COMcheck Software Version 4.1,1.0
Envelope Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Ciinnate Zone:
Project Type:
Vertical Glazing / Wall Area:
2017 Florida Building Code, Energy Conservation
Fitness BIdg Pool Addition
Daytona Beacti, Florida
2a
New Construction
28%
Construction Site: Owner/Agent: Designer/Contractor:Latitude MargaritavilleMargaritaville AvenueDaytona Beach, FL 32124
Additional Efficiency Package(s)
Reduced interior lighting power. Requirements are Implicitly enforced within Interior lighting allowance calculations.
Building Area Floor Area
1-Exercise Center: Nonresidential 5127
Envelope Assemblies
Assembly Gross Area Cavity Cent Proposed Budget U-or R-Value R-Value U-Factor Facton.)
Perimeter
Floor 1: Slab-On-Grade:Unheated, [BIdg. Use 1 - Exercise Centerj (c)
Roof 1: Insulation Entirely Above Deck: High Albedo Roof Required, 3-Year-Aged Solar Reflectance = 0.55, Thermal Emittance = 0.75 (e),[BIdg. Use 1 - Exercise Center]
NORTH
Exterior Wall 1 copy 3: Concrete Block:8", Partially Grouted, CellsInsulated, Normal Density, Furring: Metal (d), [BIdg, Use 1 - ExerciseCenterj
EAST
Exterior Wall 1 copy 1: Concrete Block:8", Partially Grouted, CellsInsulated, Normal Density, Furring: Metal (d), (BIdg. Use 1 - ExerciseCenter]
Window 2: Metal Frame with Thermal Break:Fixed, Pert. Specs.:Product ID Solarban, SHGC 0.40, PF 0.50, [BIdg. Use 1 - ExerciseCenter] (b)
SOUTH
Exterior Wall 1 copy 2: Concrete Block:8", Partially Grouted, CellsInsulated, Normal Density, Furring: Metal (d). (BIdg. Use 1 - ExerciseCenter]
Window 3: Metal Frame with Thermal Break:Fixed. Pert. Specs.:
Product ID Solarban, SHGC 0.40, PF 0.50, [BIdg. Use 1 - ExerciseCenter] (b)
WEST
Exterior Wall 1: Concrete Block:8", Partially Grouted, Cells Insulated,Normal Density, Furring: Metal (d). [BIdg. Use 1 - Exercise Center]
329
5127
100
850
208
1728
555
850
25.0
0.0 3.8
0.0 3.8
0.0 3.8
0.0 3.8
0.730
0.039
0.085
0.085
0.500
0.085
0.500
0.085
0.730
0.039
0.151
0.151
0,500
0.151
0.500
0.151
Project Title: Fitness BIdg Pool Addition
Data filename: D:\Gregory Engineering\2020 Projects\20020 (Margaritaville Daytona)\20020_POOL.cck
Report date: 08/07/20
Page 1 of 20
Assembly Gross Area
or
Perimeter
Cavity
R-Value
Cont
R-Value
Proposed
U-Factor
Budget U-
Factor(a>
Window 1: Metal Frame with Thermal Break;Fixed, Pert. Specs.:Product ID Solarban, SHGC 0.40, PF 0.50, [BIdg. Use 1 - ExerciseCenter] (b)
208 0.500 0.500
(a) Budget U-fectors are used for software baseline caicuiatlons ONLY, and are not code requirements.(b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.(c) Siab-On-Grade proposed and budget U-factors shown in table are F-factors.(d) CMU insulated cells must be filled with a material having a maximum thermal conductivity of 0.44 Btu in,/h-ft2-degrees F. Perlite,
vermicuiite, polystyrene beads, or spray foam as defined in ASHRAE 2009 Handbook of Fundamentals meet this requirement. Othermaterials require documentation of thermal conductivity.
(e) High albedo roof requirement options: 1) 3-year aged solar reflectance >= 0.55 thermal emittance >= 0.75, 2) 3-year aged solar reflectanceindex >= 64.0, 3) Initial year aged solar reflectance >= 0.70 thermal emittance >= 0.75, 4) Initial year aged solar reflectance index >= 82.0.
Envelope PASSES: Design 13% better than code
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permit application. The proposed envelope systems have beendesigned to meet the 2017 Florida Building Code, Energy Conservation requirements in COMcheck Version 4.1.1.0 and to complywith any applicable mandatory requirements listed in the / r
Michael T. Lucas, AlA
Name-Title Signature Dat
Project Title: Fitness Bidg Pool Addition
Data filename: D:\Gregory Engineering\2020 Projects\20020 (Margaritaville Daytona)\20020_POOL.cck
Report date: 08/07/20
Page 2 of 20
COMcheck Software Version 4.1.1.0
Interior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title;
Project Type:
2017 Florida Building Code, Energy Conservation
Fitness Bldg Pool Addition
New Construction
Construction Site:
Latitude MargaritavilleMargafitavllle AvenueDaytona Beach, FL 32124
Owner/Agent: Designer/Contractor:
Additional Efficiency Package(s)
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting aiiowance calculations.
