Class B Construction Cost Estimate Template

Basis of EstimatePROJECT INFORMATIONProject:Project NamePark:Park NamePark Alpha:Park CodePMIS:TBD or PMIS number if knownEstimate Date:Estimate DatePrepared By:Estimator NameCompany:CompanyAddress:AddressCity, State Zip:CityPhone:PhoneBACKGROUND SUPPORTING MATERIAL (Scope of Work):Briefly describe scope of work included in the estimate, plan dates, exclusions, etc. List any Government Furnished Property (GFP)SOURCE OF COST DATA:Document all sources of cost information used in the estimate. (Attach additional information if necessary)ESTIMATE ASSUMPTIONS:Describe any assumptions made to prepare estimate and highlight areas needing clarification for future estimates.MAJOR CHANGES FROM PREVIOUS ESTIMATE:Describe any major changes in scope of work, materials, systems, assumptions, etc. from the previous estimate version.DESCRIPTION OF MARK-UP & ADD-ONS:Location Factor:0.00%Describe source and rationale for location factor hereRemoteness Factor:0.00%Site is___miles from published commercial center. Describe other impacts includedWage Rate Factor:0.00%Explain method and justify valueState & Local Taxes:0.00%Describe type of tax and rates usedDesign Contingency:0.00%Explain & JustifyStandard. General Conditions:0.00%Explain & JustifyGovernment General Conditions:0.00%Explain & JustifyHistoric Preservation Factor:0.00%Describe rationale for using this factorContractor Overhead:0.00%Explain & JustifyContractor Profit:0.00%Explain & JustifyBonds and Permits:0.00%Explain & JustifyContracting Method Adjustment:0.00%Describe anticipated contract method and justify value used.Annual Inflation Escalation Factor:0.00%Projected annual inflation rate.Time Until Project Midpoint (Months)0Number of months from estimate (or data) date until the projects midpoint of construction.OTHER COMMENTS:Provide any additional information, qualifications, etc.

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&4

&13BASIS OF ESTIMATE&L&6&F &A&C&11Page &P of &N&R&6Print Date: &DWhen using City Cost Index (CCI) published by RS Means, a CCI of 112.1 should be converted to +12.1 location factor and a CCI of 93.5 converted to a -6.5 location factor.

Project Cost SummaryProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodePMIS Number:TBD or PMIS number if knownReviewed By:Reviewer NameDate:Review DateAsset / Project ElementSize/CountUnitsAsset / Project Element Name0UnitItem No.WBSDescriptionMaterial Cost/UnitTotal Material CostInstallation Cost/UnitTotal Install CostDirect Cost/UnitTotal Direct CostsNET Cost/UnitTotal NET Costs1A10Foundations0.00.00.00.00.00.00.00.02A20Basement Construction0.00.00.00.00.00.00.00.03B10Superstructure0.00.00.00.00.00.00.00.04B20Exterior Enclosure0.00.00.00.00.00.00.00.05B30Roofing0.00.00.00.00.00.00.00.06C10Interior Construction0.00.00.00.00.00.00.00.07C20Stairs0.00.00.00.00.00.00.00.08C30Interior Finishes0.00.00.00.00.00.00.00.09D10Conveying Systems0.00.00.00.00.00.00.00.010D20Plumbing Systems0.00.00.00.00.00.00.00.011D30HVAC0.00.00.00.00.00.00.00.012D40Fire Protection0.00.00.00.00.00.00.00.013D50Electrical0.00.00.00.00.00.00.00.014E10Equipment0.00.00.00.00.00.00.00.015E20Furnishings0.00.00.00.00.00.00.00.016F10Special Construction0.00.00.00.00.00.00.00.017F20Selective Building Demolition0.00.00.00.00.00.00.00.018G10Site Preparation0.00.00.00.00.00.00.00.019G20Site Improvements0.00.00.00.00.00.00.00.020G30Site Mechanical Utilities0.00.00.00.00.00.00.00.021G40Site Electrical Utilities0.00.00.00.00.00.00.00.022G50Other Site Construction0.00.00.00.00.00.00.00.023XXSpecial Use - 10.00.00.00.00.00.00.00.024XXSpecial Use - 20.00.00.00.00.00.00.00.025XXSpecial Use - 30.00.00.00.00.00.00.00.0Subtotal Direct Construction Costs0.00.00.00.00.0$00.0$0Total Value of Government Furnished Property (GFP) Included in Direct Costs .$0.000.00.0$0In most cases GFP is normally zero - see footnote-Direct Cost Subtotal without GFP .0.00.0$0Published Location Factor0.00%$0Notes & Comments:Remoteness Factor0.00%$0Federal Wage Rate Factor0.00%Generally applied against Labor Costs only.$0State & Local Taxes0.00%Generally applied against Material Costs only. Please Note if application differs.$0Design Contingency0.00%$0Total Direct Construction Costs$0Standard General Conditions0.00%Applied to Total Direct Construction Cost less GFP$0Government General Conditions0.00%Applied to Total Direct Construction Cost less GFP$0Historic Preservation Factor0.00%Applied to Total Direct Construction Cost less GFP$0Subtotal NET Construction Cost$0Overhead0.00%$0Profit0.00%$0Estimated NET Construction Cost$0Bonds & Permits0.00%$0Contracting Method Adjustment0.00%$0Inflation Escalation0MonthsAnnual Rate =0.00%Inc. Bonds & CMA$0Total Estimated NET Cost of Construction$0GFP costs are only used when the Government pre-purchases items, or provides other materials out of Government inventory, to be installed by contractor. Adjustments and Markup on GFP only include Inflation Escalation; No other adjustment factors or O&P markup have been applied.

