Post on 10-Oct-2020
Corporate PresentationCorporate Presentationpp
Endeavour to Pioneer and Excel
Set up India's first independent po e plant in Andh a P adeshpower plant in Andhra Pradesh
Developed India's first brownfield airport project at ChhatrapatiShivaji International Airport, MumbaiMumbai
Built the first privately operated six-lane road project at Jaipur Kishangarh Expressway in RajasthanRajasthan
Spearheaded India's largest overseas greenfield investment of USD 10 billion in an integrated mine rail and port project in mine, rail and port project in Queensland, Australia
Operates India's largest non-profit emergency service organization GVK EMRI across twelve states
2
GVK EMRI across twelve states and 2 UTs with around 25,000 employees and 5000 ambulances
OverviewBusiness VerticalsBusiness VerticalsBeyond Business
Overview
Focussed on Infrastructure and Infrastructure and Resources
Operates in India, Australia, Indonesia
A Responsible Corporate Citizen
4
Business
Infrastructure
ROADS RAIL PORTS
Resources Others
5
Investments
Committed investments of over USD 20 billion globally
Invested over USD 4.3 billion in India
Over USD 6.6 billion in the pipeline in India
USD 10 billion investment plans in investment plans in Australia
6
Excellence - In Business and Beyond
Dr. GVK Reddy, Founder Chairman and MD, GVK, awarded Padma Bhushan, one of India’s highest civilian honours, in 2011
Dr. GVK Reddy awarded the ET Entrepreneur of the Year 2009 by Indian’s leading Financial daily, The Economic Times
GVK EMRI, India’s largest emergency response service bagged Innovation of India Award 2012 for Public Service
GVK Chhatrapati Shivajip jInternational Airport, Mumbai rated as third best airport globally on customer experience in 2011 by Airports Council International (ACI)
GVK Bengaluru International Airport honoured with the Golden Peacock Environment Management Award 2012
GVK’s acquisition of Australian coal i h b d d h
7
mines has been awarded the Asia Deal of the Year and Asia Outbound Investor of the Year, 2012
Business VerticalsInfrastructureInfrastructure
Resources
Others
Infrastructure EnergyEnergy
GasThermalThermalHydro
9
Infrastructure - Energy
GAS THERMAL HYDRO
Andhra Pradesh Punjab Uttarakhand
JegurupaduPhase 1 & 2: 445 MWPhase 3: 800 MW
Gautamih
Goindwal Sahib: 540 MW
Khadur Sahib: 2 x 660 MW
Alaknanda: 330 MW Bogudiyar Sarkari Bhyol: 146 MWMapang Bogudiyar: 200 MW
Jammu & Kashmir
Cumulative Capacity 6000 MW10Operational Operational Under DevelopmentUnder DevelopmentUnder ConstructionUnder Construction
Phase 1: 469 MW Phase 2: 800 MW
Ratle: 850 MW
Infrastructure AirportsAirports
Chhatrapati ShivajiInternational Airport, p ,MumbaiBengaluru International AirportBali International Airport, IndonesiaYogyakarta International Airport Indonesia
11
Airport, Indonesia
Infrastructure - Airports
MUMBAI BENGALURU INDONESIA
Chhatrapati Shivaji International Airport, Mumbai
Concession period:60 yearsCurrent capacity: 40 Mn PaxC t P T ffi i FY
Bengaluru International Airport, Bangalore
Concession period: 60 yearsCurrent capacity:
Denpasar International Airport, Bali
Operation, management and development contract of non-aeronautical commercial facilities
Current Passenger Traffic in FY 2011-12: 30.74 Mn PaxFirst Brownfield airport under Public Private Partnership (PPP) in India
Current capacity: 12 Mn PaxCurrent Passenger Traffic in FY 2011-12: 12 Mn PaxFirst Greenfield airport under Public Private Partnership (PPP)
for existing and upcoming new international airports
Yogyakarta International Airport, Java
Developing an international
12
Handling 44 mppa
p ( )in India Developing an international
greenfield airport
Operational Operational Under ConstructionUnder Construction
Infrastructure TransportationTransportation
RoadsRailRailPorts
13
Infrastructure - Transportation
RAIL PORTSROADS
India AustraliaAustraliaJaipur-Kishangarh Project, Rajasthan: 542.4 lane km
First privately operated 6-lane expressway projectExecuted six months ahead f h d l
Acquired 100% equityMulti-user and Multi-cargo facility Awarded Preferred Developer status for Abbot Point at T3
Acquired 100% equityFirst standard gauge privately owned railway from Galilee Basin to Abbot Point Port25,000 tonne haul per train
of scheduleDeoli-Kota Project, Rajasthan: 332.16 lane kmBagodara-Vasad Project, Gujarat: 611.4 lane km
