MANAGING INFORMATION TECHNOLOGY7th EDITION
CHAPTER 10
METHODOLOGIES FOR PURCHASED SOFTWARE PACKAGES
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-2
THE MAKE-OR-BUY DECISION.
Make Buy
Cost savings
Faster speed of implementation
Better fit for company’s needs
- In large companies today, application software is typically both custom developed and purchased. - In small businesses, software is typically purchased.
Why?
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-3
THE MAKE-OR-BUY DECISION
Advantages and Disadvantages of Purchasing
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-4
PURCHASING METHODOLOGY
• Development of a high-level cost estimate - with business manager and IS analyst input
Initiating the Purchasing process
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-5
PURCHASING METHODOLOGY
• Steps for purchasing application packages fit into the three SDLC phases (referred to as the modified SDLC approach)
The Purchasing Steps
Fig 10.1
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-6
PURCHASING METHODOLOGY
• In comparison to an SDLC methodology, the Definition phase has additional steps, and the Construction phase is greatly reduced.
• In special circumstances, if the package is new, the purchaser may play a major role as an Alpha or Beta site for the vendor:
- Alpha site: plays a role in determining the final functionality and user interface design for the new package
- Beta site: plays a role in user acceptance testing
The Purchasing Steps, continued
αβ
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-7
PURCHASING METHODOLOGY
• Two traditional SDLC steps:
• Five additional steps:
Definition Phase
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-8
DEFINITION PHASE
• Determine whether the proposed system is economically, technically, and operationally feasible
• In addition, the feasibility of purchasing rather than building the system is considered
- Preliminary investigation of available packaged systems
- Detailed cost-benefit analysis for budgeting and monitoring purposes
Feasibility Analysis
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-9
DEFINITION PHASE
• As when creating custom software, Requirements Definition is a critical step in the purchase methodology
• But rather than create detailed requirements for in-house custom development, this step focuses on defining functional requirements needed to develop a Request for Proposal (RFP)
Requirements Definition
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-10
DEFINITION PHASE
• Eliminate all but a few promising candidate packages
• Evaluate:
- Available features of a package
- Compatibility with current hardware and software
- Vendor track record
Create Short List of Suitable Packages
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-11
DEFINITION PHASE
• Business and IS team members work together to determine relevant criteria to select the best package
• Some criteria may be mandatory, while others may be desirable
Establish Criteria for Selection
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-12
DEFINITION PHASE
• Request for Proposal (RFP): A formal document sent to potential vendors inviting them to submit a proposal describing their software package and how it meets the company’s needs
• Gives vendors information about:
- System’s objectives and requirements
- Environment in which the system will be used
- General criteria used to evaluate proposals
- Conditions for submitting proposals
Develop and Distribute RFP
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-13
DEFINITION PHASE
Example of Content in RFP
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-14
DEFINITION PHASE
• Collect data from:
- Vendors’ responses from RFPs
- Vendor demonstrations (for a few leading packages)- References from users in other companies
• Project team evaluates how well available packages meet company’s needs
Choose Package
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-15
DEFINITION PHASE
• Use of an attorney for contracting with a vendor reduces likelihood of future legal problems
• Contract type has implications for the risk level of the purchasing company
- for fixed-price contracts, the purchasing company knows the total price in advance
- for cost-reimbursement contracts, the purchasing company pays the vendor’s direct and indirect costs and thus assumes a much greater risk
Negotiate Contract
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-16
PURCHASING METHODOLOGY
Discrepancies between needs and package capabilities will need to be dealt with by:
- Modifying the package- Changing internal procedures- Living with the differences
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-17
CONSTRUCTION PHASE
• System Design and Building steps are only necessary if modifications are to be made to the package.
• However, essentially all packages will require “configuring” the package to meet the organization’s needs by making choices using pre-programmed templates by the vendor.
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-18
CONSTRUCTION PHASE
• System Design and Building:
- Typically the vendor does not provide the source code for the package, so the company typically contracts with the vendor (or a certified third party firm) for modifying the package.
- Changes may also be required for other existing company systems that interface with the package.
