Post on 01-Jan-2016
Community Development
Department
PINE LAKES PARKWAY NORTH ROADWAY IMPROVEMENTS
Community Development
Department
PINE LAKES PARKWAY NORTH ROADWAY IMPROVEMENTS
• Project Summary• Increase safety of roadway: Similar improvements that were completed along
the southern portion of Pine Lakes Parkway. • Increase super elevation of curves.• Add paved shoulders along both sides of roadway.• Add left turn lanes onto Brushwood and Brookside Lanes.
• Provide continuous multi-use path along roadway.• Installation of street lights.• Convert existing overhead utilities to underground.
• Status• 2007 - City Council approved a Work Order for the Design of the Project.• 2011 - City Council approved Change Order for additional design work.• 2011 – City Council approves Capital Improvement Plan for construction of
project in FY12.• 2011 - Design Complete: Currently under review by City and Utility
Companies.
Community Development
Department
UNDERGROUND CONVERSION HISTORY
• 2007• 12/18/2007 City Council approved the FPL conversion of overhead lines to
underground in conjunction with the Belle Terre 4-Laning Project. • City received a $255,355.00 credit contingent upon the completion of an
additional 1-mile of conversion.• Pine Lakes Parkway was identified and agreed to by FPL as the additional
contiguous1-mile segment.
Community Development
Department
UNDERGROUND UTILITIES
Segment 1: Underground Utilities installed as part of new roadway alignment – Belle Terre 4-Laning Project
Segment 2: Underground Utilities converted to underground as part of Belle Terre 4-Laning Project
Segment 3: Proposed segment to meet 3-mile conversion in order to receive cost reduction.Work to be completed as part of Pine Lakes Parkway Roadway Improvement Project
Community Development
Department
UNDERGROUND CONVERSION OPTIONS
• Option One – Approve Agreements• Approve agreements in amount of $309,623.00 and proceed with Pine Lakes
Parkway North Roadway Improvements Project.• Deadline to issue payment and execute FPL Agreements is 12/28/2011.
• Option Two – Do Not Approve Agreements• Do not convert existing utilities.
• Will require repayment of $255,355.00 credit received for conversion of existing utilities as part of Belle Terre 4-Laning Project.
• Will require redesign of multi-use path due to conflicts with existing utility poles.
• Forfeit of a $242,984.00 credit for the conversion of the Pine Lakes FPL Utilities.