Concrete Batch Plants Applicability of EPC Local Rules March 30, 2010

Post on 22-Feb-2016

39 views 0 download

Tags:

description

Concrete Batch Plants Applicability of EPC Local Rules March 30, 2010. Jason Waters, P.E. Environmental Protection Commission of Hillsborough County (EPCHC). Public Notification. Public Notice Requirements EPC Rule 1-3.24, Paragraph 2. General and Relocatable Permits. - PowerPoint PPT Presentation

Transcript of Concrete Batch Plants Applicability of EPC Local Rules March 30, 2010

Concrete Batch Plants

Applicability of EPC Local Rules

March 30, 2010

Jason Waters, P.E.

Environmental Protection Commission of Hillsborough County (EPCHC)

Public Notification

• Public Notice Requirements– EPC Rule 1-3.24, Paragraph 2. General and

Relocatable Permits.– Facility must pick up and post the sign within 5

days of submitting notification to EPC, and the sign must remain posted for 30 days, or for the duration of the operation if it is less than 30 days.

Visible Emissions TestsEPC RULE 1-3.52,

VISIBLE EMISSIONS– 20% Hillsborough

County-All Sources– 5% Hillsborough County-

Material Handling Sources

– Annual VE requirement for all permitted sources subject to this section or Rule 62-296.320(4)(b)1., F.A.C.

• Contact EPC Air Compliance at:

813-627-2600• Website:

www.epchc.org

Questions