Allowed interior Lighting Power
A 8 0
Area Category Floor Area Allowed(ft2) Watts/n2
Allowed Watts
(BXC)
1 -Exercise Center 5127 0.76 3876
Total Allowed Watts = 3876
Proposed Interior Lighting Power
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B C D
Lamps/ # of FixtureFixture Fixtures Watt
E
(CXD)
1-Exercise Center
LED 1: LED Other Fixture Unit 125Vy; 1 15 120 1800
Total Proposed Watts = 1800
llnterior Lighting PASSES: Design 54% better than code
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have beendesigned to meet the 2017 Florida Building Code, Energy Conseryatf^ requirements in COMcheck Version 4.1.1.0 and to complywith any applicable mandatory requirements listed in the InspertioiyChecklii
I. Bryan Shaffer
Name - Title bate"/e ̂ ja
Project Title: Fitness Bldg Pool Addition
Data filename: D;\Gregory Engineering\2020 Projects\20020 (Margaritaville Daytona)\20020_POOL.cck
Report date: 08/07/20
Page 3 of 20
COMcheck Software Version 4.1,1.0
Exterior Lighting Compliance Certificate
Project Information
Energy Code;
Project Title;
Project Type:
Exterior Lighting Zone
2017 Florida Building Code, Energy ConservationFitness BIdg Pool Addition
New Construction
2 (Residential mixed use area)
Construction Site:
Latitude Margarltavillel^argaritavllle AvenueDaytona Beach, FL 32124
Allowed Exterior Lighting Power
A
Area/Surface Category
Owner/Agent; Designer/Contractor
B C D EQuantity Allowed Tradable Allowed Watts
Watts / Unit Wattage (B X 0)
Other door (not main entry) 9 ft of door 20 Yes 180
Total Tradable Watts (a) = 180Total Allowed Watts = 180
Total Allowed Supplemental Watts (b) = 600(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.(b) A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting PowerA
Fixture ID : Description / Lamp I Wattage Per Lamp / BallastB O D E
Lamps/ # of Fixture (C X D)Fixture Fixtures Watt
Other door (not main entrvl (9 ft of door widthV Tradable WattageLED 1: LED PAR 20W: 1 3 20 60
Total Tradable Proposed Watts - 60
[Exterior Lighting PASSES: Design 92% better than code
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document Is consistent with the building plans,specifications, and other calculations submitted with this permit appHp^n. The proposed exterior lighting systems have beendesigned to meet the 2017 Florida Building Code. Energy Conserv&tfoo/i^qulrements in COMcheclt Version 4.1.1.0 and to complywith any applicable mandatory requirements listed in the InspeetioRrOieckllst^
J. Bryan Shaffer
Name - Title Signa Date
Project Title: Fitness Bidg Pool Addition
Data filename: D:\Gregory Engineerlng\2020 Projects\20020 (Margaritaville Daytona)\20020_POOL.cckReport date: 08/07/20
Page 4 of 20
COMchecfc Software Version 4.1.1.0
Mechanical Compliance Certificate
Project Information
Energy Code;
Project Title:
Location:
Climate Zone:
Project Type:
2017 Florida Building Code. Energy Conservation
Fitness BIdg Pool Addition
Daytona Beach, Florida
2a
H&n Construction
Construction Site:
Latitude MargaritavllleMargaritaville AvenueDaytona Beach, FL 32124
Owner/Agent: Designer/Contractor:
Additional Efficiency Package(s)
Reduced interior lighting power. Requirements are Implicitly enforced within interior lighting allowance calculations.
Mechanical Systems List
Quantity System Type & Description
1 HVAC System 1 (Single Zone):
Cooling: 1 each - Single Package DX Unit, Capacity = 310 kOtu/h, Alr-Cooled Condenser, Air EconomizerProposed Efficiency = 11.60 EER, Required Efficiency: 10.00 EER +11.6 lEER
Fan System: None
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented In this document is consistent with the building plans,specifications, and other calculations submitted with this permit application. The proposed mechanical systems have beendesigned to meet the 2017 Florida Building Code. Enew Conservation requirements in COMchec/c Version 4.1.1.0 and to complywith any applicable mandatory requirements listecUrTmfevifi^ection Checklist.
W. Michael Gregory, PEName - Title Sigrature
OS idh&Date ' t
Project Title: Fitness BIdg Pool Addition
Data filename: D:\Gregory Engineering\2020 Projects\20020 (Margaritaville Daytona)\20020_POOL.cck
Report date: 08/07/20
Page 5 of 20
COMcheck Software Version 4.1.1.0
Inspection ChecklistEnergy Code: 2017 Florida Building Code, Energy Conservation
Requirements: 0.0% were addressed directly in the COMcheck softwareText in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For eachrequirement the user certifies that a code requirement will be met and how that is documented, or that an exceptionis being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
#
& Reg.IDPlan Review Complies? Comments/Assumptions
C103.2
[PRl]i
C103.2
[PR2Y
C103.2
[PR4]i
C103.2
[PR8]i
Plans and/or specifications provide allinformation with which compliancecan be determined for the buildingenvelope and document whereexceptions to the standard areclaimed.
□Complies□ooes Not□Not Observable□Not Applicable
Plans, specifications, and/orcalculations provide all informationwith which compliance can bedetermined for the mechanicalsystems and equipment anddocument where exceptions to thestandard are claimed. Loadcalculations per acceptableengineering standards andhandbooks.
□Complies□poes Not□Not Observable□Not Applicable
Plans, specifications, and/or □Compliescalculations provide all information □poes Notwith which compliance can bedetermined for the interior lighting ^and electrical systems and equipment b-'Not Applicableand document where exceptions tothe standard are claimed. Informationprovided should include interiorlighting power calculations, wattage ofbulbs and ballasts, transformers andcontrol devices.
C402.4.1[PR10]i
C402.4.1[PRllji
Plans, specifications, and/orcalculations provide all informationwith which compliance can bedetermined for the exterior lightingand electrical systems and equipmentand document where exceptions tothe standard are claimed, informationprovided should include exteriorlighting power calculations, wattage ofbulbs and ballasts, transformers andcontrol devices.
The vertical fenestration area <= 30percent of the gross above-grade wallarea.
□Complies□poes Not□Not Observable□Not Applicable
The skylight area <= 3 percent of thegross roof area.
□complies□ Poes Not□Not Observable□Not Applicable□complies□Poes Not□Not Observable□Not Applicable
ijHigh Impact (Tier 1) j 2 j Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Fitness BIdg Pooi AdditionPata filename: P:\Gregory Engineering\2020 Projects\20020 (Margaritaville Paytona)\20020_POOL.cck
Report date: 08/07/20Page 6 of 20
Section
#
& Req.iO
C402.4.2
[PR14]i
Plan Review
C402.5.9.(1-4)[PR16]i
In enclosed spaces > 2,500 ft2directly under a roof with ceilingheights >15 ft. and used as an office,lobby, atrium, concourse, corridor,storage, gymnasium/exercise center,convention center, automotiveservice, manufacturing, non-refrigerated warehouse, retail store,distribution/sorting area,transportation, or workshop, thefollowing requirements apply: (a) thedaylight zone under skylights is >=half the floor area; (b) the skylightarea to daylight zone is >= 3 percentwith a skylight VT >= 0.40; or aminimum skylight effective aperture>= 1 percent.
Ceilings with vented dropped ceilingcavities over conditioned spaces havea continuous air barrier between theconditioned space and the ventedunconditioned space and are sealed tothe air barrier of the walls. Unventeddropped ceiling cavities overconditioned spaces without air barrierbetween the conditioned andunconditioned space are sealed fromthe exterior environment and adjacentspaces by a continuous air barrier andis sealed to the air barrier of the walls.Unconditioned spaces above separatetenancies contain dividing partitionsbetween the tenancies to form a
continuous air barrier that is sealed atthe ceiling and roof. Building cavitiesdesigned to be air distribution systemcomponents are sealed according tothe criteria for air ducts, plenums, etc.in Section C403.2.7.
Complies?
□complies□Does Not□Not Observable□Not Applicable
Comments/Assumptions
□complies□poes Not□Not Observable□Not Applicable
i
Additional Comments/Assumptions:
1 jHigh Impact (Tier 1) 2 Medium Impact (Tier 2) 3 I Low Impact (Tier 3)
Project Title: Fitness BIdg Pool AdditionData filename: D:\Gregory Engineering\2020 Projects\20020 (Margaritaville Daytona)\20020_POOL.cck
Report date: 08/07/20Page 7 of 20
Section
#
& Req.lD
C303.2
[F04]2
C303.2.1
[F06]i
C402.2.5
[F03P
Footing / Foundation Inspection Complies? Comments/Assumptions
Slab edge Insulation installed permanufacturer's instructions.
