Creating RAIL YARD Tucson

690 views 0 download

Tags:

Transcript of Creating RAIL YARD Tucson

CREATING RAIL YARDPHASE I

MAKE ROOM FOR RAIL YARD Clear Out 11,500 SF of Manufacturing Space.

Liquidate Manufacturing Equipment, including 70 commercial sewing machines.

Another trip to the recycle yard.

PHASE II

THE DESIGN FOR

RAIL YARD DESKS &

TABLES HAD TO BE

PROTOTYPED EIGHT TIMES,

TO REFINE THE LOOK

WE WANTED.

Sand Blast 100’ of 16’ High Brick Walls.

A PERRY PHOTO THAT WAS MADE INTO A LARGE STRETCHED CANVAS.

OCTOBER 1, 2014

WELCOME TO YOUR NEW

OFFICE

RAIL YARD OFFERS NON-TRADITIONALUPSCALE URBAN EXECUTIVE SUITES

FOR THE SOPHISTICATED CREATIVE PROFESSIONAL

ON THE EDGE OF DOWNTOWN TUCSON

RAIL YARD IS INDUSTRIAL CHIC

MEETS SOPHISTICATED SOUTHWEST

HOME FOR SPECIAL EVENTS

HOST YOUR EVENT AT RAIL YARD

PROUD SPONSOR OF TEDxTUCSON

ASSOCIATES

TUCSON’S FINEST LUXURY HOME REMODELER

NATIONALLY RECOGNIZEDAWARD WINNING INTERIOR DESIGN

2013 RECIPIENT MASTER OF THE

SOUTHWEST

LUXURY FURNITURE & WINDOW COVERINGS HANDCRAFTED ON SITE

RAIL YARD TABLES & DESKS ARE MADE ON THE PREMISES AT PERRY LUXE

PERRY ART STUDIO