Sheet1BDTCL 765/400 kV SUBSTATION BHOPAL(M.P.)DAILY CHECKLIST FOR ICT'S and REACTORSDate:Shift:Time:Sl. No.Items to be inspectedICT-1ICT-2Spare ICTIndore LRJabalpur LR765 kV Bus Reactor765 kV Spare Line Reactor765 kV Spare Bus Reactor400 kV Bus ReactorRYBRYBRYBRYBRYB1OTI2WTI2.1HV2.2LV2.3IV3Fan Running nos.4Pump Running nos.5Oil Level6N2 system status7Abnormal Noise.If any?8Oil Leakages.If any?

Date:Shift:Time:1OTI2WTI2.1HV2.2LV2.3IV3Fan Running nos.4Pump Running nos.5Oil Level6N2 system status7Abnormal Noise.If any?8Oil Leakages.If any?

Date:Shift:Time:1OTI2WTI2.1HV2.2LV2.3IV3Fan Running nos.4Pump Running nos.5Oil Level6N2 system status7Abnormal Noise.If any?8Oil Leakages.If any?