Exterior insulation protected againstdamage, sunlight, moisture, wind,landscaping and equipmentmaintenance activities.
Slab edge insulation R-value.
C402.2.6 Radiant heating systems panels[F012]^ insulated to >=R-3.5 on face oppositei space being heated.
C403.2.4.
5,
C403.2.4.
16|[F09P
Snow/ice melting system sensors forfuture connection to controls. Freeze
protection systems have automaticcontrols installed.
□Complies□poes Not□Not Observable□Not Applicable□complies□poes Not□Not Observable□Not Applicable□complies□poes Not□Not Observable□Not Applicable□complies□Poes Not□Not Observable□Not Applicable□complies□poes Not□Not Observable□Not Applicable
See the hnvelope Assemblies table for values.
See the Envelope Assemblies table for values.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Fitness BIdg Pool AdditionPata filename: P:\Gregory Engineering\2020 Projects\20020 (Margaritaville Paytona)\20020_POOL.cck
Report date: 08/07/20Page 8 of 20
Framing / Rough-In InspectionSection
#
6t Req.lD j
C303.1.3 Fenestration products rated in[FR12P accordance with NFRC.
C303.1.3 Fenestration products are certified as[FR13]^ to performance labels or certificates
provided.
C402.4.3 Vertical fenestration SHGC value.
[FR10]i
|C402.4.3, Vertical fenestration U-Factor.C402.4.3.
4
[FR8]i
C402.5.1
[FRieji
C402.5.2,C402.5.4
[FR18P
Complies?
□complies□ooes Not□Not Observable□Not Applicable□Complies□Does Not□Not Observable□Not Applicable□complies□Does Not□Not Observable□Not Applicable□complies□Does Not□Not Observable□Not Applicable
Comments/Assumptions
See the hnvelope Assemblies table for values.
See the Envelope Assemblies table for values.
The building envelope contains acontinuous air barrier that is sealed inan approved manner and eitherconstructed or tested in an approvedmanner. Air barrier penetrations aresealed in an approved manner.Factory-built fenestration and doorsare labeled as meeting air leakagerequirements.
□complies□Does Not□Not Observable□Not Applicable
□complies□Does Not□Not Observable□Not Applicable
Additional Comments/Assumptions:
1 iFligh Impact (Tier 1) 2 I Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Fitness BIdg Pool AdditionData filename: D:\Gregory Engineering\2020 Projects\20020 (Margaritaville Daytona)\20020_POOL.cck
Report date: 08/07/20Page 9 of 20
Section
#
& Req.lD
C404.5,C404.5.1,
C404.5.2
[PL6P
1C404.6.3i[PL7P
|C404.7|[PL8P
Plumbing Rough-in Inspection
Heated water supply piping conformsto pipe length and volumerequirements. Refer to section details.
Pumps that circulate water between aheater and storage tank have controlsthat limit operation from startup to<= 5 minutes after end of heatingcycle.
Water distribution system that pumpswater from a heated-water supplypipe back to the heated-water sourcethrough a cold-water supply pipe is ademand recirculation water system.Pumps within this system havecontrols that start the pump uponreceiving a signal from the action of auser of a fixture or appliance andlimits the temperature of the waterentering the cold-water piping to104''F.
Complies?
□complies□Does Not□Not Observable□Not Applicable
□complies□poes Not□Not Observable□Not Applicable□complies□poes Not□Not Observable□Not Applicable
Comments/Assumptions
Additional Comments/Assumptions:
1 jHigh Impact (Tier 1) 2 j Medium Impact (Tier 2) 3 ! Low Impact (Tier 3)
Project Title: Fitness BIdg Pool AdditionData filename: P:\Gregory Engineerlng\2020 Projects\20020 (Margaritaville Paytona)\20020_POOL.cck
Report date: 08/07/20Page 10 of 20
Section
#
& Req.lD
C402.2.6
[ME41]3
C402.5.5.C403.2.4.
3
[ME3P
C403.2.12
.1
[ME65P
C403.2.12
.3
[ME117P
C403.2.9.
1.1
[ME60]2
Mechanical Rough-In Inspection Complies? Comments/Assumptions
C403.2.9.
2
[ME79P
IC403.2.9.il.2![ME80]2
C403.2.9.
1.3
[ME81]2
Thermally ineffective panel surfaces of □Compliessensible heating panels haveinsulation >= R-3.5.
