Post on 28-Sep-2020
ALBERTO B. ESQUEJO, JR
CHIEF, PLANNING AND DESIGN DIVISION
DATE:
SUBMITTED:
EMMANUEL W. DIAZ, CESE
OIC-ASSISTANT REGIONAL DIRECTOR
DATE:
RECOMMENDED:
RONNEL M. TAN, CESO IV
REGIONAL DIRECTOR
DATE:
APPROVED:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. 1
Planning and Design Division
Bridges & Other Public Works Design Section
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
LOCATION: PAOAY, ILOCOS NORTE
PAOAY MPS BUILDING
C.Y. 2021 PROJECT
CONSTRUCTION OF STANDARD TYPE B/C
LINE AND GRADE
LAND USE AND ZONING
ARCHITECTURAL
STRUCTURAL
SANITARY
ELECTRICAL
FIRE DEPARTMENT
BRIDGES AND OTHER PUBLIC WORKS DESIGN SECTION
REPUBLIC OF THE PHILIPPINES
PLANNING AND DESIGN DIVISION
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
SAN FERNANDO CITY
REGION I
OFFICE OF THE REGIONAL DIRECTOR
TABLE OF CONTENTS
1 PERSPECTIVE
A 1
SCALE 1:100 M
3 SITE DEVELOPMENT PLAN
A 1
NTS
2 VICINITY MAP
A 1
OIC - ASSISTANT REGIONAL DIRECTOR
EMMANUEL W. DIAZ, CESE
REGIONAL DIRECTOR
RONNEL M. TAN, CESO IV
ARCHITECT II
JULIUS M. GACETA
CHARRY B. RABAGO
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. 1
Planning and Design Division
Bridges & Other Public Works Design Section
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
DESIGNED:
DATE:
CHIEF, PLANNING AND DESIGN DIVISION
ALBERTO B. ESQUEJO, JR.
DRAWN:
DRAFTSMAN II
DONALD R. RIMANDO
CHECKED:
ARCHITECT III
PROJECT & LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
DATE: DATE: DATE:
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION
RUEL O. BODESTYNE
SET NO.: SHEET NO.:
A
PAOAY, ILOCOS NORTE
30
A1
02 30
VICINITY MAP
SITE DEVELOPMENT PLAN
A2 GROUND FLOOR PLAN
A3 ROOF PLANROOF DECK FLOOR PLAN
A1
12.00
4.00
8.0
0
4.0
04
.0
0
1.2
01
.2
0
4.00 4.00
1.20 1.20
RD RD
RD RD
RD RD
RD RD
C
B
1 2 3 4
c
B
A
PERSPECTIVES
A4 FRONT ELEVATION
A5 LONGITUDINAL SECTION
A6 SCHEDULE OF DOORS AND WINDOWS
PERSPECTIVE
VICINITY MAP
SITE DEVELOPMENT PLAN
TABLE OF CONTENTS
SECOND FLOOR PLAN
RIGHT ELEVATION
REAR ELEVATION
LEFT ELEVATION
A7
GROUND FLOOR REFLECTIVE CEILING PLAN
SCHEDULE OF DOORS AND WINDOWS
SECONDFLOOR REFLECTIVE CEILING PLAN
ROOF DECK REFLECTIVE CEILING PLAN
GYPSUM BOARD DETAIL
A8
GROUND FLR. COMMON T&B PLAN
SECOND FLR. COMMON T&B PLAN
COMMON T&B SECTION DETAILS
A9
COLUMN CASING DETAIL
DET. OF WALL PARTITION FOR HOLDING AREA @ DETENTION CELL
COMBAT HOLES DETAIL @ ROOFDECK
DETAIL OF CUSTODIAL DETENTION CELL
DETAIL OF LOCKERS
A10
LADDER RUNG DETAIL DETAILS OF EVIDENCE CABINET
S1
STRUCTURAL NOTES
FOUNDATION PLANS2
SECOND FLOOR FRAMING PLAN
ROOF DECK FRAMING PLAN
ROOF BEAM PLAN
ROOF FRAMING PLANS3
C2F1 DETAIL
C1F2 DETAIL
STRUCTURAL SCHEDULES4
COLUMN FOOTING-BEAM CONNECTION DETAIL
TYPICAL BEAM DETAIL
SLAB DETAIL
WALL FOOTING DETAILS5
TRUSS DIAGRAM
TRUSS DETAIL
SPOT DETAILS
STAIR PLAN S6
STAIR DETAILS RAMP DETAIL
STAIR ON GRADE
E2 ROOF DECK LIGHTING LAYOUT
GROUND FLOOR POWER LAYOUT
SECOND FLOOR POWER LAYOUT
ROOF DECK POWER LAYOUT