• System Testing:
- User acceptance testing of configured package (and/or modified package)
- IS specialist or vendor testing on organization’s equipment
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-19
IMPLEMENTATION PHASE
• Same three steps as for Implementation phase for custom development:
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-20
IMPLEMENTATION PHASE
• Installation planning, training, data cleanup, and conversion• Success dependent on:
- Quality of vendor support- Package size and complexity
• Special attention needs to be given to training, especially if there are significant changes in the way employees do their work
• Change management is a set of activities designed to help overcome resistance by business users to the new system
Installation
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-21
IMPLEMENTATION PHASE
• Operations is the same, whether the package was built or bought
• Initial success highly dependent on good communication with the vendor
• Long-term success also dependent on how well the system has been integrated into the company’s ongoing operations
Operations
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-22
IMPLEMENTATION PHASE
• Most common = vendor handles package maintenance, as specified in the contract
• Advantage:- Can lead to significant cost avoidance over the life of the
system• Disadvantages:
- Purchasing company totally dependent on vendor for future system changes
- May not get specific changes that the company wants
Maintenance
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-23
PURCHASING METHODOLOGY
• Project manager: usually is an IS manager, but may be a business manager (or both)
• IS analysts and IS specialists who will operate the system• Representatives of key business managers and users
• Software vendor personnel • Sometimes a third-party implementation partner (other than
vendor)
• For contracting:
purchasing specialists and attorneys
Project Team
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-24
ENTERPRISE SYSTEM PACKAGES
• Enterprise Resource Planning (ERP) systems are software packages designed to integrate all departmental and functional systems into a single integrated system
• Packages are more complex to implement because they can impact an entire enterprise
• Companies purchase to achieve business benefits and IT platform benefits, such as:
- Enables access to integrated data for better decision making
- Takes advantage of client/server platform
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-25
ENTERPRISE SYSTEM PACKAGES
.
Five Factors for Successful ERP implementation:
•Top management is engaged in the project, not just involved•Project leaders are veterans, and team members are decision makers•Third parties fill gaps in expertise and transfer their knowledge•Change management goes hand-in-hand with project planning•A satisficing mind-set prevails
Source: Brown and Vessey, MIS Quarterly Executive, 2003
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-26
OPEN SOURCE SOFTWARE
Open Source Software
• Free to acquire, so lower upfront costs• Ability to access and modify the source code
• Third parties also provide fee-based products:
- Advanced features for the product
- Maintenance and training
- Documentation and manuals
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-27
OPEN SOURCE SOFTWARE
• Open Source Software Licensing
• There are many different licenses for open source software• All allow for the modification and redistribution of source
code, but some have conditions or restrictions• It is important for managers to be aware of the specific
terms of a license so that they are not violated
Open Source Licenses
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-28
OPEN SOURCE SOFTWARE
• Advantages
- Large pool of volunteer testers and developers
- Ability to modify source code
- Not dependent on a single vendor
- Acquisition cost is the same for one copy or thousands
- May use the software for any purpose
- May be easier to interface open source packages with each other
Open Source Applications
Open Source in the Enterprise
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-29
OPEN SOURCE SOFTWARE
• Disadvantages
- No complete documentation without paying for it
- May not be viable for software that is not common to many organizations
- Different adopters may duplicate efforts in development
- Must be careful in choosing a licensing agreement that fits the company’s needs
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-30
APPLICATION SERVICE PROVIDERS (ASPs)
Application Service Providers (ASPs)
• Purchaser elects to use a “hosted” application rather than to purchase the software application and operate it in-house
• Company pays ASP vendor for delivering the software functionality over the Internet to company employees (and sometimes business partners)
• ASP vendor = an ongoing service provider
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-31
APPLICATION SERVICE PROVIDERS (ASPs)
• ASP Advantages
- Cost savings and faster speed of implementation- Usually involves monthly fees rather than large
infrastructure investment
• ASP Disadvantages
- Dependence on an external vendor for both software and ongoing operations
- Contract based on initial estimates of required service levels
Customization by ASPs by 2004
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-32
APPLICATION SERVICE PROVIDERS (ASPs)
• Service Level Agreement (SLA) specifies performance expectations for the ASP, including:
- System uptime
- Recovery time
- Wait time on calls to the help desk
- Notifications about software upgrades
- Other factors important to the customer
• This agreement should be a key part of the ASP contract
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 10-33
COPYRIGHT
All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or
transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or
otherwise, without the prior written permission of the publisher. Printed in the United States of
America.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall