Executive Summary
The Problem
Solar PV gives DC Power
But load is AC
Needs a DC-AC convertor
Now if we add a battery
Battery stores only DC
Require a AC-DC convertor for charging
Require a DC-AC convertor during discharging
For low power, each convertor* can have 10 to 15% loss
Solar with battery may have 25 to 45% loss
DC-AC
AC-DC DC-AC
battery
Load AC
grid
Solar DC
DC Advantage Basic Home Loads are moving to DC
Electronics devices work on low-voltage DC
TV (LED/LCD), laptops. Cell-phones, speaker-phones, tablets,
speakers
AC to DC conversion has losses from 20% to 50% in each device
Refrigerators, air-conditioners, washing machine moving to BLDC motors
AC fan 72W BLDC fan 30W
at speed 1 60W 9W
CFL tube 36W LED tube 15W
low intensity na 4W
Move to Solar-DC at Premises
48V DC line as an additional power line at home
Highly power-efficient usage of Solar
Low-power from grid alone converted from AC-DC
Designed to have minimal loss
Battery can be added with higher efficiency (no convertors), if required
AC-DC
battery
Load grid
Solar
48VDC
48VDC
48VDC
Why is Decentralized Solar important?
Grid: ₹4 to 9 per kWh:
Diesel generator: ₹24 per unit at 85% load: instantaneous
at 40% generator load, costs goes up to ₹34 per unit
Battery back-up: storage costs ₹12-15 + ₹5 per kWh
Solar PV: under ₹5 per kWh when dc is used: day time only
Conversion to AC may add ₹1.00 per unit; No land-cost added
Solar PV power price at DC level
PV cost per kW 60000 sun-hours per day 5
interest rate % 12% sun-days / year 300
depreciation (yrs) 20 total units gen per year 1700
yearly payment ₹ 8033 Losses 10%
price per unit
₹5.25
Chronology of Progress
* Expected
Milestone Date
IITM 90KW Solar Project - Start 10-May-13
UDC Project Approval from MHRD 26-Sept-13
IITM 90KW Solar Project Commissioning 28-Sept-13
UDC-Approval-TN 20-Dec-13
UDC-Approval-AP 02-Jan-14
IITM 1MW Project 04-Feb-14
GOA Implementation – Tenet, CSTRI Lab 30-Apr-14
UDC-Approval-KL 07-May-14
UDC-Approval-OD 22-Aug-14
UDC-Trial: GFRG Implementation 16-Sept-14
Cygni Company Incorporation 18-Oct-14
UDC-TN: Commissioning 02-Dec-14
UDC-AP: Commissioning* 28-Dec-14
Management Team
Venkat Rajaraman:
MS from Stanford University
20-years of system design and engineering
management
Earlier with Su-Kam (CEO); Portal Player (VP
Engg) and Sun MicroSystems
CEO Solaris since 2010
CEO – HR, Finance,
Project Management
V Ramakrishna:
MBA in HR
20-years of experience in HR & Project Mgmt.
Earlier with Su-Kam as Senior Project
Manager and NVIDIA as Sr. Executive.
General Manager –
HR & Admin
Technical Architect
Deepesh Gujarathi:
15-years of experience in embedded system
and product development
Earlier Co-Founder of Svena Energy - Clean-
tech start-up in energy efficient products & design
services.
Design BLDC motor control, battery monitoring
and LED lighting products
Cygni Business
o Solarsis in-business since 2010.
o On-grid, Distributed Generation, Roof-top
Solar Projects.
o Completed 17MW of Solar-AC Projects.
o 3MW of Solar-AC Projects On-going
New Solar-DC Business
Solarsis existing
Solar-AC Business*
Cygni
VISION
100MW Solar-DC installations in 5 years!
UDC & Solar DC Solutions
Solutions
Solar-DC
GOA OGH
UDC w/ Brown-Out Focus
Area
Solar-DC Technology Productization
o RBM (Remote, Buzzer, Metering) Unit
o OGH (Off-Grid Home) Unit
o BPU (Buzzer Protection Unit)
o DPAU-L (DC Power Augmentation Unit – Low Cost)
o LVCO (Low-Voltage Cut-off) 1ϕ and 3ϕ
o GRPS BoC (Brown-out Control)
o GOA – Management Unit
o DC-DC Converters (Mobile, Laptop Chargers and TV adapters)*
o UDPM*
* In Phase-2
Residential Market- India o 186 TWh/yr or 21% of total energy consumption
o Ceiling fans and lights – 115TWh or 62%
o 4x growth from 16,000 million sft in 2005 to 64,000 million sft
by 2030
o 1million new homes per year increasing to 3million by 2030
o Typical home configuration (106sqm floor area)
o 4.8KW connected load and 3577units/yr energy consumption
o >$10B market opportunity
Source: RESIDENTIAL BUILDINGS IN INDIA: ENERGY USE PROJECTIONS AND
SAVINGS POTENTIALS – Technical Report • September 2014 2
Low-Voltage DC Eco-system
Barrier to Entry
Trust
Customer Ownership
Scale
First Mover
Innovation
Cost
Green: Current
Orange: Roadmap
GOA Solution
Apartment Complex with 24 flats
Backup power provided
Lifts, Water
pumps,
AirCon,
Heaters,
sockets for
mixer-
grinder, hair
dryer etc.