E3 GROUND FLOOR EMERGENCY LIGHTING/FIRE ALARM LAYOUT
SECOND FLOOR EMERGENCY LIGHTING/FIRE ALARM LAYOUT
ROOF DECK EMERGENCY LIGHTING/ FIRE ALARM LAYOUT
GROUND FLOOR AIRCONDITIONING LAYOUT
E3 GROUND FLOOR EMERGENCY LIGHTING/FIRE ALARM LAYOUT
SECOND FLOOR EMERGENCY LIGHTING/FIRE ALARM LAYOUT
ROOF DECK EMERGENCY LIGHTING/ FIRE ALARM LAYOUT
GROUND FLOOR AIRCONDITIONING LAYOUT
E1 GENERAL NOTES
LEGENDS
GROUND FLOOR LIGHTING LAYOUT
SECOND FLOOR LIGHTING LAYOUT
E3 GROUND FLOOR EMERGENCY LIGHTING/FIRE ALARM LAYOUT
SECOND FLOOR EMERGENCY LIGHTING/FIRE ALARM LAYOUT
ROOF DECK EMERGENCY LIGHTING/ FIRE ALARM LAYOUT
GROUND FLOOR AIRCONDITIONING LAYOUT
E4 SECONDFLOOR AIRCONDITIONING LAYOUT
ROOF DECK AIRCONDITIONING LAYOUT
GROUND FLOOR TV CABLE AND CCTV LAYOUT
SECOND FLOOR TV CABLE AND CCTV LAYOUT
E5 ROOF DECK TV CABLE AND CCTV LAYOUT
GROUND FLOOR TELECOMMUNICATIONS LAYOUT
SECOND FLOOR TELECOMMUNICATIONS LAYOUT
ROOF DECK TELECOMMUNICATIONS LAYOUT
E6 POWER PANEL LOAD SCHEDULE
POWER PANEL SINGLE LINE DIAGRAM
POWER PANEL TWO SINGLE LOAD SCHEDULE
POWER PANEL TWO SINGLE LINE DIAGRAM
E7 MDP LOAD SCHEDULE
MDP SINGLE LINE DIAGRAM
RISER DIAGRAM
E7 MDP LOAD SCHEDULE
MDP SINGLE LINE DIAGRAM
RISER DIAGRAM
P1 GENERAL NOTES
ABBREVATIO/ BRANCH SIZING
MOUNTING HEIGHTS
CATCH BASIN DETAIL
PITCH OF PIPE LINE
WALL CLEANOUT DETAIL
FLOOR DRAIN DETAIL
P2 GROUND FLR. SEWER LINE LAYOUT 2ND FLR. SEWER LINE LAYOUT
P3 ROOF DECK SEWER LINE LAYOUT ROOF PLAN SEWER LINE LAYOUT
P4 GROUND FLR. WATER LINE LAYOUT 2ND FLR. WATER LINE LAYOUT
P5 ROOF DECK WATER LINE LAYOUT
ISOMETRY SEWER LINE LAYOUT
ISOMETRY WATER LINE LAYOUT
P6 SEPTIC TANK DETAIL
CONSTRUCTION OF STANDARD TYPE B/C PAOAY MPS BUILDING
A
A2
03
GROUND FLOOR PLAN
SECOND FLOOR PLAN
SCALE 1:80 M
1 GROUND FLOOR PLAN
A 2
SCALE 1:80 M
2 SECOND FLOOR PLAN
A 2
8.0
0M
EVIDENCE
8.0
0M
UP
P O R C H
DETENTION CELL
12.00M
INTEL/
INVESTIGATION
DETENTION CELL
FEMALE
OFCR.
DESK
UP
FIN/PCR
ADMIN/LOG/
CABINET
HANGING
L O B B Y
MALE
ARMORY
0.50
UP
2.254.00
CANOPY LN.
4.00
T&B
UP
H A L L W A Y
REST RM.
COP/ DEP. COP
CONFERENCE RM
LO
CK
ER
QUARTERS
87654321
OPNS
EVIDENCE
RM
RADIO
DN
12.00M
20 19 11 10
canopy ln.
4.0
0
4.00
0.50
4.0
0
1.8
3
2.4
32
.8
82
.7
0
0.5
00
.5
0
3.00 1.00 1.10 1.10 1.80
5.00
4.004.00
4.00
4.0
0
2.4
34
.0
01
.5
8
0.5
0
0.5
0
1
W
2
W
2
W
2
W
4
W
4
W
7
W
6
W
4
D
1
W
1
W
1
W
2.9
32
.1
52
.9
3
2
D
2
D
2
D
3
D
4
D
2
W
1
W
6
W
4
W
2
W
3
D
7
D5
D
4
D
6
D
7
D
2
D
1
D
2
D
2
D
5
W
0.50
LAV
WC
SHO.
SHO.
SHO.LAV
LAV
WC
WC
WCCD/ GAD
(w/ juvenile area)
3.60
0.9
0
ste
ps w
id
th
0.95
0.7
5
2.0
0
COMMON
T&B
1
W
COMMON
T&B
1.9
0
po
rch
w
id
th
1
W
0.50
6
W
2
SEE D
ETAIL O
F W
ALL PARTITIO
N O
F H
OLD
IN
G AREA
@D
ETEN
TIO
N CELL
VARIFOLD
PARTITION
VARIFOLD
PARTITION
2.5
7
4.0
0
3.0
0
LA
DD
ER
RU
NG
LA
DD
ER
RU
NG
LA
DD
ER
RU
NG
LA
DD
ER
RU
NG
7654321
1
2
3
4
1
2
3
1
canopy ln.
canopy ln.
canopy ln.
7
W
canopy ln.
canopy ln.
canopy ln.
canopy ln.
canopy ln.
canopy ln.
canopy ln.
canopy ln.
canopy ln.
canopy ln.
canopy ln.canopy ln.