□Does Not□Not Observable□Not Applicable□compliesStair and elevator shaft vents have
motorized dampers that automatically □ooes Notclose. □N
HVAC fan systems at designconditions do not exceed allowabie
ot Observable□Not Applicable
□complies□Does Not
See the Mechanical Systems list for values.
fan system motor nameplate hp or fan observablesystem bhp. vauic
□Not ApplicableFans have efficiency grade (PEG) >= □Complies67. The total efficiency of the fan at □Does Notthe design point of operation <= 15% „ observableof maximum total efficiency of the H UDservaoie
l_INot Applicable
HVAC ducts and plenums insulatedand sealed according to FloridaSection C403.2.9. Table C403.2.9.1.
□complies□Does Not□Not Observable□Not Applicable□complies□Does Not□Not Observable□Not Applicable
All ducts, air handlers, filter boxes,building cavities, mechanical closetsand enclosed support platforms thatform the primary air containmentpassageways for air distributionsystems are constructed and erectedin accordance with Table C403.2.9.2and with Chapter 6 of the FloridaBuilding Code, Mechanical. Ducts arebe constructed, braced, reinforcedand installed to provide structuralstrength and durability. All transversejoints, longitudinal seams and fittingconnections are securely fastened inaccordance with the applicablestandards of this section.
Duct insulation is protected fromdamage but not limited to thefollowing; 1. Insulation exposed toweather is suitable for outdoorservice. Cellular foam insulation isprotected or painted with a coatingthat is water retardant and providesshielding from solar radiation. 2.Insulation covering cooling ductslocated outside the conditioned spaceis vapor retardant located outside theinsulation, all penetrations and Jointsof which shall be sealed.
Additional insulation with vaporbarrier is provided where theminimum duct insulation requirements r-i., ...of Section C403.2.9.1.1 are Observabledetermined to be insufficient toprevent condensation.
□Complies□Does Not□Not Observable□Not Applicable
□Complies□Does Not
□Not Applicable
1 i High Impact (Tier 1) 2 | Medium impact (Tier 2) 3 } Low Impact (Tier 3)
Project Title: Fitness BIdg Pool Addition Report date: 08/07/20Data filename: D:\Gregory Engineering\2020 Projects\20020 (Margaritaville Daytona)\20020_POOL.cck Page 11 of 20
Section
#
& Req.lD I
C403.2.13 Unenclosed spaces that are heated[ME71]^ use only radiant heat.
Mechanical Rough-In Inspectio
C403.2.3
[ME55F
C403.2.9.
3
[ME10]2
C403.2.9.
4
[ME78]2
C403.2.9.
5
[ME76]2
C403.2.9.
6
[ME77P
C408.2.2.
1
[ME53P
C403.2.6.
1
[ME59]i
C403.2.6.
2
[ME115P
HVAC equipment efficiency verified.
n Complies?
□complies□poes Not□Not Observable□Not Applicable□complies□Poes Not□Not Observable□Not Applicable□complies□Poes Not□Not Observable□Not Applicable
Comments/Assumptions
Pucts, air handlers, filter boxes,building cavities, mechanical closetsand enclosed support platforms thatform the primary air containmentpassageways for air distributionsystems are sealed in accordance withthe applicable criteria of this sectionand Table C403.2.9.2.
Cavities in framed spaces are not □Compliesused to deliver air from or return air to □poes Notthe conditioning system unless theycontain an air duct insert which isinsulated in accordance with SectionC403.2.9.1 and constructed andsealed in accordance with therequirements of Section C403.2.9.2appropriate for the duct materialsused.
Air distribution systems are sized anddesigned in accordance withrecognized engineering standards.Refer to section details.
□Not Obse
□Complies□poes Not□Not Obse
Air-handling units not installed inattics of commercial buildings.
Air system balancing accomplished ina manner to first minimize throttlinglosses, then for fans with fan systempower greater than 1 hp, fan speedsshall be adjusted to meet design flowconditions. Balancing procedures shallbe in accordance with NEBBProcedural Standards, the AABC,National Standards, or equivalentprocedures.Pemand control ventilation providedfor spaces >500 ft2 and >25people/1000 ft2 occupant density andserved by systems with air sideeconomizer, auto modulating outsideair damper control, or design airflow>3,000 cfm.
Enclosed parking garage ventilationhas automatic contaminant detectionand capacity to stage or modulatefans to 50% or less of design capacity.
C403.2.7[ME57]i
Exhaust air energy recovery onsystems meeting Table C403.2.7(l)and C403.2.7(2).
See the Mechanical Systems list for values.
rvable□Not Applicable
rvable□Not Applicable□complies□Poes Not□Not Observable□Not Applicable□complies□poes Not□Not Observable□Not Applicable
□Complies□Poes Not□Not Observable□Not Applicable
□Complies□poes Not□Not Observable□Not Applicable□complies□poes Not□Not Observable□Not Applicable
11 High Impact (Tier 1) 2 j Medium Impact (Tier 2) 3 I Low Impact (Tier 3)
Project Title; Fitness BIdg Pool AdditionPata filename: P:\Gregory Engineering\2020 Projects\20020 (Margaritaville Paytona)\20020_POOL.cck
Report date: 08/07/20Page 12 of 20
Section
#
& Req.lD
C403.2.8
[ME116P
C403.4.4.