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&4&"Arial,Regular"&"Arial,Bold"&13PROJECT COST SUMMARY&L&6&F&A&CPage &P of &N&R&6Print Date: &D, &T

A10 - FoundationsProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemA10FoundationsTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostA1010STANDARD FOUNDATIONSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSTANDARD FOUNDATIONS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostA1020SPECIAL FOUNDATIONSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL FOUNDATIONS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostA1030SLAB ON GRADEOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSLAB ON GRADE0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemA10FoundationsUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostA10Foundations0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

A20 - BasementProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemA20Basement ConstructionTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostA2010BASEMENT EXCAVATIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASEMENT EXCAVATION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostA2020BASEMENT WALLSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASEMENT WALLS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemA20Basement ConstructionUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostA20Basement Construction0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

B10 - SuperstructureProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemB10SuperstructureTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB1010FLOOR CONSTRUCTIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALFLOOR CONSTRUCTION1000Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB1020ROOF CONSTRUCTIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALROOF CONSTRUCTION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemB10SuperstructureUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB10Superstructure0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

B20 - Exterior EnclosureProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemB20Exterior EnclosureTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB2010EXTERIOR WALLSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALEXTERIOR WALLS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB2020EXTERIOR WINDOWSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALEXTERIOR WINDOWS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB2030EXTERIOR DOORSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALEXTERIOR DOORS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemB20Exterior EnclosureUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB20Exterior Enclosure0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

B30 - RoofingProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemB30RoofingTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB3010ROOF COVERINGSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALROOF COVERINGS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB3020ROOF OPENINGSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALROOF OPENINGS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemB30RoofingUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB30Roofing0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

C10 - Interior ConstructionProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemC10Interior ConstructionTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC1010INTERIOR PARTITIONSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALINTERIOR PARTITIONS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC1020INTERIOR DOORSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALINTERIOR DOORS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC1030FITTINGSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALFITTINGS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemC10Interior ConstructionUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC10Interior Construction0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

C20 - StairsProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemC20StairsTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC2010STAIR CONSTRUCTIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSTAIR CONSTRUCTION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC2020STAIR FINISHESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSTAIR FINISHES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemC20StairsUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC20Stairs0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

C30 Interior FinishesProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemC30Interior FinishesTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC3010WALL FINISHESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALWALL FINISHES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC3020FLOOR FINISHESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALFLOOR FINISHES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC3030CEILING FINISHESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALCEILING FINISHES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemC30Interior FinishesUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC30Interior Finishes0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

D10 Conveying SystemsProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemD10Conveying SystemsTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD1010ELEVATORSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALELEVATORS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD1020ESCALATORS & MOVING WALKSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALESCALATORS & MOVING WALKS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD1030MATERIAL HANDLING SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALMATERIAL HANDLING SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD1090OTHER CONVEYING SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER CONVEYING SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemD10Conveying SystemsUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD10Conveying Systems0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

D20 - PlumbingProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemD20Plumbing SystemsTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD2010PLUMBING FIXTURESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALPLUMBING FIXTURES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD2020DOMESTIC WATER DISTRIBUTIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALDOMESTIC WATER DISTRIBUTION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD2030SANITARY WASTEOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSANITARY WASTE0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD2040RAIN WATER DRAINAGEOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALRAIN WATER DRAINAGE0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD2050SPECIAL PLUMBING SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL PLUMBING SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD2090OTHER PLUMBING SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER PLUMBING SYSTEMS0Unit0.0$00.0$00.0$0Summary ItemD20Plumbing SystemsUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD20Plumbing Systems0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&6 &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