PLANTBOX
PLANT BOX
PLA
NT
BO
X
1.2
5
4.20
C
4.00 4.00
0.85
1.1
0
2.50 2.801.20 1.50
1.00
2.9
3
1.4
5
3.2
5
8.0
0
8.0
0
B
C
B
3.15
5
WSEE D
ETAIL O
F W
ALL PARTITIO
N
OF D
ETEN
TIO
N CELL
SEE
DETAIL
SEE
DETAIL
SEE
DETAIL
SEE
LOCKER
DETAIL
0.500.50
0.50
0.50
0.50
0.50 0.50
0.5
0
0.5
0
0.5
00
.5
0
A
8 9 10 11
9
12
1.2
5
2.20
0.40 0.90
B
c
1 2 3 4
12
3 4
c
B
A
OIC - ASSISTANT REGIONAL DIRECTOR
EMMANUEL W. DIAZ, CESE
REGIONAL DIRECTOR
RONNEL M. TAN, CESO IV
ARCHITECT II
JULIUS M. GACETA
CHARRY B. RABAGO
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. 1
Planning and Design Division
Bridges & Other Public Works Design Section
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
DESIGNED:
DATE:
CHIEF, PLANNING AND DESIGN DIVISION
ALBERTO B. ESQUEJO, JR.
DRAWN:
DRAFTSMAN II
DONALD R. RIMANDO
CHECKED:
ARCHITECT III
PROJECT & LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
DATE: DATE: DATE:
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION
RUEL O. BODESTYNE
SET NO.: SHEET NO.:
A
PAOAY, ILOCOS NORTE
30
RAMP
UP
2.1
81
.2
5
canopy ln.
FF-1 600X600 MM CERAMIC FLOOR TILES (GLAZED)
300X300 MM CERAMIC FLOOR TILES (UNGLAZED)FF-2
WF-1PLASTERED CEMENT TO BE PAINTED (VERIFY COLOR)
600X600 MM CERAMIC WALL TILES (GLAZED)
SCHEDULE OF FLOOR FINISHES
SCHEDULE OF WALL FINISHES
WF-2
FF - 1
E±0.60
FF - 2
E±0.50
FF - 1
E±0.20
WF - 1
WF - 1
WF - 1
WF - 1
WF - 1
WF - 1
WF - 2
WF - 2
WF - 2
FF - 2
E±0.50
FF - 1
E±0.60
FF - 2
E±0.50
WF - 1
WF - 1
WF - 1
8.1
D
8.2
D
CONSTRUCTION OF STANDARD TYPE B/C PAOAY MPS BUILDING
A
A3
04
THIRD FLOOR PLAN
ROOF PLAN
12.00
4.00
8.0
0
4.0
04
.0
0
1.2
01
.2
0
4.00 4.00
1.20 1.20
RD
RD
RD
RD
RD RD
RD RD
PRE-COATED (WHITE)
# 24 G.I. LONG SPAN RIBBED
ROOF SHEETS
PRE-FAB (PAINTED) ROOF GUTTER
COVERED PLASTIC SCREEN
# 24 G.I. PRE-PAINTED
SHEET RIDGE ROLL
C
B2 3 4 6 81
9
1011121314151618
DN
19
WASH AREA
F/QUARTERS
2
D
2
D
M/QUARTERS
MULTI PURPOSE AREA
DRY WALL
1
W
6
W
3
W
4
D
LAV
WC
SHO.
COMMON
T&B
5 7
C
B
7
W
4
W
FD
FD
FD
FD
FD
4.00 4.00 4.00
12.00
ROOF LINE
4.00
4.0
0
8.0
01
.2
01
.2
0
FIRE EXIT
1 2 3 4
c
B
A
1 2 3 4
c
B
A
SCALE 1:80 M
1 THIRD FLOOR PLAN
A 3
SCALE 1:80 M
2 ROOF PLAN
A 3
OIC - ASSISTANT REGIONAL DIRECTOR
EMMANUEL W. DIAZ, CESE
REGIONAL DIRECTOR
RONNEL M. TAN, CESO IV
ARCHITECT II
JULIUS M. GACETA
CHARRY B. RABAGO
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. 1
Planning and Design Division
Bridges & Other Public Works Design Section
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
DESIGNED:
DATE:
CHIEF, PLANNING AND DESIGN DIVISION
ALBERTO B. ESQUEJO, JR.
DRAWN:
DRAFTSMAN II
DONALD R. RIMANDO
CHECKED:
ARCHITECT III
PROJECT & LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
DATE: DATE: DATE:
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION
RUEL O. BODESTYNE
SET NO.: SHEET NO.:
A
PAOAY, ILOCOS NORTE
30
2.50
FF - 2
E±0.50
FF - 1
E±0.60
WF - 1
WF - 2
FF-1 600X600 MM CERAMIC FLOOR TILES (GLAZED)
300X300 MM CERAMIC FLOOR TILES (UNGLAZED)FF-2
WF-1PLASTERED CEMENT TO BE PAINTED (VERIFY COLOR)
600X600 MM CERAMIC WALL TILES (GLAZED)
SCHEDULE OF FLOOR FINISHES
SCHEDULE OF WALL FINISHES
WF-2
CONSTRUCTION OF STANDARD TYPE B/C PAOAY MPS BUILDING
05
FRONT ELEVATION
RIGHT SIDE ELEVATION
REAR ELEVATION
LEFT SIDE ELEVATION
SCALE 1:100 M
1 FRONT ELEVATION
A 4
SCALE 1:100 M
3 REAR ELEVATION
A 4
SCALE 1:100 M
2 RIGHT SIDE ELEVATION
A 4SCALE 1:100 M
LEFT SIDE ELEVATION4
A 4
OIC - ASSISTANT REGIONAL DIRECTOR
EMMANUEL W. DIAZ, CESE
REGIONAL DIRECTOR
RONNEL M. TAN, CESO IV
ARCHITECT II
JULIUS M. GACETA
CHARRY B. RABAGO
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. 1
Planning and Design Division
Bridges & Other Public Works Design Section
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
DESIGNED:
DATE:
CHIEF, PLANNING AND DESIGN DIVISION
ALBERTO B. ESQUEJO, JR.