6
[MEllOp
C408.2.2.
1
[ME53]3
C403.5,C403.5.1,C403.5.2
[ME123P
C403.5.3
[ME124P
I Mechanical Rough-in Inspection
Kitchen exhaust systems comply withreplacement air and conditionedsupply air limitations, and satisfy hoodrating requirements and maximumexhaust rate criteria.
Multiple zone VAV systems with DDCof individual zone boxes have static
pressure setpoint reset controls.
Air outlets and zone terminal devices
have means for air balancing.
Refrigerated display cases, walk-incoolers or walk-in freezers served byremote compressors and remotecondensers not located in a
condensing unit, have fan-poweredcondensers that comply with SectionsC403.5.1 and refrigeration compressorsystems that comply with C403.5.2..
Condensing coils installed in cool airstream of another air-conditioningunit. The condensing coil of one air-conditioning unit shall not be installedin the cool air stream of another air-
conditioning unit.
Complies?
□complies□Does Not□Not Observable□Not Applicable□Complies□Ooes Not□Not Observable□Not Applicable□Complies□Ooes Not□Not Observable□Not Applicable□complies□Ooes Not□Not Observable□Not Applicable
□complies□Ooes Not□Not Observable□Not Applicable
Comments/Assumptions
See the Mechanical Systems list for values.
Additional Comments/Assumptions:
11 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 I Low Impact (Tier 3)
Project Title: Fitness BIdg Pool AdditionData filename: D:\Gregory Engineering\2020 Projects\20020 (Margaritaville Daytona)\20020_POOL.cck
Report date: 08/07/20Page 13 of 20
Section
#
& Req.lD
C405.2.1
[EL15]i
C405.2.1
[EL18]i
C405.2.1.C405.2.2.
3
[EL23]2
Rough-in Electricai Inspection Complies? Comments/Assumptions
Lighting controls Installed to uniformly DCompllesreduce the lighting load by at least DDoes Not50%. □N
Occupancy sensors Installed inrequired spaces.
ot Observable□Not Applicable□compilesDooes Not□Not Observable□Not Applicable
Independent lighting controls installed □Compliesper approved lighting plans and all □poes Notmanual controls readily accessible and r-,., . ,visible to occupants. DNot Obsen/abie
□Not Applicable
iC405.2.2. Automatic controls to shut off all1 building lighting Installed In all[EL22]^ buildings.
C4Q5.2.3 Daylight zones provided with[EL16]^ Individual controls that control the
lights Independent of general arealighting.
C405.2.3.C405.2.3.1,C405.2.3.2[EL20]^
C405.2.3.C405.2.3.1,C405.2.3.3fEL21]i
C405.2.4[EL4]i
C405.2.4[EL8]i
Primary sidelighted areas areequipped with required lightingcontrols.
Enclosed spaces with daylight areaunder skylights and rooftop monitorsare equipped with required lightingcontrols.
□complies□ooes Not□Not Observable□Not Applicable□complies□poes Not□Not Observable□Not Applicable□complies□Poes Not□Not Observable□Not Applicable
□compiles□poes Not□Not Observable□Not Applicable
C405.2.5[EL25]"""
IC405.3i[EL6]i
Separate lighting control devices forspecific uses installed per approvedlighting plans.
Additional interior lighting powerallowed for special functions per theapproved lighting plans and Isautomatically controlled andseparated from general lighting.Automatic lighting controls for exteriorlighting installed. Controls will bedaylight controlled, set based onbusiness operation time-of-day, orreduce connected lighting > 30%.Exit signs do not exceed 5 watts perface.
□complies□poes Not□Not Observable□Not Applicable□Complies□poes Not□Not Observable□Not Applicable□complies□poes Not□Not Observable□Not Applicable□compiles□poes Not□Not Observable□Not Applicable
Additional Comments/Assumptions:
1 i High Impact (Tier 1) Medium Impact (Tier 2) 3 I Low Impact (Tier 3)
Project Title: Fitness BIdg Pool Addition Report date: 08/07/20Data filename: P:\Gregory Englneerlng\2020 Projects\20020 (Margarltaville Paytona)\20020_POOL.cck Page 14 of 20
1 High Impact (Tier 1) j 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Fitness BIdg Pool Addition Report date: 08/07/20
Data filename: D:\Gregory Engineering\2020 Projects\20020 (Margaritaville Daytona)\20020_POOL.cck Page 15 of 20
Section
#
& Req.iD
C303.1
[IN3]i
C303.1
[INIOP
C303.2
[IN7]J
C303.2.1
[IN14P
C402.2.
nN17p
C402.2.3
[IN6P
C402.2.5
[IN8P
C402.2.6
[IN18P
C402.3
[IN5P
C402.2.2
[IN2]i
C402.5.1.
