000

0:00 1:20 2:40 4:00 5:20 6:40 8:00 9:20 10:40 12:00 13:20 14:40 16:00 17:20 18:40 20:00 21:20 22:40 0:00

Actual Load 1 in2 Forecast 1 in 10 Forecast

50,085 MW

28,424 MW

July 24, 2006

21,661 MW Delta

5

Key Challenge… Increasing Load Factor (Winter)

6

Key Challenge… Integrating Intermittent Resources

Integrating & Firming the energy production from this wind park

0

100

200

300

400

500

600

700

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Meg

awat

ts

Average

Each Day is a different color…

Day 29

Day 5 Day 26

Day 9

Tehachapi Wind Generation in April – 2005

7

Wind vs. Actual Load on a Typical Hot Day in 2006

CAISO Wind Generation

July 2006 Heat Wave

0

200

400

600

800

1,000

1,200

07/1

6/06

07/1

7/06

07/1

7/06

07/1

8/06

07/1

8/06

07/1

9/06

07/1

9/06

07/2

0/06

07/2

0/06

07/2

1/06

07/2

1/06

07/2

2/06

07/2

2/06

07/2

3/06

07/2

3/06

07/2

4/06

07/2

4/06

07/2

5/06

07/2

5/06

07/2

6/06

07/2

6/06

MW

Wind Generation Wind Generation at Peak

Total Wind Generation Installed Capacity = 2,648 MW

Wind Generation at Peak

8

Demand Response Working Groups

Five Working Groups Formed to Help Shape the Future Model and Integration of Demand Response Resources Vision for Demand Resources- CPUC lead DR Participation in MRTU Release 1- CAISO lead DR Participation in MRTU Release 1A- CAISO lead DR Product Specification- CEC lead Appropriate DR Infrastructure- CEC lead

9

Example…the Need for Integration

Under MRTU:

Expected Emergency Triggered DR Amount: 1,700 MW

Demand Forecast: 45,000 MW

DA Forward Market Clears: 43,000 MW

CAISO Commits 2,000 MW of additional capacity to be available

The CAISO did not commit only 300 MWs (45,000 -1,700 = 43,300), the CAISO must plan to meet all the load, even the non-firm load that may be available for interruption if a system emergency is declared. The CAISO does not plan the system to be in an emergency state so that it can have access to emergency triggered resources.

10

Retail Programs to Wholesale Market Products

Retail Programs Wholesale Products

Wholesale Market Products: Day-ahead Market

• Energy: Price-Responsive Demand• Ancillary Services: Non-spin, Spin & Regulation

Residual Unit Commitment Capacity

Real-time Market• Energy Market- Balancing Energy• Ancillary Services- Non-spin, Spin & Regulation

11

Questions?

Contact Info:John Goodin

(916) 608-7154

jgoodin@caiso.com