PROPOSED CONSTRUCTION OF
3-STOREY PAOAY
MUNICIPAL POLICE STATION
DRAWN:
DRAFTSMAN II
DONALD R. RIMANDO
CHECKED:
ARCHITECT III
PROJECT & LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
DATE: DATE: DATE:
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION
RUEL O. BODESTYNE
SET NO.: SHEET NO.:
A
PAOAY, ILOCOS NORTE
30
2.1
0
PRE-FAB (PAINTED) GUTTER
COVERED PLASTIC SCREEN
NGL
GROUND FLR FFL
2ND FLR FFL
ROOFDECK FLR FFL
3.5
0.6
03
.5
0
TOP OF PARAPET
1.2
0
1.5
0
TOP OF ROOF BEAM
2.7
0
3.5
0
0.60
3.5
0
ROOFDECK FLR FFL
2ND FLR FFL
GROUND FLR FFL
NGL
2.7
01
.5
0
1.2
0
TOP OF PARAPET
TOP OF ROOF BEAM
0.30
0.30
NGL
GROUND FLR FFL
2ND FLR FFL
ROOFDECK FLR FFL
3.5
0.6
03
.5
0
TOP OF PARAPET
1.2
01
.5
01
.5
0
TOP OF ROOF BEAM
NGLGROUND FLR FFL
2ND FLR FFL
ROOFDECK FLR FFL
3.5
0.6
03
.5
0
TOP OF PARAPET
1.2
01
.5
01
.5
0
TOP OF ROOF BEAM
4.00 4.00 4.00
12.001.20 1.20
1 2 3 4
4.00 4.00
8.001.20 1.20
A B C
4.00
8.00
3.00
1.20 1.20
C B A
4.00 4.00 4.00
12.001.20 1.20
4 3 2 1
TYPICAL HAND RAILING SEE DETAIL
CONCRETE
CANOPY
CONCRETE
CANOPY
ALL-AROUND CONCRETE MOULDING
SEE DETAIL
CONCRETE WINDOW CANOPY
SEE DETAIL
TYPICAL HAND RAILING SEE DETAIL
(PNP GRAY) PAINTED FIN.
PARAPET WALL/
COLUMN CASING
PAINTED FIN. (PNP BLUE)
(PNP GRAY) PAINTED FIN.
PARAPET WALL/
COLUMN CASING PAINTED FIN. (PNP BLUE)
PRE-COATED (WHITE)
# 24 G.I. LONG SPAN
RIBBED TYPE
ROOF SHEETS
0.10
1.5
0
0.10
1.5
0
A4
A5
06
LONGITUDINAL SECTION
CROSS SECTION
SCALE 1:80 M
1 LONGITUDINAL SECTION
A 5
SCALE 1:80 M
2 CROSS SECTION
A 5
OIC - ASSISTANT REGIONAL DIRECTOR
EMMANUEL W. DIAZ, CESE
REGIONAL DIRECTOR
RONNEL M. TAN, CESO IV
ARCHITECT II
JULIUS M. GACETA
CHARRY B. RABAGO
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. 1
Planning and Design Division
Bridges & Other Public Works Design Section
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
DESIGNED:
DATE:
CHIEF, PLANNING AND DESIGN DIVISION
ALBERTO B. ESQUEJO, JR.
DRAWN:
DRAFTSMAN II
DONALD R. RIMANDO
CHECKED:
ARCHITECT III
PROJECT & LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
DATE: DATE: DATE:
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION
RUEL O. BODESTYNE
SET NO.: SHEET NO.:
A
PAOAY, ILOCOS NORTE
30
3.5
03
.5
00
.6
0
GROUND FLR FFL
NGL
ROOFDECK FFL
SECOND FLR FFL
L O B B Y
QUARTERS
HALLWAY
T&B
MULTI PURPOSE AREA
SEE TRUSS DETAIL
2.7
0
CEILING LINE
2.7
0
CEILING LINE
TOP OF PARAPET
4.00 4.00
8.00
2.4
0
3.5
03
.5
00
.6
0
CEILING LINE
2.00
3.5
0
FLOOR TILES FIN.
FLOOR TILES FIN.
FLOOR TILES FIN.
PRE-FAB (PAINTED) GUTTER
COVERED PLASTIC SCREEN
TYPICAL
HAND RAILING
SEE DETAIL
1.3
0
1.4
9
TOP OF ROOF BEAM
2.7
0
2.16
T&B
A B C
DETENTION CELL
MALE
FIN/PCR
ADMIN/LOG/HALLWAY
SLIDERM.
RADIO
H A L L W A YCOP
SEE TRUSS DETAIL
MULTI PURPOSE AREA
3.5
03
.5
00
.6
0
NGL
GROUND FLR FFL
ROOFDECK FLR FFL
2ND FLR FFL
2.7
0
CEILING LINE
2.7
0
CEILING LINE
1.5
0
12.00M
4.00 4.00 4.00
FLOOR TILES FIN.