1
[INl]'
insulation inspection
Roof insulation installed permanufacturer's instructions. Blown or
poured loose-fill insulation is installedonly where the roof slope is <=3 in12.
Building envelope insulation is labeledwith R-value or insulation certificate
providing R-value and other relevantdata.
Above-grade wall insulation installedper manufacturer's instructions.
Exterior insulation is protected fromdamage with a protective material.Verification for exposed foundationinsulation may need to occur duringFoundation Inspection.
Insulation intended to meet the roof
insulation requirements cannot beinstalled on top of a suspendedceiling. Mark this requirementcompliant if insulation is installedaccordingly.Above-grade wall insulation R-value.
Complies?
□complies□Does Not□Not Observable□Not Applicable□Complies□Does Not□Not Observable□Not Applicable□complies□Does Not□Not Observable□Not Applicable□complies□Does Not□Not Observable□Not Applicable□Complies□Does Not□Not Observable□Not Applicable
Comments/Assumptions
Floor insulation R-value.
□complies□Does Not□Not Observable□Not Applicable□complies□Does Not□Not Observable□Not Applicable
Radiant panels and associated □Compliescomponents, designed for heat □Does Nottransfer from the panel surfaces to the i.
□Not Observableoccupdnts or indoor spdco sro ^insulated with a minimum of R-3.5. UNot Applicable
See the Envelope Assemblies table for values.
See the Envelope Assemblies table for values.
High-albedo roofs satisfy one of thefollowing: 3-year-aged solarreflectance >= 0.55 and thermalemittance >= 0.75 or 3-year-agedsolar reflectance index >= 64.0.
Roof R-value. For some ceilingsystems, verification may need tooccur during Framing Inspection.
All sources of air leakage in thebuilding thermal envelope are sealed,caulked, gasketed, weather strippedor wrapped with moisture vapor-permeable wrapping material tominimize air leakage.
□Complies□Does Not□Not Observable□Not Applicable□Complies□Does Not□Not Observable□Not Applicable□complies□Does Not□Not Observable□Not Applicable
See the Envelope Assemblies table for values.
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 2 ] Medium Impact (Tier 2) 3 I Low Impact (Tier 3)
Project Title: Fitness BIdg Pool Addition Report date: 08/07/20Data filename: D:\Gregory Engineering\2020 Projects\20020 (Margaritaville Daytona)\20020_POOL.cck Page 16 of 20
Final InspectionSection i
# j& Req.lD I
C303.3, Furnished O&M instructions forC408.2.5. systems and equipment to the2 building owner or designated[FI17]' representative.
C303.3,C408.2.5.
3
[FI813
C403.2.4.
2.4
[FI56P
C402.5.3
[FI51P
C402.5.8
[FI26P
C403.2.1
[FI50P
C403.2.2
[FI27P
C403.2.4.
1
[FI47P
C403.2.4.
1.2
[FI38P
Furnished O&M manuals for HVAC
systems within 90 days of systemacceptance.
Minimum one humidity control deviceper installedhumidification/dehumidification
system. Controls preventsimultaneous operation ofhumidification and dehumidification
equipment.
Where open combustion air ductsprovide combustion air to opencombustion fuel burning appliances,the appliances and combustion airopening are located outside thebuilding thermal envelope or enclosedin a room, isolated from inside thethermal envelope. Such rooms aresealed and insulated.
Recessed luminaires in thermal
envelope to limit infiltration and be ICrated and labeled. Seal between
interior finish and luminaire housing.
HVAC systems and equipment designloads calculated in accordance with
AiMSI/ASHRAE/ACCA Standard 183 orACCA Manual N or by an approvedequivalent computational procedure.Design loads shall be attached to thecode compliance form submitted tothe building department when thebuilding is permitted or, in the eventthe mechanical permit is obtained at alater time, the sizing calculation shallbe submitted with the application forthe mechanical permit.
HVAC systems and equipmentcapacity does not exceed calculatedloads.
Heating and cooling to each zone iscontrolled by a thermostat control.Minimum one humidity control deviceper installedhumidification/dehumidificationsystem.
Thermostatic controls have a 5 "F
deadband.
Complies?