Lights, fans,
electronics,
sockets for
electronic
off-the-shelf
AC devices
NO INTERVENTION
BA
CK
UP
OP
TIO
NS
Diesel Generator
Inverter + Battery
Green Offices /
Apartments
Our Solution- Solar DC
48V DC
5 kWp
GOA
230VAC
Grid 2.7 kW
230VAC
Grid (optional) Battery
(25 kWh)
48V DC
Load (up to 7.2 kW)
• Low Cost, high efficiency multi-home solar solution
• GOA Box: Proprietary technology developed in collaboration with IITM
Solar-DC Solution
High efficiency at >96%
Seamlessly integrates solar, grid and battery
Smart Load Control
Prioritized source selection
Remote monitoring and management
DC digital metering - 0.5 class accuracy
Intelligent Solar MPPT control
Meter reading integration with hand-held devices
NoC with centralized management
Savings Calculator
Description Value UoM
Conventional Loads (4 fans, 8 lights) 600 Watts
Utilization per day 8 hours
Cost of power (including 2hr of backup) 7.5 INR
Units of Power Consumed per home per day 4.8 KWh
Power Bill per day per home 36 INR
Current Power Bill per year 13,140 INR
Future DC Load (50% savings) 300 Watts
Future Power Bill (50% from grid @Rs6/unit) 2,628 INR
Rs13,140 Rs5,400 Rs2,628 Rs5,112
Value Proposition – Streaming Model
Cygni Savings UoM Value
Power Generation Mix of
GOA system
Solar:Grid:Battery 45:50:5
Capex per home (24home
system)
Rs20,000
Return on Capital to Cygni Per Annum Rs5,400
ROI Years 3.7
Current annual
electricity bill
Cygni annual
charges Future annual
electricity bill
Annual
Customer Savings
Value Proposition - Customer
Pay Monthly
Pay Less
No obligation / only pay per use
Don’t have to do anything
Feel Good
Cost Roadmap
With 100K Volume
With MNRE
Solar Subsidy
Incremental Cost
Today
With BEE
Intervention
With 1M Volume
Rs 20,000
(TO)
(Rs 2,000)
TO + 1 Year
(Rs 500)
TO + 2 Yrs
(Rs 1,000)
TO + 3 Yrs
(Rs 500)
TO + 4 Yrs
Incremental Cost (projected): Rs 16,000 per Home
Revenue Projection
Year 1 Year 2 Year 3 Year 4 Year 5
2.4KW
GOA
Units (in
‘000)
0.4 1.7 5.8 15.5 31.8
CapEx 0.7 Cr 7.2 Cr 41 Cr 122 Cr 284 Cr
Go-to-market strategy
o Focus Area – GOA o Targeted at Residential and Commercial consumers.
o Sell as a box (CapEx) or as a solution (Stream)
o Shift gradually more towards streaming model
o Upside – OGH o Position an an alternative to Home Inverter Market
o Productize and sell OGH box.
o Channel Network / Franchisee for deployments & Service
o 100K OGH initiative
o Upside – UDC o 100,000 home UDC project, Proposal stage at MoP
o 8-10 Sub-Station (SS) in a one town.
o Cygni will do SS side work.
o Channel / Network for home deployments
Scaling up challenges
o Math has to work
o Customer has to see / experience value
o Business Timing
o Team skill set
o Ability to execute
o Hard work & Sincerity
Current Installations - Solar DC
~100KW (includes ongoing)
>1000 homes
Several installations including CSTRI
Lab, Tenet Lab, GFRG building, TEDA
office etc.
Presence in AP, TN, KN, OD
GOA Installation
UDC Pilot Installations
S.No Description #homes/UDC @Sub-Station
# Homes planned KWp
1 UDC-TN 1000 219* 10.95
2 UDC-AP 1000 236** 11.80
3 UDC-KL 1000 320** 16.00
3 UDC-OD 1000 500** 25.00
Total 4000 1275 63.75 * completed, ** In-Progress
Funding Requirement
S.No Category Description Requirement (in Lakhs)
1 Capex 1.1MW implementation at Rs6.6Cr per MW (Streaming model @50% of homes) 330
2 R&D/Prod R&D Lab, IQC Lab set-up, Supply Chain, Test Equipments. 220
3 G&A Employee Exp, R&D/SW/HW exp, One-time Setup Expenses 450
S.No Category Description
Requirement (in Lakhs)
1 UDC 100K Project: Rs900 per home at SS level 900
2 UDC 100K Project: Rs100 per home for Meter Installation 100
Summary
Equity: 10cr
Working Capital: 10cr
Equity funds utilization
Working Capital utilization
Thank you
Partner with CYGNI
Contact: www.cygni.com; email: info@cygni.com
MAKE SOLAR YOUR POWER