FLOOR TILES FIN.
FLOOR TILES FIN.
CONC. SLAB
CEILING FIN.
FLOOR TILES FIN.
PRE-FAB (PAINTED) GUTTER
COVERED PLASTIC SCREEN
1.3
0
TOP OF PARAPET
1.5
0
TOP OF ROOF BEAM
2.7
0
2.16
0.6
0
ARMORY FLR LN
F/ QUARTERS
WASH AREA
COMMON T&B
1 2 3 4
CONSTRUCTION OF STANDARD TYPE B/C PAOAY MPS BUILDING
A6
07 30
SCHEDULE OF DOORS & WINDOWS
0.80
2.1
0
2.1
0
25mm Ø
Round Bars
0.90m
SCALE 1:50 M
1 SCHEDULE OF DOORS & WINDOWS
A 6
OIC - ASSISTANT REGIONAL DIRECTOR
EMMANUEL W. DIAZ, CESE
REGIONAL DIRECTOR
RONNEL M. TAN, CESO IV
ARCHITECT II
JULIUS M. GACETA
CHARRY B. RABAGO
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. 1
Planning and Design Division
Bridges & Other Public Works Design Section
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
DESIGNED:
DATE:
CHIEF, PLANNING AND DESIGN DIVISION
ALBERTO B. ESQUEJO, JR.
DRAWN:
DRAFTSMAN II
DONALD R. RIMANDO
CHECKED:
ARCHITECT III
PROJECT & LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
DATE: DATE: DATE:
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION
RUEL O. BODESTYNE
SET NO.: SHEET NO.:
A
PAOAY, ILOCOS NORTE
30
F F
F FF
2.1
00
.3
0
0.70 1.90 0.70
DIMENSION 0.90 M x 2.10 M
WCCD/GAD(with juvinile area), ADMIN/LOG/FIN/PCR
INTEL/ INVESTIGATION, QUARTERS,OPNS,COP/DEP.,FEMALE QUARTERS,MALE
QUARTERS
NO. OF SET 8 SETS
D
2
DESCRIPTION
D
1
DIMENSION 3.40 M x 2.45 M
LOCATION GROUND FLOOR LOBBY
NO. OF SET 1 SET
DESCRIPTION
ALUMINUM DOUBLE SWING DOOR POWDER COATED
TINTED FIXED GLASS SIDINGS W/ STEEL/ALUM ROOL-UP DOOR
2.1
0
1.0
0
DIMENSION 0.80 M x 2.10 M
LOCATION RADIO ROOM, REST ROOM
NO. OF SET 2 SETS
D
3
DESCRIPTION
DIMENSION 0.70 M x 2.10 M
LOCATION COMMON T&B@GROUND FLOOR, 2ND FLOOR,REST ROOM,
ROOF DECK T&B
NO. OF SET 4 SETS
D
4
DESCRIPTION
DIMENSION 0.90 M x 2.10 M
LOCATION EXIT(BACK)DOOR
NO. OF SET 1 SET
D
5
DESCRIPTION
2.1
0
0.70
0.3
5
0.90
F
2.1
0
DIMENSION 0.90 M x 2.10 M
LOCATION MALE AND FEMALE DETENTION CELL
NO. OF SET 2 SETS
D
7
DESCRIPTION
D
6
DIMENSION 0.80 x 2.10
LOCATION HOLDING AREA
NO. OF SET 1 SET
DESCRIPTION STEEL DOOR W/ NITE LATCH LOCK W/ STEEL GRILLS
DIMENSION 0.90 M x 2.10 M
LOCATION ARMORY
NO. OF SET 1 SET
D
8.1
DESCRIPTION
DIMENSION 2.20M x1.50M
LOCATION INTEL/INVESTIGATION RM., WCCD/GAD, CONFERENCE RM.
QUARTERS,OPNS, MALE QUARTERS
NO. OF SET 8 SETS
W
1
DESCRIPTION
DIMENSION 1.40 M x 1.50 M
LOCATION INTER/INVESTIGATION, WCCD/GAD,REST RM., 2ND FLR. STAIR LOBBY
NO. OF SET 5 SETS
W
2
DESCRIPTION
DIMENSION 0.50 M x 00.35 M
LOCATION ALL TOILET AND BATH
NO. OF SET 4 SETS
W
4
DESCRIPTION
W
3
DIMENSION 2.10 M x 0.75 M
LOCATION FEMALE QUARTERS
NO. OF SET 1 SET
DESCRIPTION
DIMENSION 1.00 M x0.35 M
LOCATION MALE AND FEMALE DETENTION CELL
NO. OF SET 2 SETS
W
5
DESCRIPTION
DIMENSION 0.70 M x 1.50 M
LOCATION ADMIN/LOG/FIN/PCR, RADIO ROOM, COP/DEP. COP, FEMALE
QUARTERS
NO. OF SET 4 SETS
W
6
DESCRIPTION
DIMENSION 2.40 M x 0.50 M
LOCATION STAIRS LANDING
NO. OF SET 2 SET
W
7
DESCRIPTION
6 D
0.6
0.6
0
2.1
0
0.80
7 D
Round Bars
25mm Ø
2.1
00.80
8.1
D
8.2
D
0.90m
0.4
m
0.5m
2.1
0m
D
8.2
FIN. FLR. LN.