Coal handling and stockpiling facility of 80 mtpa capacity 2 dedicated ship berths
IndiaMoU with Govt of Gujarat to
60 mtpa scalable to 120 mtpaInvestment of USD 3.5 billion
Shivpuri-Dewas Project, Madhya Pradesh: 1329.84 lane km
MoU with Govt of Gujarat to develop a greenfield port at Okhamandi
14
2816 lane Km 80 million tonne capacity500 Km
ResourcesCoalOil & Gas
15
Resources
COAL COAL OIL & GAS
AustraliaAcquired Alpha coal (Open-Cut): 79%Alpha West (Underground): 79%
I di I diKevin’s Corner: (30% Open, 70% Underground) – 100%Total capacity: 80 mtpaOne of the world’s largest coal mining operations
IndiaCoal mines at Tokisud and Seregarah Block, Jharkhand being developed as captive coal mines to provide coal for the
i th l j t i
IndiaPartnered with BHP Billiton for exploration of oil blocks off the West coast of IndiaGathering and interpreting
8 billion tonne reserves16
7 Blocks
mining operationsReceived all the key approvals
upcoming thermal projects in Punjab
latest seismic data
Other BusinessHospitalityLife Sciences Realty
17
Other Business
HOSPITALITY LIFE SCIENCES REALTY
TAJGVK Hotels: 1093 rooms
Hyderabad
GVK BIO is Asia’s leading Contract Research Organisation with over 2,000
i ti t t d Taj Krishna: Rooms - 261Taj Deccan: Rooms - 157Taj Banjara: Rooms - 122Vivanta by Taj: Rooms - 181
Chandigarh
scientists, support and analytical staff
GVK BIO provides research support ranging from Analytical Services, Biology,
ChandigarhTaj Chandigarh: Rooms - 152
ChennaiTaj Clubhouse: Rooms - 220
h l
Chemistry, Clinical Research, Clinical Pharmacology, Informatics and Process Research & Contract Manufacturing
GVK one Mall, Hyderabad
Sky City, Mumbai Airport
Sky Gardens, BengaluruAirport
18
Upcoming hotel projects in Mumbai and Bengaluru
Industrial Park, Tamil Nadu
8 TAJGVK hotels Biosciences and Research Prime AssetsOperational Operational Under DevelopmentUnder DevelopmentUnder ConstructionUnder Construction
Beyond Business
Beyond Business
Healthcare – GVK EMRIHealthcare GVK EMRI
Environment and Sustainability
Community Development
Art, Culture and Sports
20
Beyond Business
ART, CULTURE AND SPORTS
COMMUNITY DEVELOPMENT
ENVIRONMENT & SUSTAINABILITY
HEALTHCARE GVK EMRI
Largest emergency Largest emergency response services response services
Environment and Environment and sustainability initiatives sustainability initiatives
Provides Education
1.25 km 1.25 km scenographyscenography, , Art Wall, at the new Art Wall, at the new response services response services
which attends to which attends to emergencies like emergencies like medical crises, law & medical crises, law & order situations and order situations and fire disastersfire disasters
sustainability initiatives sustainability initiatives including energy including energy conservation, water conservation, water management and management and efforts to minimize efforts to minimize ecological impact are ecological impact are
EducationHealth and HygieneCommunity based projectsEmpowermentEntrepreneurship
Art Wall, at the new Art Wall, at the new T2 terminal at T2 terminal at CSIA, Mumbai, is the the longest art wall in a longest art wall in a public utility building public utility building in the worldin the world
21
Covers over 600 million Covers over 600 million people across India, people across India, saving precious livessaving precious lives
the conscious steps the conscious steps taken at each of GVK’s taken at each of GVK’s projects. projects.
Developmentfor the underprivileged Supports and
endorses excellence in sports
Our Employees…Our Strength
A 44,000 unified workforce with diverse skill sets, contributes its bit to India’s growth by executing world class projects
Environment which encourages innovative thinking, transparency and participative managementparticipative management
Manpower across sectors: Energy and Transportation - 3,000Airports - 9,500 Life Sciences - 4,000EMRI - 25,000TAJGVK – 2,000Others – 500
22
A Summary
Pioneer in several public pprivate partnership projects Diverse and balanced portfolioTrack record of quality and timely execution of large projects within budgetsAbility to iron out socio-political challenges, adapt to and integrate with local environmentlocal environmentExperienced workforce with project and fund management expertise, focused on value creation for all stakeholdersCommitted to integrate business goals with environmental and socialresponsibilities
23
Thank you