□complies□Ooes Not□Not Observable□Not Applicable
Comments/Assumptions
□Complies□Ooes Not□Not Observable□Not Applicable
□complies□ooes Not□Not Observable□Not Applicable
□complies□ooes Not□Not Observable□Not Applicable
□complies□Does Not□Not Observable□Not Applicable□complies□Does Not□Not Observable□Not Applicable
□complies□Does Not□Not Observable□Not Applicable□complies□Does Not□Not Observable□Not Applicable
□complies□Does Not□Not Observable□Not Applicable
1! High Impact (Tier 1) 2 I Medium Impact (Tier 2) 3 I Low Impact (Tier 3)
Project Title: Fitness BIdg Pool AdditionData filename: D:\Gregory Engineering\2020 Projects\20020 (Margaritaville Daytona)\20020_POOL.cck
Report date; 08/07/20Page 17 of 20
Section
#
& Req.lD
C403.2.4.
1.3
[FI20P
C403.2.4.
2
[FI39]3
C408.2.2
[Fi54p
C403.2.4.
2.1,C403.2.4.
2.2
[FI40]3
C405.4.1
[F118]^
C405.5.1
[FI19P
C408.2.1
[FI28P
C408.2.3.
jl[FI31]i
C408.2.3.
2
[FIlOP
C408.2.4
[FI29]i
Final Inspection
Temperature controls have setpointoverlap restrictions.
Each zone equipped with setbackcontrols using automatic time clock orprogrammable control system.
Construction documents require that awritten balance report be provided tothe building owner or rep for HVACsystems serving zones with totalcondition area > 5,000 sqft. Airdistribution systems shall be tested,adjusted, and balanced by a licensedengineer or certified company.
Automatic Controls: Setback to 55°F
(heat) and 85°F (cool); 7-day clock, 2-hour occupant override, 10-hourbackup
Interior installed lamp and fixturelighting power is consistent with whatis shown on the approved lightingplans, demonstrating proposed wattsare less than or equal to allowedwatts.
Exterior lighting power is consistentwith what is shown on the approvedlighting plans, demonstratingproposed watts are less than or equalto allowed watts.
Commissioning plan developed byregistered design professional orapproved agency.
HVAC equipment has been tested toensure proper operation.
C408.2.5.
1
[Fiyp
HVAC control systems have beentested to ensure proper operation,calibration and adjustment of controls.
Preliminary commissioning reportcompleted and certified by registereddesign professional or approvedagency.
Furnished HVAC as-built drawingssubmitted within 90 days of systemacceptance.
Complies?
□complies□poes Not□Not Observable□Not Applicable□complies□poes Not□Not Observable□Not Applicable□complies□poes Not□Not Observable□Not Applicable
□complies□Poes Not□Not Observable□Not Applicable
□Complies□Poes Not□Not Observable□Not Applicable
□complies□poes Not□Not Observable□Not Applicable□complies□poes Not□Not Observable□Not Applicable□complies□poes Not□Not Observable□Not Applicable□Complies□Poes Not□Not Observable□Not Applicable□complies□poes Not□Not Observable□Not Applicable□complies□poes Not□Not Observable□Not Applicable
Comments/Assumptions
See the Interior Lighting fixture schedule for values.
See the Exterior Lighting fixture schedule for values.
11 High Impact (Tier 1) ; 2 | Medium Impact (Tier 2) 3 [Low Impact (Tier 3)Project Title: Fitness BIdg Pool AdditionPata filename: O:\Gregory Engineering\2020 Projects\20020 (Margaritaville Paytona)\20020_POOL.cck
Report date: 08/07/20Page 18 of 20
Final inspectionSection |#
& Req.lD j
C408.2.5. Furnished as-built drawings for1 electric power systems within 90 days[FI16P of system acceptance.
C408.2.5.
3
[FI43]i
C408.2.5.
4
[FI30P
IC408.3l[FI33]i
An air and/or hydronic systembalancing report is provided for HVACsystems.
Final commissioning report due tobuilding owner within 90 days ofreceipt of certificate of occupancy.
Lighting systems have been tested toensure proper calibration, adjustment,programming, and operation.
Complies?
□Complies□Does Not□Not Observable□Not Applicable□complies□Does Not□Not Observable□Not Applicable□complies□Does Not□Not Observable□Not Applicable□complies□Does Not□Not Observabie□Not Appiicable
Comments/Assumptions
Additional Comments/Assumptions:
11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 {Low Impact (Tier 3)
Project Title: Fitness BIdg Pool Addition Report date: 08/07/20Data filename: D:\Gregory Engineering\2020 Projects\20020 (Margaritaville Daytona)\20020_POOL.cck Page 19 of 20