0.9
0
2.20
1.5
0
0.35
SLIDE
FF
0.9
01
.5
0
1.40
1.6
5
2.10
0.7
5
F F
0.50
0.3
51
.7
5
0.3
51
.7
5
w/ 50mmØ Spacing O.C.
25mmØ Round Bar
1.00
1.5
00
.9
0
FFL OF LANDING
0.6
50
.5
0
2.40
0.57 0.57 0.57 0.57
2 1
PANEL DOOR W/ SLIGHT CARVING PANEL DOOR W/SLIGHT CARVING
0.90
PVC DOOR WITH SELECTED DESIGN FROM FABRICATOR ALUMINUM SWING DOOR POWDER COATED W/ FIXED GLASS
W/ NITE LATCH LOCK
STEEL DOOR JAMB
STEEL DOOR
W/ STEEL GRILLS
D8.1-STEEL GRILL DOOR W/ DOUBLE LOCK AND RECEIVING COUNTER
D8.2-STEEL DOOR W/ NITE LATCH LOCK & EXHAUST LOUVER
ALUMINUM SLIDING WINDOW POWDER COATED FINISH
WITH 5mm THK. TINTED GLASS W/ FIXED WINDOW SIDINGS
ALUMINUM SLIDING WINDOW POWDER COATED FINISH WITH
5mm THK. TINTED GLASS W/ FIXED WINDOW SIDINGS
ALUMINUM SLIDING WINDOW POWDER COATED
FINISH WITH 5mm THK. TINTED GLASS
ALUMINUM AWNING WINDOW POWDER COATED
FINISH WITH 5mm" THK. TINTED GLASS
ALUMINUM AWNING WINDOW POWDER COATED
FINISH WITH 5mm" THK. TINTED GLASS
STEEL FIXED WINDOW W/ 25mmØ ROUND BAR W/ 50 mmØ
SPACING O.C.
ALUMINUM AWNING WINDOW POWDER COATED
FINISH WITH 5mm" THK. TINTED GLASS
0.70
CONSTRUCTION OF STANDARD TYPE B/C PAOAY MPS BUILDING
OIC - ASSISTANT REGIONAL DIRECTOR
EMMANUEL W. DIAZ, CESE
REGIONAL DIRECTOR
RONNEL M. TAN, CESO IV
ARCHITECT II
JULIUS M. GACETA
CHARRY B. RABAGO
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. 1
Planning and Design Division
Bridges & Other Public Works Design Section
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
DESIGNED:
DATE:
CHIEF, PLANNING AND DESIGN DIVISION
ALBERTO B. ESQUEJO, JR.
DRAWN:
DRAFTSMAN II
DONALD R. RIMANDO
CHECKED:
ARCHITECT III
PROJECT & LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
DATE: DATE: DATE:
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION
RUEL O. BODESTYNE
SET NO.: SHEET NO.:
A
PAOAY, ILOCOS NORTE
30
GROUND FLOOR REFLECTIVE CEILING PLAN
SECOND FLOOR REFLECTIVE CEILING PLAN
ROOF DECK REFLECTIVE CEILING PLAN
GYPSUM BOARD DETAIL
2 REFLECTIVE CEILING PLAN
A 7
SCALE 1:100 M
SECOND FLOOR
8.0
0M
12.00M
UP
UP
4.0
0
4.00
4.0
0
1.8
3
2.4
32
.8
82
.7
0
2.5
7
4.0
0
LA
DD
ER
RU
NG
canopy ln.
canopy ln.
canopy ln.
canopy ln.
canopy ln.
canopy ln.
4.00 4.00
1.1
0
2.9
3
1.4
5
3.2
5
8.0
0
A
B
c
1 2
3
4
2.88
1.0
0
3.36
RAMP
UP
1.7
41
.0
0
canopy ln.
1
2
3
4
8.0
0M
2.254.00
CANOPY LN.
4.00 1.75
UP
DN
12.00M
4.004.004.00
4.0
04
.0
0
2.4
34
.0
01
.5
8
0.5
0
2.9
32
.1
52
.9
3
LA
DD
ER
RU
NG
LA
DD
ER
RU
NG
canopy ln.
canopy ln.
canopy ln.
canopy ln.
canopy ln.
8.0
0
12
3 4
c
B
A
SWITCH CONNECTED TO PP2
CIRCUIT NO. 3
1 REFLECTIVE CEILING PLAN
A 7
SCALE 1:100 M
GROUND FLOOR
DN
4.00 4.00 4.00
12.00
4.0
04
.0
0
8.0
01
.2
01
.2
0
FIRE EXIT
1 2 3 4
c
B
A
3 REFLECTIVE CEILING PLAN
A 7
SCALE 1:100 M
ROOF DECK
WALL ANGLE
12mm THK GYPSUM BOARD
HANGER
0.0
5
0.05
METAL FURRING SPACE @ 0.60m O.C.
