Congestion Managementwith Electrical Vehicles

ECN PowerMatcher Team

2 08-05-23

Cluster-level Behavior in Reality

3 08-05-23

Plug-in Electric Cars and Distribution Networks

LV grid

MVgrid

Distributionstation

4 08-05-23

Uncontrolled charging5 hours charging

[KVA

]

About 5 cars per 100 dwellings

Maximum transport capacity

Available Network Capacity II

Source: ITM Project

5 08-05-23

Uncontrolled charging5 hours charging

00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00

[KVA

]

About 25 cars per 100 dwellings

Reinforcement of transport capacity

Available Network Capacity III

Source: ITM Project

6 08-05-23

Plug-in Electric Cars and Distribution Networks

LV grid

MVgrid

Distributionstation

7 08-05-23

Controlled charging5 hours charging

[KVA

]

About 25 cars per 100 dwellings

Maximum transport capacity

Available Network Capacity IV

Source: ITM Project

8 08-05-23

Intelligent Charging Results

Substation Load:1) Base load: the load of the

substation without electric vehicles.

2) No control: the load of the substation with uncoordinated charging of the vehicles.

3) PowerMatcher: the load of the substation with PowerMatcher coordinated charging.