D30- HVACProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemD30HVACTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD3010ENERGY SUPPLYOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALENERGY SUPPLY0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD3020HEAT GENERATING SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALHEAT GENERATING SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD3030COOLING GENERATING SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALCOOLING GENERATING SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD3040DISTRIBUTION SYSTEMS (HVAC)Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALDISTRIBUTION SYSTEMS (HVAC)0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD3050TERMINAL & PACKAGE UNITSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALTERMINAL & PACKAGE UNITS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG3060CONTROLS & INSTRUMENTATIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALCONTROLS & INSTRUMENTATION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG3070SPECIAL HVAC SYSTEMS & EQUIPMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL HVAC SYSTEMS & EQUIPMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG3080SYSTEM TESTING & BALANCINGOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSYSTEM TESTING & BALANCING0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG3090OTHER HVAC SYSTEMS & EQUIPMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER HVAC SYSTEMS & EQUIPMENT0Unit0.0$00.0$00.0$0Summary ItemD30HVACUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD30HVAC0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

D40- Fire ProtectionProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemD40Fire ProtectionTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD4010FIRE PROTECTION SPRINKLERS SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALFIRE PROTECTION SPRINKLERS SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD4020STANDPIPE & HOSE SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSTANDPIPE & HOSE SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD4030FIRE PROTECTION SPECIALTIESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALFIRE PROTECTION SPECIALTIES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD4090OTHER FIRE PROTECTION SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER FIRE PROTECTION SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemD40Fire ProtectionUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD40Fire Protection0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

D50 - ElectricalProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemD50ElectricalTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD5010ELECTRICAL SERVICE & DISTRIBUTIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALELECTRICAL SERVICE & DISTRIBUTION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD5020LIGHTING & BRANCH WIRINGOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALLIGHTING & BRANCH WIRING0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD5030COMMUNICATIONS & SECURITYOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALCOMMUNICATIONS & SECURITY0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD5040SPECIAL ELECTRICAL SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL ELECTRICAL SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD5090OTHER ELECTRICAL SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER ELECTRICAL SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemD50ElectricalUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD50Electrical0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

E10 - EquipmentProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemE10EquipmentTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE1010COMMERCIAL EQUIPMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALCOMMERCIAL EQUIPMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE1020INSTITUTIONAL EQUIPMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALINSTITUTIONAL EQUIPMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE1030VEHICULAR EQUIPMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALVEHICULAR EQUIPMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE1090OTHER EQUIPMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER EQUIPMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemE10EquipmentUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE10Equipment0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

E-20 FurnishingsProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemE20FurnishingsTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE2010FIXED FURNISHINGSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALFIXED FURNISHINGS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE2020MOVABLE FURNISHINGSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALMOVABLE FURNISHINGS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE2090OTHER FURNISHINGSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER FURNISHINGS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemE20FurnishingsUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE20Furnishings0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

F10 - Special ConstructionProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemF10Special ConstructionTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF1010SPECIAL STRUCTURESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL STRUCTURES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF1020INTEGRATED CONSTRUCTIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALINTEGRATED CONSTRUCTION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF1030SPECIAL CONSTRUCTION SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL CONSTRUCTION SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF1040SPECIAL FACILITIESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL FACILITIES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF1050SPECIAL CONTROLS & INSTRUMENTATIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL CONTROLS & INSTRUMENTATION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemF10Special ConstructionUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF10Special Construction0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

F20 - Selective DemolitionProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemF20Selective Building DemolitionTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF2010BUILDING ELEMENTS DEMOLITIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBUILDING ELEMENTS DEMOLITION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF2020HAZARDOUS COMPONENTS ABATEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALHAZARDOUS COMPONENTS ABATEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemF20Selective Building DemolitionUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF20Selective Building Demolition0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

G10 Site PreparationProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemG10Site PreparationTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG1010SITE CLEARINGOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSITE CLEARING0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG1020SITE DEMOLITION & RELOCATIONSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSITE DEMOLITION & RELOCATIONS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG1030SITE EARTHWORKOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSITE EARTHWORK0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG1040HAZARDOUS WASTE REMEDIATIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALHAZARDOUS WASTE REMEDIATION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG1090OTHER SITE PREPARATIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER SITE PREPARATION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemG10Site PreparationUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG10Site Preparation0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

G20 - Site ImprovementsProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemG20Site ImprovementsTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG2010ROADWAYSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALROADWAYS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG2020PARKING LOTSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALPARKING LOTS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG2030PEDESTRIAN PAVINGOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALPEDESTRIAN PAVING0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG2040SITE DEVELOPMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSITE DEVELOPMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG2050LANDSCAPINGOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALLANDSCAPING0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG2060SITE FURNISHINGSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSITE FURNISHINGS0Unit0.0$00.0$00.0$0Summary ItemG20Site ImprovementsUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG20Site Improvements0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

G-30 - Site MechanicalProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemG30Site Mechanical UtilitiesTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG3010WATER SUPPLYOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALWATER SUPPLY0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG3020SANITARY SEWEROptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSANITARY SEWER0Unit0.0$00.0$00.0$0Uniformat