CEIILING JOINT
WALL ANGLE
MAIN CHANNEL SPACED @ 1.20m O.C
HANGER
METAL FURRING CHANNEL
SPACED @ 0.60m O.C
9mm THK GYPSUM BOARD
TYPICAL CEILING TO WALL TERMINATION
ISOMETRIC VIEW
GYPSUM CEILING
NTS
4
A 7
GYPSUM BOARD DETAIL
CEILING
7 WATTS LED PINLIGHT
2-36 WATTS, FLOURESCENT LAMP,
MIRRORIZED FIXTURE
10mm GYPSUM BOARD
1-36 WATTS, FLOURESCENT LAMP,
MIRRORIZED FIXTURE
08 30
A7
10mm GYPSUM BOARD
CONSTRUCTION OF STANDARD TYPE B/C PAOAY MPS BUILDING
SCALE 1:20 M
1 COMMON TOILET & BATHROOM PLAN
A 8
GROUND FLOOR
SCALE 1:50 M
2 COMMON TOILET & BATHROOM PLAN
A 8
SECOND FLOOR
2.4
0
FIN FLR LN
CEILING LN
300X300 GLAZED CERAMIC
WALL TILES
SHOWER HEAD
SHOWER VALVE
SECTION "2"
FFL
CEILING LINE
300X300 GLAZED CERAMIC
WALL TILES
SECTION "1"
WALL PAINT FINISH
2.4
0
SECTION "3" SECTION "4"
SECTION "6"SECTION "5"
2.4
0
2.4
0
1.7
0
2.4
0
300X300 GLAZED CERAMIC
WALL TILES
SHOWER CURTAIN
WALL TILES
FFL
FFL
CEILING LINE
CEILING LINE
CEILING LINE
CEILING LINE
FFL
4.8
0
0.05
6.9
9
0.51
1.50
2.50
3.5
0
0.2
5
2.9
9
0.05
WALL PAINT FINISH
0.05
1.5
0
1.5
0
4
D
4
D
3
W
3
W
1.00 1.20 1.00
3.20M
1.001.201.00
3.20M
2.43 2.43
GYPSUM BOARD CEILING FIN.
GYPSUM BOARD CEILING
FIN.
4.5MM HARDIFLEX CEILING FIN
4.5MM HARDIFLEX CEILING FIN
4.5MM HARDIFLEX CEILING FIN
1.8
0
1.7
0
1.8
0
22
3
C
C C
T&B
T&B
1.00 1.20 1.00
3
W
3
W
4
D
4
D
3.20M
300X300 GLAZED CERAMIC
4.8
6
PLAN
c
2
SCALE 1:50 M
3 COMMON T&B SECTION DETAILS
OIC - ASSISTANT REGIONAL DIRECTOR
EMMANUEL W. DIAZ, CESE
REGIONAL DIRECTOR
RONNEL M. TAN, CESO IV
ARCHITECT II
JULIUS M. GACETA
CHARRY B. RABAGO
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. 1
Planning and Design Division
Bridges & Other Public Works Design Section
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
DESIGNED:
DATE:
CHIEF, PLANNING AND DESIGN DIVISION
ALBERTO B. ESQUEJO, JR.
DRAWN:
DRAFTSMAN II
DONALD R. RIMANDO
CHECKED:
ARCHITECT III
PROJECT & LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
DATE: DATE: DATE:
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION
RUEL O. BODESTYNE
SET NO.: SHEET NO.:
A
PAOAY, ILOCOS NORTE
30
PLAN
T&B
4
D
2.50
1.5
0
3
c
09 30
A8
A 8
GROUND FLOOR COMMON T&B PLAN
SECOND FLOOR T&B PLAN
COMMON T&B SECTION DETAILS
CONSTRUCTION OF STANDARD TYPE B/C PAOAY MPS BUILDING
A9
10 30
COLUMN CAING DETAILS
DETAIL OF WALL PARTITION FOR HOLDING
COLUMN CASING DETAILS
DETAIL OF WALL PARTITION FOR HOLDING AREA @
DETENTION CELL
SCALE 1:25 M
5 DETAIL OF LOCKERS
A 9
3.5
0
FLOOR LINE
FLOOR LINE
CEILING LINE
0.60
2.4
0
1.2
01
.2
0
0.45 0.45
SIDE VIEW
FRONT VIEW
3/4" THK PLYWOOD
CABINET PANEL DOOR
CHB
WAL
L
3/4" THK PLYWOOD
CABINET/SHELVES/
PARTITION SIDINGS
HANGER ROD
USE:
LIGHT GAUGE METAL FURRING
FOR THE CABINET FRAME
(ALUM. METAL FURRING)
1 3
2 4
CONCEALED
HINGES FOR
LOCKER HINGE
STAINLESS STEEL
CABINET HANDLE
LOCKER
1.80
75
86
0.45 0.45
0.6
0
2.4
0
1.2
01
.2
0
PLAN
SCALE 1:20 M
4 COLUMN CASING DETAILS
A 9
CORNER COLUMN CASEMID-COLUMN CASE
0.50
0.50
0.50
0.35
SCALE 1:30 M
3 COMBAT HOLES DETAIL @ ROOFDECK LEVEL
A 9
SCALE 1:50 M
2
DETAIL OF WALL PARTITION
FOR HOLDING AREA @ DETENTION CELL
A 9
FIRING HOLE W'
10-15CM THK.
STEEL PLATE
IN STEEL HINGES
SWING COVER
0.8
5M
HIG
H
+- 0.12 M
0.50
PARAPET (CONCRETE) WALL
FLOOR LINE SEE STRUCTURAL DETAIL
1.3
0
TOP OF PARAPET WALL
0.500.50
D
6FFL
BOT. OF SLAB
STEEL GRILLS
W/ NITE LATCH LOCK
STEEL DOOR
STEEL DOOR JAMB
5.18
0.80
3.5
0
TOP OF SLAB
2.1
01
.3
0
0.1
0
25mmØSQUARE BAR
STEEL GRILLS
25mm Ø ROUND BAR
SPACED @ .10 MTRS.
STEEL GRILLS
6
D
2.1
5
OIC - ASSISTANT REGIONAL DIRECTOR
EMMANUEL W. DIAZ, CESE
REGIONAL DIRECTOR
RONNEL M. TAN, CESO IV
ARCHITECT II
JULIUS M. GACETA
CHARRY B. RABAGO
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. 1
Planning and Design Division
Bridges & Other Public Works Design Section
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
DESIGNED:
DATE:
CHIEF, PLANNING AND DESIGN DIVISION
ALBERTO B. ESQUEJO, JR.
DRAWN:
DRAFTSMAN II
DONALD R. RIMANDO
CHECKED:
ARCHITECT III
PROJECT & LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
DATE: DATE: DATE:
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION
RUEL O. BODESTYNE
SET NO.: SHEET NO.:
A
PAOAY, ILOCOS NORTE
30
PNP BLUE, PAINTED FIN.
ON 4" CHB BUILT UP CASING
W/ 10MM∅ DOWEL
@ 800MM AND
CONTROL JOINT
25mm Ø ROUND BAR
STEEL GRILL DOOR
MASONRY WALL
.10
D7
THRESHOLD
CONCRETE
D7
25mm Ø ROUND BAR
SPACED @ .10 MTRS.
DETAIL OF CUSTODIAL DETENTION CELL
7
D
7
D
2.10
1.40
0.80
1.00
0.90
1.00
0.30
25mm Ø ROUND BAR
STEEL GRILL DOOR
TOP PLAN
ELEVATION
SCALE 1: 50
3.50
STEEL GRILLS
.10
BOT. OF FLR. SLAB
CONCRETE
THRESHOLD
STIFFENER COLUMN
SIZE: 0.10 X 0.30 M.
4-12MMØ VERT. BARS
TIES- 1@0.05, 4@0.10,
4@.15 REST @0.20M. OC
0.80
4
A 9
CONSTRUCTION OF STANDARD TYPE B/C PAOAY MPS BUILDING
A10
11 30
GROUND FLOOR COMMON T&B PLAN
SECOND FLOOR COMMON T&B PLAN
COMMON T&B SECTION ETAILS
OIC - ASSISTANT REGIONAL DIRECTOR
EMMANUEL W. DIAZ, CESE
REGIONAL DIRECTOR
RONNEL M. TAN, CESO IV
ARCHITECT II
JULIUS M. GACETA
CHARRY B. RABAGO
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. 1
Planning and Design Division
Bridges & Other Public Works Design Section
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION
DESIGNED:
DATE:
CHIEF, PLANNING AND DESIGN DIVISION
ALBERTO B. ESQUEJO, JR.
DRAWN:
DRAFTSMAN II
DONALD R. RIMANDO
CHECKED:
ARCHITECT III
PROJECT & LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
DATE: DATE: DATE:
CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION
RUEL O. BODESTYNE
SET NO.: SHEET NO.:
A
PAOAY, ILOCOS NORTE
30
0.15
0.50
CH
B W
AL
L
20MM DIA ROUND BAR
LADDER RUNG
1/4" X 2"ANGLE BAR
WELDED CONNECTION
1/4" X 2" FLAT BAR FRAME
WELDED CONNECTION
1/4" DIA EXPANSION BOLT
0.30
6" T
HK
C
HB
W
AL
L
0.15
0.30
0.30
0.30
0.30
0.30
0.60
0.50 M. LADDER WIDTH
CHB WALL
0.60
0.60
20MM DIA ROUND BAR
GRAB BAR SPACED
@0.30M O.C.
1/4" X 2" ANGLE BAR
WELDED CONNECTION
1/4" X 2" FLAT BAR FRAME
WELDED CONNECTION
1/4" DIA EXPANSION BOLT
SPACED @ 0.60 M. OC.
0.60
0.60
0.60
SCALE 1:20
FRONT VIEW
SCALE 1:20
SIDE VIEW
7
D
7
D
0.80
1.00
0.90
1.00
0.30
TOP PLAN
0.80
25mm Ø ROUND BAR
STEEL GRILL DOOR
MASONRY WALL
.10
D7
THRESHOLD
CONCRETE
D7
25mm Ø ROUND BAR
SPACED @ .10 MTRS.
2.10
1.40
25mm Ø ROUND BAR
STEEL GRILL DOOR
3.50
STEEL GRILLS
.10
BOT. OF FLR. SLAB
CONCRETE
THRESHOLD
STIFFENER COLUMN
SIZE: 0.10 X 0.30 M.
4-12MMØ VERT. BARS
TIES- 1@0.05, 4@0.10,
4@.15 REST @0.20M. OC
ELEVATION
4.60
GRAB
BAR
LADD
ER R
UNG
HEIG
HT
0.30
LADDER RUNG
SEE DETAIL
BOT. LN. OF PARAPET
2.90
LAST
LAD
DER
HEIG
HT
EVIDENCE
2
D
STEEL
ACCORDION
SLIDING
STEEL DOOR
1.65
INTEL/
INVES
0.60
TOP PLAN
SCALE 1:50
LADDER RUNG ELEVATION
SCALE 1:10
TOP VIEW
SCALE NTS
1 TYPICAL GRAB BAR LADDER RUNG DETAIL
A 10 SCALE 1:50 M
2 DETAILS OF EVIDENCE CABINET
A 10
CONSTRUCTION OF STANDARD TYPE B/C PAOAY MPS BUILDING